Deputy Reinf. Concrete
|
7/13/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
7/13/2018
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
7/16/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/17/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Excavation/Setback/Form/Re-Bar
|
7/17/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/18/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/20/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/23/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
7/23/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
7/23/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/24/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
7/24/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
7/24/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/25/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
7/25/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/26/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
7/26/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
7/26/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
7/27/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
7/27/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
7/30/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
7/30/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
8/1/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
8/1/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
8/1/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
8/2/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
8/2/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
8/3/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
8/6/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
8/8/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
8/8/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
8/9/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
8/14/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
8/15/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
8/16/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
8/17/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
8/17/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
8/20/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
8/21/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
8/21/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
8/22/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
8/22/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
8/23/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
8/23/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Piling/Pier/Caisson
|
8/23/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
8/24/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
8/24/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
8/29/2018
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
8/29/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/30/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
8/30/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/31/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
8/31/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
9/5/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
9/6/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
9/20/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
9/24/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
9/26/2018
|
No Access for Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
10/1/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
10/1/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
10/2/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Green Building Rough
|
10/2/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
10/2/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Verify Sprinkler Sign Off
|
10/2/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
10/3/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
10/5/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
10/9/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
10/9/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
10/10/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
10/11/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
10/12/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
10/15/2018
|
Partial Approval
|
JAMES POWERS
|
Green Building Rough
|
10/15/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
Reinforced Concrete Frame
|
10/15/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
Deputy Shotcrete
|
10/16/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
10/17/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Green Building Rough
|
10/17/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
10/17/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Verify Sprinkler Sign Off
|
10/17/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
10/18/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
10/19/2018
|
Partial Approval
|
JAMES POWERS
|
Green Building Rough
|
10/19/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
Verify Sprinkler Sign Off
|
10/19/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
Deputy Drilled-In Anchors
|
10/24/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
10/24/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
10/26/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Green Building Rough
|
10/26/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
10/26/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Verify Sprinkler Sign Off
|
10/26/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
10/29/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
11/1/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
11/2/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
11/5/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Masonry Wall/Backfill
|
11/5/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
11/19/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
11/20/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
11/27/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
11/30/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Green Building Rough
|
11/30/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
11/30/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Verify Sprinkler Sign Off
|
11/30/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
12/4/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Green Building Rough
|
12/10/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
12/10/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Verify Sprinkler Sign Off
|
12/10/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
12/11/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Green Building Rough
|
12/13/2018
|
Approved
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
12/13/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Verify Sprinkler Sign Off
|
12/13/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
12/17/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
12/17/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
12/17/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
12/18/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
12/19/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
12/19/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
12/20/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
12/20/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
12/20/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Verify Sprinkler Sign Off
|
12/20/2018
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
12/26/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
12/28/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
12/28/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
1/2/2019
|
Not Ready for Inspection
|
TED RIES
|
Pre-Inspection
|
1/2/2019
|
Not Ready for Inspection
|
TED RIES
|
Deputy Reinf. Concrete
|
1/4/2019
|
Approved
|
TED RIES
|
Masonry Wall/Backfill
|
1/4/2019
|
Partial Approval
|
TED RIES
|
Deputy Reinf. Concrete
|
1/7/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
1/14/2019
|
No Access for Inspection
|
ERNESTO CORRAL
|
Reinforced Masonry Frame
|
1/14/2019
|
No Access for Inspection
|
ERNESTO CORRAL
|
Verify Sprinkler Sign Off
|
1/14/2019
|
No Access for Inspection
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
1/15/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Reinforced Masonry Frame
|
1/15/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
1/18/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
1/18/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
1/18/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
1/23/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
1/24/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
1/25/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
1/25/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Verify Sprinkler Sign Off
|
1/25/2019
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
1/28/2019
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
1/29/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
1/31/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
1/31/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
2/1/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
2/1/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
2/7/2019
|
Approved
|
TED RIES
|
Reinforced Concrete Frame
|
2/7/2019
|
Partial Approval
|
TED RIES
|
Structural Steel Frame
|
2/7/2019
|
Partial Approval
|
TED RIES
|
Verify Sprinkler Sign Off
|
2/7/2019
|
Not Ready for Inspection
|
TED RIES
|
Deputy Drilled-In Anchors
|
2/8/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
2/13/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
2/22/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
3/11/2019
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Reinforced Masonry Frame
|
3/11/2019
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
3/13/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Masonry Wall/Backfill
|
3/13/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
3/14/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
3/14/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
3/18/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
3/19/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
3/21/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
3/22/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/27/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
3/28/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
3/29/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
3/29/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
4/1/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
4/1/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
4/2/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Shotcrete
|
4/3/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
4/4/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Verify Sprinkler Sign Off
|
4/4/2019
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Wood Frame
|
4/8/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
4/9/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
4/10/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
4/26/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
4/26/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Masonry Wall/Backfill
|
4/26/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
5/6/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Floor/Roof Diaphrgm/Shear Wall
|
5/9/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
5/10/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
5/14/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
5/29/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
5/31/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
6/4/2019
|
Conditional Approval
|
JEFFREY FULTON
|
Floor/Roof Diaphrgm/Shear Wall
|
6/4/2019
|
Partial Approval
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
6/7/2019
|
Conditional Approval
|
JEFFREY FULTON
|
Excavation/Setback/Form/Re-Bar
|
6/10/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
6/10/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
6/11/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
6/11/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Floor/Roof Diaphrgm/Shear Wall
|
6/11/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
6/13/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Floor/Roof Diaphrgm/Shear Wall
|
6/13/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Masonry Wall/Backfill
|
6/14/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
6/17/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
6/18/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
6/20/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
6/21/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
6/21/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
6/25/2019
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
6/27/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
6/27/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
6/28/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
7/1/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
7/1/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Floor/Roof Diaphrgm/Shear Wall
|
7/1/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
7/9/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
7/9/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Floor/Roof Diaphrgm/Shear Wall
|
7/10/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
7/15/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
7/18/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Masonry
|
7/19/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Steel/Welding
|
7/19/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Steel/Welding
|
7/22/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
7/23/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
7/25/2019
|
Conditional Approval
|
JEFFREY FULTON
|
Floor/Roof Diaphrgm/Shear Wall
|
7/26/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Reinforced Masonry Frame
|
7/26/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Steel/Welding
|
7/29/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Floor/Roof Diaphrgm/Shear Wall
|
8/5/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Insulation
|
8/5/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
8/6/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
8/15/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
8/21/2019
|
Approved
|
DANIEL MC AULIFFE
|
Floor/Roof Diaphrgm/Shear Wall
|
8/21/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
Floor/Roof Diaphrgm/Shear Wall
|
8/26/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Floor/Roof Diaphrgm/Shear Wall
|
8/27/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
9/3/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
9/4/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
Footing/Foundation/Slab
|
9/19/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Masonry Wall/Backfill
|
9/19/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
9/26/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
10/1/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
10/3/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
Floor/Roof Diaphrgm/Shear Wall
|
10/18/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Insulation
|
10/18/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Insulation
|
11/8/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Insulation
|
11/26/2019
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Light Gage Steel Frame
|
11/26/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Insulation
|
1/15/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
Insulation
|
2/21/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
Verify Sprinkler Sign Off
|
2/21/2020
|
Approved
|
ERNESTO CORRAL
|
Wood Frame
|
2/21/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Wood Construction
|
2/24/2020
|
Conditional Approval
|
ERNESTO CORRAL
|
Insulation
|
2/25/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
Insulation
|
2/27/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
Wood Frame
|
2/27/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
Insulation
|
3/4/2020
|
Not Ready for Inspection
|
RONALD PACHECO
|
Insulation
|
3/6/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Steel/Welding
|
5/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
Deputy Steel/Welding
|
5/6/2020
|
Conditional Approval
|
ERNESTO CORRAL
|
Insulation
|
5/11/2020
|
Partial Approval
|
NICK DANERI
|
Wood Frame
|
5/11/2020
|
Order to Comply Issued
|
NICK DANERI
|
Interior/Exterior Lathing
|
5/15/2020
|
Partial Approval
|
NICK DANERI
|
Insulation
|
5/22/2020
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
6/24/2020
|
Partial Approval
|
NICK DANERI
|
Insulation
|
6/24/2020
|
Partial Approval
|
NICK DANERI
|
Interior/Exterior Lathing
|
7/2/2020
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
7/2/2020
|
Not Ready for Inspection
|
NICK DANERI
|
Drywall Nailing
|
7/7/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
Light Gage Steel Frame
|
7/7/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
T-Bar Ceiling
|
7/7/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
Interior/Exterior Lathing
|
7/8/2020
|
Partial Inspection
|
KATY RAMIREZ
|
Light Gage Steel Frame
|
7/8/2020
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
7/13/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
Insulation
|
7/13/2020
|
Partial Approval
|
KATY RAMIREZ
|
Light Gage Steel Frame
|
7/13/2020
|
Partial Inspection
|
KATY RAMIREZ
|
Structural Steel Frame
|
7/13/2020
|
Not Ready for Inspection
|
KATY RAMIREZ
|
Drywall Nailing
|
7/14/2020
|
Partial Inspection
|
KATY RAMIREZ
|
Light Gage Steel Frame
|
7/14/2020
|
Corrections Issued
|
KATY RAMIREZ
|
Light Gage Steel Frame
|
7/17/2020
|
Partial Approval
|
KATY RAMIREZ
|
Drywall Nailing
|
7/24/2020
|
Partial Approval
|
KATY RAMIREZ
|
Insulation
|
7/24/2020
|
Partial Approval
|
KATY RAMIREZ
|
Drywall Nailing
|
7/31/2020
|
Corrections Issued
|
KATY RAMIREZ
|
Drywall Nailing
|
8/5/2020
|
Partial Approval
|
KATY RAMIREZ
|
Special/Order Compliance
|
8/13/2020
|
Partial Inspection
|
KATY RAMIREZ
|
Drywall Nailing
|
8/18/2020
|
Partial Approval
|
KATY RAMIREZ
|
Interior/Exterior Lathing
|
8/18/2020
|
Partial Approval
|
KATY RAMIREZ
|
Drywall Nailing
|
8/25/2020
|
Partial Approval
|
KATY RAMIREZ
|
Pre-Inspection
|
9/30/2020
|
Partial Inspection
|
KATY RAMIREZ
|
Light Gage Steel Frame
|
12/1/2020
|
Partial Approval
|
KATY RAMIREZ
|
Insulation
|
1/15/2021
|
Partial Approval
|
RONALD PACHECO
|
Drywall Nailing
|
2/18/2021
|
Corrections Issued
|
KATY RAMIREZ
|
Drywall Nailing
|
3/4/2021
|
Partial Approval
|
KATY RAMIREZ
|
Special/Order Compliance
|
8/26/2021
|
Corrections Issued
|
KATY RAMIREZ
|
Final
|
12/20/2021
|
Not Ready for Inspection
|
NICK DANERI
|
Footing/Foundation/Slab
|
12/20/2021
|
Approved
|
NICK DANERI
|
Green Building Final
|
12/20/2021
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
12/20/2021
|
Approved
|
NICK DANERI
|
SGSOV-Seismic Gas S/O Valve
|
12/20/2021
|
SGSOV Not Ready
|
NICK DANERI
|
Smoke Detectors
|
12/20/2021
|
Not Ready for Inspection
|
NICK DANERI
|
Wood Frame
|
12/20/2021
|
Approved
|
NICK DANERI
|
Special/Order Compliance
|
1/6/2022
|
Partial Approval
|
NICK DANERI
|
Special/Order Compliance
|
1/7/2022
|
Partial Inspection
|
NICK DANERI
|
Special/Order Compliance
|
4/18/2022
|
Partial Inspection
|
NICK DANERI
|
Special/Order Compliance
|
6/16/2022
|
Partial Inspection
|
NICK DANERI
|
Final
|
10/4/2022
|
Partial Inspection
|
TED RIES
|
Green Building Final
|
10/4/2022
|
Conditional Approval
|
TED RIES
|
SGSOV-Seismic Gas S/O Valve
|
10/4/2022
|
SGSOV Approved
|
TED RIES
|
Smoke Detectors
|
10/4/2022
|
Approved
|
TED RIES
|
Special/Order Compliance
|
10/27/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
Special/Order Compliance
|
11/2/2022
|
Partial Approval
|
NICK DANERI
|
Final
|
11/9/2022
|
Conditional Approval
|
NICK DANERI
|
Green Building Final
|
11/9/2022
|
Not Ready for Inspection
|
NICK DANERI
|
Final
|
11/22/2022
|
OK for TCO
|
NICK DANERI
|
Green Building Final
|
11/22/2022
|
Approved
|
NICK DANERI
|
Special/Order Compliance
|
11/29/2022
|
Conditional Approval
|
NICK DANERI
|
Special/Order Compliance
|
11/30/2022
|
Partial Inspection
|
NICK DANERI
|
Special/Order Compliance
|
5/3/2023
|
Conditional Approval
|
NICK DANERI
|