|
Pre-Inspection
|
9/7/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/5/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
1/5/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
1/17/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
1/18/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/18/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/19/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/22/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
1/22/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/23/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
1/23/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/24/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
1/24/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
1/24/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
1/25/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/30/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/30/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/2/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/2/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/2/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
2/2/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
2/6/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/7/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/8/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
2/8/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
2/13/2018
|
Approved
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
2/13/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
2/13/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
2/13/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
2/13/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
2/15/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/21/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/21/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/22/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/27/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
3/1/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
3/2/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/12/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
3/19/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
3/19/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
3/19/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/3/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/5/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/10/2018
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
4/10/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
4/10/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
4/10/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/12/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/30/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/1/2018
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
5/1/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
5/1/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
5/1/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/2/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/3/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
5/3/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
5/3/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/4/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
5/4/2018
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
5/4/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
5/4/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
5/4/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/7/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
5/7/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Shotcrete
|
5/7/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
5/8/2018
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
5/8/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
5/8/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/9/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
5/9/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
5/10/2018
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
5/10/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
5/10/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
5/10/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
5/11/2018
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Shotcrete
|
5/11/2018
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
5/11/2018
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/14/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
5/14/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
5/14/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
5/15/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
5/16/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Concrete
|
5/17/2018
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
5/17/2018
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Shotcrete
|
5/17/2018
|
Approved
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/17/2018
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Masonry Frame
|
5/17/2018
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
5/18/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Concrete
|
5/21/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
5/21/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
5/22/2018
|
Approved
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
5/22/2018
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
5/23/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
5/23/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
5/24/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
5/25/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
5/30/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
5/31/2018
|
Approved
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/31/2018
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
5/31/2018
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
5/31/2018
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
6/4/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
6/4/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
6/8/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/22/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/28/2018
|
Approved
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
6/28/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/2/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
7/2/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
7/2/2018
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
7/2/2018
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
7/3/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/5/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/6/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
7/6/2018
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
7/6/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
7/6/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
7/9/2018
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
7/9/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
7/9/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
7/10/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
7/11/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
7/12/2018
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
7/12/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
7/12/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
7/12/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
7/13/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/19/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
7/19/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
7/19/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
7/19/2018
|
Corrections Issued
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
7/19/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/25/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
7/25/2018
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
7/25/2018
|
Partial Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
7/25/2018
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
7/26/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/27/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Green Building Rough
|
7/30/2018
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
7/30/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
7/30/2018
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
7/31/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/3/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/13/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Green Building Rough
|
8/13/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/14/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/28/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
8/28/2018
|
Approved
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/28/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
8/28/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
8/28/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
8/28/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
8/29/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
8/30/2018
|
Approved
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/30/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
9/4/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
9/4/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
9/4/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/6/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
9/6/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
9/6/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
9/6/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/7/2018
|
Approved
|
JEFFREY DURAN
|
|
Drywall Nailing
|
9/7/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
9/7/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/10/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
9/20/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
9/20/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
9/20/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/21/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
10/9/2018
|
Approved
|
JEFFREY DURAN
|
|
Drywall Nailing
|
10/9/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/9/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
10/9/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
10/9/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/26/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
10/31/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
11/5/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
11/6/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/6/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
11/6/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
11/15/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
11/28/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/28/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
11/28/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
12/17/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/20/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
1/9/2019
|
Approved
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/9/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/24/2019
|
Partial Approval
|
ROBERT COLE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/8/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
2/11/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
2/11/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/26/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
3/13/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
3/13/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
3/13/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/15/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
3/19/2019
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Verify Sprinkler Sign Off
|
3/19/2019
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
3/19/2019
|
Partial Approval
|
DANIEL VARNUM
|
|
Insulation
|
3/20/2019
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Wood Construction
|
3/22/2019
|
Approved
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/22/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/27/2019
|
Partial Approval
|
ROBERT COLE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/28/2019
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/1/2019
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/2/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/3/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/5/2019
|
Conditional Approval
|
CAMERON CHABAN
|
|
Insulation
|
4/5/2019
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
4/9/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
4/9/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Insulation
|
4/9/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
4/12/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Insulation
|
4/25/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/30/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
4/30/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/1/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
5/1/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
5/2/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/2/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
5/2/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
5/3/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/3/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
5/7/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/7/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
5/7/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
5/22/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
5/22/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
5/29/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
5/29/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
5/29/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
5/31/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
5/31/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Insulation
|
5/31/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
6/10/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
6/14/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
6/14/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
6/14/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
6/21/2019
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
6/21/2019
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
6/21/2019
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
7/15/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
7/18/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/23/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
8/1/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Wood Frame
|
8/2/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
8/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
8/14/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
8/21/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/22/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
8/22/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
8/22/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/27/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Green Building Rough
|
8/27/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Insulation
|
8/27/2019
|
Partial Approval
|
ROBERT COLE
|
|
Drywall Nailing
|
8/29/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
8/29/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
9/5/2019
|
Partial Approval
|
DANIEL VARNUM
|
|
Drywall Nailing
|
9/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
9/12/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Insulation
|
9/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
9/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
9/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
10/3/2019
|
Partial Approval
|
ROBERT COLE
|
|
Insulation
|
10/3/2019
|
Partial Approval
|
ROBERT COLE
|
|
Insulation
|
10/15/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
10/22/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
10/22/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Insulation
|
10/25/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
10/30/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
10/30/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
11/1/2019
|
Partial Approval
|
JAMES STEPHENS
|
|
Insulation
|
11/8/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
11/14/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
11/19/2019
|
Partial Approval
|
JAMES STEPHENS
|
|
Green Building Rough
|
11/19/2019
|
Not Ready for Inspection
|
JAMES STEPHENS
|
|
Drywall Nailing
|
11/27/2019
|
Partial Approval
|
FRED WOHLFARTH
|
|
Green Building Rough
|
11/27/2019
|
Not Ready for Inspection
|
FRED WOHLFARTH
|
|
Insulation
|
12/3/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
12/6/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
12/13/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
12/13/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
12/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
12/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
12/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
1/17/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
1/17/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
1/24/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
1/24/2020
|
Partial Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
1/28/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
2/5/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
3/3/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
3/20/2020
|
Partial Inspection
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
4/6/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Pre-Inspection
|
4/6/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
4/16/2020
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
4/16/2020
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
7/13/2020
|
Approved
|
JOHN KITCKO
|
|
Final
|
7/13/2020
|
Conditional Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
7/13/2020
|
Approved
|
JOHN KITCKO
|
|
Green Building Final
|
7/13/2020
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
7/13/2020
|
Approved
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
7/13/2020
|
Approved
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
7/13/2020
|
Approved
|
JOHN KITCKO
|
|
SGSOV-Seismic Gas S/O Valve
|
7/13/2020
|
SGSOV Approved
|
JOHN KITCKO
|
|
SUSMP-Std. Urban Storm Water
|
7/13/2020
|
Approved
|
JOHN KITCKO
|
|
Smoke Detectors
|
7/13/2020
|
Approved
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
7/13/2020
|
Approved
|
JOHN KITCKO
|
|
Wood Frame
|
7/13/2020
|
Approved
|
JOHN KITCKO
|
|
Final
|
8/18/2020
|
OK to Issue CofO
|
JOHN KITCKO
|