5901 W SUNSET BLVD 90028
Certificate Information: 5901 W SUNSET BLVD 90028
- Application / Permit
- 16010-10022-04681
- Plan Check / Job No.
- B19LA03538
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (13) Office
- Work Description
- PROPOSED OPENINGS IN THE POST TENSIONED SLABS AT LEVELS 7-13 OF A HIGHRISE BUILDING. FRAME IN THESE OPENINGS AND INFILL WITH STEEL JOIST FRAMING. PROPOSED ELEVATOR AT FIRST LEVEL. DURING THE TENANT IMPROVEMENT -ALL AREA MUST BE MADE ACCESSIBLE VIA RAMPS -PER DISABLED ACCESS REQUIREMENTNT. ORIG WORK DESCR= HIGHRISE OFFICE BLDG WITH RETAIL ON GROUND FLOOR, PARKING IN BASEMENT LEVELS AND LEVELS 2 THROUGH 5 WITH OFFICE FROM 6TH TO 13. THE PT SLABS were approved under 10010 and 10012 supplementals.
- Permit Issued
- Issued on 4/5/2019
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 3/31/2020
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 2/20/2019 | APPLICANT |
| Assigned to Plan Check Engineer | 2/22/2019 | JOHN VASQUEZ |
| Corrections Issued | 2/25/2019 | JOHN VASQUEZ |
| Quality Review Completed | 2/27/2019 | CHARLES CHANG |
| Building Plans Picked Up | 2/28/2019 | APPLICANT |
| Applicant returned to address corrections | 3/27/2019 | JOHN VASQUEZ |
| Plan Check Approved | 4/3/2019 | JOHN VASQUEZ |
| Issued | 4/5/2019 | LADBS |
| Permit Finaled | 3/31/2020 | DAVID BURKHEAD |
Permit Application Clearance Information
| CPC | Cleared | 3/1/2019 | SOPHIE GABEL-SCHEINBAU |
| Project located in CRA area | Cleared | 3/1/2019 | JIM URQUHART |
| Project located in CRA area | Cleared | 3/1/2019 | JIM URQUHART |
| Project located in CRA area | Cleared | 3/1/2019 | JIM URQUHART |
| Fire Marshall Fire Life Safety | Cleared | 3/15/2019 | DOMINIQUE MEDINA |
| Green Code | Cleared | 3/22/2019 | DONALD CRICHLOW |
| DAS Clearance | Cleared | 3/26/2019 | JOHN VASQUEZ |
Contact Information
| Architect | Sommerhalder, Olivier R; Lic. No.: C32170 | 844 GRANT #C SANTA MONICA, CA 90405 |
| Contractor | Hathaway Dinwiddie Construction Company; Lic. No.: 729664-A | 275 BATTERY STREET SUITE 300 SAN FRANCISCO, CA 941113330 |
| Engineer | Powers, Brian Frederick; Lic. No.: C75902 | 2090 WEST 31ST STREET LOS ANGELES, CA 90018 |
| Engineer | Wilkerson, Ryan Lee; Lic. No.: S4728 | 20734 SARDINIA WAY PORTER RANCH, CA 91326 |
Inspector Information
| DAVID BURKHEAD, (213) 482-7294 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 4/8/2019 | Approved | JEFF BYTHEWAY |
| Deputy Drilled-In Anchors | 4/16/2019 | Approved | JEFF BYTHEWAY |
| Deputy Pre-Stress Concrete | 4/16/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 4/16/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Masonry | 4/16/2019 | Approved | JEFF BYTHEWAY |
| Footing/Foundation/Slab | 4/16/2019 | Partial Approval | JEFF BYTHEWAY |
| Deputy Drilled-In Anchors | 4/17/2019 | Approved | JEFF BYTHEWAY |
| Deputy Pre-Stress Concrete | 4/17/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 4/17/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Masonry | 4/17/2019 | Approved | JEFF BYTHEWAY |
| Footing/Foundation/Slab | 4/17/2019 | Partial Approval | JEFF BYTHEWAY |
| Deputy Drilled-In Anchors | 4/18/2019 | Approved | JEFF BYTHEWAY |
| Deputy Pre-Stress Concrete | 4/18/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 4/18/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Masonry | 4/18/2019 | Approved | JEFF BYTHEWAY |
| Footing/Foundation/Slab | 4/18/2019 | Partial Approval | JEFF BYTHEWAY |
| Deputy Drilled-In Anchors | 4/19/2019 | Approved | JEFF BYTHEWAY |
| Deputy Pre-Stress Concrete | 4/19/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 4/19/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Masonry | 4/19/2019 | Approved | JEFF BYTHEWAY |
| Deputy Drilled-In Anchors | 4/22/2019 | Approved | JEFF BYTHEWAY |
| Deputy Pre-Stress Concrete | 4/22/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 4/22/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Masonry | 4/22/2019 | Approved | JEFF BYTHEWAY |
| Footing/Foundation/Slab | 4/23/2019 | Partial Approval | JEFF BYTHEWAY |
| Deputy Drilled-In Anchors | 4/24/2019 | Approved | JEFF BYTHEWAY |
| Deputy Pre-Stress Concrete | 4/24/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 4/24/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Masonry | 4/24/2019 | Approved | JEFF BYTHEWAY |
| Deputy Steel/Welding | 4/24/2019 | Approved | JEFF BYTHEWAY |
| Deputy Drilled-In Anchors | 4/25/2019 | Approved | JEFF BYTHEWAY |
| Deputy Pre-Stress Concrete | 4/25/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 4/25/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Masonry | 4/25/2019 | Approved | JEFF BYTHEWAY |
| Deputy Steel/Welding | 4/25/2019 | Approved | JEFF BYTHEWAY |
| Footing/Foundation/Slab | 4/25/2019 | Partial Approval | JEFF BYTHEWAY |
| Deputy Drilled-In Anchors | 4/26/2019 | Approved | JEFF BYTHEWAY |
| Deputy Pre-Stress Concrete | 4/26/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 4/26/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Masonry | 4/26/2019 | Approved | JEFF BYTHEWAY |
| Deputy Steel/Welding | 4/26/2019 | Approved | JEFF BYTHEWAY |
| Deputy Drilled-In Anchors | 4/29/2019 | Approved | JEFF BYTHEWAY |
| Deputy Pre-Stress Concrete | 4/29/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Concrete | 4/29/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Masonry | 4/29/2019 | Approved | JEFF BYTHEWAY |
| Deputy Steel/Welding | 4/29/2019 | Approved | JEFF BYTHEWAY |
| Footing/Foundation/Slab | 4/30/2019 | Approved | JEFF BYTHEWAY |
| Light Gage Steel Frame | 5/7/2019 | Partial Approval | JEFF BYTHEWAY |
| Drywall Nailing | 5/24/2019 | Approved | JEFF BYTHEWAY |
| Drywall Nailing | 6/3/2019 | Approved | JEFF BYTHEWAY |
| Final | 7/22/2019 | Not Ready for Inspection | JEFF BYTHEWAY |
| Reinforced Concrete Frame | 7/22/2019 | Approved | JEFF BYTHEWAY |
| Smoke Detectors | 7/22/2019 | Approved | JEFF BYTHEWAY |