Footing/Foundation/Slab
|
5/23/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Green Building Rough
|
5/24/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Concrete Frame
|
5/24/2018
|
Partial Approval
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
5/24/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
5/30/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Green Building Rough
|
5/31/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Concrete Frame
|
5/31/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
5/31/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
6/4/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
6/6/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
6/15/2018
|
Partial Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
6/20/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Green Building Rough
|
6/20/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Masonry Frame
|
6/20/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
6/20/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Concrete Frame
|
6/21/2018
|
Partial Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
6/25/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Green Building Rough
|
6/25/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Masonry Frame
|
6/25/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
6/25/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
6/26/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Masonry Wall/Backfill
|
6/26/2018
|
Partial Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
6/27/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
6/28/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
6/29/2018
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
6/29/2018
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Masonry Frame
|
6/29/2018
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
6/29/2018
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
7/2/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Green Building Rough
|
7/3/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Masonry Frame
|
7/3/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
7/3/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Concrete Frame
|
7/6/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Green Building Rough
|
7/9/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Masonry Frame
|
7/9/2018
|
Partial Approval
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
7/9/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
7/10/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
7/11/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
7/12/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Green Building Rough
|
7/12/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Masonry Frame
|
7/12/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
7/12/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
7/13/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
7/13/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Green Building Rough
|
7/16/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Masonry Frame
|
7/16/2018
|
Partial Approval
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
7/16/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
7/17/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
8/28/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
8/29/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
8/30/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
8/31/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
10/3/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Green Building Rough
|
10/3/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Concrete Frame
|
10/3/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
10/3/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
10/4/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
10/9/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
10/10/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
10/11/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
10/12/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
10/23/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
10/24/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
10/25/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
10/26/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
10/29/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
10/29/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
10/31/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
11/1/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
11/1/2018
|
Partial Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
11/2/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Green Building Rough
|
11/5/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Structural Steel Frame
|
11/5/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
11/5/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
11/9/2018
|
Partial Approval
|
ROBERT COLE
|
|
Green Building Rough
|
11/14/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Structural Steel Frame
|
11/14/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
11/14/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
11/16/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
11/27/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
11/28/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
11/28/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Green Building Rough
|
11/29/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Reinforced Concrete Frame
|
11/29/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
11/29/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
12/3/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
12/3/2018
|
Partial Approval
|
ROBERT COLE
|
|
Light Gage Steel Frame
|
1/4/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
1/7/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
1/8/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
1/9/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
1/9/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Light Gage Steel Frame
|
1/11/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/25/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/4/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Light Gage Steel Frame
|
2/4/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Wood Construction
|
2/7/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/7/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Light Gage Steel Frame
|
2/7/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Green Building Rough
|
2/11/2019
|
No Access for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
2/11/2019
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
2/11/2019
|
No Access for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/26/2019
|
Partial Approval
|
ROBERT COLE
|
|
Light Gage Steel Frame
|
2/28/2019
|
Corrections Issued
|
ROBERT COLE
|
|
Green Building Rough
|
3/1/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Structural Steel Frame
|
3/1/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
3/1/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
3/4/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Grading
|
3/8/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/11/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/12/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/13/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Light Gage Steel Frame
|
3/13/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Special/Order Compliance
|
3/13/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/14/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/15/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/18/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Special/Order Compliance
|
3/18/2019
|
Partial Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/19/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/20/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Special/Order Compliance
|
3/20/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/21/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/26/2019
|
Approved
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
3/26/2019
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
3/26/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Fireproofing
|
3/27/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Special/Order Compliance
|
3/27/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/28/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Light Gage Steel Frame
|
3/28/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Special/Order Compliance
|
3/28/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Fireproofing
|
3/29/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
4/1/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/1/2019
|
Partial Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
4/2/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
4/3/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
4/4/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
4/5/2019
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Fireproofing
|
4/8/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
4/9/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
4/10/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Insulation
|
4/10/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Light Gage Steel Frame
|
4/10/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Special/Order Compliance
|
4/10/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Fireproofing
|
4/11/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Fireproofing
|
4/12/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Insulation
|
4/16/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Interior/Exterior Lathing
|
4/16/2019
|
Partial Approval
|
ROBERT COLE
|
|
Interior/Exterior Lathing
|
4/22/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Interior/Exterior Lathing
|
4/23/2019
|
Partial Approval
|
ROBERT COLE
|
|
Interior/Exterior Lathing
|
4/25/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Insulation
|
4/29/2019
|
Partial Approval
|
ROBERT COLE
|
|
Interior/Exterior Lathing
|
4/29/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Green Building Rough
|
4/30/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Structural Steel Frame
|
4/30/2019
|
Corrections Issued
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
4/30/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Light Gage Steel Frame
|
5/1/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Interior/Exterior Lathing
|
5/6/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Insulation
|
5/8/2019
|
Partial Approval
|
ROBERT COLE
|
|
Interior/Exterior Lathing
|
5/8/2019
|
Partial Approval
|
ROBERT COLE
|
|
Interior/Exterior Lathing
|
5/13/2019
|
Approved
|
ROBERT COLE
|
|
Insulation
|
5/15/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Insulation
|
5/28/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Green Building Rough
|
6/3/2019
|
Approved
|
ROBERT COLE
|
|
Structural Steel Frame
|
6/3/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
6/3/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Light Gage Steel Frame
|
7/29/2019
|
Partial Approval
|
ROBERT COLE
|
|
T-Bar Ceiling
|
8/1/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Interior/Exterior Lathing
|
8/6/2019
|
Partial Approval
|
ROBERT COLE
|
|
T-Bar Ceiling
|
8/12/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Special/Order Compliance
|
8/14/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
T-Bar Ceiling
|
8/14/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Drywall Nailing
|
9/18/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Final
|
9/18/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
9/18/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Green Building Final
|
9/18/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Concrete Frame
|
9/18/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Masonry Frame
|
9/18/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
SGSOV-Seismic Gas S/O Valve
|
9/18/2019
|
SGSOV Not Ready
|
ROBERT COLE
|
|
Smoke Detectors
|
9/18/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Structural Steel Frame
|
9/18/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
9/18/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Drywall Nailing
|
10/7/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Final
|
10/7/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
10/7/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Green Building Final
|
10/7/2019
|
Approved
|
ROBERT COLE
|
|
Reinforced Concrete Frame
|
10/7/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Masonry Frame
|
10/7/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
SGSOV-Seismic Gas S/O Valve
|
10/7/2019
|
SGSOV Not Ready
|
ROBERT COLE
|
|
Smoke Detectors
|
10/7/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Structural Steel Frame
|
10/7/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
10/7/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Special/Order Compliance
|
11/21/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Drywall Nailing
|
1/7/2020
|
Approved
|
ROBERT COLE
|
|
Final
|
1/7/2020
|
Partial Inspection
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
1/7/2020
|
Approved
|
ROBERT COLE
|
|
Reinforced Concrete Frame
|
1/7/2020
|
Approved
|
ROBERT COLE
|
|
Reinforced Masonry Frame
|
1/7/2020
|
Approved
|
ROBERT COLE
|
|
SGSOV-Seismic Gas S/O Valve
|
1/7/2020
|
SGSOV Approved
|
ROBERT COLE
|
|
Smoke Detectors
|
1/7/2020
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Structural Steel Frame
|
1/7/2020
|
Approved
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
1/7/2020
|
Approved
|
ROBERT COLE
|
|
Final
|
1/9/2020
|
Partial Inspection
|
ROBERT COLE
|
|
Smoke Detectors
|
1/9/2020
|
Partial Inspection
|
ROBERT COLE
|
|
Special/Order Compliance
|
1/10/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Final
|
1/14/2020
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Smoke Detectors
|
1/14/2020
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Final
|
1/21/2020
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Smoke Detectors
|
1/21/2020
|
Approved
|
ROBERT COLE
|
|
Special/Order Compliance
|
1/23/2020
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Final
|
1/27/2020
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Special/Order Compliance
|
1/29/2020
|
Partial Approval
|
ROBERT COLE
|
|
Final
|
2/27/2020
|
Partial Approval
|
ROBERT COLE
|
|
Final
|
7/10/2020
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Special/Order Compliance
|
7/30/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
3/1/2021
|
Approved
|
HAMID PISHEHVAR
|