6825 W MULHOLLAND DR 90068

Certificate Information: 6825 W MULHOLLAND DR 90068

Application / Permit
16010-10000-06399
Plan Check / Job No.
B16LA20774
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
New, irregular-shaped one-story single family dwelling over basement with attached two-car garage and attached uncovered decks with pool and spa.
Permit Issued
Issued on 6/14/2018
Issuing Office
Metro
Current Status
CofO Issued on 7/5/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/30/2016 APPLICANT
Green Plans Picked Up 2/3/2017 APPLICANT
Assigned to Plan Check Engineer 2/9/2017 ERIC CABRERA
Corrections Issued 2/15/2017 ERIC CABRERA
Quality Review Completed 2/16/2017 DAVID CHANG
Building Plans Picked Up 3/23/2017 APPLICANT
Applicant returned to address corrections 1/29/2018 CHRISTOPHER KOMANCHECK
Applicant returned to address corrections 2/1/2018 CHRISTOPHER KOMANCHECK
Applicant returned to address corrections 2/2/2018 CHRISTOPHER KOMANCHECK
Applicant returned to address corrections 3/15/2018 CHRISTOPHER KOMANCHECK
Applicant returned to address corrections 4/12/2018 CHRISTOPHER KOMANCHECK
Applicant returned to address corrections 4/23/2018 CHRISTOPHER KOMANCHECK
Applicant returned to address corrections 5/11/2018 CHRISTOPHER KOMANCHECK
Applicant returned to address corrections 6/5/2018 CHRISTOPHER KOMANCHECK
Plan Check Approved 6/14/2018 CHRISTOPHER KOMANCHECK
Issued 6/14/2018 LADBS
CofO in Progress 4/18/2022 BRIAN SULLIVAN
Permit Finaled 7/5/2022 DEROLD HAUFF
CofO Issued 7/5/2022 DEROLD HAUFF
Permit Finaled 7/5/2022 DEROLD HAUFF

Permit Application Clearance Information

Miscellaneous Cleared 5/15/2017 RICK TORRES
Address approval Cleared 1/30/2018 CUC NGUYEN
BHO/Hillside ordinance Cleared 1/30/2018 JOHN LIN
BHO/Hillside ordinance Cleared 1/30/2018 JOHN LIN
Eng Process Fee Ord 176,300 Cleared 1/30/2018 JOHN LIN
Disturb/Remove Protected Trees Cleared 2/5/2018 LUIS TORRES
Certificate of Compliance Cleared 3/5/2018 MARC WOERSCHING
BHO/Hillside ordinance Cleared 3/15/2018 NAZILA NOORIFAR
Excavation more than 5-ft deep Cleared 3/15/2018 CALOSHA APPROVED
GPI Written Notices Cleared 3/15/2018 ERIC CABRERA
Grading Pre-Inspection Cleared 3/15/2018 ERIC CABRERA
Sewer availability Cleared 3/15/2018 NAZILA NOORIFAR
Miscellaneous Cleared 3/20/2018 DAISY BENICIA
Specific Plan Cleared 3/20/2018 DAISY BENICIA
BHO/Hillside ordinance Cleared 3/30/2018 ADRIAN SANCHEZ
Hydrant and Access approval Cleared 4/12/2018 ROBERT DUFF
Green Code Cleared 4/19/2018 NEGAR NEJAD
Private sewage disp. approval Cleared 4/27/2018 CHRISTOPHER KOMANCHECK
Low Impact Development Cleared 5/11/2018 RYAN HUDSON
Roof/Waste drainage to street Cleared 5/11/2018 JAMES MORALEZ
Miscellaneous Cleared 5/31/2018 CHRISTINE REUSCH
Permit Cleared 6/12/2018 JOHN LIN

Contact Information

Architect 6543, Franklin Avenue; Lic. No.: C34875 # 306      LOS ANGELES, CA 90028
Contractor Owner-Builder       ,
Engineer Kim, Hong Kook; Lic. No.: C64529 839 S MUIRFIELD RD      LOS ANGELES, CA 90005
Engineer Kim, Hosang; Lic. No.: C67288 10632 BALCOM AVE      GRANADA HILLS, CA 91344
Engineer Liston, Leonard Irvin; Lic. No.: C31902 889 PIERCE CT STE 101      THOUSAND OAKS, CA 91360
Geologist Holt, Jacob William; Lic. No.: EG2282 5158 COCHRAN ST      SIMI VALLEY, CA 93063
Landscape Architect Sparks, Shelley E.; Lic. No.: LA2896 12324 MOORPARK STREET      STUDIO CITY, CA 91604

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/19/2019 Partial Inspection BRIAN SULLIVAN
Deputy Reinf. Concrete 5/5/2020 Conditional Approval BRIAN SULLIVAN
Piling/Pier/Caisson 5/6/2020 Not Ready for Inspection BRIAN SULLIVAN
Piling/Pier/Caisson 5/8/2020 Partial Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 5/11/2020 Conditional Approval BRIAN SULLIVAN
Deputy Grading 6/5/2020 Conditional Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 6/18/2020 Partial Approval CHRISTOPHER DELLEFIELD
Piling/Pier/Caisson 6/22/2020 Approved BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 7/13/2020 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 7/13/2020 Partial Approval BRIAN SULLIVAN
Deputy Steel/Welding 7/20/2020 Conditional Approval BRIAN SULLIVAN
PLUMBING-Rough 8/12/2020 Not Ready for Inspection BRIAN SULLIVAN
Sewer 8/12/2020 Not Ready for Inspection BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 8/18/2020 Partial Approval BRIAN SULLIVAN
PLUMBING-Rough 8/18/2020 Partial Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 9/2/2020 Approved BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 9/2/2020 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 9/2/2020 Partial Approval BRIAN SULLIVAN
Reinforced Concrete Frame 9/2/2020 Partial Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 9/21/2020 No Access for Inspection ELMER BLAND
Excavation/Setback/Form/Re-Bar 9/21/2020 Partial Approval BRIAN SULLIVAN
Piling/Pier/Caisson 9/21/2020 Not Ready for Inspection BRIAN SULLIVAN
Reinforced Concrete Frame 9/21/2020 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 10/6/2020 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 10/6/2020 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 10/16/2020 Partial Approval BRIAN SULLIVAN
Deputy Steel/Welding 11/5/2020 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 11/6/2020 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 11/9/2020 Partial Approval BRIAN SULLIVAN
Green Building Rough 11/9/2020 Not Ready for Inspection BRIAN SULLIVAN
MERV13>=Rough 11/9/2020 Not Ready for Inspection BRIAN SULLIVAN
Structural Steel Frame 11/9/2020 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 11/9/2020 Not Ready for Inspection BRIAN SULLIVAN
Deputy Steel/Welding 11/12/2020 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 11/18/2020 Not Ready for Inspection BRIAN SULLIVAN
Green Building Rough 11/18/2020 Not Ready for Inspection BRIAN SULLIVAN
MERV13>=Rough 11/18/2020 Not Ready for Inspection BRIAN SULLIVAN
Reinforced Concrete Frame 11/18/2020 Not Ready for Inspection BRIAN SULLIVAN
Structural Steel Frame 11/18/2020 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 11/18/2020 Not Ready for Inspection BRIAN SULLIVAN
Deputy Steel/Welding 11/19/2020 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 11/20/2020 No Access for Inspection ELMER BLAND
Deputy Steel/Welding 11/24/2020 No Access for Inspection ELMER BLAND
Deputy Steel/Welding 11/25/2020 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 12/1/2020 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 12/1/2020 Partial Approval BRIAN SULLIVAN
Deputy Steel/Welding 12/2/2020 No Access for Inspection ELMER BLAND
Deputy Steel/Welding 12/3/2020 No Access for Inspection ELMER BLAND
Deputy Steel/Welding 12/4/2020 No Access for Inspection ELMER BLAND
Deputy Steel/Welding 12/7/2020 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 12/8/2020 No Access for Inspection ELMER BLAND
Excavation/Setback/Form/Re-Bar 12/14/2020 Partial Approval BRIAN SULLIVAN
Green Building Rough 12/14/2020 Not Ready for Inspection BRIAN SULLIVAN
MERV13>=Rough 12/14/2020 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 12/14/2020 Not Ready for Inspection BRIAN SULLIVAN
Green Building Rough 12/18/2020 Not Ready for Inspection BRIAN SULLIVAN
MERV13>=Rough 12/18/2020 Not Ready for Inspection BRIAN SULLIVAN
Structural Steel Frame 12/18/2020 Partial Approval BRIAN SULLIVAN
Verify Sprinkler Sign Off 12/18/2020 Not Ready for Inspection BRIAN SULLIVAN
Deputy Steel/Welding 1/22/2021 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 1/25/2021 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 1/27/2021 No Access for Inspection ELMER BLAND
Deputy Steel/Welding 1/28/2021 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 2/1/2021 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 2/2/2021 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 2/5/2021 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 2/8/2021 Conditional Approval BRIAN SULLIVAN
BUILDING-Rough-Frame 4/19/2021 Not Ready for Inspection BRIAN SULLIVAN
Green Building Rough 4/19/2021 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Rough 4/19/2021 Partial Approval BRIAN SULLIVAN
MERV13>=Rough 4/19/2021 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Rough 4/19/2021 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 4/19/2021 Not Ready for Inspection BRIAN SULLIVAN
Wood Frame 4/19/2021 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Rough 4/20/2021 Approved BRIAN SULLIVAN
Structural Steel Frame 4/20/2021 Partial Approval BRIAN SULLIVAN
Insulation 4/22/2021 Not Ready for Inspection BRIAN SULLIVAN
Rough-Elec/Plmb/HVAC 4/22/2021 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 5/3/2021 Approved BRIAN SULLIVAN
ELECTRICAL-Rough 5/3/2021 Approved BRIAN SULLIVAN
Green Building Rough 5/3/2021 Approved BRIAN SULLIVAN
HVAC-Rough 5/3/2021 Conditional Approval BRIAN SULLIVAN
MERV13>=Rough 5/3/2021 Approved BRIAN SULLIVAN
Verify Sprinkler Sign Off 5/3/2021 Approved BRIAN SULLIVAN
HVAC-Rough 5/4/2021 Not Ready for Inspection BRIAN SULLIVAN
Wood Frame 5/5/2021 Approved BRIAN SULLIVAN
Insulation 5/6/2021 Conditional Approval BRIAN SULLIVAN
Insulation 5/12/2021 Approved BRIAN SULLIVAN
Drywall Nailing 6/3/2021 Approved BRIAN SULLIVAN
Insulation 6/3/2021 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 7/7/2021 Approved BRIAN SULLIVAN
Shower Pan 7/7/2021 Approved BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 8/17/2021 Not Ready for Inspection BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 9/15/2021 Not Ready for Inspection BRIAN SULLIVAN
Sewer 10/8/2021 Approved BRIAN SULLIVAN
ELECTRICAL-Final 2/8/2022 Not Ready for Inspection BRIAN SULLIVAN
Green Building Final 2/8/2022 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Final 2/8/2022 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Final 2/8/2022 Approved BRIAN SULLIVAN
Smoke Detectors 2/8/2022 Approved BRIAN SULLIVAN
ELECTRICAL-Final 2/28/2022 Approved BRIAN SULLIVAN
Final 2/28/2022 Not Ready for Inspection BRIAN SULLIVAN
Footing/Foundation/Slab 2/28/2022 Approved BRIAN SULLIVAN
Green Building Final 2/28/2022 Approved BRIAN SULLIVAN
HVAC-Final 2/28/2022 Approved BRIAN SULLIVAN
MERV13>=Final 2/28/2022 Approved BRIAN SULLIVAN
PLUMBING-Final 2/28/2022 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 2/28/2022 SGSOV Approved BRIAN SULLIVAN
Service/Power Release 2/28/2022 Not Ready for Inspection BRIAN SULLIVAN
Structural Steel Frame 2/28/2022 Approved BRIAN SULLIVAN
Service/Power Release 3/14/2022 Corrections Issued BRIAN SULLIVAN
ELECTRICAL-Final 3/16/2022 Approved BRIAN SULLIVAN
Pool/Spa Cover 3/16/2022 Not Ready for Inspection BRIAN SULLIVAN
Service/Power Release 3/16/2022 Approved BRIAN SULLIVAN
Final 4/6/2022 Corrections Issued BRIAN SULLIVAN
Final 4/18/2022 OK to Issue CofO BRIAN SULLIVAN