8415 W HILLSIDE AVE 90069

Certificate Information: 8415 W HILLSIDE AVE 90069

Application / Permit
16010-20000-05314
Plan Check / Job No.
B16VN16194
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Build type-V construction NFPA13-D sprinkler throughout irregular shape 61'5" x 52' 2-story SFD with basement, roof deck, attached garage and filled deck at rear for infinity pools (under separate permit).
Permit Issued
Issued on 5/18/2018
Issuing Office
West Los Angeles
Current Status
Issued on 5/18/2018
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 11/21/2016 APPLICANT
Assigned to Plan Check Engineer 12/22/2016 ALDOUS CHIC
Corrections Issued 12/27/2016 ALDOUS CHIC
Quality Review Completed 12/30/2016 GUANG MIN TUNG
Building Plans Picked Up 1/11/2017 APPLICANT
Green Plans Picked Up 3/9/2017 APPLICANT
Applicant returned to address corrections 4/20/2017 ALDOUS CHIC
Applicant returned to address corrections 1/17/2018 ALDOUS CHIC
Applicant returned to address corrections 3/14/2018 ALDOUS CHIC
Applicant returned to address corrections 4/18/2018 ALDOUS CHIC
Applicant returned to address corrections 4/20/2018 ALDOUS CHIC
Plan Check Approved 4/24/2018 ALDOUS CHIC
Issued 5/18/2018 LADBS

Permit Application Clearance Information

Grading Pre-Inspection Cleared 12/7/2016 ALDOUS CHIC
BHO/Hillside ordinance Cleared 3/29/2017 ROCHELLE DUNGCA
BHO/Hillside ordinance Cleared 2/26/2018 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 2/26/2018 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 2/26/2018 LEE GUILBEAUX
Highway dedication Cleared 2/26/2018 LEE GUILBEAUX
Permit Cleared 2/26/2018 LEE GUILBEAUX
Permit Cleared 2/26/2018 LEE GUILBEAUX
Sewer availability Cleared 2/26/2018 LEE GUILBEAUX
Miscellaneous Cleared 3/9/2018 STEVEN WECHSLER
Miscellaneous Cleared 3/9/2018 STEVEN WECHSLER
Miscellaneous Cleared 3/9/2018 STEVEN WECHSLER
Green Code Cleared 3/12/2018 MICHAEL AYERS
Excavation more than 5-ft deep Cleared 3/23/2018 CALOSHA APPROVED
Hydrant and Access approval Cleared 4/17/2018 GILBERT URREA
Work Adjacent to Public Way Cleared 4/17/2018 TERRY PHAN
GPI Written Notices Cleared 4/18/2018 ALDOUS CHIC
Low Impact Development Cleared 4/23/2018 SAM NAVID
Roof/Waste drainage to street Cleared 4/23/2018 STEVE MELGAR

Contact Information

Architect Maly, Farzin; Lic. No.: C33731 PO BOX 57002      SHERMAN OAKS, CA 91413
Contractor Owner-Builder       ,
Engineer Le, Thang Huu; Lic. No.: S4978 507 MAGELLAN RD      ARCADIA, CA 91007
Engineer Mahn, Jonathan Edward; Lic. No.: C60293 12848 FOOTHILL BLVD      SYLMAR, CA 91381
Geologist Pongracz-Bartha, Ed; Lic. No.: EG2370 26018 PALOMITA DR      VALENCIA, CA 91355

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/2/2018 Partial Inspection DANNY TOLENTINO
Excavation/Setback/Form/Re-Bar 8/13/2019 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 8/13/2019 Partial Approval RAUL BARAJAS
Deputy Steel/Welding 8/22/2019 Approved RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 8/29/2019 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 8/29/2019 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 10/2/2019 Conditional Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 10/28/2019 Partial Inspection RAUL BARAJAS
Footing/Foundation/Slab 10/28/2019 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 10/28/2019 Partial Approval RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 11/22/2019 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 11/22/2019 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 12/10/2019 Conditional Approval RAUL BARAJAS
Piling/Pier/Caisson 2/28/2020 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 3/9/2020 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 3/9/2020 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 3/10/2020 Conditional Approval ROBERT CORNELL
Deputy Reinf. Concrete 3/12/2020 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 3/18/2020 Conditional Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 3/20/2020 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 3/20/2020 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 3/23/2020 Conditional Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 4/2/2020 Approved RAUL BARAJAS
Piling/Pier/Caisson 4/2/2020 Approved RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 4/27/2020 Approved RAUL BARAJAS
Green Building Rough 4/27/2020 Not Ready for Inspection RAUL BARAJAS
Reinforced Concrete Frame 4/27/2020 Partial Approval RAUL BARAJAS
Verify Sprinkler Sign Off 4/27/2020 Not Ready for Inspection RAUL BARAJAS
Deputy Shotcrete 5/1/2020 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 6/17/2020 No Access for Inspection RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 7/14/2020 Partial Approval RAUL BARAJAS
Deputy Shotcrete 7/21/2020 Conditional Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 9/1/2020 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 9/9/2020 Conditional Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 10/19/2020 Partial Approval RAUL BARAJAS
Pre-Gunite 10/19/2020 Partial Approval RAUL BARAJAS
PLUMBING-Rough 8/27/2021 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 6/7/2022 Partial Approval ALIZAH MAYAGOITIA
Pool Piping 6/7/2022 Approved ALIZAH MAYAGOITIA
Pre-Gunite 6/7/2022 Partial Approval ALIZAH MAYAGOITIA
Excavation/Setback/Form/Re-Bar 9/20/2022 Partial Approval JOAQUIN GREENOUGH
Footing/Foundation/Slab 9/20/2022 Partial Approval JOAQUIN GREENOUGH
Excavation/Setback/Form/Re-Bar 11/1/2022 Partial Approval RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 11/1/2022 Not Ready for Inspection RAUL BARAJAS
Deputy Reinf. Concrete 12/16/2022 Conditional Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 12/28/2022 Partial Approval STUART CHAPMAN
Footing/Foundation/Slab 12/28/2022 Partial Approval STUART CHAPMAN
Deputy Reinf. Concrete 3/7/2023 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 4/24/2023 Partial Approval STUART CHAPMAN
Deputy Reinf. Concrete 5/3/2023 Conditional Approval STUART CHAPMAN
Footing/Foundation/Slab 5/3/2024 Not Ready for Inspection RAUL BARAJAS