Deputy Reinf. Concrete
|
9/20/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/22/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/26/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/28/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/29/2022
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/31/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Pre-Inspection
|
2/1/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Drywall Nailing
|
3/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Final
|
3/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
3/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Final
|
3/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
3/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
3/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
3/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
SGSOV-Seismic Gas S/O Valve
|
3/4/2024
|
SGSOV Not Ready
|
ROBERT DAVIS
|
|
Smoke Detectors
|
3/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
3/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
3/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/2/2024
|
Approved
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
5/2/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
5/2/2024
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/3/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
5/3/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
5/6/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
5/7/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
5/7/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
5/8/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/9/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
5/9/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
5/9/2024
|
Partial Inspection
|
BRIAN KELLY
|
|
Deputy Reinf. Concrete
|
5/10/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
5/10/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
5/13/2024
|
Approved
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
5/13/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
5/16/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/21/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
5/23/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/12/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/14/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/20/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/28/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
6/28/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/1/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/12/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/15/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/15/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/16/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/26/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/29/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/30/2024
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/30/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/30/2024
|
Off-Hour Fees Due
|
|
|
Excavation/Setback/Form/Re-Bar
|
7/30/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/6/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
8/6/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/7/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
8/7/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/8/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
8/8/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/9/2024
|
Approved
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
8/16/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/19/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
8/20/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
8/22/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
8/22/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
8/23/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
8/23/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
8/26/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
8/27/2024
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
8/28/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/29/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
8/29/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
8/30/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
9/3/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
9/4/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
9/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
9/5/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
9/5/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
9/5/2024
|
Not Ready for Inspection
|
CHRISTOPHER BLACKWOOD
|
|
Verify Sprinkler Sign Off
|
9/5/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
9/6/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
9/6/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
9/9/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
9/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
9/10/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
9/10/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
9/11/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
9/11/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
9/12/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
10/11/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
10/15/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
10/25/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/5/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
11/5/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
11/5/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
11/6/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
11/7/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
11/7/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
11/14/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
11/22/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
11/26/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
11/27/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
12/2/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
12/13/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
12/13/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
12/16/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/17/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
12/18/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
12/19/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
12/19/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
12/20/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
12/23/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
1/2/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
1/6/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
1/10/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
1/13/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
1/14/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
1/15/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
1/16/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
1/24/2025
|
Approved
|
ROBERT DAVIS
|
|
Structural Steel Frame
|
1/24/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
1/27/2025
|
Approved
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
1/27/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
1/30/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
2/12/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
2/25/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
2/27/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
3/6/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
3/7/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
3/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
3/8/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
3/10/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
3/11/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/12/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/13/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/14/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
3/17/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/18/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/19/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/20/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
3/24/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
3/28/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/28/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
3/29/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/1/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
4/24/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
4/24/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
5/2/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
5/5/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
5/6/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/7/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
5/14/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
5/21/2025
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
5/21/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
6/4/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/6/2025
|
Approved
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/6/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/10/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
6/20/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/23/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
6/24/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/26/2025
|
No Access for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
6/27/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
6/27/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
6/27/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/3/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/14/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
7/15/2025
|
Approved
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/15/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
7/29/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/30/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
8/13/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/15/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
8/29/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
9/2/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
9/3/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
9/5/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
9/8/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
9/8/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
9/10/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/12/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
9/16/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
9/17/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/18/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
9/19/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
9/24/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
9/25/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
10/6/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
10/10/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
10/10/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
10/10/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
10/17/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
11/3/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
11/4/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
11/4/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
11/4/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
11/10/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
11/12/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
11/13/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
11/13/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
11/13/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
11/20/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
11/26/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
11/26/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
11/26/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
12/4/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
12/4/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
12/4/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
12/4/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
1/5/2026
|
Approved
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
1/7/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
1/8/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
1/8/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
1/8/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
1/9/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
1/13/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
1/15/2026
|
Approved
|
ROBERT DAVIS
|
|
Green Building Rough
|
1/21/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
1/21/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
1/21/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
1/26/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
2/19/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
3/3/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
3/5/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
3/5/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
3/5/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
3/13/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
3/17/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
3/17/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
3/17/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/27/2026
|
Conditional Approval
|
ROBERT DAVIS
|