2451 N ARBUTUS DR 90049

Certificate Information: 2451 N ARBUTUS DR 90049

Application / Permit
16010-30000-05298
Plan Check / Job No.
B16WL06089
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
New 3-Story SFD with attached 5-car garage
Permit Issued
Issued on 6/5/2018
Issuing Office
West Los Angeles
Current Status
Issued on 6/5/2018
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/6/2016 APPLICANT
Assigned to Plan Check Engineer 12/15/2016 DIEGO BAUTISTA
Corrections Issued 12/19/2016 DIEGO BAUTISTA
Green Plans Picked Up 12/20/2016 APPLICANT
Quality Review Completed 12/22/2016 STEVEN KIM
Building Plans Picked Up 12/22/2016 APPLICANT
Applicant returned to address corrections 6/21/2017 DIEGO BAUTISTA
Applicant returned to address corrections 3/5/2018 ERWIN PASCUA
Applicant returned to address corrections 5/16/2018 ERWIN PASCUA
Plan Check Approved 6/5/2018 ERWIN PASCUA
Issued 6/5/2018 LADBS

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 12/30/2016 ROCHELLE DUNGCA
BHO/Hillside ordinance Cleared 12/30/2016 ROCHELLE DUNGCA
BHO/Hillside ordinance Cleared 12/30/2016 ROCHELLE DUNGCA
Permit Cleared 12/30/2016 ROCHELLE DUNGCA
Hydrant and Access approval Cleared 1/10/2017 ROBERT DUFF
Green Code Cleared 3/14/2018 BRYAN MEYER
Eng Process Fee Ord 176,300 Cleared 3/28/2018 LEE GUILBEAUX
Sewer availability Cleared 3/28/2018 LEE GUILBEAUX
Low Impact Development Cleared 5/21/2018 MITESH PATEL
Miscellaneous Cleared 5/22/2018 NOAH MCCOY
Roof/Waste drainage to street Cleared 5/22/2018 STEVEN JIN
Watercourse Cleared 5/22/2018 DENNIS BRAGIN
Address approval Cleared 6/1/2018 STEVEN JIN
GPI Written Notices Cleared 6/1/2018 DIEGO BAUTISTA
Grading Pre-Inspection Cleared 6/1/2018 DIEGO BAUTISTA

Contact Information

Architect , ; Lic. No.: C29604 3451 BUTLER AVENUE      LOS ANGELES, CA 90066
Contractor Houck Construction Inc; Lic. No.: 768547-B 1531 PONTIUS AVENUE      LOS ANGELES, CA 90025
Engineer , ; Lic. No.: C82109 18765 STRATTON LANE      HUNTINGTON BEACH, XA 92648
Engineer Daneshfar, Kourosh Dan; Lic. No.: C68377 19722 ARMINTA ST      WINNETKA, CA 91306
Engineer Tran, Quang Tai; Lic. No.: C70929 3889 FOUNTAIN ST      CAMARILLO, CA 93012
Geologist Feffer, Joshua Rafael; Lic. No.: EG2138 12253 GORHAM AVE      LOS ANGELES, CA 90049

Inspector Information

KEVIN SARGSYAN, (310) 914-3889 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Piling/Pier/Caisson 5/24/2019 Partial Approval TIM CHRISTENSEN
Piling/Pier/Caisson 5/29/2019 Corrections Issued TIM CHRISTENSEN
Footing/Foundation/Slab 6/11/2019 Partial Approval TIM CHRISTENSEN
Deputy Reinf. Concrete 6/12/2019 Conditional Approval TIM CHRISTENSEN
Reinforced Concrete Frame 6/24/2019 Partial Approval DAVID FEILER
Deputy Shotcrete 6/26/2019 Conditional Approval TIM CHRISTENSEN
Footing/Foundation/Slab 9/4/2019 Partial Approval DAVID FEILER
Footing/Foundation/Slab 1/29/2020 Not Ready for Inspection TIM CHRISTENSEN
Green Building Rough 6/12/2020 Not Ready for Inspection ROBERT SHELLY
Reinforced Concrete Frame 6/12/2020 Partial Approval ROBERT SHELLY
Verify Sprinkler Sign Off 6/12/2020 Not Ready for Inspection ROBERT SHELLY
Deputy Shotcrete 6/15/2020 No Access for Inspection ROBERT SHELLY
Piling/Pier/Caisson 1/12/2021 Partial Approval JOHNNY MIRANDA
Deputy Reinf. Concrete 5/4/2021 Partial Approval JOHN KIDWELL
Excavation/Setback/Form/Re-Bar 5/4/2021 Partial Approval JOHN KIDWELL
Deputy Reinf. Concrete 6/24/2021 Partial Approval JOHN KIDWELL
Excavation/Setback/Form/Re-Bar 6/25/2021 Partial Approval JUAN VALENZUELA
Deputy Shotcrete 7/2/2021 Conditional Approval ADAM ESCOTO
Deputy Reinf. Concrete 8/16/2021 Approved JUAN VALENZUELA
Piling/Pier/Caisson 8/16/2021 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 9/10/2021 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 9/13/2021 Conditional Approval JAVIER RAMOS JR
Deputy Reinf. Concrete 9/14/2021 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 9/29/2021 Approved JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 9/29/2021 Partial Approval JUAN VALENZUELA
Deputy Shotcrete 10/4/2021 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 11/3/2021 Partial Approval GERMAN RODRIGUEZ MENDOZA
Deputy Reinf. Concrete 11/9/2021 Conditional Approval DANIEL ORRANTE
Deputy Reinf. Concrete 12/16/2021 Approved ANDREW NAVE
Excavation/Setback/Form/Re-Bar 12/16/2021 Partial Approval ANDREW NAVE
Excavation/Setback/Form/Re-Bar 12/22/2021 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 12/23/2021 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 1/10/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 2/9/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 2/10/2022 Approved MICHAEL PELHAM
Deputy Reinf. Concrete 2/11/2022 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 2/22/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 2/23/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 3/2/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 3/3/2022 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 3/8/2022 Partial Approval JUAN VALENZUELA
Deputy Shotcrete 3/9/2022 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 3/22/2022 Approved MICHAEL PELHAM
Excavation/Setback/Form/Re-Bar 3/23/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 3/25/2022 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 4/20/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 4/21/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 4/27/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 5/17/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 5/18/2022 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 5/19/2022 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 5/26/2022 Conditional Approval BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 5/26/2022 Partial Approval BRENDAN LOONEY
Deputy Reinf. Concrete 6/1/2022 Conditional Approval BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 6/1/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 6/10/2022 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 6/13/2022 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 7/21/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 7/22/2022 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 7/26/2022 Not Ready for Inspection JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 7/28/2022 Partial Approval ANDREW NAVE
ELECTRICAL-Rough 8/1/2022 Partial Approval ANDREW NAVE
Deputy Reinf. Concrete 8/2/2022 No Access for Inspection KENNETH NAGLE
Deputy Reinf. Concrete 8/3/2022 Conditional Approval ANDREW NAVE
Excavation/Setback/Form/Re-Bar 8/3/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 8/4/2022 Approved ANDREW NAVE
Deputy Reinf. Concrete 9/2/2022 Approved JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 9/2/2022 Partial Approval JUAN VALENZUELA
Underground Mechanical 9/2/2022 Partial Approval JUAN VALENZUELA
ELECTRICAL-Rough 9/8/2022 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 9/8/2022 Partial Approval JUAN VALENZUELA
PLUMBING-Rough 9/8/2022 Partial Inspection JUAN VALENZUELA
Deputy Reinf. Concrete 9/14/2022 Conditional Approval MICHAEL PELHAM
Deputy Steel/Welding 9/28/2022 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 10/4/2022 Conditional Approval JUAN VALENZUELA
Deputy Steel/Welding 10/7/2022 Conditional Approval MICHAEL PELHAM
Underground Mechanical 10/14/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 10/25/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 10/28/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 11/1/2022 Conditional Approval MICHAEL PELHAM
Underground Mechanical 11/2/2022 Partial Approval JUAN VALENZUELA
HVAC-Rough 11/3/2022 Partial Approval JUAN VALENZUELA
PLUMBING-Rough 11/4/2022 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 11/15/2022 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 11/15/2022 Conditional Approval MICHAEL PELHAM
Deputy Wood Construction 11/18/2022 Conditional Approval JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 11/22/2022 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 11/28/2022 Partial Approval KENNETH NAGLE
Deputy Reinf. Concrete 11/29/2022 Conditional Approval JUAN VALENZUELA
Deputy Reinf. Concrete 12/9/2022 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 12/9/2022 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 12/16/2022 Conditional Approval CHRISTOPHER WILSON
Deputy Wood Construction 12/19/2022 Conditional Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 12/20/2022 Not Ready for Inspection JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 12/21/2022 Corrections Issued JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 12/27/2022 Corrections Issued JUAN VALENZUELA
Special/Order Compliance 12/27/2022 Partial Inspection STEPHANIE SWANSON
Deputy Drilled-In Anchors 12/28/2022 Conditional Approval KEVIN SARGSYAN
Deputy Wood Construction 12/28/2022 Conditional Approval KEVIN SARGSYAN
Deputy Drilled-In Anchors 1/4/2023 Conditional Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 1/12/2023 Partial Approval KEVIN SARGSYAN
Sewer 1/12/2023 Not Ready for Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 2/3/2023 Partial Approval KEVIN SARGSYAN
Deputy Drilled-In Anchors 4/4/2023 No Access for Inspection KENNETH NAGLE
Deputy Reinf. Concrete 4/10/2023 Conditional Approval KEVIN SARGSYAN
Sewer 5/12/2023 Partial Approval KEVIN SARGSYAN
Sewer 5/30/2023 Partial Inspection KEVIN SARGSYAN
Footing/Foundation/Slab 8/30/2023 Partial Inspection KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 9/11/2023 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 9/11/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 10/6/2023 Corrections Issued KEVIN SARGSYAN
HVAC-Rough 10/18/2023 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Rough 10/18/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 10/23/2023 Corrections Issued KEVIN SARGSYAN
HVAC-Rough 10/25/2023 Partial Inspection KEVIN SARGSYAN
HVAC-Rough 11/1/2023 Partial Approval ARAM AVEDISIAN
HVAC-Rough 11/13/2023 Approved KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 12/21/2023 Not Ready for Inspection KEVIN SARGSYAN
Wood Frame 12/21/2023 Not Ready for Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 12/27/2023 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 1/2/2024 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 1/10/2024 Approved KEVIN SARGSYAN
Reinforced Concrete Frame 1/10/2024 Not Ready for Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 2/14/2024 Partial Approval KEVIN SARGSYAN
Deputy Wood Construction 2/28/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Rough 2/28/2024 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 2/28/2024 Partial Approval KEVIN SARGSYAN
Sewer 2/28/2024 Not Ready for Inspection KEVIN SARGSYAN
Gas Test 3/11/2024 Partial Approval KEVIN SARGSYAN
Sewer 3/11/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Rough 4/16/2024 Partial Inspection KEVIN SARGSYAN
Deputy Wood Construction 5/7/2024 Conditional Approval KEVIN SARGSYAN
ELECTRICAL-Rough 5/7/2024 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 6/7/2024 Approved KEVIN SARGSYAN
PLUMBING-Rough 6/7/2024 Partial Approval KEVIN SARGSYAN
Shower Pan 6/7/2024 Approved KEVIN SARGSYAN
HVAC-Rough 6/25/2024 Approved KEVIN SARGSYAN
PLUMBING-Rough 6/25/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Rough 8/6/2024 Corrections Issued KEVIN SARGSYAN
Insulation 8/13/2024 Partial Approval KEVIN SARGSYAN
Deputy Steel/Welding 8/16/2024 Conditional Approval KEVIN SARGSYAN
Interior/Exterior Lathing 8/26/2024 Not Ready for Inspection KEVIN SARGSYAN
Interior/Exterior Lathing 9/18/2024 Partial Approval KEVIN SARGSYAN
Deputy Steel/Welding 9/25/2024 Conditional Approval EVAN COOPER
ELECTRICAL-Rough 10/7/2024 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 10/18/2024 Corrections Issued KEVIN SARGSYAN
Green Building Rough 10/18/2024 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 10/18/2024 Partial Approval KEVIN SARGSYAN
Verify Sprinkler Sign Off 10/18/2024 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 10/22/2024 Not Ready for Inspection KEVIN SARGSYAN
BUILDING-Rough-Frame 10/23/2024 Approved KEVIN SARGSYAN
Special/Order Compliance 10/23/2024 Corrections Issued KEVIN SARGSYAN
Insulation 10/31/2024 Approved KEVIN SARGSYAN
Drywall Nailing 12/6/2024 Not Ready for Inspection KEVIN SARGSYAN
Drywall Nailing 12/13/2024 Partial Approval KEVIN SARGSYAN
Drywall Nailing 1/7/2025 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 2/24/2025 Not Ready for Inspection KEVIN SARGSYAN
Interior/Exterior Lathing 2/27/2025 Partial Approval KEVIN SARGSYAN
Interior/Exterior Lathing 4/18/2025 Partial Approval KEVIN SARGSYAN
Interior/Exterior Lathing 4/25/2025 Approved TEMISTOCLES CAAL
Pre-Inspection 3/3/2026 Partial Inspection KEVIN SARGSYAN
Service/Power Release 3/17/2026 Approved JUAN VALENZUELA
ELECTRICAL-Final 3/26/2026 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Final 3/31/2026 Partial Approval KEVIN SARGSYAN
ELECTRICAL-Final 4/2/2026 Off-Hour Fees Due
Service/Power Release 4/2/2026 Approved KEVIN SARGSYAN
ELECTRICAL-Final 4/20/2026 Corrections Issued KEVIN SARGSYAN
PLUMBING-Final 4/21/2026 Corrections Issued KEVIN SARGSYAN
PLUMBING-Final 4/27/2026 Partial Approval EVAN COOPER
PLUMBING-Final 4/28/2026 Not Ready for Inspection ANTHONY EGSON
PLUMBING-Final 5/1/2026 Approved HERBERT GIRON
ELECTRICAL-Final 5/7/2026 Approved KEVIN SARGSYAN