Special/Order Compliance
|
6/15/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
6/22/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
7/12/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/26/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
8/26/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
8/27/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
9/3/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
9/4/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
9/6/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
9/10/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
9/24/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
9/27/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
10/8/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
10/22/2019
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Deputy Shotcrete
|
10/24/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/15/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
1/15/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
1/18/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Deputy Reinf. Concrete
|
1/30/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/31/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/3/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
2/7/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
2/10/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
2/14/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/14/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Masonry
|
2/24/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
2/25/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
2/26/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
3/2/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
3/3/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Masonry Wall/Backfill
|
3/4/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Deputy Reinf. Masonry
|
3/6/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Masonry Wall/Backfill
|
3/9/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Masonry Wall/Backfill
|
3/17/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
3/23/2020
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
3/23/2020
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
3/23/2020
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
3/24/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
3/24/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
5/6/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
5/6/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/6/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
5/6/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
5/6/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/7/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
5/7/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
5/8/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
5/8/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
5/15/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
5/26/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
5/26/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
5/26/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
7/29/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
7/29/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
10/28/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
10/28/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
10/28/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
10/29/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Masonry Wall/Backfill
|
12/10/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
1/6/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
1/8/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Other (see comments)
|
1/21/2021
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
1/21/2021
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
1/25/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
1/26/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
2/1/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
2/2/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
2/3/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
2/17/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
3/10/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
3/15/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
3/22/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
3/30/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
3/30/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
4/26/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
4/26/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
5/18/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
5/20/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
5/20/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
5/20/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/20/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
5/21/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
5/26/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
6/15/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
7/29/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
8/12/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
8/23/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
8/25/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
8/26/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
9/10/2021
|
Conditional Approval
|
MATT KELLERMAN
|
|
Deputy Drilled-In Anchors
|
9/29/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
11/4/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
11/4/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
11/4/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
11/4/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
11/4/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/15/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
11/15/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
11/15/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
11/15/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
2/8/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
3/8/2022
|
Approved
|
MICHAEL PELHAM
|
|
Deputy Drilled-In Anchors
|
3/10/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
3/10/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
3/16/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
3/16/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
3/16/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
3/25/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
3/29/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
3/29/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
3/29/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
4/4/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
4/6/2022
|
Approved
|
MICHAEL PELHAM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/13/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
4/13/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
4/13/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
4/25/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
6/21/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Green Building Rough
|
6/22/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
6/22/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
6/22/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
6/27/2022
|
Approved
|
MICHAEL PELHAM
|
|
Deputy Drilled-In Anchors
|
7/5/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
7/7/2022
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
7/12/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
7/22/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
7/22/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
7/22/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
8/1/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
8/1/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
8/1/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
8/9/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
8/9/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
8/9/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/25/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
8/25/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
8/25/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
2/27/2023
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
2/27/2023
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
2/27/2023
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
3/20/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
3/20/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
3/20/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
5/8/2023
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
5/15/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
5/15/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
5/15/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
5/15/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
5/19/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
5/19/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
5/19/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/1/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
6/1/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
6/20/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
6/28/2023
|
Partial Inspection
|
MICHAEL PELHAM
|
|
Wood Frame
|
6/28/2023
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/12/2023
|
Approved
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
8/2/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/30/2023
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
12/8/2023
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
3/13/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
3/13/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
3/15/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Pre-Gunite
|
3/15/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
3/26/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
6/3/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
6/10/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
6/10/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
6/10/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
7/9/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
7/9/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
7/9/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
7/22/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
7/23/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
7/23/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
7/24/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Gas Test
|
7/26/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Gas Test
|
7/31/2024
|
Approved
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
8/6/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
8/6/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
8/6/2024
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
8/7/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
8/26/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
9/9/2024
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
9/9/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
9/9/2024
|
Partial Inspection
|
REGINA MENDEZ
|
|
BUILDING-Rough-Frame
|
9/17/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
9/17/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
9/19/2024
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
9/19/2024
|
Partial Inspection
|
MICHAEL PELHAM
|
|
BUILDING-Rough-Frame
|
9/25/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
9/25/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Insulation
|
9/26/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
10/3/2024
|
Not Ready for Inspection
|
STEPHANIE SWANSON
|
|
Shower Pan
|
10/7/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
10/8/2024
|
Approved
|
MICHAEL ALLEN
|
|
Drywall Nailing
|
10/9/2024
|
Approved
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
10/10/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
1/8/2025
|
Approved
|
BOBBY KEY
|
|
Special/Order Compliance
|
3/17/2025
|
Not Ready for Inspection
|
MICHAEL PELHAM
|
|
Special/Order Compliance
|
1/12/2026
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
4/17/2026
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Sewer
|
4/17/2026
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Sewer
|
4/23/2026
|
Approved
|
CHRISTOPHER WILSON
|
|
Underground Mechanical
|
4/23/2026
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/4/2026
|
Partial Approval
|
EVAN COOPER
|
|
PLUMBING-Rough
|
5/7/2026
|
Approved
|
RYAN SALAZAR
|