Footing/Foundation/Slab
|
10/21/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/29/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
11/4/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
11/9/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
11/29/2021
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
12/20/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
1/5/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
1/6/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
1/19/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
1/26/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
2/3/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
2/22/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
2/22/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Masonry Wall/Backfill
|
2/23/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
2/23/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
2/24/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Masonry Wall/Backfill
|
2/25/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
2/28/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
3/2/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
3/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/21/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/7/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
4/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/21/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/21/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/27/2022
|
Partial Inspection
|
MARK FERRARI
|
|
Footing/Foundation/Slab
|
5/27/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/3/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
7/8/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/8/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/12/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
7/22/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/25/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/8/2022
|
Partial Approval
|
TED RIES
|
|
Footing/Foundation/Slab
|
8/11/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
8/15/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
8/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
8/30/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
9/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/22/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/30/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
9/30/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/6/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/21/2022
|
Off-Hour Fees Due
|
|
|
Footing/Foundation/Slab
|
10/21/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/28/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
11/3/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/4/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/15/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
11/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/28/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
11/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
12/27/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
1/4/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
1/6/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
1/9/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
1/18/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
1/27/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
1/27/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
1/30/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
1/31/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
2/14/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
2/17/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
2/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/6/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/6/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/16/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
3/24/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
4/3/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/3/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/3/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/4/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/14/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
4/28/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/3/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/16/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
5/18/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
5/19/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
5/24/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
5/25/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
6/8/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
6/9/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
6/14/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
6/26/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/26/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/26/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/27/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
6/28/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/6/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
7/18/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
8/7/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
8/17/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
8/24/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
9/14/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/3/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
10/10/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
10/19/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
10/23/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/27/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/30/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/2/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/8/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
11/14/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/17/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/22/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
11/27/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
11/29/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
12/13/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/19/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/8/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/29/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/29/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/30/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/31/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
6/6/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
6/6/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
6/11/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
6/18/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/27/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/1/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/3/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/8/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/9/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/10/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/11/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/12/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
7/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
7/17/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
7/19/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/30/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/31/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
8/1/2024
|
Partial Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/8/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
8/13/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
8/14/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
8/16/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/29/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/3/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/4/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
9/5/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
9/13/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
10/8/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
10/11/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
10/21/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
10/24/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
11/5/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
11/6/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
11/20/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
11/26/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/4/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/12/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
12/12/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
12/18/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
12/19/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
1/10/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
1/13/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
1/14/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/28/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
2/3/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
2/6/2025
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Drywall Nailing
|
2/18/2025
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Drywall Nailing
|
2/20/2025
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Wood Frame
|
2/20/2025
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Interior/Exterior Lathing
|
3/3/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
3/21/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
3/26/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
3/26/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
4/2/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
4/2/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
4/30/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
5/16/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
5/16/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
5/22/2025
|
Partial Approval
|
LARRY ARNICK
|