5617 N STROHM AVE Unit #12 91601

Certificate Information: 5617 N STROHM AVE Unit #12 91601

Application / Permit
16010-20000-03439
Plan Check / Job No.
B16VN10602
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(35) Condo-Single Family
Work Description
Propose type-V construction NFPA13-D sprinkler throughout IRR shape 20'2" x 38.5' 3-story SFD with attached garage (building type A) Per small lot subdivision pursuant to Tentative Tract Map No. 73907-SL. A certification of occupancy (temporary or final) shall not be issued until after the final map has been recorded.
Permit Issued
Issued on 11/29/2018
Issuing Office
Valley
Current Status
CofO Issued on 8/3/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/5/2016 APPLICANT
Assigned to Plan Check Engineer 9/1/2016 ALDOUS CHIC
Corrections Issued 9/6/2016 ALDOUS CHIC
Quality Review Completed 9/9/2016 GUANG MIN TUNG
Building Plans Picked Up 9/16/2016 APPLICANT
Applicant returned to address corrections 4/21/2017 ALDOUS CHIC
Applicant returned to address corrections 8/3/2017 ALDOUS CHIC
Applicant returned to address corrections 10/20/2017 ALDOUS CHIC
Applicant returned to address corrections 1/18/2018 ALDOUS CHIC
Applicant returned to address corrections 6/26/2018 ALDOUS CHIC
Plan Check Approved 11/26/2018 ALDOUS CHIC
Issued 11/29/2018 LADBS
CofO in Progress 8/3/2020 JOSEPH SAGEN
Permit Finaled 8/3/2020 DONALD SUNSERI
CofO Issued 8/3/2020 DONALD SUNSERI
Permit Finaled 8/3/2020 DONALD SUNSERI

Permit Application Clearance Information

Miscellaneous Cleared 9/8/2016 JOHN DACEY
Tract Map conditions Cleared 9/8/2016 JOHN DACEY
Tract Map conditions Cleared 9/8/2016 JOHN DACEY
Miscellaneous Cleared 9/9/2016 JOHN DALLAS
Eng Process Fee Ord 176,300 Cleared 9/13/2016 RAVIL MANAPOV
Miscellaneous Cleared 4/28/2017 JOHN DACEY
Disturb/Remove Protected Trees Cleared 6/28/2017 ADRIAN SANCHEZ
Fire Marshall Fire Life Safety Cleared 10/20/2017 JOHN DALLAS
Hydrant and Access approval Cleared 10/20/2017 JOHN DALLAS
Green Code Cleared 11/2/2017 MICHAEL AYERS
Address approval Cleared 5/21/2018 MICHAEL CASTILLO
Sewer availability Cleared 7/30/2018 EDUARDO PEDROZA
Highway dedication Cleared 8/7/2018 LEE GUILBEAUX
Miscellaneous Cleared 8/7/2018 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 8/7/2018 LEE GUILBEAUX

Contact Information

Architect Holtz, Donald Lee; Lic. No.: C21677 2404 WILSHIRE BLVD SUITE 6F      LOS ANGELES, CA 90057
Contractor D B Builders Inc; Lic. No.: 812896-B 9748 TOPANGA CANYON BLVD      CHATSWORTH, CA 91311
Engineer Nguyen, Lam Thanh; Lic. No.: C36957 12277 BAJA PANORAMA      SANTA ANA, CA 92705

Inspector Information

JOSEPH SAGEN, (818) 774-4353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Sewer 2/7/2019 Approved JOHN KIDWELL
Underground Mechanical 2/7/2019 Approved JOHN KIDWELL
Footing/Foundation/Slab 2/26/2019 Not Ready for Inspection DONALD SUNSERI
Footing/Foundation/Slab 2/28/2019 Partial Approval DONALD SUNSERI
Footing/Foundation/Slab 4/9/2019 Approved DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 5/6/2019 Partial Approval DONALD SUNSERI
Deputy Steel/Welding 5/21/2019 Approved DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 5/28/2019 Partial Approval DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 6/14/2019 Partial Approval DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 6/20/2019 Partial Approval DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 6/24/2019 Partial Approval DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 7/18/2019 Partial Approval JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 8/1/2019 Partial Approval JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 8/7/2019 Partial Approval JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 8/13/2019 Partial Inspection DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 8/28/2019 Not Ready for Inspection JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 10/16/2019 Not Ready for Inspection JOSEPH SAGEN
Pre-Inspection 10/25/2019 Partial Inspection JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 11/7/2019 Partial Approval JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 11/14/2019 Not Ready for Inspection JOSEPH SAGEN
ELECTRICAL-Rough 11/15/2019 Approved JOSEPH SAGEN
HVAC-Rough 11/15/2019 Not Ready for Inspection JOSEPH SAGEN
PLUMBING-Rough 11/15/2019 Approved JOSEPH SAGEN
HVAC-Rough 11/22/2019 Not Ready for Inspection JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 12/2/2019 Not Ready for Inspection JOSEPH SAGEN
HVAC-Rough 12/2/2019 Approved JOSEPH SAGEN
Insulation 12/2/2019 Not Ready for Inspection JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 12/5/2019 Partial Approval JOSEPH SAGEN
Green Building Rough 12/5/2019 Not Ready for Inspection JOSEPH SAGEN
Verify Sprinkler Sign Off 12/5/2019 Approved JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 12/20/2019 Not Ready for Inspection DONALD SUNSERI
Floor/Roof Diaphrgm/Shear Wall 1/3/2020 Not Ready for Inspection JOSEPH SAGEN
BUILDING-Rough-Frame 1/6/2020 Approved JOSEPH SAGEN
Green Building Rough 1/6/2020 Approved JOSEPH SAGEN
Drywall Nailing 1/14/2020 Approved JOSEPH SAGEN
Shower Pan 1/14/2020 Approved JOSEPH SAGEN
Interior/Exterior Lathing 1/22/2020 Partial Approval JOSEPH SAGEN
Interior/Exterior Lathing 1/29/2020 Approved JOSEPH SAGEN
Gas Test 3/3/2020 Approved JOSEPH SAGEN
Underground Mechanical 3/27/2020 Approved JOSEPH SAGEN
SGSOV-Seismic Gas S/O Valve 6/11/2020 SGSOV Approved JOSEPH SAGEN
Service/Power Release 6/11/2020 Approved JOSEPH SAGEN
ELECTRICAL-Final 7/23/2020 Approved JOSEPH SAGEN
HVAC-Final 7/23/2020 Not Ready for Inspection JOSEPH SAGEN
PLUMBING-Final 7/23/2020 Approved JOSEPH SAGEN
Final 7/31/2020 OK to Issue CofO JOSEPH SAGEN
Green Building Final 7/31/2020 Approved JOSEPH SAGEN
HVAC-Final 7/31/2020 Approved JOSEPH SAGEN
Smoke Detectors 7/31/2020 Approved JOSEPH SAGEN