1750 N GLENDALE BLVD 90026

Certificate Information: 1750 N GLENDALE BLVD 90026

Application / Permit
16010-10000-05634
Plan Check / Job No.
B16LA19459
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 62 UNIT 4 STORY V-A APARTMENT WITH 8 LIVE/WORK UNIT OVER 1 I-A LEVEL AND 2 SUBTERRANEAN LEVEL GARAGE PER CPC-2015-3674-DB-SPR-ZAI. DENISTY BONUS WITH 8 UNITS VERY LOW INCOME.
Permit Issued
Issued on 6/29/2018
Issuing Office
Metro
Current Status
CofO Issued on 6/1/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/21/2016 APPLICANT
Disabled Access Plans Picked Up 1/17/2017 APPLICANT
Assigned to Plan Check Engineer 1/19/2017 ARMEN JIVALAGIAN
Corrections Issued 2/22/2017 ARMEN JIVALAGIAN
Quality Review Completed 3/9/2017 BILL STUTSMAN
Building Plans Picked Up 3/10/2017 APPLICANT
Green Plans Picked Up 4/24/2017 APPLICANT
Applicant returned to address corrections 6/29/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 7/17/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 8/14/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 8/30/2017 ARMEN JIVALAGIAN
Applicant returned to address corrections 2/21/2018 ARMEN JIVALAGIAN
Applicant returned to address corrections 3/7/2018 ARMEN JIVALAGIAN
Plan Check Approved 6/28/2018 ARMEN JIVALAGIAN
Issued 6/29/2018 LADBS
TCO Issued (Expire Date: 05-29-2023) 11/30/2022 ERNESTO CORRAL
CofO in Progress 5/24/2023 NICK DANERI
CofO Issued 6/1/2023 ERNESTO CORRAL
Permit Finaled 6/1/2023 ERNESTO CORRAL

Permit Application Clearance Information

Construction near power lines Cleared 5/24/2017 ERNEST FRESQUEZ
Construction within easement Cleared 5/24/2017 ERNEST FRESQUEZ
Address approval Cleared 6/23/2017 FATIMA GUERRA
Eng Process Fee Ord 176,300 Cleared 6/23/2017 FATIMA GUERRA
Highway dedication Cleared 6/29/2017 ROCHELLE DUNGCA
Internal circulation Cleared 7/5/2017 EILEEN HUNT
Building over 3-story or 36-ft Cleared 8/30/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/30/2017 CALOSHA APPROVED
Hydrant and Access approval Cleared 8/30/2017 JOHN CONNEALLY
Low Impact Development Cleared 8/31/2017 IDA MEISAMI-FARD
Roof/Waste drainage to street Cleared 8/31/2017 NAZILA NOORIFAR
Encroachment in public way Cleared 9/5/2017 JACOB BIGLER
Sewer availability Cleared 9/8/2017 JOHN LIN
Disturb/Remove Protected Trees Cleared 11/1/2017 LUIS TORRES
Permit Cleared 11/15/2017 ZEMAMU GEBREWOLD
Work Adjacent to Public Way Cleared 11/29/2017 CHIU TAM
Green Code Cleared 12/8/2017 WILLIAM ROSE
Fire Marshall Fire Life Safety Cleared 12/13/2017 OSCAR SALGADO JR
DCP conditions approval Cleared 1/26/2018 KENNETH LE
Housing density bonus Cleared 1/26/2018 KENNETH LE
DAS Clearance Cleared 6/13/2018 CHOI YAN
"Q" conditions Cleared 6/19/2018 ULISES GONZALEZ
CPC Cleared 6/19/2018 ULISES GONZALEZ
Miscellaneous Cleared 6/19/2018 AVALYN KAMACHI
Miscellaneous Cleared 6/19/2018 ULISES GONZALEZ
Miscellaneous Cleared 6/19/2018 ULISES GONZALEZ
Opn space landscape/Water mgmt Cleared 6/19/2018 ULISES GONZALEZ
Site Plan review Cleared 6/21/2018 ULISES GONZALEZ
ZI Cleared 6/21/2018 ULISES GONZALEZ
GPI Written Notices Cleared 6/25/2018 ARMEN JIVALAGIAN
Grading Pre-Inspection Cleared 6/25/2018 ARMEN JIVALAGIAN
Bicycle Parking Cleared 6/28/2018 ADRIAN SANCHEZ

Contact Information

Contractor Owner-Builder       ,
Engineer Knur, Reinard Thomas; Lic. No.: GE2755 1435 MONCADO DR      GLENDALE, CA 91207
Engineer Krief, Dan Dov; Lic. No.: C76041 1450 S BEVERLY DR 305      LOS ANGELES, CA 90035
Engineer Mehta, Manish Jitendra; Lic. No.: C54381 16600 SHERMAN WAY STE 180      VAN NUYS, CA 91406

Inspector Information

LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JEFFREY FULTON, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 7/13/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/13/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/16/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/17/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/17/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/18/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/23/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/23/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 7/23/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/24/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 7/24/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/25/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/25/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/26/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/26/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 7/26/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/27/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/27/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/30/2018 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 7/30/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 8/1/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/1/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 8/1/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 8/2/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/2/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/3/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/6/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/8/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 8/8/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 8/9/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/14/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/15/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/16/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/22/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 8/22/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 8/23/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/23/2018 Conditional Approval ERNESTO CORRAL
Piling/Pier/Caisson 8/23/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 8/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/29/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/29/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/30/2018 Conditional Approval NICK DANERI
Deputy Shotcrete 8/30/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/31/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/31/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 9/5/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 9/6/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/24/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 9/26/2018 No Access for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 10/1/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 10/1/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 10/2/2018 Conditional Approval ERNESTO CORRAL
Green Building Rough 10/2/2018 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 10/2/2018 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 10/2/2018 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 10/3/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/5/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/9/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 10/9/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 10/10/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 10/11/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 10/12/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 10/15/2018 Partial Approval JAMES POWERS
Green Building Rough 10/15/2018 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 10/15/2018 Not Ready for Inspection JAMES POWERS
Deputy Shotcrete 10/16/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 10/17/2018 Conditional Approval ERNESTO CORRAL
Green Building Rough 10/17/2018 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 10/17/2018 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 10/17/2018 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 10/18/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/19/2018 Partial Approval JAMES POWERS
Green Building Rough 10/19/2018 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 10/19/2018 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 10/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 10/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/26/2018 Conditional Approval ERNESTO CORRAL
Green Building Rough 10/26/2018 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 10/26/2018 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 10/26/2018 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 10/29/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 11/1/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 11/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/5/2018 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 11/5/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 11/19/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 11/20/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 11/27/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/30/2018 Conditional Approval ERNESTO CORRAL
Green Building Rough 11/30/2018 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 11/30/2018 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 11/30/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 12/4/2018 Conditional Approval ERNESTO CORRAL
Green Building Rough 12/10/2018 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 12/10/2018 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 12/10/2018 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 12/11/2018 Conditional Approval ERNESTO CORRAL
Green Building Rough 12/13/2018 Approved ERNESTO CORRAL
Reinforced Concrete Frame 12/13/2018 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 12/13/2018 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 12/17/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 12/17/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 12/17/2018 Partial Inspection ERNESTO CORRAL
Deputy Shotcrete 12/18/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/19/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 12/19/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 12/20/2018 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 12/20/2018 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 12/20/2018 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 12/26/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/28/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/28/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 1/2/2019 Not Ready for Inspection TED RIES
Pre-Inspection 1/2/2019 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 1/4/2019 Approved TED RIES
Masonry Wall/Backfill 1/4/2019 Partial Approval TED RIES
Deputy Reinf. Concrete 1/7/2019 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 1/14/2019 No Access for Inspection ERNESTO CORRAL
Reinforced Masonry Frame 1/14/2019 No Access for Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 1/14/2019 No Access for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 1/15/2019 Partial Inspection ERNESTO CORRAL
Reinforced Masonry Frame 1/15/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 1/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/23/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/24/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/25/2019 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 1/25/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 1/25/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 1/28/2019 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 1/29/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/31/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 1/31/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 2/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/7/2019 Approved TED RIES
Reinforced Concrete Frame 2/7/2019 Partial Approval TED RIES
Structural Steel Frame 2/7/2019 Partial Approval TED RIES
Verify Sprinkler Sign Off 2/7/2019 Not Ready for Inspection TED RIES
Deputy Drilled-In Anchors 2/8/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/13/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/22/2019 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 3/11/2019 Not Ready for Inspection ERNESTO CORRAL
Reinforced Masonry Frame 3/11/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 3/13/2019 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 3/13/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 3/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/21/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/22/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/28/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/29/2019 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 3/29/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 4/1/2019 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 4/1/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 4/2/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 4/3/2019 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 4/4/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 4/4/2019 Not Ready for Inspection ERNESTO CORRAL
Wood Frame 4/8/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Masonry 4/9/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 4/10/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 4/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 4/26/2019 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 4/26/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 5/6/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 5/9/2019 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 5/10/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 5/14/2019 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 5/29/2019 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 5/31/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/4/2019 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 6/4/2019 Partial Approval JEFFREY FULTON
Deputy Reinf. Concrete 6/7/2019 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 6/10/2019 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 6/10/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 6/11/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/11/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 6/11/2019 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 6/13/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 6/13/2019 Partial Inspection ERNESTO CORRAL
Masonry Wall/Backfill 6/14/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Masonry 6/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/21/2019 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 6/21/2019 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 6/25/2019 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 6/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 6/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/28/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 7/1/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 7/1/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 7/9/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 7/9/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 7/10/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Masonry 7/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 7/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 7/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 7/23/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 7/25/2019 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/26/2019 Partial Inspection ERNESTO CORRAL
Reinforced Masonry Frame 7/26/2019 Partial Inspection ERNESTO CORRAL
Deputy Steel/Welding 7/29/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 8/5/2019 Partial Inspection ERNESTO CORRAL
Insulation 8/5/2019 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 8/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 8/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/21/2019 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/21/2019 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/26/2019 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 8/27/2019 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 9/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 9/4/2019 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/19/2019 Partial Inspection ERNESTO CORRAL
Masonry Wall/Backfill 9/19/2019 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 9/26/2019 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 10/1/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 10/3/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 10/18/2019 Partial Inspection ERNESTO CORRAL
Insulation 10/18/2019 Partial Inspection ERNESTO CORRAL
Insulation 11/8/2019 Partial Inspection ERNESTO CORRAL
Insulation 11/26/2019 Not Ready for Inspection ERNESTO CORRAL
Light Gage Steel Frame 11/26/2019 Partial Inspection ERNESTO CORRAL
Insulation 1/15/2020 Partial Inspection ERNESTO CORRAL
Insulation 2/21/2020 Not Ready for Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 2/21/2020 Approved ERNESTO CORRAL
Wood Frame 2/21/2020 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 2/24/2020 Conditional Approval ERNESTO CORRAL
Insulation 2/25/2020 Partial Inspection ERNESTO CORRAL
Insulation 2/27/2020 Partial Inspection ERNESTO CORRAL
Wood Frame 2/27/2020 Partial Inspection ERNESTO CORRAL
Insulation 3/4/2020 Not Ready for Inspection RONALD PACHECO
Insulation 3/6/2020 Partial Inspection ERNESTO CORRAL
Deputy Steel/Welding 5/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/6/2020 Conditional Approval ERNESTO CORRAL
Insulation 5/11/2020 Partial Approval NICK DANERI
Wood Frame 5/11/2020 Order to Comply Issued NICK DANERI
Interior/Exterior Lathing 5/15/2020 Partial Approval NICK DANERI
Insulation 5/22/2020 Partial Approval NICK DANERI
Drywall Nailing 6/24/2020 Partial Approval NICK DANERI
Insulation 6/24/2020 Partial Approval NICK DANERI
Interior/Exterior Lathing 7/2/2020 Partial Approval NICK DANERI
Light Gage Steel Frame 7/2/2020 Not Ready for Inspection NICK DANERI
Drywall Nailing 7/7/2020 Not Ready for Inspection KATY RAMIREZ
Light Gage Steel Frame 7/7/2020 Not Ready for Inspection KATY RAMIREZ
T-Bar Ceiling 7/7/2020 Not Ready for Inspection KATY RAMIREZ
Interior/Exterior Lathing 7/8/2020 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 7/8/2020 Partial Approval NICK DANERI
Drywall Nailing 7/13/2020 Not Ready for Inspection KATY RAMIREZ
Insulation 7/13/2020 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 7/13/2020 Partial Inspection KATY RAMIREZ
Structural Steel Frame 7/13/2020 Not Ready for Inspection KATY RAMIREZ
Drywall Nailing 7/14/2020 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 7/14/2020 Corrections Issued KATY RAMIREZ
Light Gage Steel Frame 7/17/2020 Partial Approval KATY RAMIREZ
Drywall Nailing 7/24/2020 Partial Approval KATY RAMIREZ
Insulation 7/24/2020 Partial Approval KATY RAMIREZ
Drywall Nailing 7/31/2020 Corrections Issued KATY RAMIREZ
Drywall Nailing 8/5/2020 Partial Approval KATY RAMIREZ
Special/Order Compliance 8/13/2020 Partial Inspection KATY RAMIREZ
Drywall Nailing 8/18/2020 Partial Approval KATY RAMIREZ
Interior/Exterior Lathing 8/18/2020 Partial Approval KATY RAMIREZ
Drywall Nailing 8/25/2020 Partial Approval KATY RAMIREZ
Pre-Inspection 9/30/2020 Partial Inspection KATY RAMIREZ
Light Gage Steel Frame 12/1/2020 Partial Approval KATY RAMIREZ
Insulation 1/15/2021 Partial Approval RONALD PACHECO
Drywall Nailing 2/18/2021 Corrections Issued KATY RAMIREZ
Drywall Nailing 3/4/2021 Partial Approval KATY RAMIREZ
Special/Order Compliance 8/26/2021 Corrections Issued KATY RAMIREZ
Final 12/20/2021 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 12/20/2021 Approved NICK DANERI
Green Building Final 12/20/2021 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 12/20/2021 Approved NICK DANERI
SGSOV-Seismic Gas S/O Valve 12/20/2021 SGSOV Not Ready NICK DANERI
Smoke Detectors 12/20/2021 Not Ready for Inspection NICK DANERI
Wood Frame 12/20/2021 Approved NICK DANERI
Special/Order Compliance 1/6/2022 Partial Approval NICK DANERI
Special/Order Compliance 1/7/2022 Partial Inspection NICK DANERI
Special/Order Compliance 4/18/2022 Partial Inspection NICK DANERI
Special/Order Compliance 6/16/2022 Partial Inspection NICK DANERI
Final 10/4/2022 Partial Inspection TED RIES
Green Building Final 10/4/2022 Conditional Approval TED RIES
SGSOV-Seismic Gas S/O Valve 10/4/2022 SGSOV Approved TED RIES
Smoke Detectors 10/4/2022 Approved TED RIES
Special/Order Compliance 10/27/2022 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 11/2/2022 Partial Approval NICK DANERI
Final 11/9/2022 Conditional Approval NICK DANERI
Green Building Final 11/9/2022 Not Ready for Inspection NICK DANERI
Final 11/22/2022 OK for TCO NICK DANERI
Green Building Final 11/22/2022 Approved NICK DANERI
Special/Order Compliance 11/29/2022 Conditional Approval NICK DANERI
Special/Order Compliance 11/30/2022 Partial Inspection NICK DANERI
Special/Order Compliance 5/3/2023 Conditional Approval NICK DANERI