20065 W RINALDI ST 91326

Certificate Information: 20065 W RINALDI ST 91326

Application / Permit
16010-10000-06137
Plan Check / Job No.
B16LA20427
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(17) Restaurant
Work Description
NEW 2-STORY TYPE I-B CORE AND SHELL MIXED USE BUILDING CONSISTING OF RESTAURANT/OFFICE/FITNESS STUDIO/COMMUNITY ROOM USES PER CPC-2016-837-SP-MCUP-DRB-SPP-SPR
Permit Issued
Issued on 11/30/2017
Issuing Office
Metro
Current Status
CofO Issued on 11/15/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/23/2016 APPLICANT
Assigned to Plan Check Engineer 2/16/2017 HERNAN ARREOLA
Building Plans Picked Up 3/8/2017 APPLICANT
Green Plans Picked Up 3/15/2017 APPLICANT
Disabled Access Plans Picked Up 3/17/2017 APPLICANT
Corrections Issued 3/20/2017 RICARDO SUPAN
Quality Review Completed 3/28/2017 ARMEN SARKISIAN
Applicant returned to address corrections 4/20/2017 RICARDO SUPAN
Applicant returned to address corrections 5/10/2017 RICARDO SUPAN
Applicant returned to address corrections 5/18/2017 RICARDO SUPAN
Applicant returned to address corrections 5/25/2017 RICARDO SUPAN
Applicant returned to address corrections 6/8/2017 RICARDO SUPAN
Applicant returned to address corrections 6/14/2017 RICARDO SUPAN
Applicant returned to address corrections 6/15/2017 RICARDO SUPAN
Applicant returned to address corrections 6/22/2017 RICARDO SUPAN
Applicant returned to address corrections 7/5/2017 RICARDO SUPAN
Applicant returned to address corrections 7/20/2017 RICARDO SUPAN
Plan Check Approved 10/19/2017 RICARDO SUPAN
Issued 11/30/2017 LADBS
TCO Issued (Expire Date: 08-26-2020) 2/28/2020 ROBERT COLE
TCO Issued (Expire Date: 03-09-2021) 9/10/2020 JEFFREY DURAN
CofO in Progress 8/19/2021 JEFFREY DURAN
Permit Finaled 11/15/2021 RICKEY JACKSON
CofO Issued 11/15/2021 RICKEY JACKSON
Permit Finaled 11/15/2021 RICKEY JACKSON

Permit Application Clearance Information

Address approval Cleared 5/11/2017 RAVIL MANAPOV
Eng Process Fee Ord 176,300 Cleared 5/11/2017 RAVIL MANAPOV
Driveway location Cleared 6/16/2017 VICENTE CORDERO
Internal circulation Cleared 6/16/2017 VICENTE CORDERO
Specific Plan Cleared 6/16/2017 VICENTE CORDERO
Low Impact Development Cleared 8/2/2017 MITESH PATEL
Hydrant and Access approval Cleared 8/25/2017 JOHN DALLAS
DAS Clearance Cleared 9/8/2017 RICARDO SUPAN
Highway dedication Cleared 9/18/2017 KENNETH PHAM
Green Code Cleared 9/21/2017 RUSSELL KELLY
Permit Cleared 9/28/2017 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 9/28/2017 LEE GUILBEAUX
"D" conditions Cleared 9/29/2017 ANNA VIDAL
"T" removal Cleared 9/29/2017 ANNA VIDAL
CPC Cleared 9/29/2017 ANNA VIDAL
CPC Cleared 9/29/2017 ANNA VIDAL
CPC Cleared 9/29/2017 ANNA VIDAL
Certificate of Compliance Cleared 9/29/2017 ANNA VIDAL
Miscellaneous Cleared 9/29/2017 ANNA VIDAL
Miscellaneous Cleared 9/29/2017 ANNA VIDAL
Miscellaneous Cleared 9/29/2017 ANNA VIDAL
Prkng lot landscape/Water mgmt Cleared 9/29/2017 ANNA VIDAL
Site Plan review Cleared 9/29/2017 ANNA VIDAL
Specific Plan Cleared 9/29/2017 ANNA VIDAL
Tract Map conditions Cleared 9/29/2017 ANNA VIDAL
Tract Map conditions Cleared 9/29/2017 ANNA VIDAL
Tract Map conditions Cleared 9/29/2017 ANNA VIDAL
Tract Map conditions Cleared 9/29/2017 ANNA VIDAL
ZA Case Cleared 9/29/2017 ANNA VIDAL
ZA Case Cleared 9/29/2017 ANNA VIDAL
ZA Case Cleared 9/29/2017 ANNA VIDAL
Sewer availability Cleared 10/11/2017 MARKOS PEREZ-BRAN
Building over 3-story or 36-ft Cleared 10/19/2017 CALOSHA APPROVED
Fire Marshall Fire Life Safety Cleared 10/19/2017 MENOA AGHAJANI
GPI Written Notices Cleared 10/19/2017 RICARDO SUPAN
Grading Pre-Inspection Cleared 10/19/2017 RICARDO SUPAN

Contact Information

Architect Rose, Hugh Mason; Lic. No.: C30461 144 N ORANGE STREET      ORANGE, CA 92866
Contractor Moorefield Construction Inc; Lic. No.: 397892-B 600 N TUSTIN AVENUE SUITE #210      SANTA ANA, CA 92705
Engineer Miller, Karen Lynn; Lic. No.: GE2257 5364 DORIS WY      TORRANCE, CA 90505
Engineer Schroeder, Mark Ernest; Lic. No.: S4110 16969 VON KARMAN AVE 240      IRVINE, CA 92606
Geologist Putnam, Lance Richard; Lic. No.: EG2469 25134 MARKEL DR      NEWHALL, CA 91321
Landscape Architect Larkins, David Kenneth; Lic. No.: LA4226 10335 JEFFERSON BLVD      CULVER CITY, CA 90232

Inspector Information

GREGORY POMISH, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI
EDWIN GREGORYONA, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/23/2018 Partial Inspection ROBERT COLE
Green Building Rough 5/24/2018 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 5/24/2018 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 5/24/2018 Not Ready for Inspection ROBERT COLE
Footing/Foundation/Slab 5/30/2018 Not Ready for Inspection ROBERT COLE
Green Building Rough 5/31/2018 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 5/31/2018 Partial Inspection ROBERT COLE
Verify Sprinkler Sign Off 5/31/2018 Not Ready for Inspection ROBERT COLE
Footing/Foundation/Slab 6/4/2018 Not Ready for Inspection ROBERT COLE
Footing/Foundation/Slab 6/6/2018 Partial Inspection ROBERT COLE
Footing/Foundation/Slab 6/15/2018 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 6/20/2018 Conditional Approval ROBERT COLE
Green Building Rough 6/20/2018 Not Ready for Inspection ROBERT COLE
Reinforced Masonry Frame 6/20/2018 Partial Inspection ROBERT COLE
Verify Sprinkler Sign Off 6/20/2018 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 6/21/2018 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 6/25/2018 Conditional Approval ROBERT COLE
Green Building Rough 6/25/2018 Not Ready for Inspection ROBERT COLE
Reinforced Masonry Frame 6/25/2018 Partial Inspection ROBERT COLE
Verify Sprinkler Sign Off 6/25/2018 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Masonry 6/26/2018 Conditional Approval ROBERT COLE
Masonry Wall/Backfill 6/26/2018 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 6/27/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 6/28/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 6/29/2018 Conditional Approval DANNY RODRIGUEZ
Green Building Rough 6/29/2018 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Masonry Frame 6/29/2018 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 6/29/2018 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 7/2/2018 Partial Inspection ROBERT COLE
Green Building Rough 7/3/2018 Not Ready for Inspection ROBERT COLE
Reinforced Masonry Frame 7/3/2018 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 7/3/2018 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 7/6/2018 Partial Inspection ROBERT COLE
Green Building Rough 7/9/2018 Not Ready for Inspection ROBERT COLE
Reinforced Masonry Frame 7/9/2018 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 7/9/2018 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Masonry 7/10/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 7/11/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 7/12/2018 Conditional Approval ROBERT COLE
Green Building Rough 7/12/2018 Not Ready for Inspection ROBERT COLE
Reinforced Masonry Frame 7/12/2018 Partial Inspection ROBERT COLE
Verify Sprinkler Sign Off 7/12/2018 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Masonry 7/13/2018 Conditional Approval JEFFREY DURAN
Reinforced Concrete Frame 7/13/2018 Not Ready for Inspection JEFFREY DURAN
Green Building Rough 7/16/2018 Not Ready for Inspection ROBERT COLE
Reinforced Masonry Frame 7/16/2018 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 7/16/2018 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Masonry 7/17/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 8/28/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 8/29/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 8/30/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 8/31/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 10/3/2018 Not Ready for Inspection ROBERT COLE
Green Building Rough 10/3/2018 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 10/3/2018 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 10/3/2018 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 10/4/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 10/9/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 10/10/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 10/11/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 10/12/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 10/23/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 10/24/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 10/25/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 10/26/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 10/29/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 10/29/2018 Partial Inspection ROBERT COLE
Deputy Steel/Welding 10/31/2018 Conditional Approval ROBERT COLE
Deputy Steel/Welding 11/1/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 11/1/2018 Partial Approval ROBERT COLE
Deputy Steel/Welding 11/2/2018 Conditional Approval JAMES STEPHENS
Green Building Rough 11/5/2018 Not Ready for Inspection ROBERT COLE
Structural Steel Frame 11/5/2018 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 11/5/2018 Not Ready for Inspection ROBERT COLE
Footing/Foundation/Slab 11/9/2018 Partial Approval ROBERT COLE
Green Building Rough 11/14/2018 Not Ready for Inspection ROBERT COLE
Structural Steel Frame 11/14/2018 Partial Inspection ROBERT COLE
Verify Sprinkler Sign Off 11/14/2018 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 11/16/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 11/27/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 11/28/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 11/28/2018 Partial Inspection ROBERT COLE
Green Building Rough 11/29/2018 Partial Inspection ROBERT COLE
Reinforced Concrete Frame 11/29/2018 Partial Inspection ROBERT COLE
Verify Sprinkler Sign Off 11/29/2018 Partial Inspection ROBERT COLE
Deputy Reinf. Concrete 12/3/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 12/3/2018 Partial Approval ROBERT COLE
Light Gage Steel Frame 1/4/2019 Partial Inspection ROBERT COLE
Deputy Steel/Welding 1/7/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 1/8/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 1/9/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 1/9/2019 Conditional Approval ROBERT COLE
Light Gage Steel Frame 1/11/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Steel/Welding 1/25/2019 Conditional Approval JAMES STEPHENS
Floor/Roof Diaphrgm/Shear Wall 2/4/2019 Not Ready for Inspection ROBERT COLE
Light Gage Steel Frame 2/4/2019 Not Ready for Inspection ROBERT COLE
Deputy Wood Construction 2/7/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 2/7/2019 Partial Inspection ROBERT COLE
Light Gage Steel Frame 2/7/2019 Partial Inspection ROBERT COLE
Green Building Rough 2/11/2019 No Access for Inspection ROBERT DAVIS
Reinforced Concrete Frame 2/11/2019 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 2/11/2019 No Access for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 2/26/2019 Partial Approval ROBERT COLE
Light Gage Steel Frame 2/28/2019 Corrections Issued ROBERT COLE
Green Building Rough 3/1/2019 Not Ready for Inspection ROBERT COLE
Structural Steel Frame 3/1/2019 Partial Inspection ROBERT COLE
Verify Sprinkler Sign Off 3/1/2019 Not Ready for Inspection ROBERT COLE
Deputy Steel/Welding 3/4/2019 Conditional Approval ROBERT COLE
Deputy Grading 3/8/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 3/11/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 3/12/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 3/13/2019 Conditional Approval ROBERT COLE
Light Gage Steel Frame 3/13/2019 Partial Inspection ROBERT COLE
Special/Order Compliance 3/13/2019 Partial Inspection ROBERT COLE
Deputy Fireproofing 3/14/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 3/15/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 3/18/2019 Conditional Approval ROBERT COLE
Special/Order Compliance 3/18/2019 Partial Approval ROBERT COLE
Deputy Fireproofing 3/19/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 3/20/2019 Conditional Approval ROBERT COLE
Special/Order Compliance 3/20/2019 Not Ready for Inspection ROBERT COLE
Deputy Fireproofing 3/21/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 3/26/2019 Approved DANNY RODRIGUEZ
Light Gage Steel Frame 3/26/2019 Partial Inspection DANNY RODRIGUEZ
Special/Order Compliance 3/26/2019 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Fireproofing 3/27/2019 Conditional Approval ROBERT COLE
Special/Order Compliance 3/27/2019 Partial Inspection ROBERT COLE
Deputy Fireproofing 3/28/2019 Conditional Approval ROBERT COLE
Light Gage Steel Frame 3/28/2019 Not Ready for Inspection ROBERT COLE
Special/Order Compliance 3/28/2019 Not Ready for Inspection ROBERT COLE
Deputy Fireproofing 3/29/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 4/1/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 4/1/2019 Partial Approval ROBERT COLE
Deputy Fireproofing 4/2/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 4/3/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 4/4/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 4/5/2019 Conditional Approval DANNY RODRIGUEZ
Deputy Fireproofing 4/8/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 4/9/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 4/10/2019 Conditional Approval ROBERT COLE
Insulation 4/10/2019 Not Ready for Inspection ROBERT COLE
Light Gage Steel Frame 4/10/2019 Not Ready for Inspection ROBERT COLE
Special/Order Compliance 4/10/2019 Not Ready for Inspection ROBERT COLE
Deputy Fireproofing 4/11/2019 Conditional Approval ROBERT COLE
Deputy Fireproofing 4/12/2019 Conditional Approval ROBERT COLE
Insulation 4/16/2019 Not Ready for Inspection ROBERT COLE
Interior/Exterior Lathing 4/16/2019 Partial Approval ROBERT COLE
Interior/Exterior Lathing 4/22/2019 Not Ready for Inspection ROBERT COLE
Interior/Exterior Lathing 4/23/2019 Partial Approval ROBERT COLE
Interior/Exterior Lathing 4/25/2019 Partial Inspection ROBERT COLE
Insulation 4/29/2019 Partial Approval ROBERT COLE
Interior/Exterior Lathing 4/29/2019 Not Ready for Inspection ROBERT COLE
Green Building Rough 4/30/2019 Not Ready for Inspection ROBERT COLE
Structural Steel Frame 4/30/2019 Corrections Issued ROBERT COLE
Verify Sprinkler Sign Off 4/30/2019 Not Ready for Inspection ROBERT COLE
Light Gage Steel Frame 5/1/2019 Partial Inspection ROBERT COLE
Interior/Exterior Lathing 5/6/2019 Not Ready for Inspection ROBERT COLE
Insulation 5/8/2019 Partial Approval ROBERT COLE
Interior/Exterior Lathing 5/8/2019 Partial Approval ROBERT COLE
Interior/Exterior Lathing 5/13/2019 Approved ROBERT COLE
Insulation 5/15/2019 Partial Inspection ROBERT COLE
Insulation 5/28/2019 Not Ready for Inspection ROBERT COLE
Green Building Rough 6/3/2019 Approved ROBERT COLE
Structural Steel Frame 6/3/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 6/3/2019 Not Ready for Inspection ROBERT COLE
Light Gage Steel Frame 7/29/2019 Partial Approval ROBERT COLE
T-Bar Ceiling 8/1/2019 Not Ready for Inspection ROBERT COLE
Interior/Exterior Lathing 8/6/2019 Partial Approval ROBERT COLE
T-Bar Ceiling 8/12/2019 Not Ready for Inspection ROBERT COLE
Special/Order Compliance 8/14/2019 Not Ready for Inspection ROBERT COLE
T-Bar Ceiling 8/14/2019 Partial Inspection ROBERT COLE
Drywall Nailing 9/18/2019 Not Ready for Inspection ROBERT COLE
Final 9/18/2019 Not Ready for Inspection ROBERT COLE
Footing/Foundation/Slab 9/18/2019 Not Ready for Inspection ROBERT COLE
Green Building Final 9/18/2019 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 9/18/2019 Not Ready for Inspection ROBERT COLE
Reinforced Masonry Frame 9/18/2019 Not Ready for Inspection ROBERT COLE
SGSOV-Seismic Gas S/O Valve 9/18/2019 SGSOV Not Ready ROBERT COLE
Smoke Detectors 9/18/2019 Not Ready for Inspection ROBERT COLE
Structural Steel Frame 9/18/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 9/18/2019 Not Ready for Inspection ROBERT COLE
Drywall Nailing 10/7/2019 Partial Inspection ROBERT COLE
Final 10/7/2019 Partial Inspection ROBERT COLE
Footing/Foundation/Slab 10/7/2019 Not Ready for Inspection ROBERT COLE
Green Building Final 10/7/2019 Approved ROBERT COLE
Reinforced Concrete Frame 10/7/2019 Not Ready for Inspection ROBERT COLE
Reinforced Masonry Frame 10/7/2019 Not Ready for Inspection ROBERT COLE
SGSOV-Seismic Gas S/O Valve 10/7/2019 SGSOV Not Ready ROBERT COLE
Smoke Detectors 10/7/2019 Not Ready for Inspection ROBERT COLE
Structural Steel Frame 10/7/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 10/7/2019 Not Ready for Inspection ROBERT COLE
Special/Order Compliance 11/21/2019 Not Ready for Inspection ROBERT COLE
Drywall Nailing 1/7/2020 Approved ROBERT COLE
Final 1/7/2020 Partial Inspection ROBERT COLE
Footing/Foundation/Slab 1/7/2020 Approved ROBERT COLE
Reinforced Concrete Frame 1/7/2020 Approved ROBERT COLE
Reinforced Masonry Frame 1/7/2020 Approved ROBERT COLE
SGSOV-Seismic Gas S/O Valve 1/7/2020 SGSOV Approved ROBERT COLE
Smoke Detectors 1/7/2020 Not Ready for Inspection ROBERT COLE
Structural Steel Frame 1/7/2020 Approved ROBERT COLE
Verify Sprinkler Sign Off 1/7/2020 Approved ROBERT COLE
Final 1/9/2020 Partial Inspection ROBERT COLE
Smoke Detectors 1/9/2020 Partial Inspection ROBERT COLE
Special/Order Compliance 1/10/2020 Not Ready for Inspection DANNY RODRIGUEZ
Final 1/14/2020 Not Ready for Inspection ROBERT COLE
Smoke Detectors 1/14/2020 Not Ready for Inspection ROBERT COLE
Final 1/21/2020 Not Ready for Inspection ROBERT COLE
Smoke Detectors 1/21/2020 Approved ROBERT COLE
Special/Order Compliance 1/23/2020 Not Ready for Inspection ROBERT COLE
Final 1/27/2020 Not Ready for Inspection ROBERT COLE
Special/Order Compliance 1/29/2020 Partial Approval ROBERT COLE
Final 2/27/2020 Partial Approval ROBERT COLE
Final 7/10/2020 Not Ready for Inspection ROBERT COLE
Special/Order Compliance 7/30/2020 Conditional Approval JEFFREY DURAN
Special/Order Compliance 3/1/2021 Approved HAMID PISHEHVAR