Piling/Pier/Caisson
|
5/24/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
Piling/Pier/Caisson
|
5/29/2019
|
Corrections Issued
|
TIM CHRISTENSEN
|
|
Footing/Foundation/Slab
|
6/11/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
Deputy Reinf. Concrete
|
6/12/2019
|
Conditional Approval
|
TIM CHRISTENSEN
|
|
Reinforced Concrete Frame
|
6/24/2019
|
Partial Approval
|
DAVID FEILER
|
|
Deputy Shotcrete
|
6/26/2019
|
Conditional Approval
|
TIM CHRISTENSEN
|
|
Footing/Foundation/Slab
|
9/4/2019
|
Partial Approval
|
DAVID FEILER
|
|
Footing/Foundation/Slab
|
1/29/2020
|
Not Ready for Inspection
|
TIM CHRISTENSEN
|
|
Green Building Rough
|
6/12/2020
|
Not Ready for Inspection
|
ROBERT SHELLY
|
|
Reinforced Concrete Frame
|
6/12/2020
|
Partial Approval
|
ROBERT SHELLY
|
|
Verify Sprinkler Sign Off
|
6/12/2020
|
Not Ready for Inspection
|
ROBERT SHELLY
|
|
Deputy Shotcrete
|
6/15/2020
|
No Access for Inspection
|
ROBERT SHELLY
|
|
Piling/Pier/Caisson
|
1/12/2021
|
Partial Approval
|
JOHNNY MIRANDA
|
|
Deputy Reinf. Concrete
|
5/4/2021
|
Partial Approval
|
JOHN KIDWELL
|
|
Excavation/Setback/Form/Re-Bar
|
5/4/2021
|
Partial Approval
|
JOHN KIDWELL
|
|
Deputy Reinf. Concrete
|
6/24/2021
|
Partial Approval
|
JOHN KIDWELL
|
|
Excavation/Setback/Form/Re-Bar
|
6/25/2021
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Shotcrete
|
7/2/2021
|
Conditional Approval
|
ADAM ESCOTO
|
|
Deputy Reinf. Concrete
|
8/16/2021
|
Approved
|
JUAN VALENZUELA
|
|
Piling/Pier/Caisson
|
8/16/2021
|
Partial Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
9/10/2021
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
9/13/2021
|
Conditional Approval
|
JAVIER RAMOS JR
|
|
Deputy Reinf. Concrete
|
9/14/2021
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
9/29/2021
|
Approved
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
9/29/2021
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Shotcrete
|
10/4/2021
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
11/3/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
11/9/2021
|
Conditional Approval
|
DANIEL ORRANTE
|
|
Deputy Reinf. Concrete
|
12/16/2021
|
Approved
|
ANDREW NAVE
|
|
Excavation/Setback/Form/Re-Bar
|
12/16/2021
|
Partial Approval
|
ANDREW NAVE
|
|
Excavation/Setback/Form/Re-Bar
|
12/22/2021
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
12/23/2021
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
1/10/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
2/9/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
2/10/2022
|
Approved
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
2/11/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
2/22/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
2/23/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
3/2/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
3/3/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
3/8/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Shotcrete
|
3/9/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
3/22/2022
|
Approved
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
3/23/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
3/25/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
4/20/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
4/21/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
4/27/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
5/17/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
5/18/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
5/19/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
5/26/2022
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Excavation/Setback/Form/Re-Bar
|
5/26/2022
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
6/1/2022
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Excavation/Setback/Form/Re-Bar
|
6/1/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
6/10/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
6/13/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
7/21/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
7/22/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
7/26/2022
|
Not Ready for Inspection
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
7/28/2022
|
Partial Approval
|
ANDREW NAVE
|
|
ELECTRICAL-Rough
|
8/1/2022
|
Partial Approval
|
ANDREW NAVE
|
|
Deputy Reinf. Concrete
|
8/2/2022
|
No Access for Inspection
|
KENNETH NAGLE
|
|
Deputy Reinf. Concrete
|
8/3/2022
|
Conditional Approval
|
ANDREW NAVE
|
|
Excavation/Setback/Form/Re-Bar
|
8/3/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
8/4/2022
|
Approved
|
ANDREW NAVE
|
|
Deputy Reinf. Concrete
|
9/2/2022
|
Approved
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
9/2/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Underground Mechanical
|
9/2/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
ELECTRICAL-Rough
|
9/8/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
9/8/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
PLUMBING-Rough
|
9/8/2022
|
Partial Inspection
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
9/14/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Steel/Welding
|
9/28/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
10/4/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Steel/Welding
|
10/7/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Underground Mechanical
|
10/14/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
10/25/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
10/28/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
11/1/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Underground Mechanical
|
11/2/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
HVAC-Rough
|
11/3/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
PLUMBING-Rough
|
11/4/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
11/15/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
11/15/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Wood Construction
|
11/18/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/22/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
Excavation/Setback/Form/Re-Bar
|
11/28/2022
|
Partial Approval
|
KENNETH NAGLE
|
|
Deputy Reinf. Concrete
|
11/29/2022
|
Conditional Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
12/9/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
12/9/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
12/16/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
12/19/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/20/2022
|
Not Ready for Inspection
|
JUAN VALENZUELA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/21/2022
|
Corrections Issued
|
JUAN VALENZUELA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/27/2022
|
Corrections Issued
|
JUAN VALENZUELA
|
|
Special/Order Compliance
|
12/27/2022
|
Partial Inspection
|
STEPHANIE SWANSON
|
|
Deputy Drilled-In Anchors
|
12/28/2022
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
Deputy Wood Construction
|
12/28/2022
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
Deputy Drilled-In Anchors
|
1/4/2023
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/12/2023
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Sewer
|
1/12/2023
|
Not Ready for Inspection
|
KEVIN SARGSYAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/3/2023
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Deputy Drilled-In Anchors
|
4/4/2023
|
No Access for Inspection
|
KENNETH NAGLE
|
|
Deputy Reinf. Concrete
|
4/10/2023
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
Sewer
|
5/12/2023
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Sewer
|
5/30/2023
|
Partial Inspection
|
KEVIN SARGSYAN
|
|
Footing/Foundation/Slab
|
8/30/2023
|
Partial Inspection
|
KEVIN SARGSYAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/11/2023
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Footing/Foundation/Slab
|
9/11/2023
|
Partial Approval
|
KEVIN SARGSYAN
|
|
PLUMBING-Rough
|
10/6/2023
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
HVAC-Rough
|
10/18/2023
|
Not Ready for Inspection
|
KEVIN SARGSYAN
|
|
PLUMBING-Rough
|
10/18/2023
|
Partial Approval
|
KEVIN SARGSYAN
|
|
PLUMBING-Rough
|
10/23/2023
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
HVAC-Rough
|
10/25/2023
|
Partial Inspection
|
KEVIN SARGSYAN
|
|
HVAC-Rough
|
11/1/2023
|
Partial Approval
|
ARAM AVEDISIAN
|
|
HVAC-Rough
|
11/13/2023
|
Approved
|
KEVIN SARGSYAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/21/2023
|
Not Ready for Inspection
|
KEVIN SARGSYAN
|
|
Wood Frame
|
12/21/2023
|
Not Ready for Inspection
|
KEVIN SARGSYAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/27/2023
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/2/2024
|
Partial Approval
|
KEVIN SARGSYAN
|
|
PLUMBING-Rough
|
1/10/2024
|
Approved
|
KEVIN SARGSYAN
|
|
Reinforced Concrete Frame
|
1/10/2024
|
Not Ready for Inspection
|
KEVIN SARGSYAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/14/2024
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Deputy Wood Construction
|
2/28/2024
|
Approved
|
KEVIN SARGSYAN
|
|
ELECTRICAL-Rough
|
2/28/2024
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/28/2024
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Sewer
|
2/28/2024
|
Not Ready for Inspection
|
KEVIN SARGSYAN
|
|
Gas Test
|
3/11/2024
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Sewer
|
3/11/2024
|
Approved
|
KEVIN SARGSYAN
|
|
ELECTRICAL-Rough
|
4/16/2024
|
Partial Inspection
|
KEVIN SARGSYAN
|
|
Deputy Wood Construction
|
5/7/2024
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
ELECTRICAL-Rough
|
5/7/2024
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/7/2024
|
Approved
|
KEVIN SARGSYAN
|
|
PLUMBING-Rough
|
6/7/2024
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Shower Pan
|
6/7/2024
|
Approved
|
KEVIN SARGSYAN
|
|
HVAC-Rough
|
6/25/2024
|
Approved
|
KEVIN SARGSYAN
|
|
PLUMBING-Rough
|
6/25/2024
|
Approved
|
KEVIN SARGSYAN
|
|
ELECTRICAL-Rough
|
8/6/2024
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
Insulation
|
8/13/2024
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Deputy Steel/Welding
|
8/16/2024
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
Interior/Exterior Lathing
|
8/26/2024
|
Not Ready for Inspection
|
KEVIN SARGSYAN
|
|
Interior/Exterior Lathing
|
9/18/2024
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Deputy Steel/Welding
|
9/25/2024
|
Conditional Approval
|
EVAN COOPER
|
|
ELECTRICAL-Rough
|
10/7/2024
|
Approved
|
KEVIN SARGSYAN
|
|
BUILDING-Rough-Frame
|
10/18/2024
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
Green Building Rough
|
10/18/2024
|
Approved
|
KEVIN SARGSYAN
|
|
Interior/Exterior Lathing
|
10/18/2024
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Verify Sprinkler Sign Off
|
10/18/2024
|
Approved
|
KEVIN SARGSYAN
|
|
BUILDING-Rough-Frame
|
10/22/2024
|
Not Ready for Inspection
|
KEVIN SARGSYAN
|
|
BUILDING-Rough-Frame
|
10/23/2024
|
Approved
|
KEVIN SARGSYAN
|
|
Special/Order Compliance
|
10/23/2024
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
Insulation
|
10/31/2024
|
Approved
|
KEVIN SARGSYAN
|
|
Drywall Nailing
|
12/6/2024
|
Not Ready for Inspection
|
KEVIN SARGSYAN
|
|
Drywall Nailing
|
12/13/2024
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Drywall Nailing
|
1/7/2025
|
Approved
|
KEVIN SARGSYAN
|
|
Interior/Exterior Lathing
|
2/24/2025
|
Not Ready for Inspection
|
KEVIN SARGSYAN
|
|
Interior/Exterior Lathing
|
2/27/2025
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Interior/Exterior Lathing
|
4/18/2025
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Interior/Exterior Lathing
|
4/25/2025
|
Approved
|
TEMISTOCLES CAAL
|
|
Pre-Inspection
|
3/3/2026
|
Partial Inspection
|
KEVIN SARGSYAN
|
|
Service/Power Release
|
3/17/2026
|
Approved
|
JUAN VALENZUELA
|
|
ELECTRICAL-Final
|
3/26/2026
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
ELECTRICAL-Final
|
3/31/2026
|
Partial Approval
|
KEVIN SARGSYAN
|
|
ELECTRICAL-Final
|
4/2/2026
|
Off-Hour Fees Due
|
|
|
Service/Power Release
|
4/2/2026
|
Approved
|
KEVIN SARGSYAN
|
|
ELECTRICAL-Final
|
4/20/2026
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
PLUMBING-Final
|
4/21/2026
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
PLUMBING-Final
|
4/27/2026
|
Partial Approval
|
EVAN COOPER
|
|
PLUMBING-Final
|
4/28/2026
|
Not Ready for Inspection
|
ANTHONY EGSON
|
|
PLUMBING-Final
|
5/1/2026
|
Approved
|
HERBERT GIRON
|
|
ELECTRICAL-Final
|
5/7/2026
|
Approved
|
KEVIN SARGSYAN
|