1504 N KENTER AVE 90049

Certificate Information: 1504 N KENTER AVE 90049

Application / Permit
16010-30000-06356
Plan Check / Job No.
B16WL06939
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Addition and major remodel for SFD. Construct basement w/ attached garage and pool structure. Leaving portion of wall of existing building.
Permit Issued
Issued on 8/16/2019
Issuing Office
West Los Angeles
Current Status
CofO Issued on 2/12/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/29/2016 APPLICANT
Assigned to Plan Check Engineer 2/2/2017 MANUEL GARCIA
Corrections Issued 2/7/2017 MANUEL GARCIA
Quality Review Completed 2/7/2017 STEVEN KIM
Building Plans Picked Up 2/9/2017 APPLICANT
Applicant returned to address corrections 3/30/2017 MANUEL GARCIA
Applicant returned to address corrections 4/12/2017 MANUEL GARCIA
Applicant returned to address corrections 5/18/2017 MANUEL GARCIA
Applicant returned to address corrections 6/9/2017 MANUEL GARCIA
Applicant returned to address corrections 6/19/2017 MANUEL GARCIA
Applicant returned to address corrections 7/18/2017 MANUEL GARCIA
Green Plans Picked Up 11/28/2017 APPLICANT
Applicant returned to address corrections 11/30/2017 MANUEL GARCIA
Plan Check Approved 7/26/2019 MANUEL GARCIA
Issued 8/16/2019 LADBS
CofO in Progress 2/7/2025 KEVIN SARGSYAN
Permit Finaled 2/12/2025 RICHARD STEINBACH
CofO Issued 2/12/2025 RICHARD STEINBACH
Permit Finaled 2/12/2025 RICHARD STEINBACH

Permit Application Clearance Information

Address approval Cleared 2/9/2017 CHEN ZHANG
BHO/Hillside ordinance Cleared 2/9/2017 CHEN ZHANG
BHO/Hillside ordinance Cleared 2/9/2017 CHEN ZHANG
BHO/Hillside ordinance Cleared 2/9/2017 CHEN ZHANG
Eng Process Fee Ord 176,300 Cleared 2/9/2017 CHEN ZHANG
Permit Cleared 2/9/2017 CHEN ZHANG
Sewer availability Cleared 2/9/2017 CHEN ZHANG
Grading Pre-Inspection Cleared 11/30/2017 MANUEL GARCIA
Low Impact Development Cleared 2/5/2018 RYAN HUDSON
Roof/Waste drainage to street Cleared 2/5/2018 STEVE MELGAR
Green Code Cleared 2/8/2018 MANUEL GARCIA
Building over 3-story or 36-ft Cleared 1/15/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 1/15/2019 CALOSHA APPROVED
Hydrant and Access approval Cleared 1/17/2019 GILBERT URREA

Contact Information

Architect Landry,, Richard; Lic. No.: C21848 1818 S.SEPULVEDA BLVD      LOS ANGELES, CA 90025
Contractor Abbott R T Construction Inc; Lic. No.: 746685-B 543 COUNTRY CLUB DRIVE BOX 205      SIMI VALLEY, CA 93065
Engineer Naraghi-Arani,, Kamran; Lic. No.: C40985 30423 CANWOOD ST STE 223      AGOURA HILLS, CA 91301
Engineer Nelson,, Chris Donald; Lic. No.: L6385 31238 VIA COLINAS STE C      WESTLAKE VILLAGE, CA 91362
Geologist Daugherty,, Daniel Thomas; Lic. No.: EG2569 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/30/2019 Partial Inspection TIM CHRISTENSEN
Sewer 9/25/2019 Partial Approval TIM CHRISTENSEN
Pre-Inspection 10/10/2019 Corrections Issued TIM CHRISTENSEN
Deputy Reinf. Concrete 11/26/2019 Conditional Approval TIM CHRISTENSEN
Piling/Pier/Caisson 12/18/2019 Not Ready for Inspection TIM CHRISTENSEN
Piling/Pier/Caisson 1/30/2020 Partial Approval TIM CHRISTENSEN
Special/Order Compliance 2/20/2020 Partial Approval TIM CHRISTENSEN
Piling/Pier/Caisson 4/30/2020 Conditional Approval TIM CHRISTENSEN
Excavation/Setback/Form/Re-Bar 9/3/2020 Not Ready for Inspection TIM CHRISTENSEN
Excavation/Setback/Form/Re-Bar 9/25/2020 Not Ready for Inspection TIM CHRISTENSEN
Excavation/Setback/Form/Re-Bar 10/1/2020 Partial Approval TIM CHRISTENSEN
Excavation/Setback/Form/Re-Bar 11/4/2020 Not Ready for Inspection JOHN KIDWELL
Excavation/Setback/Form/Re-Bar 11/6/2020 Corrections Issued KENNETH NAGLE
Excavation/Setback/Form/Re-Bar 11/10/2020 Partial Approval OGANES TARAKHCHYAN
Footing/Foundation/Slab 12/31/2020 Corrections Issued EVAN COOPER
Footing/Foundation/Slab 1/8/2021 Not Ready for Inspection MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 2/5/2021 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 2/24/2021 Partial Inspection KENNETH NAGLE
Excavation/Setback/Form/Re-Bar 3/8/2021 Not Ready for Inspection PIERRE VEGA
Excavation/Setback/Form/Re-Bar 4/26/2021 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 5/11/2021 Partial Approval JUAN VALENZUELA
PLUMBING-Rough 5/13/2021 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 5/21/2021 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 6/2/2021 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 7/7/2021 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 7/8/2021 No Result Entered DANNY TOLENTINO
Grading Pre-Inspection 7/20/2021 Corrections Issued JUAN VALENZUELA
Footing/Foundation/Slab 7/29/2021 Partial Inspection JUAN VALENZUELA
Footing/Foundation/Slab 8/18/2021 Partial Approval JUAN VALENZUELA
Footing/Foundation/Slab 8/31/2021 Partial Approval JUAN VALENZUELA
Deputy Steel/Welding 9/10/2021 No Result Entered DANNY TOLENTINO
Excavation/Setback/Form/Re-Bar 9/15/2021 Partial Approval JUAN VALENZUELA
PLUMBING-Rough 9/22/2021 Partial Approval DANIEL ORRANTE
Footing/Foundation/Slab 10/4/2021 Partial Approval JUAN VALENZUELA
Deck 10/13/2021 Partial Approval JUAN VALENZUELA
Deputy Steel/Welding 10/14/2021 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 10/15/2021 Conditional Approval JUAN VALENZUELA
Deputy Steel/Welding 10/15/2021 Conditional Approval JUAN VALENZUELA
Deputy Steel/Welding 10/21/2021 No Result Entered DANNY TOLENTINO
Deputy Reinf. Concrete 10/22/2021 Approved DANIEL ORRANTE
Deputy Steel/Welding 10/22/2021 Conditional Approval DANIEL ORRANTE
Deputy Steel/Welding 10/27/2021 No Result Entered DANNY TOLENTINO
Deputy Steel/Welding 11/12/2021 No Result Entered DANNY TOLENTINO
Deputy Steel/Welding 11/15/2021 Approved DANIEL ORRANTE
Floor/Roof Diaphrgm/Shear Wall 11/15/2021 Approved DANIEL ORRANTE
PLUMBING-Rough 11/15/2021 Partial Approval DANIEL ORRANTE
Deputy Steel/Welding 11/16/2021 Conditional Approval RYAN SALAZAR
Deputy Reinf. Concrete 11/17/2021 No Result Entered DANNY TOLENTINO
Deputy Steel/Welding 11/18/2021 Conditional Approval RYAN SALAZAR
Deputy Steel/Welding 11/19/2021 No Result Entered DANNY TOLENTINO
Deputy Steel/Welding 11/23/2021 No Result Entered DANNY TOLENTINO
PLUMBING-Rough 11/23/2021 Not Ready for Inspection JUAN VALENZUELA
Deputy Steel/Welding 11/24/2021 Approved DEANDRE HOFFMAN
Deputy Steel/Welding 11/30/2021 No Result Entered DANNY TOLENTINO
Deputy Steel/Welding 12/2/2021 No Result Entered DANNY TOLENTINO
Deputy Steel/Welding 12/3/2021 Conditional Approval JUAN VALENZUELA
Deputy Steel/Welding 12/8/2021 No Result Entered DANNY TOLENTINO
Deputy Steel/Welding 12/9/2021 Conditional Approval JUAN VALENZUELA
Deputy Steel/Welding 12/10/2021 Conditional Approval DANIEL ORRANTE
Deputy Steel/Welding 12/16/2021 No Result Entered DANNY TOLENTINO
Deputy Steel/Welding 12/17/2021 Conditional Approval MICHAEL PELHAM
Deputy Steel/Welding 12/21/2021 No Result Entered DANNY TOLENTINO
Floor/Roof Diaphrgm/Shear Wall 1/5/2022 Not Ready for Inspection JOHN KIDWELL
Floor/Roof Diaphrgm/Shear Wall 1/10/2022 Partial Approval JUAN VALENZUELA
Deputy Drilled-In Anchors 1/13/2022 No Result Entered DANNY TOLENTINO
Deputy Steel/Welding 1/25/2022 No Result Entered DANNY TOLENTINO
Deputy Steel/Welding 1/26/2022 No Result Entered DANNY TOLENTINO
Floor/Roof Diaphrgm/Shear Wall 2/1/2022 Partial Inspection JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 2/4/2022 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 2/14/2022 Partial Approval JUAN VALENZUELA
Deputy Steel/Welding 2/25/2022 Conditional Approval JUAN VALENZUELA
Deputy Steel/Welding 3/3/2022 Conditional Approval JUAN VALENZUELA
Deputy Drilled-In Anchors 3/4/2022 Conditional Approval JUAN VALENZUELA
Deputy Steel/Welding 3/4/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 3/8/2022 Partial Approval JUAN VALENZUELA
Deputy Steel/Welding 3/14/2022 Conditional Approval JUAN VALENZUELA
Special/Order Compliance 3/31/2022 Partial Inspection JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 4/5/2022 Approved JUAN VALENZUELA
PLUMBING-Rough 4/18/2022 Partial Inspection JUAN VALENZUELA
Deputy Steel/Welding 4/28/2022 Conditional Approval JUAN VALENZUELA
Deputy Drilled-In Anchors 4/29/2022 Conditional Approval JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 5/4/2022 Corrections Issued JUAN VALENZUELA
Deputy Wood Construction 5/5/2022 Conditional Approval JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 5/6/2022 Partial Approval JUAN VALENZUELA
HVAC-Rough 5/9/2022 Corrections Issued JUAN VALENZUELA
PLUMBING-Rough 5/9/2022 Not Ready for Inspection JUAN VALENZUELA
PLUMBING-Rough 5/10/2022 Approved JUAN VALENZUELA
HVAC-Rough 5/19/2022 Partial Inspection JUAN VALENZUELA
Insulation 6/3/2022 Partial Approval JUAN VALENZUELA
Underground Mechanical 6/13/2022 Partial Approval JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 7/7/2022 Partial Approval JUAN VALENZUELA
Deputy Drilled-In Anchors 7/18/2022 Conditional Approval JUAN VALENZUELA
Deputy Steel/Welding 7/18/2022 Conditional Approval JUAN VALENZUELA
Shower Pan 7/20/2022 Partial Approval JUAN VALENZUELA
ELECTRICAL-Rough 7/27/2022 Corrections Issued ANDREW NAVE
ELECTRICAL-Rough 8/5/2022 Partial Approval JUAN VALENZUELA
Deputy Steel/Welding 8/8/2022 Conditional Approval ANDREW NAVE
Deputy Steel/Welding 8/9/2022 Conditional Approval ANDREW NAVE
Interior/Exterior Lathing 8/9/2022 Partial Approval JUAN VALENZUELA
Shower Pan 8/16/2022 Approved JUAN VALENZUELA
Interior/Exterior Lathing 8/19/2022 Partial Approval JUAN VALENZUELA
ELECTRICAL-Rough 8/24/2022 Not Ready for Inspection JUAN VALENZUELA
ELECTRICAL-Rough 9/1/2022 Corrections Issued JUAN VALENZUELA
Interior/Exterior Lathing 9/22/2022 Partial Approval JUAN VALENZUELA
Deputy Drilled-In Anchors 9/26/2022 Conditional Approval JUAN VALENZUELA
Deputy Steel/Welding 9/26/2022 Conditional Approval JUAN VALENZUELA
Interior/Exterior Lathing 10/4/2022 Partial Approval JUAN VALENZUELA
Deputy Drilled-In Anchors 10/13/2022 Conditional Approval MICHAEL PELHAM
Pre-Inspection 11/17/2022 Partial Inspection JUAN VALENZUELA
ELECTRICAL-Rough 11/22/2022 Partial Approval JUAN VALENZUELA
BUILDING-Rough-Frame 12/22/2022 Approved JUAN VALENZUELA
ELECTRICAL-Rough 12/22/2022 Approved JUAN VALENZUELA
Green Building Rough 12/22/2022 Approved JUAN VALENZUELA
HVAC-Rough 12/22/2022 Approved JUAN VALENZUELA
Verify Sprinkler Sign Off 12/22/2022 Approved JUAN VALENZUELA
Insulation 12/27/2022 Corrections Issued JUAN VALENZUELA
Interior/Exterior Lathing 12/27/2022 Not Ready for Inspection JUAN VALENZUELA
Special/Order Compliance 12/27/2022 Partial Inspection STEPHANIE SWANSON
Insulation 12/29/2022 Approved JUAN VALENZUELA
Deputy Drilled-In Anchors 1/6/2023 Approved CLAYTON GRAHAM
Interior/Exterior Lathing 2/6/2023 Partial Approval KEVIN SARGSYAN
Drywall Nailing 2/8/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 2/22/2023 Corrections Issued KEVIN SARGSYAN
Drywall Nailing 3/20/2023 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 4/5/2023 Approved KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 5/2/2023 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 5/26/2023 Partial Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 8/8/2023 No Access for Inspection KEVIN SARGSYAN
ELECTRICAL-Rough 9/18/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 9/18/2023 Approved KEVIN SARGSYAN
Gas Test 1/12/2024 Not Ready for Inspection KEVIN SARGSYAN
Sewer 1/12/2024 Not Ready for Inspection KEVIN SARGSYAN
Underground Mechanical 1/12/2024 Not Ready for Inspection KEVIN SARGSYAN
Gas Test 1/17/2024 Partial Approval KEVIN SARGSYAN
Sewer 1/17/2024 Partial Approval KEVIN SARGSYAN
Underground Mechanical 1/17/2024 Partial Approval KEVIN SARGSYAN
Sewer 3/4/2024 Approved ARAM AVEDISIAN
Underground Mechanical 3/4/2024 Approved ARAM AVEDISIAN
Gas Test 3/6/2024 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 3/12/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Final 4/12/2024 Not Ready for Inspection KEVIN SARGSYAN
ELECTRICAL-Final 4/18/2024 Partial Approval ARAM AVEDISIAN
Enclosure/Fence 4/26/2024 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 5/9/2024 Conditional Approval MICHAEL PELHAM
ELECTRICAL-Final 5/23/2024 Approved KEVIN SARGSYAN
PLUMBING-Final 6/3/2024 Not Ready for Inspection KEVIN SARGSYAN
HVAC-Final 7/5/2024 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Final 7/5/2024 Corrections Issued KEVIN SARGSYAN
HVAC-Final 7/16/2024 Approved KEVIN SARGSYAN
PLUMBING-Final 7/31/2024 Approved KEVIN SARGSYAN
Service/Power Release 10/17/2024 Approved KENNETH NAGLE
Drywall Nailing 1/23/2025 Approved KEVIN SARGSYAN
Final 1/23/2025 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 1/23/2025 Approved KEVIN SARGSYAN
Green Building Final 1/23/2025 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 1/23/2025 SGSOV Approved KEVIN SARGSYAN
Smoke Detectors 1/23/2025 Approved KEVIN SARGSYAN
Final 1/28/2025 Corrections Issued KEVIN SARGSYAN
Final 2/5/2025 OK to Issue CofO KEVIN SARGSYAN