|
Footing/Foundation/Slab
|
2/28/2017
|
Partial Inspection
|
ANTHONY ANDERSON
|
|
Piling/Pier/Caisson
|
3/2/2017
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Footing/Foundation/Slab
|
4/27/2017
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
5/22/2017
|
Partial Inspection
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
5/24/2017
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
7/6/2017
|
Approved
|
JOEL LAUNCHBAUGH
|
|
Deputy Reinf. Concrete
|
7/27/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
7/28/2017
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
8/2/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Special/Order Compliance
|
8/5/2017
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
8/23/2017
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
8/25/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
8/31/2017
|
Corrections Issued
|
ANTHONY ANDERSON
|
|
Special/Order Compliance
|
9/2/2017
|
No Access for Inspection
|
DANIEL ORRANTE
|
|
Deputy Drilled-In Anchors
|
9/15/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Deputy Drilled-In Anchors
|
9/20/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Deputy Shotcrete
|
9/20/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Deputy Shotcrete
|
9/21/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Deputy Shotcrete
|
9/22/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
10/2/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Deputy Shotcrete
|
10/3/2017
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Shotcrete
|
10/4/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Deputy Shotcrete
|
10/5/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
10/13/2017
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Shotcrete
|
10/17/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
10/19/2017
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
11/17/2017
|
Approved
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
1/29/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Drilled-In Anchors
|
2/22/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Drilled-In Anchors
|
2/23/2018
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Deputy Shotcrete
|
2/23/2018
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
2/23/2018
|
Not Ready for Inspection
|
ANTHONY ANDERSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/27/2018
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
2/27/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Shotcrete
|
3/9/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
3/29/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
4/19/2018
|
Corrections Issued
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
4/20/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Reinf. Concrete
|
4/23/2018
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/23/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Green Building Rough
|
4/23/2018
|
Partial Inspection
|
ANTHONY ANDERSON
|
|
Verify Sprinkler Sign Off
|
4/23/2018
|
Partial Inspection
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
4/24/2018
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
5/7/2018
|
Corrections Issued
|
ANTHONY ANDERSON
|
|
Deputy Shotcrete
|
5/8/2018
|
Approved
|
MATT KELLERMAN
|
|
Deputy Shotcrete
|
5/9/2018
|
Approved
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
5/9/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
PLUMBING-Rough
|
5/16/2018
|
Partial Approval
|
DANIEL ORRANTE
|
|
Footing/Foundation/Slab
|
5/24/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Reinforced Concrete Frame
|
6/15/2018
|
Corrections Issued
|
JOEL LAUNCHBAUGH
|
|
Reinforced Concrete Frame
|
6/18/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
BUILDING-Rough-Frame
|
7/27/2018
|
Not Ready for Inspection
|
JONATHAN HOM
|
|
Excavation/Setback/Form/Re-Bar
|
7/27/2018
|
Conditional Approval
|
JONATHAN HOM
|
|
Footing/Foundation/Slab
|
7/27/2018
|
Conditional Approval
|
JONATHAN HOM
|
|
Green Building Rough
|
7/27/2018
|
Not Ready for Inspection
|
JONATHAN HOM
|
|
Verify Sprinkler Sign Off
|
7/27/2018
|
Not Ready for Inspection
|
JONATHAN HOM
|
|
Deputy Reinf. Concrete
|
7/30/2018
|
Conditional Approval
|
JONATHAN HOM
|
|
Deputy Shotcrete
|
8/31/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
9/20/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
9/21/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
9/24/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Shotcrete
|
9/25/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
10/6/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
10/11/2018
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
10/17/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
10/20/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
10/22/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
10/26/2018
|
No Access for Inspection
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
11/2/2018
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
11/3/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
11/6/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
11/7/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
11/7/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
11/9/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
11/14/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
11/15/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
11/19/2018
|
Conditional Approval
|
CARLOS MATAMOROS
|
|
Footing/Foundation/Slab
|
11/27/2018
|
Conditional Approval
|
CARLOS MATAMOROS
|
|
Footing/Foundation/Slab
|
12/18/2018
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
12/28/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
1/4/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
1/4/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
2/28/2019
|
Approved
|
ROBERT SHELLY
|
|
Deputy Steel/Welding
|
3/5/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
3/6/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
5/16/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
5/31/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
6/27/2019
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/17/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
7/19/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
7/22/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/24/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
7/25/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
8/9/2019
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Reinforced Concrete Frame
|
8/9/2019
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Verify Sprinkler Sign Off
|
8/9/2019
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Excavation/Setback/Form/Re-Bar
|
8/27/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
9/3/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deck
|
9/4/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Pool Piping
|
9/4/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
9/6/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
9/21/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
9/24/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
9/25/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Special/Order Compliance
|
10/1/2019
|
Approved
|
CARLOS MATAMOROS
|
|
Deputy Other (see comments)
|
10/8/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
10/8/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
10/9/2019
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
Green Building Rough
|
10/11/2019
|
Not Ready for Inspection
|
DAVID FEILER
|
|
Reinforced Masonry Frame
|
10/11/2019
|
Partial Approval
|
DAVID FEILER
|
|
Verify Sprinkler Sign Off
|
10/11/2019
|
Not Ready for Inspection
|
DAVID FEILER
|
|
Special/Order Compliance
|
10/12/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
12/2/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
12/13/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
12/13/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
12/17/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
12/17/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
12/18/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/19/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Masonry Wall/Backfill
|
12/19/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
12/27/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
12/27/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Masonry Frame
|
12/27/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
12/27/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
12/30/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/6/2020
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Green Building Rough
|
1/6/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Reinforced Masonry Frame
|
1/6/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Verify Sprinkler Sign Off
|
1/6/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Deputy Steel/Welding
|
1/7/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
1/8/2020
|
Corrections Issued
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
1/10/2020
|
Approved
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
1/13/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
1/14/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
1/15/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
1/16/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
1/21/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
1/22/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
1/24/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
2/6/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/6/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
2/7/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/7/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
2/7/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
2/7/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
2/10/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
2/12/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Reinforced Masonry Frame
|
2/13/2020
|
Corrections Issued
|
ANTHONY MCDOWALL
|
|
Deputy Steel/Welding
|
2/14/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Structural Steel Frame
|
2/18/2020
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Deputy Drilled-In Anchors
|
2/20/2020
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Steel/Welding
|
2/21/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/24/2020
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
2/24/2020
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
2/24/2020
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
2/24/2020
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
2/25/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/25/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
3/6/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
3/6/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
3/6/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
3/6/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
3/10/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Green Building Rough
|
3/17/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
3/17/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
3/17/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
3/23/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
3/25/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
3/27/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
3/31/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
Green Building Rough
|
4/1/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
4/1/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
4/1/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
4/2/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/16/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
4/21/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
4/22/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/23/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
4/27/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
4/27/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
4/27/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
4/27/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
4/28/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
4/29/2020
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
4/30/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Structural Steel Frame
|
4/30/2020
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Verify Sprinkler Sign Off
|
4/30/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/26/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
5/26/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
5/26/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
5/27/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
BUILDING-Rough-Frame
|
5/28/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/28/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
5/28/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
5/28/2020
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/2/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
6/11/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/25/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
7/6/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
7/21/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
7/21/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
7/21/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
7/22/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
7/23/2020
|
Corrections Issued
|
ANTHONY MCDOWALL
|
|
HVAC-Rough
|
7/27/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
7/29/2020
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
HVAC-Rough
|
7/30/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
7/31/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
7/31/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
8/3/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
8/4/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
8/4/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Light Gage Steel Frame
|
8/6/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Light Gage Steel Frame
|
8/7/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
8/17/2020
|
Partial Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Insulation
|
8/19/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
8/19/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
8/24/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Light Gage Steel Frame
|
8/25/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
8/26/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
8/28/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
8/28/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Light Gage Steel Frame
|
8/31/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
9/1/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Insulation
|
9/3/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Light Gage Steel Frame
|
9/4/2020
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Light Gage Steel Frame
|
9/14/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Light Gage Steel Frame
|
9/21/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Light Gage Steel Frame
|
9/23/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
9/25/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Insulation
|
9/28/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
9/29/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
10/5/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
10/7/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
10/7/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
10/14/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
10/15/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
10/15/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
10/20/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
10/20/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Masonry Wall/Backfill
|
10/21/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Masonry Wall/Backfill
|
10/26/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
10/26/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
10/29/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Deputy Reinf. Concrete
|
10/29/2020
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
Green Building Rough
|
10/29/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Verify Sprinkler Sign Off
|
10/29/2020
|
Approved
|
ANTHONY MCDOWALL
|
|
Light Gage Steel Frame
|
11/9/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
11/9/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Light Gage Steel Frame
|
11/18/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
11/18/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
11/23/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Light Gage Steel Frame
|
11/24/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
11/25/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
11/25/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
12/2/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
12/24/2020
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Green Building Rough
|
12/24/2020
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
1/4/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
1/4/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Sewer
|
1/8/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Sewer
|
1/21/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
1/22/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
1/26/2021
|
Approved
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
1/26/2021
|
Approved
|
CHRISTOPHER WILSON
|
|
Light Gage Steel Frame
|
1/26/2021
|
Approved
|
CHRISTOPHER WILSON
|
|
Insulation
|
2/11/2021
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Drywall Nailing
|
3/2/2021
|
Approved
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
3/10/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Gas Test
|
3/17/2021
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
PLUMBING-Rough
|
3/17/2021
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Gas Test
|
3/22/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Gas Test
|
3/25/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
4/23/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/20/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/25/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/28/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
6/4/2021
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
PLUMBING-Rough
|
6/8/2021
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
PLUMBING-Rough
|
7/26/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
7/28/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Drilled-In Anchors
|
8/16/2021
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Pool Piping
|
8/31/2021
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deck
|
12/28/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deck
|
1/3/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
1/3/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Light Gage Steel Frame
|
2/15/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
2/17/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/18/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
2/22/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
2/28/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
4/7/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Service/Power Release
|
7/18/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
11/8/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Final
|
11/16/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
11/16/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
11/16/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
11/16/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
Reinforced Masonry Frame
|
11/16/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
SGSOV-Seismic Gas S/O Valve
|
11/16/2022
|
SGSOV Not Ready
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
11/16/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
11/16/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
12/6/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/6/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
SGSOV-Seismic Gas S/O Valve
|
12/6/2022
|
SGSOV Approved
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
12/6/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
12/9/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
12/9/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
12/9/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/9/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/13/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Final
|
12/13/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
12/13/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
12/13/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/16/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
12/16/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
12/20/2022
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
1/10/2023
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
Final
|
4/14/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
4/14/2023
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
4/17/2023
|
Conditional Approval
|
CHRISTOPHER WILSON
|