21121 W VANOWEN ST #1-101 91303

Certificate Information: 21121 W VANOWEN ST #1-101 91303

Application / Permit
16010-20000-06159
Plan Check / Job No.
B16VN17946
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 196'-0" X 110'-0" 7-STORY, OVER 1-LEVEL BASEMENT PARKING GARAGE MIXED-USE BLDG (5-RETAIL TENANTS @ GRADE & 101-UNIT APARTMENTS ABOVE; PER DIR-2016-4563-SPP). BASEMENT, 1ST, 2ND FLRS TYPE IA, AND FLRS 3RD-7TH, TYPE IIIA. FIRE SPRINKLERS REQ'D THROUGH-OUT.
Permit Issued
Issued on 12/19/2018
Issuing Office
Valley
Current Status
CofO Issued on 8/11/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/23/2016 APPLICANT
Assigned to Plan Check Engineer 2/16/2017 DOUGLAS NAKATANI
Corrections Issued 3/28/2017 DOUGLAS NAKATANI
Disabled Access Plans Picked Up 3/28/2017 APPLICANT
Green Plans Picked Up 3/28/2017 APPLICANT
Quality Review Completed 4/6/2017 KAMRAN GHOTBI RAVANDI
Building Plans Picked Up 4/13/2017 APPLICANT
Applicant returned to address corrections 5/3/2018 ALEXANDER SBARDELLATI
Applicant returned to address corrections 5/23/2018 ALEXANDER SBARDELLATI
Applicant returned to address corrections 8/9/2018 ALEXANDER SBARDELLATI
Applicant returned to address corrections 11/15/2018 ALEXANDER SBARDELLATI
Applicant returned to address corrections 11/28/2018 ALEXANDER SBARDELLATI
Plan Check Approved 12/7/2018 ALEXANDER SBARDELLATI
Issued 12/19/2018 LADBS
CofO in Progress 8/8/2022 CAMERON CHABAN
Permit Finaled 8/11/2022 DAVID TSAU
CofO Issued 8/11/2022 DAVID TSAU
Permit Finaled 8/11/2022 DAVID TSAU

Permit Application Clearance Information

Address approval Cleared 1/9/2018 CELINA MORENO
Eng Process Fee Ord 176,300 Cleared 4/5/2018 MARKOS PEREZ-BRAN
Sewer availability Cleared 4/5/2018 MARKOS PEREZ-BRAN
Hydrant and Access approval Cleared 4/16/2018 JOHN DALLAS
Driveway location Cleared 6/7/2018 VICENTE CORDERO
Green Code Cleared 6/7/2018 BRYAN MEYER
Internal circulation Cleared 6/7/2018 VICENTE CORDERO
Highway dedication Cleared 7/12/2018 KENNETH PHAM
Fire Marshall Fire Life Safety Cleared 8/23/2018 DOMINIQUE MEDINA
DAS Clearance Cleared 8/31/2018 NORLITO MEDRANO
Low Impact Development Cleared 9/5/2018 SAM NAVID
Roof/Waste drainage to street Cleared 9/5/2018 SOPHEA EK
Frnt yard landscape/Water mgmt Cleared 9/14/2018 JESSE RAMOS
Miscellaneous Cleared 9/14/2018 JESSE RAMOS
Opn space landscape/Water mgmt Cleared 9/14/2018 JESSE RAMOS
Site Plan review Cleared 9/14/2018 JESSE RAMOS
Specific Plan Cleared 9/14/2018 JESSE RAMOS
ZI Cleared 9/14/2018 JESSE RAMOS
Specific Plan Cleared 9/25/2018 VICENTE CORDERO
Work Adjacent to Public Way Cleared 10/24/2018 STEVE MELGAR
Building over 3-story or 36-ft Cleared 10/26/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 10/26/2018 CALOSHA APPROVED
Permit Cleared 10/26/2018 LEE GUILBEAUX

Contact Information

Architect Kim, Seong Bae; Lic. No.: C23320 3450 WILSHIRE BLVD SUITE 1000      LOS ANGELES, CA 90010
Contractor Alpa Construction Inc; Lic. No.: 708299-B PO BOX 2548      VAN NUYS, CA 91404
Engineer Lee, Sang Youck; Lic. No.: S3821 3531 BROOKHILL ST      GLENDALE, CA 91214
Engineer Nzeogu,, Godfrey Iheanacho; Lic. No.: C61921 1507 EAST GLADWICK ST      CARSON, CA 90746
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Special/Order Compliance 5/29/2018 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 2/1/2019 Corrections Issued JEFFREY DURAN
Pre-Inspection 2/1/2019 Approved JEFFREY DURAN
Wood Frame 2/12/2019 Not Ready for Inspection JEFFREY DURAN
Footing/Foundation/Slab 2/20/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/5/2019 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 6/6/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/7/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 6/14/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/17/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 6/17/2019 Partial Approval MILLARD ARDOIN
Deputy Reinf. Concrete 6/19/2019 Conditional Approval JAMES STEPHENS
Deputy Shotcrete 6/21/2019 Conditional Approval ROBERT COLE
Deputy Shotcrete 6/24/2019 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 6/25/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 6/25/2019 Partial Approval JEFFREY DURAN
Deputy Shotcrete 6/26/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 6/26/2019 Partial Approval JEFFREY DURAN
Deputy Shotcrete 6/27/2019 Approved JEFFREY DURAN
Green Building Rough 6/27/2019 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 6/27/2019 Conditional Approval JEFFREY DURAN
Verify Sprinkler Sign Off 6/27/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Other (see comments) 6/28/2019 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 6/28/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 7/19/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/23/2019 Conditional Approval JAMES STEPHENS
Excavation/Setback/Form/Re-Bar 7/26/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/6/2019 Corrections Issued DANNY RODRIGUEZ
Deputy Shotcrete 8/8/2019 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 8/8/2019 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 8/13/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/14/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/15/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 8/15/2019 Partial Inspection ROBERT COLE
Deputy Reinf. Concrete 8/16/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 8/16/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 8/20/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/20/2019 Partial Approval JEFFREY DURAN
Deputy Shotcrete 8/23/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/6/2019 Corrections Issued JEFFREY DURAN
Deputy Reinf. Concrete 9/9/2019 Conditional Approval JAMES STEPHENS
Excavation/Setback/Form/Re-Bar 9/10/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/19/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/20/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/25/2019 Partial Approval JEFFREY DURAN
Deputy Shotcrete 9/26/2019 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 9/27/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/1/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/4/2019 Not Ready for Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/8/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/21/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/22/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/23/2019 Conditional Approval JEFFREY DURAN
Wood Frame 11/12/2019 Partial Approval JEFFREY DURAN
Insulation 11/14/2019 Partial Approval JEFFREY DURAN
Deputy Wood Construction 11/19/2019 Conditional Approval RICKEY JACKSON
Wood Frame 11/21/2019 Partial Approval JEFFREY DURAN
Drywall Nailing 11/27/2019 Partial Approval HAMID PISHEHVAR
Green Building Rough 11/27/2019 Partial Approval HAMID PISHEHVAR
Wood Frame 11/27/2019 Partial Approval HAMID PISHEHVAR
Insulation 12/4/2019 Not Ready for Inspection JEFFREY DURAN
Insulation 12/9/2019 Partial Approval JEFFREY DURAN
Deputy Wood Construction 12/12/2019 Conditional Approval JEFFREY DURAN
Wood Frame 12/13/2019 Partial Approval JEFFREY DURAN
Deputy Wood Construction 12/17/2019 Conditional Approval JEFFREY DURAN
Drywall Nailing 12/17/2019 Not Ready for Inspection JEFFREY DURAN
Green Building Rough 12/17/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Wood Construction 12/19/2019 Approved JEFFREY DURAN
Drywall Nailing 12/19/2019 Partial Approval JEFFREY DURAN
Green Building Rough 12/19/2019 Not Ready for Inspection JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 12/26/2019 Partial Approval JEFFREY DURAN
Insulation 12/26/2019 Not Ready for Inspection JEFFREY DURAN
Insulation 12/27/2019 Partial Approval JEFFREY DURAN
Special/Order Compliance 12/27/2019 Corrections Issued JEFFREY DURAN
Deputy Steel/Welding 1/13/2020 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 1/21/2020 Partial Approval JEFFREY DURAN
Deputy Wood Construction 1/23/2020 Conditional Approval JAMES STEPHENS
Drywall Nailing 1/24/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 1/24/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 1/24/2020 Not Ready for Inspection JEFFREY DURAN
Wood Frame 1/24/2020 Partial Approval JEFFREY DURAN
Insulation 2/5/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 2/5/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 2/7/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 2/11/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/14/2020 Not Ready for Inspection ROBERT COLE
Masonry Wall/Backfill 2/14/2020 Partial Inspection ROBERT COLE
Deputy Wood Construction 2/19/2020 Approved JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/19/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 2/19/2020 Partial Inspection JEFFREY DURAN
Drywall Nailing 2/20/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/20/2020 Partial Approval JEFFREY DURAN
Green Building Rough 2/20/2020 Partial Inspection JEFFREY DURAN
Insulation 2/25/2020 Not Ready for Inspection JEFFREY DURAN
Deputy Wood Construction 3/6/2020 Approved JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 3/6/2020 Partial Approval JEFFREY DURAN
Deputy Wood Construction 3/25/2020 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 3/26/2020 Conditional Approval CAMERON CHABAN
Floor/Roof Diaphrgm/Shear Wall 3/26/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 3/31/2020 Conditional Approval JEFFREY DURAN
Insulation 4/1/2020 Partial Approval JEFFREY DURAN
Special/Order Compliance 4/1/2020 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 4/10/2020 Conditional Approval JEFFREY DURAN
Insulation 4/14/2020 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Wood Construction 4/17/2020 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 4/21/2020 Approved HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 4/23/2020 Not Ready for Inspection ROBERT COLE
Insulation 4/23/2020 Not Ready for Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 4/24/2020 Not Ready for Inspection JEFFREY FULTON
Insulation 4/24/2020 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 4/27/2020 Partial Inspection JEFFREY FULTON
Insulation 4/30/2020 Partial Inspection JEFFREY FULTON
Wood Frame 4/30/2020 Partial Inspection JEFFREY FULTON
Insulation 5/4/2020 Partial Inspection JEFFREY FULTON
Wood Frame 5/4/2020 Partial Inspection JEFFREY FULTON
Deputy Wood Construction 5/5/2020 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/5/2020 Partial Inspection JEFFREY FULTON
Insulation 5/5/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/6/2020 Partial Inspection DANIEL VARNUM
Green Building Rough 5/6/2020 Not Ready for Inspection DANIEL VARNUM
Wood Frame 5/8/2020 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 5/12/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 5/12/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 5/12/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 5/13/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 5/13/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 5/19/2020 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 5/19/2020 Partial Approval ROBERT COLE
Green Building Rough 5/19/2020 Not Ready for Inspection ROBERT COLE
Wood Frame 5/19/2020 Partial Approval ROBERT COLE
Deputy Wood Construction 5/20/2020 Approved JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 5/20/2020 Conditional Approval JEFFREY DURAN
Insulation 5/20/2020 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 5/21/2020 Partial Approval JEFFREY DURAN
Insulation 5/21/2020 Partial Approval JEFFREY DURAN
Special/Order Compliance 5/21/2020 Corrections Issued JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 5/22/2020 Partial Approval JEFFREY DURAN
Insulation 5/22/2020 Partial Approval JEFFREY DURAN
Insulation 5/26/2020 Partial Approval ROBERT COLE
Wood Frame 5/26/2020 Partial Approval ROBERT COLE
Insulation 5/28/2020 Approved HAMID PISHEHVAR
Floor/Roof Diaphrgm/Shear Wall 6/2/2020 Approved HAMID PISHEHVAR
Deputy Wood Construction 6/3/2020 Conditional Approval JEFFREY FULTON
Drywall Nailing 6/4/2020 Partial Approval DANNY RODRIGUEZ
Green Building Rough 6/4/2020 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Wood Construction 6/10/2020 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 6/10/2020 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 6/12/2020 Approved HAMID PISHEHVAR
Drywall Nailing 6/16/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 6/16/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 6/16/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 6/22/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/24/2020 Not Ready for Inspection HAMID PISHEHVAR
Green Building Rough 6/24/2020 Not Ready for Inspection HAMID PISHEHVAR
Drywall Nailing 6/29/2020 Partial Approval DANNY RODRIGUEZ
Green Building Rough 6/29/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 7/13/2020 Partial Approval DANNY RODRIGUEZ
Wood Frame 7/15/2020 Partial Approval DANNY RODRIGUEZ
Green Building Rough 7/20/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 7/20/2020 Partial Approval DANNY RODRIGUEZ
Wood Frame 7/20/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 7/23/2020 Partial Approval HAMID PISHEHVAR
Green Building Rough 7/23/2020 Partial Approval HAMID PISHEHVAR
Interior/Exterior Lathing 7/28/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 7/30/2020 Partial Approval HAMID PISHEHVAR
Green Building Rough 7/30/2020 Partial Approval HAMID PISHEHVAR
Drywall Nailing 8/4/2020 Partial Approval HAMID PISHEHVAR
Green Building Rough 8/4/2020 Partial Approval HAMID PISHEHVAR
Drywall Nailing 8/6/2020 Partial Inspection JEFFREY FULTON
Green Building Rough 8/6/2020 Not Ready for Inspection JEFFREY FULTON
Insulation 8/6/2020 Partial Inspection JEFFREY FULTON
Insulation 8/7/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/12/2020 Partial Approval HAMID PISHEHVAR
Green Building Rough 8/12/2020 Partial Approval HAMID PISHEHVAR
Drywall Nailing 8/17/2020 Partial Inspection JEFFREY FULTON
Green Building Rough 8/17/2020 Not Ready for Inspection JEFFREY FULTON
Insulation 8/18/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/26/2020 Partial Inspection JEFFREY FULTON
Insulation 8/26/2020 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 8/27/2020 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 8/31/2020 Approved HAMID PISHEHVAR
Wood Frame 9/1/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 9/3/2020 Partial Inspection JEFFREY FULTON
Green Building Rough 9/3/2020 Not Ready for Inspection JEFFREY FULTON
Wood Frame 9/4/2020 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 9/8/2020 Partial Inspection JEFFREY FULTON
Wood Frame 9/8/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 9/9/2020 Partial Inspection JEFFREY FULTON
Green Building Rough 9/9/2020 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 9/9/2020 Not Ready for Inspection JEFFREY FULTON
Wood Frame 9/10/2020 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 9/16/2020 Approved HAMID PISHEHVAR
Drywall Nailing 9/17/2020 Partial Inspection JEFFREY FULTON
Green Building Rough 9/17/2020 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 9/24/2020 Partial Inspection JEFFREY FULTON
Green Building Rough 9/24/2020 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 9/28/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 9/28/2020 Partial Inspection DANNY RODRIGUEZ
Insulation 9/28/2020 Partial Approval DANNY RODRIGUEZ
Insulation 9/29/2020 Approved HAMID PISHEHVAR
Interior/Exterior Lathing 9/29/2020 Approved HAMID PISHEHVAR
Drywall Nailing 9/30/2020 Not Ready for Inspection DANIEL VARNUM
Green Building Rough 9/30/2020 Not Ready for Inspection DANIEL VARNUM
Light Gage Steel Frame 10/2/2020 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 10/8/2020 Not Ready for Inspection JEFFREY FULTON
Insulation 10/8/2020 Not Ready for Inspection JEFFREY FULTON
Wood Frame 10/8/2020 Partial Inspection JEFFREY FULTON
Wood Frame 10/9/2020 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 10/13/2020 Partial Inspection JEFFREY FULTON
Wood Frame 10/13/2020 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 10/14/2020 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 10/16/2020 Approved HAMID PISHEHVAR
Drywall Nailing 10/20/2020 Partial Inspection JEFFREY FULTON
Green Building Rough 10/20/2020 Not Ready for Inspection JEFFREY FULTON
Insulation 10/21/2020 No Access for Inspection HAMID PISHEHVAR
Drywall Nailing 10/22/2020 Partial Inspection HAMID PISHEHVAR
Green Building Rough 10/22/2020 Partial Approval HAMID PISHEHVAR
Insulation 10/22/2020 Approved HAMID PISHEHVAR
Light Gage Steel Frame 10/23/2020 Approved HAMID PISHEHVAR
Drywall Nailing 10/28/2020 Partial Inspection JEFFREY FULTON
Green Building Rough 10/28/2020 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 10/28/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/30/2020 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 10/30/2020 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 11/4/2020 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 11/4/2020 Partial Inspection JEFFREY FULTON
Insulation 11/5/2020 Partial Approval HAMID PISHEHVAR
Drywall Nailing 11/10/2020 Partial Approval HAMID PISHEHVAR
Green Building Rough 11/10/2020 Partial Inspection HAMID PISHEHVAR
Drywall Nailing 11/17/2020 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 11/17/2020 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 12/1/2020 Partial Approval HAMID PISHEHVAR
Green Building Rough 12/1/2020 Not Ready for Inspection HAMID PISHEHVAR
Interior/Exterior Lathing 12/1/2020 Partial Approval HAMID PISHEHVAR
Interior/Exterior Lathing 12/3/2020 Partial Approval HAMID PISHEHVAR
Drywall Nailing 12/4/2020 Partial Inspection JEFFREY FULTON
Green Building Rough 12/4/2020 Approved JEFFREY FULTON
Insulation 12/8/2020 Partial Inspection JEFFREY FULTON
Wood Frame 12/8/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 12/16/2020 Approved HAMID PISHEHVAR
Insulation 12/17/2020 Approved HAMID PISHEHVAR
Insulation 12/18/2020 Approved HAMID PISHEHVAR
Drywall Nailing 12/22/2020 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 12/23/2020 Partial Inspection JEFFREY FULTON
Wood Frame 1/6/2021 Partial Inspection JEFFREY FULTON
Insulation 1/7/2021 Partial Inspection JEFFREY FULTON
Wood Frame 1/7/2021 Partial Inspection JEFFREY FULTON
Insulation 1/8/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/12/2021 Approved HAMID PISHEHVAR
Interior/Exterior Lathing 1/12/2021 Approved HAMID PISHEHVAR
Drywall Nailing 1/15/2021 Partial Inspection JEFFREY FULTON
Insulation 1/15/2021 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 1/22/2021 Approved HAMID PISHEHVAR
Drywall Nailing 1/22/2021 Approved HAMID PISHEHVAR
Masonry Wall/Backfill 1/22/2021 Approved HAMID PISHEHVAR
Insulation 1/27/2021 Approved HAMID PISHEHVAR
Masonry Wall/Backfill 1/27/2021 Approved HAMID PISHEHVAR
Light Gage Steel Frame 2/12/2021 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 2/17/2021 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 2/18/2021 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 2/19/2021 Partial Inspection CAMERON CHABAN
Deputy Reinf. Masonry 3/12/2021 Approved HAMID PISHEHVAR
Masonry Wall/Backfill 3/12/2021 Conditional Approval CAMERON CHABAN
Masonry Wall/Backfill 3/19/2021 Approved HAMID PISHEHVAR
Special/Order Compliance 4/6/2021 Partial Approval CAMERON CHABAN
Light Gage Steel Frame 4/20/2021 Partial Approval CAMERON CHABAN
Pre-Inspection 4/28/2021 Approved HAMID PISHEHVAR
Insulation 5/3/2021 Partial Approval CAMERON CHABAN
Pre-Inspection 5/14/2021 Partial Approval CAMERON CHABAN
Pre-Inspection 5/19/2021 Approved HAMID PISHEHVAR
Final 6/24/2021 Partial Inspection CAMERON CHABAN
Footing/Foundation/Slab 6/24/2021 Approved CAMERON CHABAN
Green Building Final 6/24/2021 Partial Inspection CAMERON CHABAN
Reinforced Concrete Frame 6/24/2021 Conditional Approval CAMERON CHABAN
Reinforced Masonry Frame 6/24/2021 Conditional Approval CAMERON CHABAN
SGSOV-Seismic Gas S/O Valve 6/24/2021 SGSOV Not Ready CAMERON CHABAN
Smoke Detectors 6/24/2021 Not Ready for Inspection CAMERON CHABAN
Verify Sprinkler Sign Off 6/24/2021 Not Ready for Inspection CAMERON CHABAN
Smoke Detectors 7/15/2021 Not Ready for Inspection JEFF BYTHEWAY
Special/Order Compliance 10/13/2021 Not Ready for Inspection DANIEL VARNUM
Verify Sprinkler Sign Off 10/13/2021 Not Ready for Inspection DANIEL VARNUM
Final 1/28/2022 Partial Inspection CAMERON CHABAN
Green Building Final 1/28/2022 Approved CAMERON CHABAN
Reinforced Concrete Frame 1/28/2022 Approved CAMERON CHABAN
Reinforced Masonry Frame 1/28/2022 Approved CAMERON CHABAN
SGSOV-Seismic Gas S/O Valve 1/28/2022 SGSOV Approved CAMERON CHABAN
Smoke Detectors 1/28/2022 Approved CAMERON CHABAN
Verify Sprinkler Sign Off 1/28/2022 Approved CAMERON CHABAN
Final 6/7/2022 Partial Inspection CAMERON CHABAN
Final 7/14/2022 Not Ready for Inspection CAMERON CHABAN
Final 8/5/2022 OK to Issue CofO CAMERON CHABAN