1400 N CAHUENGA BLVD 90028

Certificate Information: 1400 N CAHUENGA BLVD 90028

Application / Permit
16010-10000-05898
Plan Check / Job No.
B16LA20080
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
NEW 8 STORY HOTEL WITH RESTAURANT AT GROUND FLOOR (CORE&SHELL ONLY) AND TOP LEVEL AMENITY WITH THREE SUBTERRANEAN GARAGE BASEMENTS. 4TH FLOOR USE IS FOR MECHANICAL USE ONLY.
Permit Issued
Issued on 9/15/2017
Issuing Office
Metro
Current Status
CofO Issued on 8/30/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/19/2016 APPLICANT
Assigned to Plan Check Engineer 1/26/2017 ARMEN JIVALAGIAN
Green Plans Picked Up 1/30/2017 APPLICANT
Disabled Access Plans Picked Up 2/1/2017 APPLICANT
Corrections Issued 2/9/2017 ARMEN JIVALAGIAN
Quality Review Completed 2/16/2017 BILL STUTSMAN
Building Plans Picked Up 2/21/2017 APPLICANT
Applicant returned to address corrections 4/11/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 4/20/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 4/24/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 5/1/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 5/8/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 5/17/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 5/22/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 6/5/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 6/19/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 7/3/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 7/17/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 8/14/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 8/28/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 9/12/2017 ARMEN JIVALAGIAN
Plan Check Approved 9/15/2017 ARMEN JIVALAGIAN
Issued 9/15/2017 LADBS
TCO Issued (Expire Date: 02-21-2022) 8/25/2021 ERNESTO CORRAL
TCO Issued (Expire Date: 08-23-2022) 2/24/2022 TED RIES
TCO Issued (Expire Date: 02-19-2023) 8/23/2022 TERRY HERR
CofO in Progress 8/30/2022 TERRY HERR
CofO in Progress 8/30/2022 TERRY HERR
Permit Finaled 8/30/2022 TERRY HERR
CofO Issued 8/30/2022 TERRY HERR
Permit Finaled 8/30/2022 TERRY HERR

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/2/2017 CARLA VALLADARES
Address approval Cleared 3/29/2017 ALFREDO JARA
Sewer availability Cleared 3/29/2017 ALFREDO JARA
Encroachment in public way Cleared 5/16/2017 JAMES KHO
Marquee approval Cleared 5/16/2017 JAMES KHO
Green Code Cleared 5/25/2017 DONALD CRICHLOW
Hydrant and Access approval Cleared 5/31/2017 ROBERT DUFF
Internal circulation Cleared 5/31/2017 TAIMOUR TANAVOLI
Marquee approval - CUL Cleared 6/20/2017 HAROOT AVANESIAN
Bicycle Parking Cleared 7/17/2017 JAMES KHO
DAS Clearance Cleared 8/16/2017 WAI LAU
Transportation Demand Ord. Cleared 8/23/2017 JOHNATHAN YU
"D" conditions Cleared 8/24/2017 NORALI MARTINEZ
Miscellaneous Cleared 8/24/2017 NORALI MARTINEZ
Miscellaneous Cleared 8/24/2017 NORALI MARTINEZ
Miscellaneous Cleared 8/24/2017 NORALI MARTINEZ
Site Plan review Cleared 8/24/2017 NORALI MARTINEZ
Tract Map conditions Cleared 8/24/2017 NORALI MARTINEZ
ZI Cleared 8/24/2017 NORALI MARTINEZ
ZA Case Cleared 8/28/2017 NORALI MARTINEZ
Building over 3-story or 36-ft Cleared 8/29/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/29/2017 CALOSHA APPROVED
Construction near power lines Cleared 8/31/2017 ERNEST FRESQUEZ
Construction within easement Cleared 8/31/2017 ERNEST FRESQUEZ
Food Service Establishment Cleared 8/31/2017 KENNETH BROWNE
Highway dedication Cleared 9/5/2017 CELINA MORENO
Project located in CRA area Cleared 9/8/2017 CRAIG BULLOCK
Fire Marshall Fire Life Safety Cleared 9/12/2017 DOMINIQUE MEDINA
Low Impact Development Cleared 9/12/2017 MICHAEL SCADUTO
Work Adjacent to Public Way Cleared 9/14/2017 TERRY PHAN
Miscellaneous Cleared 9/15/2017 ARMEN JIVALAGIAN
Office of Finance Referral Cleared 9/15/2017 CAROLINA GUARDADO
Permit Cleared 9/15/2017 TERRY PHAN
Roof/Waste drainage to street Cleared 9/15/2017 TERRY PHAN

Contact Information

Architect Ha, Simon Y; Lic. No.: C31188 7902 LOUISE LANE      LA PALMA, CA 90623
Contractor Davis / Reed Construction Inc; Lic. No.: 813480-B 12250 EL CAMINO REAL #240      SAN DIEGO, CA 92130
Engineer Cefali, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Hassan, Mohamed Ali; Lic. No.: S5285 3621 HARBOR BLVD STE 125      SANTA ANA, CA 92704
Engineer Petroni, Matthew Brian; Lic. No.: C69473 1809 GOODMAN AVE      REDONDO BEACH, CA 90278
Engineer Walter, Scott John; Lic. No.: GE2476 14428 HAMLIN ST STE 200      VAN NUYS, CA 91401

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Steel/Welding 10/16/2017 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 10/17/2017 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 10/18/2017 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 10/31/2017 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 11/1/2017 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 11/6/2017 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 11/13/2017 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 12/20/2017 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 12/20/2017 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 12/21/2017 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 12/22/2017 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 12/28/2017 Not Ready for Inspection JEFF BYTHEWAY
Footing/Foundation/Slab 12/28/2017 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 1/2/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 1/2/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/3/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 1/3/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/4/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 1/4/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/5/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 1/5/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 1/8/2018 Not Ready for Inspection JEFF BYTHEWAY
Green Building Rough 1/10/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 1/10/2018 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 1/10/2018 Not Ready for Inspection JEFF BYTHEWAY
Green Building Rough 1/11/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 1/11/2018 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 1/11/2018 OK to Expire Permit JEFF BYTHEWAY
Footing/Foundation/Slab 1/12/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 1/26/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 1/26/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 1/29/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 2/1/2018 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 2/2/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/5/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 2/16/2018 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 2/23/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 2/26/2018 Conditional Approval TED RIES
Deputy Shotcrete 2/26/2018 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/27/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/27/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 2/27/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 2/28/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/28/2018 Approved JEFF BYTHEWAY
Green Building Rough 2/28/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 2/28/2018 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 2/28/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 3/1/2018 Conditional Approval TED RIES
Deputy Shotcrete 3/1/2018 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/2/2018 Conditional Approval TED RIES
Deputy Shotcrete 3/2/2018 Conditional Approval TED RIES
Footing/Foundation/Slab 3/16/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 3/19/2018 Approved JEFF BYTHEWAY
Special/Order Compliance 3/22/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 3/23/2018 Partial Approval JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/24/2018 Partial Approval JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/26/2018 Partial Approval JEFF BYTHEWAY
Green Building Rough 3/27/2018 No Access for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 3/27/2018 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 3/27/2018 Not Ready for Inspection JEFF BYTHEWAY
Green Building Rough 4/4/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 4/4/2018 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 4/4/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/6/2018 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/18/2018 Conditional Approval TED RIES
Green Building Rough 4/24/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 4/24/2018 Partial Approval JEFF BYTHEWAY
Green Building Rough 4/30/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 4/30/2018 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 5/16/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/17/2018 Approved JEFF BYTHEWAY
Deputy Other (see comments) 5/18/2018 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 5/18/2018 Approved JEFF BYTHEWAY
Special/Order Compliance 5/18/2018 Approved TED RIES
Deputy Steel/Welding 5/21/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/22/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/23/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/24/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/25/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/29/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/30/2018 Conditional Approval JEFF BYTHEWAY
Masonry Wall/Backfill 5/30/2018 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 5/31/2018 No Access for Inspection TED RIES
Masonry Wall/Backfill 5/31/2018 No Access for Inspection TED RIES
Deputy Reinf. Masonry 6/1/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/1/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/4/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/5/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/6/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/6/2018 Approved JEFF BYTHEWAY
Green Building Rough 6/6/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 6/6/2018 Partial Approval JEFF BYTHEWAY
Reinforced Masonry Frame 6/6/2018 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/7/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/7/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 6/7/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/8/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/8/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/11/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/13/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/13/2018 Approved JEFF BYTHEWAY
Green Building Rough 6/13/2018 Not Ready for Inspection JEFF BYTHEWAY
Masonry Wall/Backfill 6/13/2018 Partial Approval JEFF BYTHEWAY
Reinforced Concrete Frame 6/13/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/14/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/14/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/15/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/15/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/18/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/19/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/20/2018 Approved JEFF BYTHEWAY
Green Building Rough 6/20/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 6/20/2018 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 6/21/2018 Approved JEFF BYTHEWAY
Masonry Wall/Backfill 6/21/2018 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 6/22/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/25/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/26/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/27/2018 Approved JEFF BYTHEWAY
Masonry Wall/Backfill 6/27/2018 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 6/28/2018 Approved JEFF BYTHEWAY
Green Building Rough 6/28/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 6/28/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/29/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/29/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 6/29/2018 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 7/3/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/5/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/6/2018 Approved JEFF BYTHEWAY
Green Building Rough 7/9/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 7/9/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Masonry Frame 7/9/2018 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 7/10/2018 Approved JEFF BYTHEWAY
Green Building Rough 7/11/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 7/11/2018 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 7/13/2018 Partial Inspection JEFF BYTHEWAY
Deputy Steel/Welding 7/16/2018 Approved JEFF BYTHEWAY
Deputy Fireproofing 7/17/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/17/2018 Approved JEFF BYTHEWAY
Green Building Rough 7/17/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 7/17/2018 Partial Approval JEFF BYTHEWAY
Deputy Fireproofing 7/18/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/18/2018 Approved JEFF BYTHEWAY
Deputy Fireproofing 7/19/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/19/2018 Approved JEFF BYTHEWAY
Deputy Fireproofing 7/20/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/20/2018 Approved JEFF BYTHEWAY
Special/Order Compliance 7/23/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/24/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 7/24/2018 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 7/24/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/25/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 7/25/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/25/2018 Approved JEFF BYTHEWAY
Green Building Rough 7/25/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 7/25/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/26/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 7/26/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/26/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/27/2018 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/1/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 8/1/2018 Not Ready for Inspection LARRY ARNICK
Wall Anchors 8/1/2018 Partial Approval LARRY ARNICK
Deputy Steel/Welding 8/2/2018 Approved JEFF BYTHEWAY
Wall Anchors 8/2/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/9/2018 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 8/15/2018 Partial Inspection JEFF BYTHEWAY
Green Building Rough 8/27/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 8/27/2018 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 8/30/2018 Approved JEFF BYTHEWAY
Green Building Rough 8/30/2018 Not Ready for Inspection JEFF BYTHEWAY
Structural Steel Frame 8/30/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 9/10/2018 Approved JEFF BYTHEWAY
Green Building Rough 9/10/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 9/10/2018 Partial Approval JEFF BYTHEWAY
Drywall Nailing 9/25/2018 Partial Approval JEFF BYTHEWAY
Green Building Rough 9/26/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 9/26/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Masonry Frame 9/26/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 9/28/2018 Approved TED RIES
Footing/Foundation/Slab 9/28/2018 Partial Approval TED RIES
Drywall Nailing 10/5/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 10/12/2018 Approved JEFF BYTHEWAY
Drywall Nailing 10/12/2018 Partial Approval JEFF BYTHEWAY
Green Building Rough 10/12/2018 Not Ready for Inspection JEFF BYTHEWAY
Light Gage Steel Frame 10/12/2018 Partial Approval JEFF BYTHEWAY
Reinforced Concrete Frame 10/12/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 10/15/2018 Approved JEFF BYTHEWAY
Drywall Nailing 10/15/2018 Not Ready for Inspection JEFF BYTHEWAY
Light Gage Steel Frame 10/15/2018 Not Ready for Inspection JEFF BYTHEWAY
Light Gage Steel Frame 10/23/2018 Not Ready for Inspection JEFF BYTHEWAY
Light Gage Steel Frame 10/31/2018 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 11/7/2018 Corrections Issued JEFF BYTHEWAY
Footing/Foundation/Slab 11/16/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 11/19/2018 Approved JEFF BYTHEWAY
Pre-Inspection 12/17/2018 Approved JEFF BYTHEWAY
Deputy Fireproofing 12/19/2018 Approved JEFF BYTHEWAY
Deputy Fireproofing 12/20/2018 Approved JEFF BYTHEWAY
Deputy Fireproofing 12/21/2018 Approved JEFF BYTHEWAY
Light Gage Steel Frame 1/9/2019 Partial Inspection JEFF BYTHEWAY
Light Gage Steel Frame 1/23/2019 Partial Inspection JEFF BYTHEWAY
Light Gage Steel Frame 1/31/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 2/6/2019 Partial Inspection JEFF BYTHEWAY
Green Building Rough 2/8/2019 Not Ready for Inspection JEFF BYTHEWAY
Structural Steel Frame 2/8/2019 Partial Inspection JEFF BYTHEWAY
Light Gage Steel Frame 2/19/2019 Partial Inspection JEFF BYTHEWAY
Insulation 3/7/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 3/11/2019 Partial Approval JEFF BYTHEWAY
Insulation 3/13/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 3/15/2019 Partial Approval JEFF BYTHEWAY
Insulation 3/18/2019 Partial Inspection JEFF BYTHEWAY
Drywall Nailing 3/26/2019 Partial Approval JEFF BYTHEWAY
Insulation 3/26/2019 Corrections Issued JEFF BYTHEWAY
Light Gage Steel Frame 3/26/2019 Partial Approval JEFF BYTHEWAY
T-Bar Ceiling 3/26/2019 Partial Inspection JEFF BYTHEWAY
T-Bar Ceiling 4/4/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 4/11/2019 Partial Inspection JEFF BYTHEWAY
Drywall Nailing 4/16/2019 Conditional Approval JEFF BYTHEWAY
Light Gage Steel Frame 4/22/2019 Partial Inspection JEFF BYTHEWAY
T-Bar Ceiling 4/22/2019 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 4/23/2019 Partial Approval JEFF BYTHEWAY
Insulation 4/29/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/1/2019 Approved JEFF BYTHEWAY
Deputy Fireproofing 5/2/2019 Approved JEFF BYTHEWAY
Light Gage Steel Frame 5/2/2019 Partial Inspection JEFF BYTHEWAY
T-Bar Ceiling 5/2/2019 Partial Approval JEFF BYTHEWAY
Deputy Fireproofing 5/3/2019 Approved JEFF BYTHEWAY
Light Gage Steel Frame 5/7/2019 Not Ready for Inspection JEFF BYTHEWAY
Light Gage Steel Frame 5/9/2019 Partial Approval JEFF BYTHEWAY
T-Bar Ceiling 5/21/2019 Partial Inspection HAMID PISHEHVAR
T-Bar Ceiling 5/23/2019 Corrections Issued JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 5/29/2019 Corrections Issued JEFF BYTHEWAY
T-Bar Ceiling 6/6/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 6/10/2019 Partial Approval JEFF BYTHEWAY
Deputy Fireproofing 6/12/2019 Approved JEFF BYTHEWAY
Deputy Fireproofing 6/13/2019 Approved JEFF BYTHEWAY
Deputy Fireproofing 6/14/2019 Approved JEFF BYTHEWAY
Pre-Inspection 6/17/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 6/20/2019 Corrections Issued JEFF BYTHEWAY
Light Gage Steel Frame 7/2/2019 Partial Inspection JEFF BYTHEWAY
Light Gage Steel Frame 7/8/2019 Partial Approval JEFF BYTHEWAY
Pre-Inspection 7/8/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 7/11/2019 Partial Approval JEFF BYTHEWAY
Insulation 7/19/2019 Corrections Issued JEFF BYTHEWAY
Light Gage Steel Frame 7/23/2019 Partial Inspection JEFF BYTHEWAY
Green Building Rough 7/30/2019 Conditional Approval DANIEL MC AULIFFE
Structural Steel Frame 7/30/2019 Not Ready for Inspection DANIEL MC AULIFFE
Green Building Rough 8/2/2019 Not Ready for Inspection JAMES POWERS
Insulation 8/2/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/6/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 8/8/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 8/14/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 8/22/2019 Corrections Issued JEFF BYTHEWAY
Drywall Nailing 8/29/2019 Partial Inspection JEFF BYTHEWAY
Green Building Rough 8/29/2019 Not Ready for Inspection JEFF BYTHEWAY
Insulation 9/4/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 9/9/2019 Partial Approval JEFF BYTHEWAY
Insulation 9/16/2019 Not Ready for Inspection JEFF BYTHEWAY
Light Gage Steel Frame 9/16/2019 Partial Inspection JEFF BYTHEWAY
Interior/Exterior Lathing 9/18/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 9/18/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 9/25/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 9/26/2019 Not Ready for Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 9/27/2019 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 10/2/2019 Not Ready for Inspection JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 10/7/2019 Partial Approval JEFF BYTHEWAY
Pre-Inspection 10/9/2019 Not Ready for Inspection JEFF BYTHEWAY
Insulation 10/11/2019 Not Ready for Inspection JEFF BYTHEWAY
Insulation 10/15/2019 Partial Inspection JEFF BYTHEWAY
Insulation 10/17/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 10/21/2019 Partial Inspection JEFF BYTHEWAY
Light Gage Steel Frame 10/23/2019 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 10/28/2019 Partial Approval JEFF BYTHEWAY
Special/Order Compliance 11/6/2019 Approved DAVID BURKHEAD
Special/Order Compliance 11/6/2019 Approved JEFF BYTHEWAY
Insulation 11/12/2019 Partial Inspection DAVID BURKHEAD
Insulation 11/14/2019 Partial Approval DAVID BURKHEAD
Insulation 11/19/2019 Corrections Issued DAVID BURKHEAD
Light Gage Steel Frame 11/19/2019 Partial Approval DAVID BURKHEAD
Insulation 11/26/2019 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/2/2019 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/3/2019 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/4/2019 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 12/6/2019 Partial Inspection DAVID BURKHEAD
Insulation 12/9/2019 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 12/18/2019 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 12/27/2019 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/30/2019 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/9/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/14/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/15/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/21/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/21/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/24/2020 Corrections Issued DAVID BURKHEAD
Light Gage Steel Frame 1/27/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/28/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/31/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 2/7/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/7/2020 Partial Approval DAVID BURKHEAD
Insulation 2/14/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/14/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/19/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/25/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/26/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/4/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/5/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/18/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/27/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/1/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/7/2020 Partial Approval DAVID BURKHEAD
Insulation 4/9/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/14/2020 Not Ready for Inspection DAVID BURKHEAD
Insulation 4/15/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/15/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/7/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/14/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 5/19/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/28/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 6/10/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/22/2020 Partial Inspection DAVID BURKHEAD
Insulation 6/25/2020 Not Ready for Inspection DAVID BURKHEAD
Insulation 6/30/2020 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 7/7/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/14/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/16/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/21/2020 Partial Approval DAVID BURKHEAD
Insulation 7/23/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/28/2020 Partial Approval DAVID BURKHEAD
Insulation 8/3/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/7/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/4/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 10/6/2020 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/14/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 10/21/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/26/2020 Conditional Approval DAVID BURKHEAD
Final 10/26/2020 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/26/2020 Approved DAVID BURKHEAD
Green Building Final 10/26/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 10/26/2020 Approved DAVID BURKHEAD
Reinforced Concrete Frame 10/26/2020 Conditional Approval DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 10/26/2020 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 10/26/2020 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 10/26/2020 Approved DAVID BURKHEAD
Light Gage Steel Frame 10/29/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/5/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/10/2020 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 11/30/2020 Approved DAVID BURKHEAD
Final 12/14/2020 Partial Inspection DAVID BURKHEAD
Green Building Final 12/14/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/14/2020 Approved DAVID BURKHEAD
Smoke Detectors 12/14/2020 Partial Inspection DAVID BURKHEAD
Final 12/22/2020 Partial Inspection DAVID BURKHEAD
Green Building Final 12/22/2020 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 12/22/2020 Partial Inspection DAVID BURKHEAD
Pre-Inspection 12/29/2020 Partial Approval DAVID BURKHEAD
Special/Order Compliance 1/4/2021 Approved DAVID BURKHEAD
Final 1/8/2021 Partial Inspection DAVID BURKHEAD
Green Building Final 1/8/2021 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 1/8/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/28/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 2/16/2021 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 2/25/2021 Approved DAVID BURKHEAD
Pre-Inspection 3/11/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 3/12/2021 Approved DAVID BURKHEAD
Pre-Inspection 3/30/2021 Approved DAVID BURKHEAD
Pre-Inspection 4/1/2021 Corrections Issued DAVID BURKHEAD
Pre-Inspection 4/20/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 7/8/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 7/20/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 7/22/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 7/28/2021 Partial Inspection DANIEL MC AULIFFE
Final 8/2/2021 Partial Inspection DAVID BURKHEAD
Green Building Final 8/2/2021 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 8/2/2021 Approved DAVID BURKHEAD
Pre-Inspection 8/6/2021 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 8/19/2021 Partial Approval DAVID BURKHEAD
Final 8/25/2021 OK to Issue CofO DAVID BURKHEAD
Green Building Final 8/25/2021 Approved DAVID BURKHEAD
Special/Order Compliance 1/27/2022 Approved DAVID BURKHEAD
Special/Order Compliance 2/3/2022 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 7/26/2022 Approved DAVID BURKHEAD