1198 N ROBERTO LANE 90077

Certificate Information: 1198 N ROBERTO LANE 90077

Application / Permit
16010-30000-04233
Plan Check / Job No.
B16WL04855
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
New SFD 2-story with basement and attached garage
Permit Issued
Issued on 5/8/2019
Issuing Office
West Los Angeles
Current Status
Issued on 5/8/2019
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/20/2016 APPLICANT
Assigned to Plan Check Engineer 10/13/2016 DIEGO BAUTISTA
Green Plans Picked Up 10/27/2016 APPLICANT
Corrections Issued 10/31/2016 DIEGO BAUTISTA
Quality Review Completed 11/1/2016 STEVEN KIM
Building Plans Picked Up 11/3/2016 APPLICANT
Applicant returned to address corrections 4/17/2017 DIEGO BAUTISTA
Applicant returned to address corrections 5/31/2017 DIEGO BAUTISTA
Applicant returned to address corrections 8/29/2017 DIEGO BAUTISTA
Applicant returned to address corrections 3/30/2018 MANUEL GARCIA
Applicant returned to address corrections 11/7/2018 MANUEL GARCIA
Applicant returned to address corrections 2/12/2019 MANUEL GARCIA
Plan Check Approved 3/18/2019 MANUEL GARCIA
Issued 5/8/2019 LADBS

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 5/31/2017 TAO YANG
BHO/Hillside ordinance Cleared 5/31/2017 TAO YANG
BHO/Hillside ordinance Cleared 5/31/2017 TAO YANG
Green Code Cleared 5/31/2017 RICHARD GARCIA
Hydrant and Access approval Cleared 5/31/2017 ROBERT DUFF
Permit Cleared 5/31/2017 TAO YANG
Eng Process Fee Ord 176,300 Cleared 8/16/2017 MAHELET GEBEYHU
Sewer availability Cleared 8/16/2017 MAHELET GEBEYHU
Low Impact Development Cleared 11/7/2018 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 2/12/2019 HISASHI KOBAYAKAWA

Contact Information

Contractor Corr Contemporary Homes Llc; Lic. No.: 913500-B 13428 MAXELLA AVENUE #816      MARINA DEL REY, CA 90292
Engineer Hollingsworth, Robert Alan; Lic. No.: GE2022 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362
Engineer Pirbadian, Amir; Lic. No.: C72413 5435 BALBOA BLVD 212      ENCINO, CA 91436

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Special/Order Compliance 6/15/2019 Partial Inspection CHRISTOPHER WILSON
Special/Order Compliance 6/22/2019 Partial Inspection CHRISTOPHER WILSON
Pre-Inspection 7/12/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 8/26/2019 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 8/26/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 8/27/2019 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 9/3/2019 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/4/2019 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 9/6/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/10/2019 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 9/24/2019 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 9/27/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/8/2019 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/22/2019 Partial Approval CARLOS MATAMOROS
Deputy Shotcrete 10/24/2019 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 1/15/2020 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 1/15/2020 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 1/18/2020 Partial Approval CARLOS MATAMOROS
Deputy Reinf. Concrete 1/30/2020 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 1/31/2020 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/3/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 2/7/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 2/10/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 2/14/2020 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 2/14/2020 Partial Approval MATT KELLERMAN
Deputy Reinf. Masonry 2/24/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 2/25/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 2/26/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 3/2/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 3/3/2020 Conditional Approval CHRISTOPHER WILSON
Masonry Wall/Backfill 3/4/2020 Partial Approval CARLOS MATAMOROS
Deputy Reinf. Masonry 3/6/2020 Partial Approval MATT KELLERMAN
Masonry Wall/Backfill 3/9/2020 Corrections Issued CHRISTOPHER WILSON
Masonry Wall/Backfill 3/17/2020 Partial Approval CHRISTOPHER WILSON
Green Building Rough 3/23/2020 No Access for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 3/23/2020 No Access for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 3/23/2020 No Access for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 3/24/2020 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 3/24/2020 Partial Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 5/6/2020 Partial Inspection CHRISTOPHER WILSON
Green Building Rough 5/6/2020 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 5/6/2020 Corrections Issued CHRISTOPHER WILSON
Reinforced Concrete Frame 5/6/2020 Corrections Issued CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/6/2020 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 5/7/2020 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 5/7/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/8/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 5/8/2020 Conditional Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 5/15/2020 Partial Approval CHRISTOPHER WILSON
Green Building Rough 5/26/2020 Partial Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 5/26/2020 Corrections Issued CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/26/2020 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 7/29/2020 Conditional Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 7/29/2020 Corrections Issued CHRISTOPHER WILSON
Green Building Rough 10/28/2020 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 10/28/2020 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 10/28/2020 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/29/2020 Conditional Approval CHRISTOPHER WILSON
Masonry Wall/Backfill 12/10/2020 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 1/6/2021 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 1/8/2021 Partial Approval CHRISTOPHER WILSON
Deputy Other (see comments) 1/21/2021 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 1/21/2021 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 1/25/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 1/26/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 2/1/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 2/2/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 2/3/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 2/17/2021 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/10/2021 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/15/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 3/22/2021 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/30/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 3/30/2021 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 4/26/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 4/26/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/18/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 5/20/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 5/20/2021 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 5/20/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/20/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/21/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 5/26/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 6/15/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Drilled-In Anchors 7/29/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Drilled-In Anchors 8/12/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 8/23/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 8/25/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 8/26/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 9/10/2021 Conditional Approval MATT KELLERMAN
Deputy Drilled-In Anchors 9/29/2021 Conditional Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 11/4/2021 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Wood Construction 11/4/2021 Conditional Approval CHRISTOPHER WILSON
Green Building Rough 11/4/2021 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 11/4/2021 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 11/4/2021 Not Ready for Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 11/15/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 11/15/2021 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 11/15/2021 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 11/15/2021 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 2/8/2022 Conditional Approval CHRISTOPHER WILSON
Deputy Drilled-In Anchors 3/8/2022 Approved MICHAEL PELHAM
Deputy Drilled-In Anchors 3/10/2022 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 3/10/2022 Conditional Approval CHRISTOPHER WILSON
Green Building Rough 3/16/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 3/16/2022 Corrections Issued CHRISTOPHER WILSON
Verify Sprinkler Sign Off 3/16/2022 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 3/25/2022 Conditional Approval CHRISTOPHER WILSON
Green Building Rough 3/29/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 3/29/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 3/29/2022 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/4/2022 Conditional Approval CHRISTOPHER WILSON
Deputy Wood Construction 4/6/2022 Approved MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 4/13/2022 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 4/13/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 4/13/2022 Not Ready for Inspection CHRISTOPHER WILSON
Wood Frame 4/25/2022 Corrections Issued CHRISTOPHER WILSON
Deputy Drilled-In Anchors 6/21/2022 Conditional Approval MICHAEL PELHAM
Green Building Rough 6/22/2022 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 6/22/2022 Corrections Issued CHRISTOPHER WILSON
Verify Sprinkler Sign Off 6/22/2022 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Drilled-In Anchors 6/27/2022 Approved MICHAEL PELHAM
Deputy Drilled-In Anchors 7/5/2022 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 7/7/2022 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 7/12/2022 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 7/22/2022 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 7/22/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 7/22/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 8/1/2022 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 8/1/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 8/1/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 8/9/2022 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 8/9/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 8/9/2022 Not Ready for Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 8/25/2022 Partial Approval CHRISTOPHER WILSON
Green Building Rough 8/25/2022 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 8/25/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 2/27/2023 No Access for Inspection CHRISTOPHER WILSON
Structural Steel Frame 2/27/2023 No Access for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 2/27/2023 No Access for Inspection CHRISTOPHER WILSON
Green Building Rough 3/20/2023 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 3/20/2023 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 3/20/2023 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 5/8/2023 Conditional Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/15/2023 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 5/15/2023 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 5/15/2023 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/15/2023 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/19/2023 Corrections Issued CHRISTOPHER WILSON
Green Building Rough 5/19/2023 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/19/2023 Not Ready for Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 6/1/2023 Corrections Issued CHRISTOPHER WILSON
Pre-Inspection 6/1/2023 Partial Approval CHRISTOPHER WILSON
Wood Frame 6/20/2023 Not Ready for Inspection CHRISTOPHER WILSON
Special/Order Compliance 6/28/2023 Partial Inspection MICHAEL PELHAM
Wood Frame 6/28/2023 Partial Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 7/12/2023 Approved CHRISTOPHER WILSON
Deputy Drilled-In Anchors 8/2/2023 Conditional Approval MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 8/30/2023 Approved CHRISTOPHER WILSON
HVAC-Rough 12/8/2023 Corrections Issued CHRISTOPHER WILSON
Deputy Drilled-In Anchors 3/13/2024 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 3/13/2024 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 3/15/2024 Corrections Issued CHRISTOPHER WILSON
Pre-Gunite 3/15/2024 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 3/26/2024 Conditional Approval CHRISTOPHER WILSON
PLUMBING-Rough 6/3/2024 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Final 6/10/2024 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 6/10/2024 Corrections Issued CHRISTOPHER WILSON
Pre-Inspection 6/10/2024 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 7/9/2024 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 7/9/2024 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 7/9/2024 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 7/22/2024 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Final 7/23/2024 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 7/23/2024 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 7/24/2024 Approved CHRISTOPHER WILSON
Gas Test 7/26/2024 Corrections Issued CHRISTOPHER WILSON
Gas Test 7/31/2024 Approved CARLOS MATAMOROS
ELECTRICAL-Rough 8/6/2024 Approved CHRISTOPHER WILSON
HVAC-Rough 8/6/2024 Approved CHRISTOPHER WILSON
Special/Order Compliance 8/6/2024 Partial Inspection CHRISTOPHER WILSON
Special/Order Compliance 8/7/2024 Corrections Issued CHRISTOPHER WILSON
Interior/Exterior Lathing 8/26/2024 Partial Approval SEAN HAUPT
Interior/Exterior Lathing 9/9/2024 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 9/9/2024 Corrections Issued CHRISTOPHER WILSON
Special/Order Compliance 9/9/2024 Partial Inspection REGINA MENDEZ
BUILDING-Rough-Frame 9/17/2024 Corrections Issued CHRISTOPHER WILSON
Verify Sprinkler Sign Off 9/17/2024 Approved CHRISTOPHER WILSON
Special/Order Compliance 9/19/2024 Partial Inspection CHRISTOPHER WILSON
Special/Order Compliance 9/19/2024 Partial Inspection MICHAEL PELHAM
BUILDING-Rough-Frame 9/25/2024 Approved CHRISTOPHER WILSON
Green Building Rough 9/25/2024 Approved CHRISTOPHER WILSON
Insulation 9/26/2024 Approved CHRISTOPHER WILSON
Shower Pan 10/3/2024 Not Ready for Inspection STEPHANIE SWANSON
Shower Pan 10/7/2024 Corrections Issued CHRISTOPHER WILSON
Shower Pan 10/8/2024 Approved MICHAEL ALLEN
Drywall Nailing 10/9/2024 Approved CHRISTOPHER WILSON
Drywall Nailing 10/10/2024 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 1/8/2025 Approved BOBBY KEY
Special/Order Compliance 3/17/2025 Not Ready for Inspection MICHAEL PELHAM
Special/Order Compliance 1/12/2026 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 4/17/2026 Not Ready for Inspection CHRISTOPHER WILSON
Sewer 4/17/2026 Corrections Issued CHRISTOPHER WILSON
Sewer 4/23/2026 Approved CHRISTOPHER WILSON
Underground Mechanical 4/23/2026 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 5/4/2026 Partial Approval EVAN COOPER
PLUMBING-Rough 5/7/2026 Approved RYAN SALAZAR