514 N SWEETZER AVE LOT 2 90048

Certificate Information: 514 N SWEETZER AVE LOT 2 90048

Application / Permit
16010-20000-01297
Plan Check / Job No.
B16VN04258
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(TRACT 73853-SL) PROPOSE NEW 3 STORY SFD AND OPEN ROOF DECK WITH ATTACHED TWO CAR GARAGE _ BUILDING SHALL BE SPRINKLER THROUGH OUT WITH NFPA 13R (SEE COMMENTS). "SMALL LOT SUBDIVISION PURSUANT TO TENTATIVE TRACT MAP #VTT-73853-SL. A CERTIFICATE OF OCCUPANCY (TEMPORARY OR FINAL) SHALL NOT BE ISSUED UNTIL AFTER THE FINAL MAP HAS BEEN RECORDED."
Permit Issued
Issued on 2/17/2017
Issuing Office
Metro
Current Status
CofO Issued on 5/2/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/31/2016 APPLICANT
Assigned to Plan Check Engineer 5/5/2016 DAWN MC NULTY
Green Plans Picked Up 5/6/2016 APPLICANT
Corrections Issued 5/26/2016 DAWN MC NULTY
Quality Review Completed 5/26/2016 STEVEN KIM
Building Plans Picked Up 5/27/2016 APPLICANT
Applicant returned to address corrections 9/8/2016 DAWN MC NULTY
Applicant returned to address corrections 9/20/2016 DAWN MC NULTY
Applicant returned to address corrections 10/5/2016 DAWN MC NULTY
Applicant returned to address corrections 11/15/2016 DAWN MC NULTY
Plan Check Approved 1/26/2017 DAWN MC NULTY
Issued 2/17/2017 LADBS
CofO in Progress 4/29/2022 SCOTT FINNILA
CofO Issued 5/2/2022 DEROLD HAUFF
Permit Finaled 5/2/2022 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 10/7/2016 RAVIL MANAPOV
Eng Process Fee Ord 176,300 Cleared 10/7/2016 RAVIL MANAPOV
Green Code Cleared 10/14/2016 MICHAEL AYERS
Hydrant and Access approval Cleared 10/25/2016 ROBERT DUFF
Sewer availability Cleared 11/16/2016 ROCHELLE DUNGCA
Miscellaneous Cleared 11/30/2016 CARLOS CUEVA
Permit Cleared 11/30/2016 CARLOS CUEVA
CPC Cleared 12/21/2016 FIPE LEILUA
Low Impact Development Cleared 12/21/2016 AYMAN JABBOURI
Roof/Waste drainage to street Cleared 12/21/2016 CARLOS CUEVA
Tract Map conditions Cleared 12/21/2016 FIPE LEILUA
Tract Map conditions Cleared 12/21/2016 FIPE LEILUA
Tract Map conditions Cleared 12/21/2016 FIPE LEILUA
Highway dedication Cleared 1/9/2017 ROCHELLE DUNGCA

Contact Information

Architect Moss, Kyle A; Lic. No.: C28077 2627 30TH STREET      SANTA MONICA, CA 90405
Contractor Silver Star Construction Engineering Inc; Lic. No.: 971938-B 1153 N BRAND BLVD      GLENDALE, CA 91202
Engineer Kim, Paul Sungkyo; Lic. No.: GE2066 21266 E SUNDANCE ST      WALNUT, CA 91789
Engineer Morris, Kyle Byron; Lic. No.: C72911 54 SANDPIPER      IRVINE, CA 92604

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 5/24/2017 Partial Approval LUIS BARRALES
ELECTRICAL-Rough 5/31/2017 Partial Approval RONALD COWAN
Footing/Foundation/Slab 6/1/2017 Not Ready for Inspection DAVID CHAN
METHANE-Barrier 6/1/2017 Not Ready for Inspection DAVID CHAN
METHANE-Subgrade 6/1/2017 Not Ready for Inspection DAVID CHAN
Footing/Foundation/Slab 6/5/2017 Approved SCOTT FINNILA
METHANE-Barrier 6/5/2017 Approved SCOTT FINNILA
METHANE-Subgrade 6/5/2017 Approved SCOTT FINNILA
Reinforced Masonry Frame 7/13/2017 Partial Approval SCOTT FINNILA
Floor/Roof Diaphrgm/Shear Wall 8/15/2017 Partial Approval SCOTT FINNILA
Floor/Roof Diaphrgm/Shear Wall 9/27/2017 Partial Approval SCOTT FINNILA
Drywall Nailing 10/5/2017 Conditional Approval MICHAEL FAUNCE
Green Building Rough 10/5/2017 Conditional Approval MICHAEL FAUNCE
Floor/Roof Diaphrgm/Shear Wall 11/20/2017 Not Ready for Inspection SCOTT FINNILA
Floor/Roof Diaphrgm/Shear Wall 11/21/2017 Partial Approval SCOTT FINNILA
Floor/Roof Diaphrgm/Shear Wall 3/12/2018 Partial Approval SCOTT FINNILA
Floor/Roof Diaphrgm/Shear Wall 5/14/2018 Partial Approval SCOTT FINNILA
PLUMBING-Rough 6/22/2018 Approved SCOTT FINNILA
Floor/Roof Diaphrgm/Shear Wall 7/3/2018 Partial Approval SCOTT FINNILA
BUILDING-Rough-Frame 7/17/2018 Partial Approval SCOTT FINNILA
Insulation 7/17/2018 Partial Approval SCOTT FINNILA
ELECTRICAL-Rough 8/2/2018 Approved SCOTT FINNILA
HVAC-Rough 8/22/2018 Corrections Issued SCOTT FINNILA
HVAC-Rough 8/28/2018 Approved SCOTT FINNILA
BUILDING-Rough-Frame 9/13/2018 Approved SCOTT FINNILA
Green Building Rough 9/13/2018 Approved SCOTT FINNILA
METHANE-Rough 9/13/2018 Approved SCOTT FINNILA
Verify Sprinkler Sign Off 9/13/2018 Approved SCOTT FINNILA
Insulation 9/25/2018 Approved ALEJANDRO DE ARTOLA
Drywall Nailing 10/9/2018 Approved ALEJANDRO DE ARTOLA
Interior/Exterior Lathing 10/16/2018 Partial Approval ALEJANDRO DE ARTOLA
Interior/Exterior Lathing 4/2/2019 Partial Approval SCOTT FINNILA
Underground Mechanical 5/20/2020 Partial Approval SCOTT FINNILA
Underground Mechanical 6/25/2020 Partial Approval SCOTT FINNILA
ELECTRICAL-Final 11/18/2021 Corrections Issued SCOTT FINNILA
PLUMBING-Final 12/14/2021 Corrections Issued SCOTT FINNILA
PLUMBING-Final 12/29/2021 Approved SCOTT FINNILA
Gas Test 1/19/2022 Corrections Issued ALEJANDRO DE ARTOLA
Gas Test 1/27/2022 Approved SCOTT FINNILA
SGSOV-Seismic Gas S/O Valve 1/27/2022 SGSOV Approved SCOTT FINNILA
ELECTRICAL-Final 3/11/2022 Approved SCOTT FINNILA
Service/Power Release 3/11/2022 Corrections Issued SCOTT FINNILA
HVAC-Final 4/14/2022 Approved SCOTT FINNILA
Service/Power Release 4/19/2022 Approved SCOTT FINNILA
Final 4/29/2022 OK to Issue CofO SCOTT FINNILA
Green Building Final 4/29/2022 Approved SCOTT FINNILA
Smoke Detectors 4/29/2022 Approved SCOTT FINNILA
Structural Steel Frame 4/29/2022 Approved SCOTT FINNILA