|
Pre-Inspection
|
4/10/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
5/24/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
5/24/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Pre-Inspection
|
5/24/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
5/28/2019
|
Partial Approval
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
5/28/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
5/29/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
5/31/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
5/31/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
6/3/2019
|
Approved
|
JASON BORUTA
|
|
Deputy Reinf. Masonry
|
6/3/2019
|
Approved
|
JASON BORUTA
|
|
Masonry Wall/Backfill
|
6/3/2019
|
Partial Approval
|
JASON BORUTA
|
|
Piling/Pier/Caisson
|
6/3/2019
|
Approved
|
JASON BORUTA
|
|
Deputy Reinf. Masonry
|
6/4/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
6/5/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
6/6/2019
|
Approved
|
TONY HARTONO
|
|
Masonry Wall/Backfill
|
6/6/2019
|
Partial Approval
|
TONY HARTONO
|
|
Piling/Pier/Caisson
|
6/6/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
6/7/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
6/7/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
6/10/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
6/10/2019
|
Partial Approval
|
TONY HARTONO
|
|
Green Building Rough
|
6/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Reinforced Concrete Frame
|
6/10/2019
|
Partial Approval
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
6/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Shotcrete
|
6/11/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
6/11/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
6/12/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
6/12/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
6/12/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
6/13/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
6/13/2019
|
Approved
|
TONY HARTONO
|
|
Pre-Inspection
|
6/20/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Pre-Inspection
|
7/3/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
7/9/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
7/9/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
7/24/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Pre-Inspection
|
7/24/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Green Building Rough
|
7/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Reinforced Concrete Frame
|
7/25/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
7/25/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
8/2/2019
|
Approved
|
TONY HARTONO
|
|
Pre-Inspection
|
8/2/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
8/5/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
8/6/2019
|
Approved
|
TONY HARTONO
|
|
Green Building Rough
|
8/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Reinforced Concrete Frame
|
8/6/2019
|
Partial Approval
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
8/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
8/12/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
8/12/2019
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
8/12/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
8/13/2019
|
Approved
|
TONY HARTONO
|
|
Green Building Rough
|
8/13/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Reinforced Masonry Frame
|
8/13/2019
|
Partial Approval
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
8/13/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
8/14/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
8/15/2019
|
Conditional Approval
|
JASON BORUTA
|
|
Reinforced Concrete Frame
|
8/15/2019
|
Partial Approval
|
JASON BORUTA
|
|
Deputy Reinf. Masonry
|
8/16/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
8/19/2019
|
Approved
|
JASON BORUTA
|
|
Deputy Shotcrete
|
8/19/2019
|
Approved
|
JASON BORUTA
|
|
Masonry Wall/Backfill
|
8/19/2019
|
Partial Approval
|
JASON BORUTA
|
|
Deputy Shotcrete
|
8/20/2019
|
Approved
|
JASON BORUTA
|
|
Deputy Reinf. Concrete
|
8/21/2019
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Shotcrete
|
8/21/2019
|
Approved
|
JASON BORUTA
|
|
Pre-Inspection
|
8/26/2019
|
Approved
|
JASON BORUTA
|
|
Pre-Inspection
|
9/5/2019
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
9/12/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/20/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
9/20/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
9/30/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
10/1/2019
|
Corrections Issued
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
10/2/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
10/3/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
10/3/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
10/4/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
10/10/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
10/11/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
10/11/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
10/15/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Masonry Wall/Backfill
|
10/18/2019
|
Partial Approval
|
TONY HARTONO
|
|
Pre-Inspection
|
10/18/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Pre-Inspection
|
10/23/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Pre-Inspection
|
10/28/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Drywall Nailing
|
11/12/2019
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
11/12/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/15/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
11/21/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/4/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
12/16/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/23/2019
|
Partial Approval
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/6/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/9/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/29/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
1/30/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/31/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
2/11/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
2/13/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/13/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
2/27/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
2/28/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/28/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
3/3/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/4/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
3/9/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/18/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
3/20/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/24/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
3/24/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/1/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/1/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
4/1/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/15/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Wall Anchors
|
4/17/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/24/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/24/2020
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
4/29/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
5/5/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/8/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
5/8/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/12/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
5/26/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
5/29/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
6/15/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
6/16/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Wood Frame
|
6/19/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/26/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/29/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
7/13/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
7/15/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
7/15/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
7/15/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
7/31/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
8/5/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/10/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
8/11/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
8/13/2020
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
8/17/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
8/18/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
8/26/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Pre-Inspection
|
9/2/2020
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
9/8/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Pre-Inspection
|
9/11/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Pre-Inspection
|
9/18/2020
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Green Building Rough
|
9/22/2020
|
Approved
|
JOHN DODGE
|
|
Verify Sprinkler Sign Off
|
9/22/2020
|
Approved
|
JOHN DODGE
|
|
Wood Frame
|
9/22/2020
|
Partial Approval
|
JOHN DODGE
|
|
Pre-Inspection
|
9/24/2020
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
9/29/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Pre-Inspection
|
9/30/2020
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
10/9/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
10/16/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
10/19/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
10/23/2020
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
11/4/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
11/9/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
12/8/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
12/14/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
12/22/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
12/29/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
12/31/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
1/6/2021
|
Partial Approval
|
NICK LAROCCA
|
|
Wood Frame
|
1/8/2021
|
Partial Approval
|
NICK LAROCCA
|
|
Insulation
|
1/14/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
1/20/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
1/26/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
1/29/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
2/4/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
2/4/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
2/5/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
2/17/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
2/17/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
2/22/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
2/23/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
2/26/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
3/12/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
3/19/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
3/25/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
3/30/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
4/1/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
4/16/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
4/26/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/28/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
5/5/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
5/26/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
5/28/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
6/1/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
6/14/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
6/18/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
6/29/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/22/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
8/19/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
9/2/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
9/2/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
9/14/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
10/4/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
10/28/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
11/8/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
12/8/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Final
|
12/8/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
12/8/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Final
|
12/8/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
12/8/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
12/8/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
12/8/2021
|
Approved
|
JEFF BYTHEWAY
|
|
SGSOV-Seismic Gas S/O Valve
|
12/8/2021
|
SGSOV Approved
|
JEFF BYTHEWAY
|
|
Smoke Detectors
|
12/8/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Structural Steel Frame
|
12/8/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Wood Frame
|
12/8/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
3/16/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/25/2022
|
Off-Hour Fees Due
|
|
|
Final
|
3/25/2022
|
Off-Hour Fees Due
|
|
|
Green Building Final
|
3/25/2022
|
Off-Hour Fees Due
|
|
|
Pre-Inspection
|
3/25/2022
|
Off-Hour Fees Due
|
|
|
Green Building Final
|
3/29/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
3/29/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
3/29/2022
|
Off-Hour Fees Due
|
|
|
Drywall Nailing
|
3/30/2022
|
Off-Hour Fees Due
|
|
|
Final
|
3/30/2022
|
Off-Hour Fees Due
|
|
|
Green Building Final
|
3/30/2022
|
Off-Hour Fees Due
|
|
|
Pre-Inspection
|
4/5/2022
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/23/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Final
|
4/23/2022
|
Conditional Approval
|
JEFF BYTHEWAY
|