340 N PATTON ST 1-44 90026

Certificate Information: 340 N PATTON ST 1-44 90026

Application / Permit
16010-30000-01451
Plan Check / Job No.
B16WL01770
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
44 unit 6-story apartment building(5-stories typve III-A above 1-story I-A podium) over 1 level type I-A subterranean garage
Permit Issued
Issued on 5/31/2018
Issuing Office
West Los Angeles
Current Status
CofO Issued on 9/23/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/8/2016 APPLICANT
Assigned to Plan Check Engineer 4/28/2016 TARIK SAOUD
Corrections Issued 5/23/2016 TARIK SAOUD
Quality Review Completed 5/27/2016 GUANG MIN TUNG
Building Plans Picked Up 5/31/2016 APPLICANT
Green Plans Picked Up 5/31/2016 APPLICANT
Applicant returned to address corrections 12/13/2016 TARIK SAOUD
Applicant returned to address corrections 5/25/2017 TARIK SAOUD
Plan Check Approved 4/11/2018 TARIK SAOUD
Issued 5/31/2018 LADBS
Permit Closed-Status Void 1/10/2019 WINSTON DUNNING
Re-Activate Permit 1/31/2019 WINSTON DUNNING
TCO Issued (Expire Date: 11-24-2021) 5/28/2021 DAVID TSAU
CofO in Progress 9/23/2021 DAVID TSAU
Permit Finaled 9/23/2021 DAVID TSAU
CofO Issued 9/23/2021 DAVID TSAU
Permit Finaled 9/23/2021 DAVID TSAU

Permit Application Clearance Information

Green Code Cleared 12/8/2016 RICHARD GARCIA
Address approval Cleared 1/26/2017 RAVIL MANAPOV
Highway dedication Cleared 2/21/2017 RAVIL MANAPOV
Stormwater Pollution Mitigatn Cleared 4/27/2017 AMMAR ELTAWIL
Eng Process Fee Ord 176,300 Cleared 4/28/2017 CARLA VALLADARES
Hydrant and Access approval Cleared 4/28/2017 JOHN CONNEALLY
Low Impact Development Cleared 4/28/2017 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 5/2/2017 HISASHI KOBAYAKAWA
Internal circulation Cleared 6/21/2017 TAIMOUR TANAVOLI
Specific Plan Cleared 6/21/2017 TAIMOUR TANAVOLI
Grading Pre-Inspection Cleared 7/5/2017 TARIK SAOUD
Fire Marshall Fire Life Safety Cleared 7/19/2017 ANDREW KO
Construction near power lines Cleared 7/27/2017 WALTER RAMIREZ
DAS Clearance Cleared 7/27/2017 EDDIE GARIN
Sewer availability Cleared 7/27/2017 NAZILA NOORIFAR
Permit Cleared 8/21/2017 MAHELET GEBEYHU
Work Adjacent to Public Way Cleared 10/6/2017 HOK CHI CHIU
Opn space landscape/Water mgmt Cleared 12/1/2017 JUSTIN BILOW
Specific Plan Cleared 12/1/2017 JUSTIN BILOW
Building over 3-story or 36-ft Cleared 12/20/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 12/20/2017 CALOSHA APPROVED
GPI Written Notices Cleared 12/20/2017 TARIK SAOUD
Miscellaneous Cleared 1/22/2018 JUSTIN BILOW

Contact Information

Contractor S H Z Development Inc; Lic. No.: 899219-B 11516 SANTA MONICA BLVD      LOS ANGELES, CA 90025
Engineer Dejban, Masoud; Lic. No.: S2521 17200 VENTURA BLVD STE 213A      ENCINO, CA 91316
Engineer Sahebi, Mo; Lic. No.: C33508 1330 OLYMPIC BL      SANTA MONICA, CA 90404

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/4/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 6/28/2018 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 8/24/2018 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/28/2018 Partial Approval WINSTON DUNNING
Deputy Steel/Welding 9/11/2018 Conditional Approval WINSTON DUNNING
Piling/Pier/Caisson 9/11/2018 Partial Inspection WINSTON DUNNING
Deputy Methane Barrier 10/2/2018 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 10/3/2018 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 10/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 10/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/10/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 10/11/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 10/11/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 10/11/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 10/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 10/24/2018 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 10/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 11/1/2018 Conditional Approval WINSTON DUNNING
Green Building Rough 11/1/2018 Partial Inspection WINSTON DUNNING
METHANE-Rough 11/1/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 11/1/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 11/1/2018 Approved WINSTON DUNNING
Deputy Methane Barrier 11/2/2018 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 11/8/2018 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 11/8/2018 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 11/8/2018 Partial Inspection WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 11/9/2018 Partial Approval WINSTON DUNNING
Deputy Shotcrete 11/13/2018 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 11/13/2018 Partial Approval WINSTON DUNNING
Deputy Reinf. Masonry 11/26/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 11/27/2018 Conditional Approval WINSTON DUNNING
Masonry Wall/Backfill 11/29/2018 Partial Approval WINSTON DUNNING
Deputy Methane Barrier 12/18/2018 Conditional Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 12/18/2018 Partial Approval WINSTON DUNNING
Deputy Methane Barrier 12/28/2018 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 1/4/2019 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 1/7/2019 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 1/8/2019 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 1/9/2019 Conditional Approval WINSTON DUNNING
Green Building Rough 1/10/2019 Partial Inspection WINSTON DUNNING
METHANE-Rough 1/10/2019 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 1/10/2019 Partial Approval WINSTON DUNNING
Green Building Rough 2/6/2019 Partial Approval EDWIN GREGORYONA
METHANE-Rough 2/6/2019 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 2/6/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 2/6/2019 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 2/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 2/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 2/20/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 2/20/2019 Conditional Approval LESLIE TRUJILLO
METHANE-Rough 2/20/2019 Approved LESLIE TRUJILLO
Masonry Wall/Backfill 2/20/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/20/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 2/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 2/25/2019 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 2/26/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/6/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 3/6/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/6/2019 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 3/19/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 3/26/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 3/26/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 4/8/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/8/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/10/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 4/15/2019 Partial Inspection LESLIE TRUJILLO
Masonry Wall/Backfill 4/15/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/15/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/7/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/8/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 5/8/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 5/8/2019 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 5/23/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 6/13/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 6/13/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 6/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 6/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 6/20/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 6/21/2019 Partial Inspection LESLIE TRUJILLO
Deputy Shotcrete 6/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 6/26/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 6/27/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 6/28/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 7/1/2019 Partial Inspection LESLIE TRUJILLO
Deputy Grading 7/3/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 7/9/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 7/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 7/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 7/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 7/12/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/15/2019 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/15/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 7/15/2019 Partial Inspection LESLIE TRUJILLO
METHANE-Subgrade 7/15/2019 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 7/18/2019 Not Ready for Inspection LESLIE TRUJILLO
Wood Frame 7/18/2019 Partial Inspection LESLIE TRUJILLO
Masonry Wall/Backfill 7/22/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 7/24/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 7/24/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 7/24/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/24/2019 Partial Inspection LESLIE TRUJILLO
Deputy Wood Construction 8/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 8/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 8/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 8/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 8/16/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 8/21/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 8/22/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 9/12/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/19/2019 No Access for Inspection LESLIE TRUJILLO
Insulation 9/23/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/30/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 10/4/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 10/8/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 10/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 10/16/2019 Conditional Approval ERNESTO CORRAL
Wood Frame 10/23/2019 Not Ready for Inspection LESLIE TRUJILLO
Wood Frame 10/29/2019 Not Ready for Inspection LESLIE TRUJILLO
Wood Frame 11/5/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 11/7/2019 Partial Inspection LESLIE TRUJILLO
Insulation 11/8/2019 Partial Approval LESLIE TRUJILLO
Insulation 11/13/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 11/15/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 11/22/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 11/25/2019 Not Ready for Inspection ERNESTO CORRAL
Wood Frame 12/3/2019 Not Ready for Inspection LESLIE TRUJILLO
Wood Frame 12/11/2019 Partial Inspection LESLIE TRUJILLO
Wood Frame 12/17/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 1/8/2020 Not Ready for Inspection LESLIE TRUJILLO
Wood Frame 1/13/2020 Partial Inspection LESLIE TRUJILLO
Insulation 1/15/2020 Partial Approval LESLIE TRUJILLO
Insulation 1/17/2020 Partial Approval LESLIE TRUJILLO
Wood Frame 1/31/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 2/3/2020 Partial Approval LESLIE TRUJILLO
Wood Frame 2/4/2020 Partial Approval LESLIE TRUJILLO
Insulation 2/6/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 2/10/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 2/11/2020 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 2/14/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 2/18/2020 Partial Approval RAFAEL ESPINOZA
Insulation 2/20/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/24/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 2/26/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 2/26/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/2/2020 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 3/3/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 3/3/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 3/10/2020 Partial Approval RAFAEL ESPINOZA
Insulation 3/13/2020 Not Ready for Inspection LESLIE TRUJILLO
Drywall Nailing 3/17/2020 Partial Approval RAFAEL ESPINOZA
Insulation 3/17/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 3/17/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 3/19/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/20/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/20/2020 Partial Approval RAFAEL ESPINOZA
Insulation 3/25/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 4/1/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 4/8/2020 Approved RAFAEL ESPINOZA
Light Gage Steel Frame 6/3/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/16/2020 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 3/3/2021 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 3/9/2021 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 3/11/2021 Corrections Issued RAFAEL ESPINOZA
Special/Order Compliance 3/31/2021 Corrections Issued RAFAEL ESPINOZA
Special/Order Compliance 4/5/2021 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 4/9/2021 Corrections Issued RAFAEL ESPINOZA
Final 5/4/2021 Corrections Issued RAFAEL ESPINOZA
Footing/Foundation/Slab 5/4/2021 Approved RAFAEL ESPINOZA
Green Building Final 5/4/2021 Approved RAFAEL ESPINOZA
Green Building Rough 5/4/2021 Approved RAFAEL ESPINOZA
METHANE-Barrier 5/4/2021 Approved RAFAEL ESPINOZA
METHANE-Subgrade 5/4/2021 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 5/4/2021 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 5/4/2021 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 5/4/2021 SGSOV Approved RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 5/4/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 5/4/2021 Approved RAFAEL ESPINOZA
Final 5/19/2021 Not Ready for Inspection RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 5/19/2021 Approved RAFAEL ESPINOZA
Final 5/28/2021 OK for TCO RAFAEL ESPINOZA
Final 9/21/2021 Partial Inspection RAFAEL ESPINOZA