8818 W PINTO PL 90069

Certificate Information: 8818 W PINTO PL 90069

Application / Permit
16010-30000-04220
Plan Check / Job No.
B16WL04832
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
new s.f.d. w/ basement
Permit Issued
Issued on 11/3/2017
Issuing Office
West Los Angeles
Current Status
Issued on 11/3/2017
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/19/2016 APPLICANT
Assigned to Plan Check Engineer 9/30/2016 DEAN RYAN REYES
Green Plans Picked Up 10/7/2016 APPLICANT
Corrections Issued 10/12/2016 DEAN RYAN REYES
Quality Review Completed 10/14/2016 STEVEN KIM
Building Plans Picked Up 10/14/2016 APPLICANT
Applicant returned to address corrections 12/2/2016 DEAN RYAN REYES
Applicant returned to address corrections 1/19/2017 DEAN RYAN REYES
Applicant returned to address corrections 2/28/2017 DEAN RYAN REYES
Applicant returned to address corrections 5/5/2017 DEAN RYAN REYES
Applicant returned to address corrections 6/2/2017 DEAN RYAN REYES
Applicant returned to address corrections 7/14/2017 DEAN RYAN REYES
Applicant returned to address corrections 8/22/2017 DEAN RYAN REYES
Applicant returned to address corrections 8/25/2017 DEAN RYAN REYES
Plan Check Approved 11/1/2017 DEAN RYAN REYES
Issued 11/3/2017 LADBS

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 10/19/2016 SEVAK ISAKHAYAN
BHO/Hillside ordinance Cleared 10/19/2016 SEVAK ISAKHAYAN
BHO/Hillside ordinance Cleared 10/19/2016 SEVAK ISAKHAYAN
Eng Process Fee Ord 176,300 Cleared 10/19/2016 SEVAK ISAKHAYAN
Sewer availability Cleared 10/19/2016 SEVAK ISAKHAYAN
Excavation more than 5-ft deep Cleared 12/2/2016 CALOSHA APPROVED
GPI Written Notices Cleared 12/2/2016 DEAN RYAN REYES
Grading Pre-Inspection Cleared 12/2/2016 DEAN RYAN REYES
Low Impact Development Cleared 12/6/2016 SAM NAVID
Distance to fire station Cleared 2/24/2017 JOHN CONNEALLY
Distance to fire station Cleared 2/24/2017 JOHN CONNEALLY
Hydrant and Access approval Cleared 2/24/2017 JOHN CONNEALLY
DPI Written Notices Cleared 8/25/2017 DEAN RYAN REYES
Demolition Pre-Inspection Cleared 8/25/2017 DEAN RYAN REYES
Green Code Cleared 8/31/2017 RICHARD GARCIA
Roof/Waste drainage to street Cleared 9/11/2017 MARKOS PEREZ-BRAN

Contact Information

Architect Brunn, Dan; Lic. No.: C31368 6363 WILSHIRE BLVD. #503      LOS ANGELES, CA 90048
Contractor Owner-Builder       ,
Engineer Hollingsworth, Robert Alan; Lic. No.: GE2022 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362
Engineer Obando, Gaspar Eduardo; Lic. No.: C71382 14000 TAHITI WY 303      MARINA DEL REY, CA 90292
Engineer Polon, Gordon Leonard; Lic. No.: C28564 709 19TH STREET      SANTA MONICA, CA 90402
Engineer Shapira, Ofer; Lic. No.: L7123 434 NORTH VISTA STREET   SURVEYING & DRAFTING SERVICES    LOS ANGELES, CA 90036
Geologist Grover, David J; Lic. No.: EG1095 31129 VIA COLINAS #707      WESTLAKE VILLAGE, CA 91362

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/21/2018 No Access for Inspection DANIEL GONZALEZ
Pre-Inspection 5/30/2018 Partial Inspection DANIEL GONZALEZ
Deputy Grading 8/8/2018 No Access for Inspection DANIEL GONZALEZ
Piling/Pier/Caisson 10/4/2018 Partial Approval DANIEL GONZALEZ
Footing/Foundation/Slab 12/28/2018 Partial Approval RONALD COWAN
Piling/Pier/Caisson 12/28/2018 Partial Approval RONALD COWAN
Footing/Foundation/Slab 2/6/2019 Not Ready for Inspection DANNY TOLENTINO
Piling/Pier/Caisson 2/6/2019 Not Ready for Inspection DANNY TOLENTINO
Special/Order Compliance 6/18/2019 Approved DANNY TOLENTINO
Footing/Foundation/Slab 5/28/2020 Partial Approval ENRIQUE MIRELES
Piling/Pier/Caisson 6/4/2020 Partial Approval RAUL BARAJAS
Footing/Foundation/Slab 6/25/2020 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 6/25/2020 Partial Approval RAUL BARAJAS
Footing/Foundation/Slab 7/31/2020 Partial Approval SCOTT FINNILA
Piling/Pier/Caisson 7/31/2020 Partial Inspection SCOTT FINNILA
Piling/Pier/Caisson 11/24/2021 Corrections Issued RAUL BARAJAS
Pre-Inspection 11/24/2021 Approved RAUL BARAJAS
Pre-Inspection 10/14/2022 Corrections Issued RAUL BARAJAS
Special/Order Compliance 2/3/2023 Corrections Issued RAUL BARAJAS
Deputy Reinf. Concrete 3/8/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 4/3/2023 Corrections Issued RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 8/25/2023 Corrections Issued RAUL BARAJAS
Green Building Rough 8/25/2023 Not Ready for Inspection RAUL BARAJAS
Piling/Pier/Caisson 8/25/2023 Not Ready for Inspection RAUL BARAJAS
Reinforced Concrete Frame 8/25/2023 Corrections Issued RAUL BARAJAS
Verify Sprinkler Sign Off 8/25/2023 Not Ready for Inspection RAUL BARAJAS
Piling/Pier/Caisson 9/11/2023 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 9/12/2023 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 9/13/2023 Partial Approval RAUL BARAJAS
Deputy Grading 9/14/2023 Approved RAUL BARAJAS
Piling/Pier/Caisson 9/14/2023 Partial Approval RAUL BARAJAS
Deputy Grading 9/15/2023 Conditional Approval RAUL BARAJAS
Deputy Grading 9/18/2023 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 9/18/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 9/18/2023 Partial Approval RAUL BARAJAS
Structural Steel Frame 9/18/2023 Not Ready for Inspection RAUL BARAJAS
Deputy Grading 9/19/2023 Conditional Approval RAUL BARAJAS
Light Gage Steel Frame 9/19/2023 Not Ready for Inspection RAUL BARAJAS
Piling/Pier/Caisson 9/19/2023 Not Ready for Inspection RAUL BARAJAS
Structural Steel Frame 9/19/2023 Not Ready for Inspection RAUL BARAJAS
Deputy Grading 9/20/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 9/20/2023 Partial Approval RAUL BARAJAS
Deputy Grading 9/21/2023 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 9/21/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 9/21/2023 Partial Inspection RAUL BARAJAS
Deputy Grading 9/22/2023 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 9/22/2023 Conditional Approval RAUL BARAJAS
Green Building Rough 9/22/2023 Not Ready for Inspection RAUL BARAJAS
Piling/Pier/Caisson 9/22/2023 Partial Approval RAUL BARAJAS
Reinforced Concrete Frame 9/22/2023 Partial Approval RAUL BARAJAS
Verify Sprinkler Sign Off 9/22/2023 Not Ready for Inspection RAUL BARAJAS
Deputy Grading 9/25/2023 Conditional Approval STUART CHAPMAN
Piling/Pier/Caisson 9/25/2023 Not Ready for Inspection STUART CHAPMAN
Deputy Grading 9/26/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 9/26/2023 Partial Approval RAUL BARAJAS
Deputy Grading 9/27/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 9/27/2023 Partial Inspection RAUL BARAJAS
Deputy Grading 9/28/2023 Conditional Approval RAUL BARAJAS
Deputy Grading 9/29/2023 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 9/29/2023 Conditional Approval ROY SPAULDING
Piling/Pier/Caisson 10/2/2023 Not Ready for Inspection STUART CHAPMAN
Piling/Pier/Caisson 10/3/2023 Not Ready for Inspection STUART CHAPMAN
Piling/Pier/Caisson 10/4/2023 Not Ready for Inspection RAUL BARAJAS
Deputy Grading 10/12/2023 Conditional Approval RAUL BARAJAS
Deputy Grading 10/13/2023 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 10/13/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 10/13/2023 Partial Approval RAUL BARAJAS
Deputy Grading 10/16/2023 Conditional Approval STUART CHAPMAN
Deputy Reinf. Concrete 10/16/2023 Conditional Approval SCOTT FINNILA
Deputy Grading 10/17/2023 Approved RAUL BARAJAS
Piling/Pier/Caisson 10/17/2023 Partial Approval RAUL BARAJAS
Deputy Grading 10/18/2023 Conditional Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 10/18/2023 Not Ready for Inspection RAUL BARAJAS
Piling/Pier/Caisson 10/18/2023 Not Ready for Inspection RAUL BARAJAS
Deputy Grading 10/19/2023 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 10/19/2023 Conditional Approval SCOTT FINNILA
Deputy Grading 10/20/2023 Conditional Approval RAUL BARAJAS
Deputy Grading 10/25/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 10/25/2023 Partial Approval RAUL BARAJAS
Deputy Grading 10/26/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 10/26/2023 Partial Inspection RAUL BARAJAS
Deputy Grading 10/27/2023 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 10/27/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 10/27/2023 Partial Inspection RAUL BARAJAS
Piling/Pier/Caisson 10/30/2023 Partial Approval RAUL BARAJAS
Deputy Grading 10/31/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 10/31/2023 Not Ready for Inspection RAUL BARAJAS
Deputy Grading 11/1/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 11/1/2023 Partial Inspection RAUL BARAJAS
Deputy Grading 11/2/2023 Conditional Approval RAUL BARAJAS
Deputy Grading 11/3/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 11/3/2023 Partial Approval RAUL BARAJAS
Deputy Grading 11/6/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 11/6/2023 Partial Approval RAUL BARAJAS
Deputy Grading 11/7/2023 Conditional Approval STUART CHAPMAN
Piling/Pier/Caisson 11/7/2023 Not Ready for Inspection BRIAN SULLIVAN
Deputy Grading 11/8/2023 Conditional Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 11/8/2023 Approved STUART CHAPMAN
Piling/Pier/Caisson 11/8/2023 Partial Approval STUART CHAPMAN
Deputy Grading 11/9/2023 Conditional Approval BRIAN SULLIVAN
Deputy Grading 11/13/2023 Conditional Approval RAUL BARAJAS
Deputy Grading 11/14/2023 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 11/14/2023 Conditional Approval RAUL BARAJAS
Deputy Grading 11/15/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 11/15/2023 Not Ready for Inspection RAUL BARAJAS
Deputy Grading 11/16/2023 Conditional Approval RAUL BARAJAS
Deputy Grading 11/17/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 11/17/2023 Partial Approval RAUL BARAJAS
Deputy Grading 11/20/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 11/20/2023 Partial Approval RAUL BARAJAS
Deputy Grading 11/21/2023 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 11/21/2023 Conditional Approval RAUL BARAJAS
Deputy Grading 11/22/2023 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 11/27/2023 Conditional Approval JOAQUIN GREENOUGH
Piling/Pier/Caisson 11/27/2023 Partial Approval JOAQUIN GREENOUGH
Deputy Grading 11/28/2023 Approved RAUL BARAJAS
Footing/Foundation/Slab 11/28/2023 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 11/28/2023 Partial Inspection RAUL BARAJAS
Deputy Grading 11/29/2023 Approved RAUL BARAJAS
Piling/Pier/Caisson 11/29/2023 Partial Approval RAUL BARAJAS
Deputy Grading 11/30/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 11/30/2023 Partial Inspection RAUL BARAJAS
Deputy Grading 12/1/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 12/1/2023 Partial Inspection RAUL BARAJAS
Deputy Grading 12/4/2023 Conditional Approval RAUL BARAJAS
Deputy Grading 12/5/2023 Conditional Approval RAUL BARAJAS
Deputy Grading 12/6/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 12/6/2023 Partial Inspection RAUL BARAJAS
Deputy Grading 12/7/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 12/7/2023 Not Ready for Inspection RAUL BARAJAS
Deputy Grading 12/8/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 12/11/2023 Partial Approval RICHARD DOCKUS
Piling/Pier/Caisson 12/12/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
Deputy Grading 12/13/2023 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 12/13/2023 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 12/14/2023 Approved RAUL BARAJAS
Deputy Grading 12/19/2023 Conditional Approval RAUL BARAJAS
Footing/Foundation/Slab 1/18/2024 Partial Approval RAUL BARAJAS
Footing/Foundation/Slab 1/30/2024 No Access for Inspection STUART CHAPMAN
Excavation/Setback/Form/Re-Bar 2/15/2024 Not Ready for Inspection ROY SPAULDING
Excavation/Setback/Form/Re-Bar 2/16/2024 Partial Inspection RAUL BARAJAS
Green Building Rough 3/19/2024 Not Ready for Inspection RAUL BARAJAS
Reinforced Concrete Frame 3/19/2024 Not Ready for Inspection RAUL BARAJAS
Verify Sprinkler Sign Off 3/19/2024 Not Ready for Inspection RAUL BARAJAS
Reinforced Concrete Frame 3/21/2024 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 3/26/2024 Not Ready for Inspection JOAQUIN GREENOUGH
Deputy Shotcrete 3/28/2024 Conditional Approval RAUL BARAJAS
Footing/Foundation/Slab 5/30/2024 Corrections Issued RAUL BARAJAS
Deputy Reinf. Concrete 5/31/2024 Conditional Approval RAUL BARAJAS
Footing/Foundation/Slab 6/5/2024 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 6/6/2024 Conditional Approval RAUL BARAJAS
Shower Pan 6/26/2024 Partial Inspection RAUL BARAJAS
Deputy Reinf. Concrete 7/24/2024 Conditional Approval RAUL BARAJAS
Footing/Foundation/Slab 7/25/2024 Partial Approval RAUL BARAJAS
Deputy Shotcrete 7/26/2024 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 8/30/2024 Conditional Approval RAUL BARAJAS
Footing/Foundation/Slab 9/3/2024 Partial Approval RAUL BARAJAS
ELECTRICAL-Rough 9/10/2024 Not Ready for Inspection RAUL BARAJAS
Deputy Shotcrete 9/13/2024 Conditional Approval RAUL BARAJAS
Footing/Foundation/Slab 10/1/2024 Partial Approval CRAIG VAUGHAN
Deputy Shotcrete 10/2/2024 Conditional Approval BRENDAN MORELLI
Deputy Drilled-In Anchors 10/22/2024 Conditional Approval RAUL BARAJAS
PLUMBING-Rough 10/25/2024 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 10/30/2024 Conditional Approval RAUL BARAJAS
Green Building Rough 10/30/2024 Not Ready for Inspection RAUL BARAJAS
Reinforced Concrete Frame 10/30/2024 Not Ready for Inspection RAUL BARAJAS
Verify Sprinkler Sign Off 10/30/2024 Not Ready for Inspection RAUL BARAJAS
Footing/Foundation/Slab 10/31/2024 Partial Approval CRAIG VAUGHAN
Deputy Reinf. Concrete 11/1/2024 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 12/4/2024 Conditional Approval ALEX COLIN
ELECTRICAL-Rough 12/4/2024 Not Ready for Inspection RAUL BARAJAS
Footing/Foundation/Slab 12/4/2024 Conditional Approval RAUL BARAJAS
ELECTRICAL-Rough 12/5/2024 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 12/6/2024 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 12/9/2024 Conditional Approval CRAIG VAUGHAN
Deputy Reinf. Concrete 12/18/2024 Conditional Approval ROY SPAULDING
Green Building Rough 12/18/2024 Not Ready for Inspection ROY SPAULDING
Reinforced Concrete Frame 12/18/2024 Partial Approval ROY SPAULDING
Verify Sprinkler Sign Off 12/18/2024 Not Ready for Inspection ROY SPAULDING
Deputy Reinf. Concrete 12/19/2024 Conditional Approval ROY SPAULDING
Deputy Shotcrete 12/19/2024 Conditional Approval ROY SPAULDING
Deputy Drilled-In Anchors 1/30/2025 Conditional Approval ALEX COLIN
Floor/Roof Diaphrgm/Shear Wall 2/14/2025 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 2/20/2025 Conditional Approval ROY SPAULDING
Footing/Foundation/Slab 3/21/2025 Not Ready for Inspection RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 3/26/2025 Corrections Issued RAUL BARAJAS
Footing/Foundation/Slab 4/8/2025 Partial Approval CRAIG VAUGHAN
Deputy Reinf. Concrete 4/10/2025 Conditional Approval BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 4/22/2025 Conditional Approval ROY SPAULDING
Deputy Wood Construction 4/23/2025 Conditional Approval BRIAN SULLIVAN
Deputy Wood Construction 5/2/2025 Conditional Approval ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 5/5/2025 Partial Approval SCOTT FINNILA
ELECTRICAL-Rough 7/21/2025 Partial Approval RAUL BARAJAS