Pre-Inspection
|
12/15/2020
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
12/28/2020
|
Conditional Approval
|
JOHN DODGE
|
|
Deputy Reinf. Concrete
|
12/30/2020
|
Approved
|
DERRICK SPENCER
|
|
Piling/Pier/Caisson
|
12/31/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
FLOOD-Elevation Certificate
|
2/24/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
2/24/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
2/24/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
2/24/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
FLOOD-Elevation Certificate
|
3/22/2021
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
3/22/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
3/22/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
3/22/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Pre-Inspection
|
3/22/2021
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/21/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
4/21/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
4/21/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/22/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/27/2021
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/27/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
4/27/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
4/27/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/3/2021
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
5/3/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
5/3/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
5/3/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
5/3/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/5/2021
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
5/5/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/6/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
5/6/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
5/7/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
5/10/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Masonry
|
5/11/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Masonry Wall/Backfill
|
5/11/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Masonry
|
5/12/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
5/13/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
5/14/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Shotcrete
|
5/17/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
5/18/2021
|
Approved
|
DERRICK SPENCER
|
|
FLOOD-Proofing Certificate
|
5/18/2021
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
5/18/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Rough
|
5/18/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
5/18/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
5/18/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
5/19/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
5/20/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
5/21/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
5/21/2021
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
5/21/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Green Building Rough
|
5/24/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Rough
|
5/24/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
5/24/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/25/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
5/25/2021
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
5/26/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Green Building Rough
|
5/27/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Rough
|
5/27/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
5/27/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
5/28/2021
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
6/1/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
6/2/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
6/2/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
6/3/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
6/3/2021
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
6/3/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
6/4/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
6/7/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
6/8/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
6/9/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
6/10/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
6/11/2021
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
6/24/2021
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
6/24/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
6/24/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
6/24/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
6/25/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
7/1/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
7/6/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
7/7/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/13/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
7/13/2021
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
7/23/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
7/23/2021
|
Approved
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
7/23/2021
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
8/5/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/6/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
8/6/2021
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
8/10/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/17/2021
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
8/18/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
8/25/2021
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/30/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/31/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/3/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/8/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
9/13/2021
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
9/13/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
9/14/2021
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
9/14/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
9/15/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/16/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
9/16/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
9/17/2021
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
9/28/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
10/1/2021
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
10/1/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
10/7/2021
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
10/7/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
10/12/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
10/12/2021
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
10/12/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
10/13/2021
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
10/18/2021
|
Partial Approval
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
10/21/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
11/15/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
11/17/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/18/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/29/2021
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
11/29/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/30/2021
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
12/2/2021
|
Approved
|
DERRICK SPENCER
|
|
METHANE-Rough
|
12/2/2021
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
12/2/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
12/3/2021
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
12/3/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
12/7/2021
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
12/8/2021
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
12/23/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
1/4/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
1/10/2022
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
1/10/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
1/11/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
1/21/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/7/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/11/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
2/15/2022
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
2/15/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
2/23/2022
|
Approved
|
DERRICK SPENCER
|
|
Masonry Wall/Backfill
|
3/9/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Drilled-In Anchors
|
3/11/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/15/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
3/15/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/16/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
3/16/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/16/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/18/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/18/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
3/31/2022
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
4/19/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/26/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
5/17/2022
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/31/2022
|
Partial Approval
|
ALAN NOVAK
|
|
Wood Frame
|
6/16/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/23/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
7/11/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/15/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/1/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
8/4/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Insulation
|
8/23/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
9/2/2022
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
9/6/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
9/16/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/16/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
9/23/2022
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/30/2022
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
10/13/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
10/25/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
11/2/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
11/23/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
11/23/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
11/23/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
11/29/2022
|
Approved
|
DERRICK SPENCER
|
|
Drywall Nailing
|
12/16/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Pre-Inspection
|
12/16/2022
|
Partial Inspection
|
FARHAD DADBIN
|
|
Pre-Inspection
|
12/16/2022
|
Partial Inspection
|
SHAVONNE ESPINOZA
|
|
Drywall Nailing
|
12/23/2022
|
Partial Approval
|
ALAN NOVAK
|
|
Drywall Nailing
|
1/17/2023
|
No Access for Inspection
|
DERRICK SPENCER
|
|
Insulation
|
1/17/2023
|
No Access for Inspection
|
DERRICK SPENCER
|
|
Drywall Nailing
|
1/19/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
1/19/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
1/20/2023
|
Approved
|
DERRICK SPENCER
|
|
Masonry Wall/Backfill
|
1/25/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Footing/Foundation/Slab
|
2/2/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
2/13/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
2/23/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
3/2/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
4/21/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
5/3/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
5/22/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
6/21/2023
|
Approved
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
6/21/2023
|
Approved
|
DERRICK SPENCER
|
|
Drywall Nailing
|
7/17/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
9/1/2023
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
9/8/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Masonry Wall/Backfill
|
9/26/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
2/20/2024
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/11/2024
|
Corrections Issued
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/26/2024
|
Approved
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
9/11/2024
|
Partial Inspection
|
DANIEL VARNUM
|
|
Final
|
10/15/2024
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Green Building Final
|
10/15/2024
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
10/15/2024
|
No Access for Inspection
|
DANIEL VARNUM
|
|
SGSOV-Seismic Gas S/O Valve
|
10/15/2024
|
SGSOV Not Ready
|
DANIEL VARNUM
|
|
Smoke Detectors
|
10/15/2024
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
10/15/2024
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Pre-Inspection
|
10/16/2024
|
Approved
|
DERRICK SPENCER
|
|
Final
|
11/25/2024
|
Partial Inspection
|
DANIEL VARNUM
|
|
Green Building Final
|
11/25/2024
|
Partial Inspection
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
11/25/2024
|
Partial Inspection
|
DANIEL VARNUM
|
|
SGSOV-Seismic Gas S/O Valve
|
11/25/2024
|
SGSOV Not Ready
|
DANIEL VARNUM
|
|
Smoke Detectors
|
11/25/2024
|
Partial Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
11/25/2024
|
Partial Inspection
|
DANIEL VARNUM
|
|
Final
|
12/2/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Green Building Final
|
12/2/2024
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
12/2/2024
|
Approved
|
DERRICK SPENCER
|
|
SGSOV-Seismic Gas S/O Valve
|
12/2/2024
|
SGSOV Approved
|
DERRICK SPENCER
|
|
Smoke Detectors
|
12/2/2024
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
12/2/2024
|
Approved
|
DERRICK SPENCER
|
|
Final
|
12/19/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Final
|
12/30/2024
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Final
|
1/3/2025
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
1/6/2025
|
Approved
|
DERRICK SPENCER
|
|
Final
|
1/7/2025
|
OK to Issue CofO
|
DERRICK SPENCER
|