6516 W SELMA AVE 90028

Certificate Information: 6516 W SELMA AVE 90028

Application / Permit
16010-10003-03901
Plan Check / Job No.
B18LA20081
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
SUPPLEMENTAL TO 16010-10000-03901. STRUCTURAL AND ARCHITECTURAL REVISIONS TO BUILDING PERMITTED UNDER 16010-10000-03901. THE BUILDING IS BEING CUT BACK AT REAR OF BUILDING AND MAINTAINING A 10' REAR YARD SETBACK, CHANGING THE SETBACK AT E'LY SIDE YARD. LONG TERM BIKE SPACES BEING MOVED FROM INSIDE THE BUILDING TO THE REAR YARD. THE ORIGINAL WORK DESC= PROPOSED 7 STORY, 212 GUESTROOM HOTEL W/ ROOFDECK/POOL AND 4 BASEMENT LEVELS OF PARKING. GROUND AND ROOFTOP RESTAURANTS (TENANT IMPROVEMENTS FOR RESTAURANTS ON SEPARATE SUBMITTALS/PERMITS)
Permit Issued
Issued on 12/3/2018
Issuing Office
Metro
Current Status
Permit Finaled on 9/25/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/20/2018 APPLICANT
Assigned to Plan Check Engineer 10/4/2018 JOHN VASQUEZ
Disabled Access Plans Picked Up 10/10/2018 APPLICANT
Green Plans Picked Up 10/16/2018 APPLICANT
Corrections Issued 10/18/2018 JOHN VASQUEZ
Quality Review Completed 10/18/2018 CHARLES CHANG
Building Plans Picked Up 10/22/2018 APPLICANT
Applicant returned to address corrections 10/30/2018 JOHN VASQUEZ
Applicant returned to address corrections 11/13/2018 JOHN VASQUEZ
Applicant returned to address corrections 11/19/2018 JOHN VASQUEZ
Plan Check Approved 12/3/2018 JOHN VASQUEZ
Issued 12/3/2018 LADBS
Permit Finaled 9/25/2021 DAVID BURKHEAD

Permit Application Clearance Information

Building over 3-story or 36-ft Cleared 10/18/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 10/18/2018 CALOSHA APPROVED
DAS Clearance Cleared 11/8/2018 SHINE LIN
Green Code Cleared 11/8/2018 COLIN LOREDO
Project located in CRA area Cleared 11/9/2018 JIM URQUHART
Project located in CRA area Cleared 11/9/2018 JIM URQUHART
"Q" conditions Cleared 11/15/2018 ANNA VAN
"T" removal Cleared 11/15/2018 ANNA VAN
Opn space landscape/Water mgmt Cleared 11/15/2018 ANNA VAN
Site Plan review Cleared 11/15/2018 ANNA VAN
Tract Map conditions Cleared 11/15/2018 ANNA VAN
ZI Cleared 11/15/2018 ANNA VAN
Encroachment in public way Cleared 11/19/2018 KAREN LE
CPC Cleared 11/20/2018 ANNA VAN
Hydrant and Access approval Cleared 11/21/2018 JOHN CONNEALLY
Fire Marshall Fire Life Safety Cleared 11/26/2018 DOMINIQUE MEDINA
Roof/Waste drainage to street Cleared 11/27/2018 ADRIAN SANCHEZ
"D" conditions Cleared 11/28/2018 IVORY CHAMBESHI
CPC Cleared 11/28/2018 IVORY CHAMBESHI
Eng Process Fee Ord 176,300 Cleared 11/29/2018 MICHAEL CASTILLO
Sewer availability Cleared 11/29/2018 MICHAEL CASTILLO

Contact Information

Architect Ha, Simon Y; Lic. No.: C31188 7902 LOUISE LANE      LA PALMA, CA 90623
Contractor Suffolk Construction Company Inc; Lic. No.: 751099-B 390 FREMONT STREET      SAN FRANCISCO, CA 94105
Engineer Cefali, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Hassan, Mohamed Ali; Lic. No.: S5285 3621 HARBOR BLVD STE 125      SANTA ANA, CA 92704
Engineer Martin, David Stuart; Lic. No.: C74143 25363 SPLENDIDO CT      STEVENSON RANCH, CA 91381

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Masonry Wall/Backfill 8/9/2019 Partial Approval JEFF BYTHEWAY