1035 N STRADELLA ROAD 90077

Certificate Information: 1035 N STRADELLA ROAD 90077

Application / Permit
16010-30000-04394
Plan Check / Job No.
B16WL05044
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW THREE STORY SFD.
Permit Issued
Issued on 3/20/2018
Issuing Office
West Los Angeles
Current Status
CofO Issued on 3/31/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/28/2016 APPLICANT
Assigned to Plan Check Engineer 10/6/2016 SERGIO SILVA
Corrections Issued 10/12/2016 SERGIO SILVA
Quality Review Completed 10/12/2016 STEVEN KIM
Building Plans Picked Up 10/13/2016 APPLICANT
Applicant returned to address corrections 1/19/2017 SERGIO SILVA
Applicant returned to address corrections 2/8/2017 SERGIO SILVA
Applicant returned to address corrections 8/9/2017 SERGIO SILVA
Applicant returned to address corrections 8/16/2017 SERGIO SILVA
Green Plans Picked Up 1/26/2018 APPLICANT
Applicant returned to address corrections 2/28/2018 SERGIO SILVA
Plan Check Approved 3/7/2018 SERGIO SILVA
Issued 3/20/2018 LADBS
CofO in Progress 3/23/2023 CHRISTOPHER WILSON
Permit Finaled 3/31/2023 DANIEL ORRANTE
CofO Issued 3/31/2023 DANIEL ORRANTE
Permit Finaled 3/31/2023 DANIEL ORRANTE

Permit Application Clearance Information

Distance to fire station Cleared 12/20/2017 JOHN CONNEALLY
Hydrant and Access approval Cleared 12/20/2017 JOHN CONNEALLY
Address approval Cleared 2/20/2018 HISASHI KOBAYAKAWA
BHO/Hillside ordinance Cleared 2/20/2018 HISASHI KOBAYAKAWA
BHO/Hillside ordinance Cleared 2/20/2018 HISASHI KOBAYAKAWA
Eng Process Fee Ord 176,300 Cleared 2/20/2018 HISASHI KOBAYAKAWA
Permit Cleared 2/20/2018 HISASHI KOBAYAKAWA
Sewer availability Cleared 2/20/2018 HISASHI KOBAYAKAWA
BHO/Hillside ordinance Cleared 3/7/2018 ANDREW SLUSSER
Excavation more than 5-ft deep Cleared 3/7/2018 CALOSHA APPROVED
GPI Written Notices Cleared 3/7/2018 SERGIO SILVA
Grading Pre-Inspection Cleared 3/7/2018 SERGIO SILVA
Green Code Cleared 3/7/2018 BRYAN MEYER
Low Impact Development Cleared 3/7/2018 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 3/7/2018 ANDREW SLUSSER

Contact Information

Architect , ; Lic. No.: C35390       ,
Contractor Owner-Builder       ,
Engineer Jahanpour-Burke, Hooshmand; Lic. No.: L8230 7728 ANTERO CR      LAS VEGAS, NV 89128
Engineer Liston, Leonard Irvin; Lic. No.: C31902 889 PIERCE CT STE 101      THOUSAND OAKS, CA 91360
Engineer Nam, Young-Keun; Lic. No.: S4029 17 SANTA EUGENIA      IRVINE, CA 92606

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 9/12/2018 No Access for Inspection MATT KELLERMAN
Deputy Reinf. Concrete 9/13/2018 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 9/14/2018 Partial Approval MATT KELLERMAN
Piling/Pier/Caisson 9/25/2018 Corrections Issued CARLOS MATAMOROS
Deputy Reinf. Concrete 9/26/2018 Partial Approval MATT KELLERMAN
Piling/Pier/Caisson 9/27/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/28/2018 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 10/9/2018 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 10/10/2018 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 10/15/2018 Corrections Issued CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/16/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/17/2018 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 10/17/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/18/2018 Conditional Approval CHRISTOPHER WILSON
Masonry Wall/Backfill 10/26/2018 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/29/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 11/20/2018 Partial Approval MATT KELLERMAN
Piling/Pier/Caisson 11/21/2018 Partial Approval MATT KELLERMAN
Piling/Pier/Caisson 11/28/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 12/6/2018 No Access for Inspection MATT KELLERMAN
Deputy Reinf. Concrete 12/14/2018 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 12/19/2018 No Access for Inspection MATT KELLERMAN
Footing/Foundation/Slab 12/21/2018 Partial Inspection CHRISTOPHER WILSON
Deputy Drilled-In Anchors 12/27/2018 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 1/9/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 1/10/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Shotcrete 1/29/2019 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 1/30/2019 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 1/31/2019 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 2/1/2019 Partial Approval MATT KELLERMAN
Piling/Pier/Caisson 2/20/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 2/25/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 3/12/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 3/14/2019 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 3/14/2019 Partial Approval ROBERT SHELLY
Deputy Reinf. Concrete 3/15/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/3/2019 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/3/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/11/2019 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/11/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/12/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Shotcrete 4/30/2019 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/1/2019 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/8/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/29/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/31/2019 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/21/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 7/8/2019 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 7/9/2019 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 7/10/2019 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 7/10/2019 Partial Approval BRIAN OLSON
Footing/Foundation/Slab 7/22/2019 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 7/30/2019 Partial Approval CARLOS MATAMOROS
Deputy Shotcrete 8/2/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 8/2/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 8/15/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 8/15/2019 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 8/15/2019 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 8/16/2019 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 8/19/2019 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 8/22/2019 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 8/27/2019 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 9/4/2019 Partial Inspection CHRISTOPHER WILSON
Piling/Pier/Caisson 9/4/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/5/2019 Conditional Approval CHRISTOPHER WILSON
PLUMBING-Rough 9/9/2019 Partial Approval ANTHONY MCDOWALL
Deputy Reinf. Concrete 9/26/2019 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 9/27/2019 Partial Approval CARLOS MATAMOROS
Deputy Reinf. Concrete 9/30/2019 Approved MATT KELLERMAN
Deputy Reinf. Concrete 10/2/2019 Conditional Approval CARLOS MATAMOROS
Deputy Reinf. Concrete 10/10/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/10/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/15/2019 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 10/21/2019 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 10/24/2019 Partial Approval MATT KELLERMAN
Special/Order Compliance 11/2/2019 Partial Inspection CHRISTOPHER WILSON
Special/Order Compliance 11/9/2019 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 11/13/2019 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 11/15/2019 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 11/15/2019 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 12/2/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 12/5/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 12/11/2019 Not Ready for Inspection MATT KELLERMAN
Footing/Foundation/Slab 12/12/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 12/13/2019 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 12/19/2019 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 12/24/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 1/7/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 1/8/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 1/10/2020 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 1/13/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 1/14/2020 Conditional Approval CHRISTOPHER WILSON
PLUMBING-Rough 1/16/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 1/24/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 1/31/2020 Corrections Issued CHRISTOPHER WILSON
Deputy Reinf. Concrete 2/4/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/4/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/5/2020 No Access for Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/6/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 2/7/2020 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 2/13/2020 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 2/27/2020 No Access for Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/3/2020 Partial Approval GERMAN RODRIGUEZ MENDOZA
Excavation/Setback/Form/Re-Bar 3/17/2020 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/18/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/19/2020 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/20/2020 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/23/2020 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/24/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/16/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/17/2020 Conditional Approval CHRISTOPHER WILSON
Wood Frame 5/12/2020 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 5/15/2020 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 5/18/2020 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/5/2020 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/9/2020 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/10/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 6/12/2020 Conditional Approval CHRISTOPHER WILSON
HVAC-Rough 6/19/2020 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 6/19/2020 Partial Inspection CHRISTOPHER WILSON
Special/Order Compliance 6/27/2020 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 7/1/2020 Corrections Issued CHRISTOPHER WILSON
Gas Test 7/6/2020 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 7/6/2020 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 7/7/2020 Partial Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 7/15/2020 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 7/27/2020 Corrections Issued CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 7/28/2020 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 7/30/2020 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 8/5/2020 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 8/13/2020 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 8/21/2020 Approved CHRISTOPHER WILSON
HVAC-Rough 8/21/2020 Corrections Issued CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 8/28/2020 Not Ready for Inspection CHRISTOPHER WILSON
Light Gage Steel Frame 8/28/2020 Not Ready for Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 8/31/2020 Not Ready for Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 9/9/2020 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 9/9/2020 Not Ready for Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 9/10/2020 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 9/10/2020 Not Ready for Inspection CHRISTOPHER WILSON
Gas Test 9/15/2020 Corrections Issued CHRISTOPHER WILSON
Light Gage Steel Frame 9/15/2020 Not Ready for Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 9/21/2020 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 9/21/2020 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 9/21/2020 Not Ready for Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 9/29/2020 Corrections Issued CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 10/7/2020 Approved CHRISTOPHER WILSON
Gas Test 10/14/2020 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 10/14/2020 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 10/14/2020 Approved CHRISTOPHER WILSON
Verify Sprinkler Sign Off 10/14/2020 Approved CHRISTOPHER WILSON
Deputy Steel/Welding 10/15/2020 Partial Approval MATT KELLERMAN
Interior/Exterior Lathing 10/19/2020 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 10/22/2020 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 11/4/2020 Corrections Issued CHRISTOPHER WILSON
Green Building Rough 11/4/2020 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 11/4/2020 Conditional Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 11/9/2020 Partial Approval CHRISTOPHER WILSON
Green Building Rough 11/9/2020 Approved CHRISTOPHER WILSON
Interior/Exterior Lathing 11/9/2020 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 11/16/2020 Corrections Issued CHRISTOPHER WILSON
BUILDING-Rough-Frame 11/20/2020 Approved CHRISTOPHER WILSON
Green Building Rough 11/20/2020 Approved CHRISTOPHER WILSON
Insulation 11/20/2020 Partial Approval CHRISTOPHER WILSON
Insulation 11/30/2020 Partial Approval JUAN VALENZUELA
Interior/Exterior Lathing 12/7/2020 Not Ready for Inspection CHRISTOPHER WILSON
Shower Pan 12/7/2020 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 12/10/2020 Approved ANTHONY MCDOWALL
Interior/Exterior Lathing 12/10/2020 Not Ready for Inspection ANTHONY MCDOWALL
Shower Pan 12/10/2020 Not Ready for Inspection ANTHONY MCDOWALL
Drywall Nailing 12/16/2020 No Access for Inspection MATT KELLERMAN
Shower Pan 12/17/2020 Partial Approval THOMAS FINNILA
Drywall Nailing 12/22/2020 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Shower Pan 12/22/2020 Approved GERMAN RODRIGUEZ MENDOZA
Deputy Reinf. Concrete 12/23/2020 Partial Approval MATT KELLERMAN
Interior/Exterior Lathing 1/5/2021 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 7/27/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 8/24/2021 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 2/28/2022 Partial Approval CHRISTOPHER WILSON
Sewer 2/28/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 3/2/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 3/7/2022 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 3/9/2022 Corrections Issued MICHAEL PELHAM
Final 3/24/2022 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Final 3/24/2022 No Access for Inspection CHRISTOPHER WILSON
ELECTRICAL-Final 4/11/2022 No Access for Inspection CHRISTOPHER WILSON
PLUMBING-Final 4/11/2022 No Access for Inspection CHRISTOPHER WILSON
Special/Order Compliance 4/20/2022 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 5/17/2022 Not Ready for Inspection CHRISTOPHER WILSON
Final 5/17/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 5/17/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Final 5/17/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 5/17/2022 Not Ready for Inspection CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 5/17/2022 SGSOV Not Ready CHRISTOPHER WILSON
Service/Power Release 5/17/2022 Not Ready for Inspection CHRISTOPHER WILSON
Special/Order Compliance 5/17/2022 Partial Inspection MICHAEL PELHAM
Pre-Inspection 5/20/2022 Partial Inspection MICHAEL PELHAM
Special/Order Compliance 5/20/2022 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 5/27/2022 Partial Approval CHRISTOPHER WILSON
SUSMP-Std. Urban Storm Water 5/31/2022 Not Ready for Inspection CHRISTOPHER WILSON
Rough-Elec/Plmb/HVAC 6/7/2022 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 6/14/2022 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 6/14/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Final 6/23/2022 Corrections Issued CHRISTOPHER WILSON
HVAC-Final 7/5/2022 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Final 9/6/2022 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Final 9/6/2022 Corrections Issued CHRISTOPHER WILSON
Final 9/7/2022 Corrections Issued CHRISTOPHER WILSON
Special/Order Compliance 9/10/2022 Corrections Issued MICHAEL PELHAM
PLUMBING-Final 9/20/2022 No Access for Inspection CHRISTOPHER WILSON
Pre-Inspection 9/20/2022 No Access for Inspection CHRISTOPHER WILSON
PLUMBING-Final 9/21/2022 Approved CHRISTOPHER WILSON
HVAC-Final 10/5/2022 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Final 10/13/2022 Corrections Issued CHRISTOPHER WILSON
HVAC-Final 10/20/2022 Approved CHRISTOPHER WILSON
Drywall Nailing 11/10/2022 Approved CHRISTOPHER WILSON
ELECTRICAL-Final 11/10/2022 Corrections Issued CHRISTOPHER WILSON
Final 11/10/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 11/10/2022 Approved CHRISTOPHER WILSON
Green Building Final 11/10/2022 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Final 11/10/2022 Approved CHRISTOPHER WILSON
Reinforced Concrete Frame 11/10/2022 Approved CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 11/10/2022 SGSOV Not Ready CHRISTOPHER WILSON
Smoke Detectors 11/10/2022 Not Ready for Inspection CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 12/8/2022 SGSOV Approved CHRISTOPHER WILSON
Smoke Detectors 1/4/2023 Approved CHRISTOPHER WILSON
Green Building Final 1/23/2023 Approved CHRISTOPHER WILSON
Service/Power Release 1/23/2023 Corrections Issued CHRISTOPHER WILSON
Final 2/23/2023 Not Ready for Inspection CHRISTOPHER WILSON
Service/Power Release 2/23/2023 Approved CHRISTOPHER WILSON
Final 3/15/2023 Corrections Issued CHRISTOPHER WILSON
Final 3/21/2023 Conditional Approval CHRISTOPHER WILSON