4333 N PORTOLA AVE 90032

Certificate Information: 4333 N PORTOLA AVE 90032

Application / Permit
16010-20000-00656
Plan Check / Job No.
B16VN02161
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2-STORY SFD WITH BASEMENT PARKING GARAGE. (SPRINKLERS REQ'D THROUGHOUT)
Permit Issued
Issued on 8/15/2019
Issuing Office
Valley
Current Status
CofO Issued on 2/25/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/19/2016 APPLICANT
Assigned to Plan Check Engineer 3/17/2016 ABDUL CHEGENI
Corrections Issued 3/24/2016 ABDUL CHEGENI
Quality Review Completed 3/24/2016 TIEN JEN WANG
Building Plans Picked Up 4/6/2016 APPLICANT
Green Plans Picked Up 4/6/2016 APPLICANT
Applicant returned to address corrections 8/26/2016 ABDUL CHEGENI
Applicant returned to address corrections 6/21/2017 ABDUL CHEGENI
Applicant returned to address corrections 8/17/2017 ABDUL CHEGENI
Applicant returned to address corrections 3/27/2018 ABDUL CHEGENI
Applicant returned to address corrections 8/31/2018 ABDUL CHEGENI
Applicant returned to address corrections 11/5/2018 ABDUL CHEGENI
Applicant returned to address corrections 2/6/2019 ABDUL CHEGENI
Applicant returned to address corrections 6/10/2019 ABDUL CHEGENI
Applicant returned to address corrections 6/25/2019 ABDUL CHEGENI
Applicant returned to address corrections 8/7/2019 ABDUL CHEGENI
Plan Check Approved 8/7/2019 ABDUL CHEGENI
Issued 8/15/2019 LADBS
CofO in Progress 2/18/2022 OSVALDO PARAMO
Permit Finaled 2/25/2022 DEROLD HAUFF
CofO Issued 2/25/2022 DEROLD HAUFF
Permit Finaled 2/25/2022 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 5/23/2016 ARMEN DERMENJIAN
BHO/Hillside ordinance Cleared 5/23/2016 ARMEN DERMENJIAN
BHO/Hillside ordinance Cleared 5/23/2016 ARMEN DERMENJIAN
BHO/Hillside ordinance Cleared 5/23/2016 ARMEN DERMENJIAN
BHO/Hillside ordinance Cleared 5/23/2016 ARMEN DERMENJIAN
BHO/Hillside ordinance Cleared 5/23/2016 ARMEN DERMENJIAN
Eng Process Fee Ord 176,300 Cleared 5/23/2016 ARMEN DERMENJIAN
Highway dedication Cleared 5/23/2016 ARMEN DERMENJIAN
Permit Cleared 5/23/2016 ARMEN DERMENJIAN
Roof/Waste drainage to street Cleared 5/23/2016 ARMEN DERMENJIAN
Sewer availability Cleared 5/23/2016 ARMEN DERMENJIAN
Green Code Cleared 7/1/2016 MICHAEL AYERS
"D" conditions Cleared 10/25/2016 EDBER MACEDO
CPC Cleared 10/25/2016 EDBER MACEDO
Hydrant and Access approval Cleared 10/25/2016 JOHN CONNEALLY
Low Impact Development Cleared 11/10/2016 AMMAR ELTAWIL
Disturb/Remove Protected Trees Cleared 3/21/2017 ADRIAN SANCHEZ
"Q" conditions Cleared 5/18/2017 NICOLE SANCHEZ
Miscellaneous Cleared 5/18/2017 HERMINIGILDO AGUSTIN
ZI Cleared 5/18/2017 NICOLE SANCHEZ
Roof/Waste drainage to street Cleared 5/19/2017 JOHN LIN
GPI Written Notices Cleared 6/21/2017 ABDUL CHEGENI
Grading Pre-Inspection Cleared 6/21/2017 ABDUL CHEGENI
Miscellaneous Cleared 6/25/2019 ABDUL CHEGENI

Contact Information

Contractor Owner-Builder       ,
Engineer Kazemi,, Nick; Lic. No.: L7022 4966 TOPANGA CYN BLVD      WOODLAND HILLS, CA 91364
Engineer Mroczka, Peter J; Lic. No.: C42648 9301 DARBY AVE APT 1      NORTHRIDGE, CA 91325
Engineer Salehipour, Sassan A; Lic. No.: GE2579 1290 N LAKE AVENUE #204      PASADENA, CA 91104
Geologist Hill, Thomas George; Lic. No.: EG1100 3210 VAL VERDE      LONG BEACH, CA 90808

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 9/26/2019 No Access for Inspection ENRIQUE MIRELES
Deputy Reinf. Concrete 1/28/2020 Approved ENRIQUE MIRELES
Sewer 2/24/2020 Partial Approval ENRIQUE MIRELES
Footing/Foundation/Slab 2/25/2020 Partial Approval ENRIQUE MIRELES
BUILDING-Rough-Frame 3/9/2020 Partial Approval ENRIQUE MIRELES
Green Building Rough 3/9/2020 Not Ready for Inspection ENRIQUE MIRELES
Verify Sprinkler Sign Off 3/9/2020 Not Ready for Inspection ENRIQUE MIRELES
BUILDING-Rough-Frame 3/27/2020 Corrections Issued ENRIQUE MIRELES
Green Building Rough 3/27/2020 Not Ready for Inspection ENRIQUE MIRELES
Verify Sprinkler Sign Off 3/27/2020 Not Ready for Inspection ENRIQUE MIRELES
BUILDING-Rough-Frame 4/6/2020 Partial Approval ENRIQUE MIRELES
Green Building Rough 4/6/2020 Not Ready for Inspection ENRIQUE MIRELES
Verify Sprinkler Sign Off 4/6/2020 Not Ready for Inspection ENRIQUE MIRELES
PLUMBING-Rough 5/13/2020 Approved ENRIQUE MIRELES
ELECTRICAL-Rough 5/26/2020 Corrections Issued ENRIQUE MIRELES
ELECTRICAL-Rough 6/5/2020 Approved ENRIQUE MIRELES
BUILDING-Rough-Frame 6/11/2020 Partial Approval CHRISTOPHER DELLEFIELD
Insulation 6/11/2020 Corrections Issued CHRISTOPHER DELLEFIELD
Insulation 6/15/2020 Approved ENRIQUE MIRELES
Interior/Exterior Lathing 6/18/2020 Approved ENRIQUE MIRELES
Drywall Nailing 6/22/2020 Approved ENRIQUE MIRELES
Green Building Rough 6/22/2020 Approved ENRIQUE MIRELES
BUILDING-Rough-Frame 2/9/2021 Not Ready for Inspection COREY HUPP
Final 2/9/2021 Not Ready for Inspection COREY HUPP
Footing/Foundation/Slab 2/9/2021 Not Ready for Inspection COREY HUPP
SGSOV-Seismic Gas S/O Valve 2/9/2021 SGSOV Not Ready COREY HUPP
Smoke Detectors 2/9/2021 Not Ready for Inspection COREY HUPP
Verify Sprinkler Sign Off 2/9/2021 Not Ready for Inspection COREY HUPP
BUILDING-Rough-Frame 1/25/2022 Approved OSVALDO PARAMO
ELECTRICAL-Final 1/25/2022 Corrections Issued OSVALDO PARAMO
Final 1/25/2022 Corrections Issued OSVALDO PARAMO
Footing/Foundation/Slab 1/25/2022 Approved OSVALDO PARAMO
Green Building Final 1/25/2022 Not Ready for Inspection OSVALDO PARAMO
HVAC-Final 1/25/2022 Corrections Issued OSVALDO PARAMO
PLUMBING-Final 1/25/2022 Corrections Issued OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 1/25/2022 SGSOV Approved OSVALDO PARAMO
Service/Power Release 1/25/2022 Not Ready for Inspection OSVALDO PARAMO
Smoke Detectors 1/25/2022 Approved OSVALDO PARAMO
Verify Sprinkler Sign Off 1/25/2022 Approved OSVALDO PARAMO
ELECTRICAL-Final 2/8/2022 Approved OSVALDO PARAMO
Final 2/8/2022 Corrections Issued OSVALDO PARAMO
Green Building Final 2/8/2022 Approved OSVALDO PARAMO
HVAC-Final 2/8/2022 Approved OSVALDO PARAMO
PLUMBING-Final 2/8/2022 Approved OSVALDO PARAMO
Service/Power Release 2/8/2022 Not Ready for Inspection OSVALDO PARAMO
Final 2/17/2022 OK to Issue CofO OSVALDO PARAMO
Service/Power Release 2/17/2022 Approved OSVALDO PARAMO