1859 N BEL-AIR ROAD 90077

Certificate Information: 1859 N BEL-AIR ROAD 90077

Application / Permit
16010-20000-02228
Plan Check / Job No.
B16VN07085
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Irregular shape 211' x 83' two story Type V-B SFD w/attached garage and basement. Building to have NFPA 13D fire sprinkler system. See comments.
Permit Issued
Issued on 1/24/2017
Issuing Office
Metro
Current Status
CofO Issued on 4/26/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/26/2016 APPLICANT
Green Plans Picked Up 7/6/2016 APPLICANT
Assigned to Plan Check Engineer 7/7/2016 FARUK SEZER
Corrections Issued 7/10/2016 FARUK SEZER
Quality Review Completed 7/14/2016 TIEN JEN WANG
Building Plans Picked Up 7/18/2016 APPLICANT
Applicant returned to address corrections 8/18/2016 FARUK SEZER
Applicant returned to address corrections 10/13/2016 FARUK SEZER
Applicant returned to address corrections 10/26/2016 FARUK SEZER
Applicant returned to address corrections 1/18/2017 FARUK SEZER
Plan Check Approved 1/20/2017 FARUK SEZER
Issued 1/24/2017 LADBS
CofO in Progress 4/22/2023 CHRISTOPHER WILSON
Permit Finaled 4/26/2023 DANIEL ORRANTE
CofO Issued 4/26/2023 DANIEL ORRANTE
Permit Finaled 4/26/2023 DANIEL ORRANTE

Permit Application Clearance Information

Miscellaneous Cleared 9/14/2016 EDBER MACEDO
Tract Map conditions Cleared 9/14/2016 EDBER MACEDO
ZA Case Cleared 9/14/2016 EDBER MACEDO
BHO/Hillside ordinance Cleared 9/28/2016 JACOB BIGLER
BHO/Hillside ordinance Cleared 9/28/2016 JACOB BIGLER
BHO/Hillside ordinance Cleared 9/28/2016 JACOB BIGLER
Distance to fire station Cleared 9/28/2016 ROBERT DUFF
Eng Process Fee Ord 176,300 Cleared 9/28/2016 JACOB BIGLER
Hydrant and Access approval Cleared 9/28/2016 ROBERT DUFF
Permit Cleared 9/28/2016 JACOB BIGLER
Sewer availability Cleared 10/3/2016 JAMES MORALEZ
Miscellaneous Cleared 10/4/2016 JACOB BIGLER
Low Impact Development Cleared 10/26/2016 MARTIN FRAGOSO
Construction near power lines Cleared 10/27/2016 LUCIO FERRER
Construction within easement Cleared 10/27/2016 LUCIO FERRER
Roof/Waste drainage to street Cleared 10/27/2016 ALFREDO JARA
Grading Pre-Inspection Cleared 11/17/2016 FARUK SEZER
Miscellaneous Cleared 11/17/2016 FARUK SEZER
Work Adjacent to Public Way Cleared 1/17/2017 RAVIL MANAPOV
Excavation more than 5-ft deep Cleared 1/18/2017 CALOSHA APPROVED
BHO/Hillside ordinance Cleared 1/19/2017 HISASHI KOBAYAKAWA
Green Code Cleared 1/20/2017 ROLLIN GETTLE III

Contact Information

Contractor American Goal Construction Inc; Lic. No.: 632978-B 18375 VENTRUA BLVD #26      TARZANA, CA 91356
Engineer Pirbadian, Amir; Lic. No.: C72413 5435 BALBOA BLVD 212      ENCINO, CA 91436
Engineer Salehipour, Sassan A; Lic. No.: GE2579 1290 N LAKE AVENUE #204      PASADENA, CA 91104
Geologist Hill, Thomas George; Lic. No.: EG1100 3210 VAL VERDE      LONG BEACH, CA 90808

Inspector Information

CHRISTOPHER WILSON, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/28/2017 Partial Inspection ANTHONY ANDERSON
Piling/Pier/Caisson 3/2/2017 Partial Approval JOEL LAUNCHBAUGH
Footing/Foundation/Slab 4/27/2017 Partial Approval ANTHONY ANDERSON
Footing/Foundation/Slab 5/22/2017 Partial Inspection ANTHONY ANDERSON
Footing/Foundation/Slab 5/24/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 7/6/2017 Approved JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 7/27/2017 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 7/28/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 8/2/2017 Conditional Approval ANTHONY ANDERSON
Special/Order Compliance 8/5/2017 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 8/23/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 8/25/2017 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 8/31/2017 Corrections Issued ANTHONY ANDERSON
Special/Order Compliance 9/2/2017 No Access for Inspection DANIEL ORRANTE
Deputy Drilled-In Anchors 9/15/2017 Conditional Approval ANTHONY ANDERSON
Deputy Drilled-In Anchors 9/20/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 9/20/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 9/21/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 9/22/2017 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 10/2/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 10/3/2017 Conditional Approval JOEL LAUNCHBAUGH
Deputy Shotcrete 10/4/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 10/5/2017 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 10/13/2017 Partial Approval ANTHONY ANDERSON
Deputy Shotcrete 10/17/2017 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 10/19/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 11/17/2017 Approved ANTHONY ANDERSON
Footing/Foundation/Slab 1/29/2018 Partial Approval ANTHONY ANDERSON
Deputy Drilled-In Anchors 2/22/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Drilled-In Anchors 2/23/2018 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 2/23/2018 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 2/23/2018 Not Ready for Inspection ANTHONY ANDERSON
Excavation/Setback/Form/Re-Bar 2/27/2018 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 2/27/2018 Partial Approval ANTHONY ANDERSON
Deputy Shotcrete 3/9/2018 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 3/29/2018 Partial Approval ANTHONY ANDERSON
Footing/Foundation/Slab 4/19/2018 Corrections Issued ANTHONY ANDERSON
Deputy Reinf. Concrete 4/20/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 4/23/2018 Conditional Approval ANTHONY ANDERSON
Excavation/Setback/Form/Re-Bar 4/23/2018 Partial Approval ANTHONY ANDERSON
Green Building Rough 4/23/2018 Partial Inspection ANTHONY ANDERSON
Verify Sprinkler Sign Off 4/23/2018 Partial Inspection ANTHONY ANDERSON
Deputy Reinf. Concrete 4/24/2018 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 5/7/2018 Corrections Issued ANTHONY ANDERSON
Deputy Shotcrete 5/8/2018 Approved MATT KELLERMAN
Deputy Shotcrete 5/9/2018 Approved ANTHONY ANDERSON
Footing/Foundation/Slab 5/9/2018 Partial Approval ANTHONY ANDERSON
PLUMBING-Rough 5/16/2018 Partial Approval DANIEL ORRANTE
Footing/Foundation/Slab 5/24/2018 Partial Approval JOEL LAUNCHBAUGH
Reinforced Concrete Frame 6/15/2018 Corrections Issued JOEL LAUNCHBAUGH
Reinforced Concrete Frame 6/18/2018 Partial Approval JOEL LAUNCHBAUGH
BUILDING-Rough-Frame 7/27/2018 Not Ready for Inspection JONATHAN HOM
Excavation/Setback/Form/Re-Bar 7/27/2018 Conditional Approval JONATHAN HOM
Footing/Foundation/Slab 7/27/2018 Conditional Approval JONATHAN HOM
Green Building Rough 7/27/2018 Not Ready for Inspection JONATHAN HOM
Verify Sprinkler Sign Off 7/27/2018 Not Ready for Inspection JONATHAN HOM
Deputy Reinf. Concrete 7/30/2018 Conditional Approval JONATHAN HOM
Deputy Shotcrete 8/31/2018 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 9/20/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Shotcrete 9/21/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Shotcrete 9/24/2018 Partial Approval MATT KELLERMAN
Deputy Shotcrete 9/25/2018 Conditional Approval CHRISTOPHER WILSON
Special/Order Compliance 10/6/2018 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 10/11/2018 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 10/17/2018 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 10/20/2018 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/22/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/26/2018 No Access for Inspection MATT KELLERMAN
Footing/Foundation/Slab 11/2/2018 Corrections Issued CHRISTOPHER WILSON
Special/Order Compliance 11/3/2018 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 11/6/2018 Partial Inspection CHRISTOPHER WILSON
Deputy Drilled-In Anchors 11/7/2018 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 11/7/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 11/9/2018 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 11/14/2018 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 11/15/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Shotcrete 11/19/2018 Conditional Approval CARLOS MATAMOROS
Footing/Foundation/Slab 11/27/2018 Conditional Approval CARLOS MATAMOROS
Footing/Foundation/Slab 12/18/2018 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 12/28/2018 Partial Approval CHRISTOPHER WILSON
Deputy Drilled-In Anchors 1/4/2019 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 1/4/2019 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 2/28/2019 Approved ROBERT SHELLY
Deputy Steel/Welding 3/5/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 3/6/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 5/16/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Drilled-In Anchors 5/31/2019 Conditional Approval CHRISTOPHER WILSON
Pre-Inspection 6/27/2019 Partial Approval CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 7/17/2019 Corrections Issued CHRISTOPHER WILSON
Wood Frame 7/19/2019 Corrections Issued CHRISTOPHER WILSON
Deputy Wood Construction 7/22/2019 Conditional Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 7/24/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 7/25/2019 Conditional Approval CHRISTOPHER WILSON
Green Building Rough 8/9/2019 Not Ready for Inspection CARLOS MATAMOROS
Reinforced Concrete Frame 8/9/2019 Not Ready for Inspection CARLOS MATAMOROS
Verify Sprinkler Sign Off 8/9/2019 Not Ready for Inspection CARLOS MATAMOROS
Excavation/Setback/Form/Re-Bar 8/27/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/3/2019 Conditional Approval CHRISTOPHER WILSON
Deck 9/4/2019 Partial Inspection CHRISTOPHER WILSON
Pool Piping 9/4/2019 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 9/6/2019 Partial Inspection CHRISTOPHER WILSON
Special/Order Compliance 9/21/2019 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 9/24/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/25/2019 Conditional Approval CHRISTOPHER WILSON
Special/Order Compliance 10/1/2019 Approved CARLOS MATAMOROS
Deputy Other (see comments) 10/8/2019 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/8/2019 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 10/9/2019 Corrections Issued CARLOS MATAMOROS
Green Building Rough 10/11/2019 Not Ready for Inspection DAVID FEILER
Reinforced Masonry Frame 10/11/2019 Partial Approval DAVID FEILER
Verify Sprinkler Sign Off 10/11/2019 Not Ready for Inspection DAVID FEILER
Special/Order Compliance 10/12/2019 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 12/2/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Masonry 12/13/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 12/13/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Drilled-In Anchors 12/17/2019 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 12/17/2019 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 12/18/2019 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 12/19/2019 Corrections Issued CHRISTOPHER WILSON
Masonry Wall/Backfill 12/19/2019 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 12/27/2019 Partial Inspection CHRISTOPHER WILSON
Green Building Rough 12/27/2019 Partial Inspection CHRISTOPHER WILSON
Reinforced Masonry Frame 12/27/2019 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 12/27/2019 Partial Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 12/30/2019 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 1/6/2020 Partial Approval ANTHONY MCDOWALL
Green Building Rough 1/6/2020 Not Ready for Inspection ANTHONY MCDOWALL
Reinforced Masonry Frame 1/6/2020 Not Ready for Inspection ANTHONY MCDOWALL
Verify Sprinkler Sign Off 1/6/2020 Not Ready for Inspection ANTHONY MCDOWALL
Deputy Steel/Welding 1/7/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 1/8/2020 Corrections Issued MATT KELLERMAN
Deputy Steel/Welding 1/10/2020 Approved MATT KELLERMAN
Deputy Steel/Welding 1/13/2020 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 1/14/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 1/15/2020 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 1/16/2020 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 1/21/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 1/22/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 1/24/2020 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 2/6/2020 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 2/6/2020 Corrections Issued CHRISTOPHER WILSON
BUILDING-Rough-Frame 2/7/2020 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/7/2020 Partial Approval CHRISTOPHER WILSON
Green Building Rough 2/7/2020 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 2/7/2020 Partial Inspection CHRISTOPHER WILSON
Structural Steel Frame 2/10/2020 Corrections Issued CHRISTOPHER WILSON
Deputy Steel/Welding 2/12/2020 Partial Approval MATT KELLERMAN
Reinforced Masonry Frame 2/13/2020 Corrections Issued ANTHONY MCDOWALL
Deputy Steel/Welding 2/14/2020 Partial Approval MATT KELLERMAN
Structural Steel Frame 2/18/2020 Not Ready for Inspection MATT KELLERMAN
Deputy Drilled-In Anchors 2/20/2020 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Deputy Steel/Welding 2/21/2020 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/24/2020 No Access for Inspection CHRISTOPHER WILSON
Green Building Rough 2/24/2020 No Access for Inspection CHRISTOPHER WILSON
Structural Steel Frame 2/24/2020 No Access for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 2/24/2020 No Access for Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 2/25/2020 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/25/2020 Corrections Issued CHRISTOPHER WILSON
Deputy Steel/Welding 3/6/2020 Partial Approval CHRISTOPHER WILSON
Green Building Rough 3/6/2020 Partial Inspection CHRISTOPHER WILSON
Structural Steel Frame 3/6/2020 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 3/6/2020 Partial Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 3/10/2020 Partial Approval MATT KELLERMAN
Green Building Rough 3/17/2020 Partial Inspection CHRISTOPHER WILSON
Structural Steel Frame 3/17/2020 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 3/17/2020 Partial Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 3/23/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 3/25/2020 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 3/27/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 3/31/2020 Partial Approval MATT KELLERMAN
Green Building Rough 4/1/2020 Partial Inspection CHRISTOPHER WILSON
Structural Steel Frame 4/1/2020 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 4/1/2020 Partial Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 4/2/2020 Conditional Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 4/16/2020 Partial Approval CHRISTOPHER WILSON
Deputy Drilled-In Anchors 4/21/2020 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 4/22/2020 Conditional Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 4/23/2020 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/27/2020 Partial Inspection CHRISTOPHER WILSON
Green Building Rough 4/27/2020 Partial Inspection CHRISTOPHER WILSON
Structural Steel Frame 4/27/2020 Corrections Issued CHRISTOPHER WILSON
Verify Sprinkler Sign Off 4/27/2020 Partial Inspection CHRISTOPHER WILSON
Structural Steel Frame 4/28/2020 Partial Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 4/29/2020 Conditional Approval CHRISTOPHER WILSON
Green Building Rough 4/30/2020 Not Ready for Inspection ANTHONY MCDOWALL
Structural Steel Frame 4/30/2020 Partial Approval ANTHONY MCDOWALL
Verify Sprinkler Sign Off 4/30/2020 Not Ready for Inspection ANTHONY MCDOWALL
Floor/Roof Diaphrgm/Shear Wall 5/26/2020 Corrections Issued CHRISTOPHER WILSON
Green Building Rough 5/26/2020 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/26/2020 Partial Inspection CHRISTOPHER WILSON
Deputy Wood Construction 5/27/2020 Partial Approval MATT KELLERMAN
BUILDING-Rough-Frame 5/28/2020 Partial Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 5/28/2020 Partial Approval CHRISTOPHER WILSON
Green Building Rough 5/28/2020 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/28/2020 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 6/2/2020 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 6/11/2020 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 6/25/2020 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 7/6/2020 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 7/21/2020 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 7/21/2020 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 7/21/2020 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 7/22/2020 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 7/23/2020 Corrections Issued ANTHONY MCDOWALL
HVAC-Rough 7/27/2020 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 7/29/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
HVAC-Rough 7/30/2020 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 7/31/2020 Approved CHRISTOPHER WILSON
Verify Sprinkler Sign Off 7/31/2020 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 8/3/2020 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 8/4/2020 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 8/4/2020 Partial Approval CHRISTOPHER WILSON
Light Gage Steel Frame 8/6/2020 Corrections Issued CHRISTOPHER WILSON
Light Gage Steel Frame 8/7/2020 Partial Approval CHRISTOPHER WILSON
Insulation 8/17/2020 Partial Inspection GERMAN RODRIGUEZ MENDOZA
Insulation 8/19/2020 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 8/19/2020 Corrections Issued CHRISTOPHER WILSON
Interior/Exterior Lathing 8/24/2020 Corrections Issued CHRISTOPHER WILSON
Light Gage Steel Frame 8/25/2020 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 8/26/2020 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 8/28/2020 Partial Approval CHRISTOPHER WILSON
Green Building Rough 8/28/2020 Partial Approval CHRISTOPHER WILSON
Light Gage Steel Frame 8/31/2020 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 9/1/2020 Corrections Issued CHRISTOPHER WILSON
Insulation 9/3/2020 Partial Approval CHRISTOPHER WILSON
Light Gage Steel Frame 9/4/2020 Not Ready for Inspection MATT KELLERMAN
Light Gage Steel Frame 9/14/2020 Corrections Issued CHRISTOPHER WILSON
Light Gage Steel Frame 9/21/2020 Corrections Issued CHRISTOPHER WILSON
Light Gage Steel Frame 9/23/2020 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 9/25/2020 Corrections Issued CHRISTOPHER WILSON
Insulation 9/28/2020 Corrections Issued CHRISTOPHER WILSON
Interior/Exterior Lathing 9/29/2020 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 10/5/2020 Approved CHRISTOPHER WILSON
Interior/Exterior Lathing 10/7/2020 Partial Approval CHRISTOPHER WILSON
Shower Pan 10/7/2020 Approved CHRISTOPHER WILSON
Interior/Exterior Lathing 10/14/2020 Not Ready for Inspection CHRISTOPHER WILSON
Drywall Nailing 10/15/2020 Corrections Issued CHRISTOPHER WILSON
Interior/Exterior Lathing 10/15/2020 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 10/20/2020 Partial Approval CHRISTOPHER WILSON
Green Building Rough 10/20/2020 Partial Approval CHRISTOPHER WILSON
Masonry Wall/Backfill 10/21/2020 Corrections Issued CHRISTOPHER WILSON
Masonry Wall/Backfill 10/26/2020 Not Ready for Inspection CHRISTOPHER WILSON
Piling/Pier/Caisson 10/26/2020 Corrections Issued CHRISTOPHER WILSON
BUILDING-Rough-Frame 10/29/2020 Not Ready for Inspection ANTHONY MCDOWALL
Deputy Reinf. Concrete 10/29/2020 Conditional Approval ANTHONY MCDOWALL
Green Building Rough 10/29/2020 Not Ready for Inspection ANTHONY MCDOWALL
Verify Sprinkler Sign Off 10/29/2020 Approved ANTHONY MCDOWALL
Light Gage Steel Frame 11/9/2020 Approved CHRISTOPHER WILSON
Wood Frame 11/9/2020 Corrections Issued CHRISTOPHER WILSON
Light Gage Steel Frame 11/18/2020 Partial Approval CHRISTOPHER WILSON
Wood Frame 11/18/2020 Partial Approval CHRISTOPHER WILSON
Insulation 11/23/2020 Partial Approval CHRISTOPHER WILSON
Light Gage Steel Frame 11/24/2020 Corrections Issued CHRISTOPHER WILSON
BUILDING-Rough-Frame 11/25/2020 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 11/25/2020 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 12/2/2020 Corrections Issued CHRISTOPHER WILSON
Drywall Nailing 12/24/2020 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Green Building Rough 12/24/2020 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Drywall Nailing 1/4/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 1/4/2021 Partial Approval CHRISTOPHER WILSON
Sewer 1/8/2021 Not Ready for Inspection CHRISTOPHER WILSON
Sewer 1/21/2021 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 1/22/2021 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 1/26/2021 Approved CHRISTOPHER WILSON
Green Building Rough 1/26/2021 Approved CHRISTOPHER WILSON
Light Gage Steel Frame 1/26/2021 Approved CHRISTOPHER WILSON
Insulation 2/11/2021 Partial Approval ANTHONY MCDOWALL
Drywall Nailing 3/2/2021 Approved CHRISTOPHER WILSON
Deputy Drilled-In Anchors 3/10/2021 Conditional Approval CHRISTOPHER WILSON
Gas Test 3/17/2021 Corrections Issued GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 3/17/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Gas Test 3/22/2021 Partial Approval CHRISTOPHER WILSON
Gas Test 3/25/2021 Corrections Issued CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/23/2021 Conditional Approval CHRISTOPHER WILSON
PLUMBING-Rough 5/20/2021 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 5/25/2021 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 5/28/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 6/4/2021 Corrections Issued GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 6/8/2021 Not Ready for Inspection MATT KELLERMAN
PLUMBING-Rough 7/26/2021 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 7/28/2021 Partial Approval CHRISTOPHER WILSON
Deputy Drilled-In Anchors 8/16/2021 Conditional Approval CHRISTOPHER WILSON
Pool Piping 8/31/2021 Partial Approval CHRISTOPHER WILSON
Deck 12/28/2021 Corrections Issued CHRISTOPHER WILSON
Deck 1/3/2022 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 1/3/2022 Corrections Issued CHRISTOPHER WILSON
Light Gage Steel Frame 2/15/2022 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 2/17/2022 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/18/2022 Not Ready for Inspection CHRISTOPHER WILSON
Piling/Pier/Caisson 2/22/2022 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 2/28/2022 Partial Approval CHRISTOPHER WILSON
PLUMBING-Final 4/7/2022 Corrections Issued CHRISTOPHER WILSON
Service/Power Release 7/18/2022 Approved CHRISTOPHER WILSON
PLUMBING-Final 11/8/2022 Corrections Issued CHRISTOPHER WILSON
Final 11/16/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 11/16/2022 Approved CHRISTOPHER WILSON
Green Building Final 11/16/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 11/16/2022 Approved CHRISTOPHER WILSON
Reinforced Masonry Frame 11/16/2022 Approved CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 11/16/2022 SGSOV Not Ready CHRISTOPHER WILSON
Smoke Detectors 11/16/2022 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 11/16/2022 Approved CHRISTOPHER WILSON
HVAC-Final 12/6/2022 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Final 12/6/2022 Not Ready for Inspection CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 12/6/2022 SGSOV Approved CHRISTOPHER WILSON
Smoke Detectors 12/6/2022 Approved CHRISTOPHER WILSON
Final 12/9/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Final 12/9/2022 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Final 12/9/2022 Approved CHRISTOPHER WILSON
PLUMBING-Final 12/9/2022 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Final 12/13/2022 Corrections Issued CHRISTOPHER WILSON
Final 12/13/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Final 12/13/2022 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Final 12/13/2022 Approved CHRISTOPHER WILSON
ELECTRICAL-Final 12/16/2022 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Final 12/16/2022 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Final 12/20/2022 Approved CHRISTOPHER WILSON
Final 1/10/2023 Corrections Issued CARLOS MATAMOROS
Final 4/14/2023 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Final 4/14/2023 Approved CHRISTOPHER WILSON
Final 4/17/2023 Conditional Approval CHRISTOPHER WILSON