330 N FAIRFAX AVE 90036

Certificate Information: 330 N FAIRFAX AVE 90036

Application / Permit
16010-10000-05602
Plan Check / Job No.
B16LA19367
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
CORE AND SHELL FOR NEW 3-STORY, 28,023 SF OFFICE BUILDING OVER 2 LEVELS OF SUBTERRANEAN PARKING MULTIPLE 1 OF 3
Permit Issued
Issued on 12/1/2017
Issuing Office
West Los Angeles
Current Status
CofO Issued on 6/22/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/13/2016 APPLICANT
Disabled Access Plans Picked Up 12/20/2016 APPLICANT
Assigned to Plan Check Engineer 1/5/2017 XIAOZHE ZHANG
Green Plans Picked Up 1/6/2017 APPLICANT
Corrections Issued 1/10/2017 XIAOZHE ZHANG
Quality Review Completed 1/10/2017 BILL STUTSMAN
Building Plans Picked Up 1/11/2017 APPLICANT
Applicant returned to address corrections 2/9/2017 XIAOZHE ZHANG
Applicant returned to address corrections 3/1/2017 XIAOZHE ZHANG
Applicant returned to address corrections 3/14/2017 XIAOZHE ZHANG
Applicant returned to address corrections 3/21/2017 XIAOZHE ZHANG
Applicant returned to address corrections 3/30/2017 XIAOZHE ZHANG
Applicant returned to address corrections 4/26/2017 XIAOZHE ZHANG
Applicant returned to address corrections 10/5/2017 XIAOZHE ZHANG
Plan Check Approved 10/19/2017 XIAOZHE ZHANG
Issued 12/1/2017 LADBS
TCO Issued (Expire Date: 10-11-2021) 4/14/2021 ERNESTO CORRAL
CofO in Progress 6/21/2021 EDWIN GREGORYONA
CofO Issued 6/22/2021 ERNESTO CORRAL
Permit Finaled 6/22/2021 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 1/13/2017 ROCHELLE DUNGCA
Eng Process Fee Ord 176,300 Cleared 1/13/2017 ROCHELLE DUNGCA
Permit Cleared 2/1/2017 LEE GUILBEAUX
Sewer availability Cleared 2/10/2017 RAVIL MANAPOV
Construction near power lines Cleared 2/15/2017 LUCIO FERRER
Construction within easement Cleared 2/15/2017 LUCIO FERRER
Driveway location Cleared 2/15/2017 EILEEN HUNT
Internal circulation Cleared 2/15/2017 EILEEN HUNT
GPI Written Notices Cleared 3/14/2017 XIAOZHE ZHANG
Grading Pre-Inspection Cleared 3/14/2017 XIAOZHE ZHANG
Encroachment in public way Cleared 3/22/2017 JAMES KHO
DAS Clearance Cleared 4/20/2017 SHINE LIN
Low Impact Development Cleared 4/20/2017 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 4/25/2017 CARLA VALLADARES
Green Code Cleared 5/1/2017 DONALD CRICHLOW
Hydrant and Access approval Cleared 6/7/2017 ROBERT DUFF
Methane Ordinance Cleared 6/7/2017 DAVE MYERS
ZA Case Cleared 7/10/2017 TRACY WILLIAMS
ZA Case Cleared 7/10/2017 TRACY WILLIAMS
Highway dedication Cleared 10/12/2017 FATIMA GUERRA
Miscellaneous Cleared 10/12/2017 SARAH GOLDMAN
Work Adjacent to Public Way Cleared 10/13/2017 TERRY PHAN
Building over 3-story or 36-ft Cleared 10/19/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 10/19/2017 CALOSHA APPROVED

Contact Information

Contractor Del Amo Construction Inc; Lic. No.: 744458-B 23840 MADISON STREET      TORRANCE, CA 90505
Engineer Reynolds, Aaron D'Angelo; Lic. No.: S4338 4022 JOELTON DRIVE      AGOURA HILLS, CA 91301

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Methane Barrier 8/6/2018 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 8/7/2018 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 8/8/2018 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 8/9/2018 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 8/10/2018 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 8/13/2018 No Access for Inspection LARRY ARNICK
Deputy Methane Barrier 8/14/2018 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 8/15/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/24/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/27/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/29/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/30/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/31/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/4/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 9/4/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 9/4/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 9/4/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 9/5/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/6/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 9/6/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 9/6/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 9/6/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 9/7/2018 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 9/12/2018 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 9/13/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/27/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 9/27/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 9/27/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 9/27/2018 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 9/28/2018 Partial Approval LARRY ARNICK
Deputy Methane Barrier 10/2/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/2/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/3/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 10/3/2018 Partial Approval LARRY ARNICK
METHANE-Barrier 10/3/2018 Partial Approval LARRY ARNICK
METHANE-Subgrade 10/3/2018 Partial Approval LARRY ARNICK
Deputy Methane Barrier 10/4/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/4/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/5/2018 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 10/9/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/9/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/9/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/10/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/10/2018 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 10/11/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/11/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/11/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 10/11/2018 Not Ready for Inspection GREGORY POMISH
METHANE-Barrier 10/11/2018 Not Ready for Inspection GREGORY POMISH
METHANE-Subgrade 10/11/2018 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/12/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/12/2018 Conditional Approval LARRY ARNICK
Green Building Rough 10/12/2018 Partial Approval LARRY ARNICK
METHANE-Rough 10/12/2018 Partial Approval LARRY ARNICK
Reinforced Masonry Frame 10/12/2018 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 10/12/2018 Not Ready for Inspection LARRY ARNICK
Deputy Methane Barrier 10/15/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/16/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/16/2018 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 10/17/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/17/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/17/2018 Conditional Approval LARRY ARNICK
Green Building Rough 10/17/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 10/17/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 10/17/2018 Conditional Approval LARRY ARNICK
Verify Sprinkler Sign Off 10/17/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 10/18/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/18/2018 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 10/19/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/19/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/19/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/23/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/23/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 10/23/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 10/23/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 10/23/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 10/24/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/24/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/25/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/25/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/26/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/26/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 10/26/2018 Partial Approval LARRY ARNICK
METHANE-Barrier 10/26/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 10/26/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 10/29/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/29/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/30/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/30/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/31/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/31/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/1/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/1/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/5/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 11/5/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 11/5/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 11/5/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 11/5/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 11/6/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 11/6/2018 Conditional Approval LARRY ARNICK
Green Building Rough 11/6/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 11/6/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 11/6/2018 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 11/6/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 11/7/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/7/2018 Approved GREGORY POMISH
Deputy Methane Barrier 11/8/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/8/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/8/2018 Approved GREGORY POMISH
Deputy Methane Barrier 11/9/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/9/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/9/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/13/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/13/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/14/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 11/14/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 11/14/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 11/14/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 11/14/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 11/15/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 11/15/2018 Conditional Approval LARRY ARNICK
Green Building Rough 11/15/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 11/15/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 11/15/2018 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 11/15/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 11/16/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 11/16/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/3/2018 Conditional Approval LARRY ARNICK
Green Building Rough 12/3/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 12/3/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 12/3/2018 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 12/3/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 12/4/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 12/4/2018 Partial Approval LARRY ARNICK
METHANE-Barrier 12/4/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 12/4/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 12/19/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/26/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/27/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/28/2018 Conditional Approval LARRY ARNICK
Green Building Rough 12/28/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 12/28/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 12/28/2018 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 12/28/2018 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 1/4/2019 Partial Approval LARRY ARNICK
METHANE-Barrier 1/4/2019 Partial Approval LARRY ARNICK
METHANE-Subgrade 1/4/2019 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 1/22/2019 Conditional Approval LARRY ARNICK
Deputy Shotcrete 1/22/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/23/2019 Conditional Approval LARRY ARNICK
Deputy Shotcrete 1/23/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/24/2019 Conditional Approval LARRY ARNICK
Deputy Shotcrete 1/24/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/25/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/25/2019 Approved GREGORY POMISH
Green Building Rough 1/28/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 1/28/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 1/28/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 1/28/2019 Not Ready for Inspection LARRY ARNICK
Deputy Shotcrete 1/29/2019 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 1/30/2019 Partial Approval LARRY ARNICK
METHANE-Barrier 1/30/2019 Partial Approval LARRY ARNICK
METHANE-Subgrade 1/30/2019 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 2/1/2019 Conditional Approval LARRY ARNICK
Deputy Shotcrete 2/1/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/6/2019 Approved GREGORY POMISH
Deputy Shotcrete 2/6/2019 Approved GREGORY POMISH
Green Building Rough 2/8/2019 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 2/8/2019 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 2/8/2019 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 2/8/2019 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 2/11/2019 Conditional Approval LARRY ARNICK
Green Building Rough 2/20/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 2/20/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 2/20/2019 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 2/20/2019 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 2/21/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/21/2019 Conditional Approval LARRY ARNICK
METHANE-Barrier 2/21/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 2/21/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 2/21/2019 Not Ready for Inspection LARRY ARNICK
Green Building Rough 2/22/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 2/22/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 2/22/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 2/22/2019 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 2/25/2019 Partial Approval LARRY ARNICK
METHANE-Barrier 2/25/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 2/25/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 3/5/2019 Conditional Approval LARRY ARNICK
Green Building Rough 3/5/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 3/5/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 3/5/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 3/5/2019 Not Ready for Inspection LARRY ARNICK
Deputy Methane Barrier 3/12/2019 Conditional Approval LARRY ARNICK
Green Building Rough 3/12/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 3/12/2019 Partial Approval LARRY ARNICK
Reinforced Concrete Frame 3/12/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 3/12/2019 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 3/20/2019 Partial Approval LARRY ARNICK
METHANE-Barrier 3/20/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 3/20/2019 Not Ready for Inspection LARRY ARNICK
Deputy Methane Barrier 4/17/2019 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 4/17/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 4/17/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 4/17/2019 Not Ready for Inspection LARRY ARNICK
Green Building Rough 4/18/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 4/18/2019 Approved LARRY ARNICK
Reinforced Concrete Frame 4/18/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 4/18/2019 Not Ready for Inspection LARRY ARNICK
Green Building Rough 5/9/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 5/9/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 5/9/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 5/13/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/14/2019 Approved JEFF BYTHEWAY
Green Building Rough 5/14/2019 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Masonry Frame 5/14/2019 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 5/14/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Masonry 5/15/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/16/2019 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 5/16/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 5/17/2019 Conditional Approval LARRY ARNICK
Green Building Rough 5/17/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 5/17/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 5/17/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 5/20/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/21/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/22/2019 Conditional Approval LARRY ARNICK
Green Building Rough 5/22/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 5/22/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 5/22/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 5/23/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/24/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/29/2019 Conditional Approval LARRY ARNICK
Green Building Rough 5/29/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 5/29/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 5/29/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 5/30/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/31/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/11/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/12/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/13/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/14/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/18/2019 Conditional Approval LARRY ARNICK
Green Building Rough 6/18/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 6/18/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 6/18/2019 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 6/19/2019 Conditional Approval LARRY ARNICK
Deputy Methane Barrier 6/20/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/20/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/21/2019 Partial Approval JAMES POWERS
Green Building Rough 6/21/2019 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 6/21/2019 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 6/21/2019 Not Ready for Inspection JAMES POWERS
Deputy Steel/Welding 6/24/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/25/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/26/2019 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 6/26/2019 Partial Approval LARRY ARNICK
METHANE-Barrier 6/26/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 6/26/2019 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 6/27/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/28/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/1/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/2/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/3/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/5/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/9/2019 Conditional Approval LARRY ARNICK
Green Building Rough 7/9/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 7/9/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 7/9/2019 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 7/10/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 7/11/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/11/2019 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 7/11/2019 Partial Approval LARRY ARNICK
Deputy Steel/Welding 7/12/2019 Conditional Approval LARRY ARNICK
Green Building Rough 7/15/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 7/15/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 7/15/2019 No Access for Inspection LARRY ARNICK
Deputy Reinf. Masonry 7/18/2019 Conditional Approval LARRY ARNICK
Green Building Rough 7/18/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 7/18/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 7/18/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 7/19/2019 Partial Approval LARRY ARNICK
Green Building Rough 7/23/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 7/23/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 7/23/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 7/25/2019 Partial Approval LARRY ARNICK
Deputy Steel/Welding 7/26/2019 Conditional Approval LARRY ARNICK
Green Building Rough 8/1/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 8/1/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 8/1/2019 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 8/2/2019 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 8/5/2019 Partial Approval LARRY ARNICK
METHANE-Barrier 8/5/2019 Approved LARRY ARNICK
METHANE-Subgrade 8/5/2019 Approved LARRY ARNICK
Deputy Reinf. Masonry 8/12/2019 Conditional Approval LARRY ARNICK
Green Building Rough 8/12/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 8/12/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 8/12/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 8/13/2019 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 8/13/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 8/16/2019 Conditional Approval LARRY ARNICK
Green Building Rough 8/16/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 8/16/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 8/16/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 8/20/2019 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 8/20/2019 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 8/22/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/26/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 8/26/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 8/26/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 8/26/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Masonry 8/27/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/27/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/28/2019 Conditional Approval LARRY ARNICK
Green Building Rough 8/28/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 8/28/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 8/28/2019 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 8/29/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/4/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 9/5/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/5/2019 Conditional Approval LARRY ARNICK
Green Building Rough 9/5/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 9/5/2019 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 9/5/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 9/6/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/6/2019 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 9/6/2019 Partial Approval LARRY ARNICK
Deputy Steel/Welding 9/10/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/11/2019 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 9/12/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 9/13/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/13/2019 Conditional Approval LARRY ARNICK
Green Building Rough 9/13/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 9/13/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 9/13/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 9/19/2019 Partial Approval LARRY ARNICK
Green Building Rough 9/19/2019 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 9/19/2019 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/1/2019 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 10/1/2019 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 10/1/2019 Partial Inspection LARRY ARNICK
Green Building Rough 10/3/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 10/3/2019 Conditional Approval LARRY ARNICK
Verify Sprinkler Sign Off 10/3/2019 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 10/10/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/15/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/16/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 10/17/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/18/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/21/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/22/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/28/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/1/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/4/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/6/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/7/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/12/2019 Conditional Approval LARRY ARNICK
Green Building Rough 11/12/2019 Partial Approval LARRY ARNICK
Reinforced Masonry Frame 11/12/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 11/12/2019 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 11/13/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 11/14/2019 Conditional Approval LARRY ARNICK
Green Building Rough 11/14/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 11/14/2019 Partial Inspection LARRY ARNICK
Verify Sprinkler Sign Off 11/14/2019 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 11/18/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/19/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/21/2019 Conditional Approval LARRY ARNICK
Green Building Rough 11/21/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 11/21/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 11/21/2019 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 11/22/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/26/2019 Conditional Approval LARRY ARNICK
Green Building Rough 11/26/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 11/26/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 11/26/2019 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 11/27/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/4/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/5/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/11/2019 Conditional Approval LARRY ARNICK
Green Building Rough 12/11/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 12/11/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 12/11/2019 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 12/12/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/13/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/16/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/17/2019 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 12/17/2019 Partial Approval LARRY ARNICK
Deputy Steel/Welding 12/18/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/3/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/7/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/8/2020 Conditional Approval LARRY ARNICK
Masonry Wall/Backfill 1/9/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 1/10/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/10/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 1/14/2020 Conditional Approval LARRY ARNICK
Green Building Rough 1/14/2020 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 1/14/2020 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 1/14/2020 Not Ready for Inspection LARRY ARNICK
Deputy Steel/Welding 1/22/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/29/2020 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 2/4/2020 Partial Approval JONATHAN QUACH
Light Gage Steel Frame 2/13/2020 Partial Approval LARRY ARNICK
Green Building Rough 2/19/2020 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 2/19/2020 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 2/19/2020 Not Ready for Inspection LARRY ARNICK
Deputy Fireproofing 2/20/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 2/21/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 2/25/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 2/26/2020 Conditional Approval JONATHAN QUACH
Deputy Fireproofing 2/27/2020 Conditional Approval LARRY ARNICK
Green Building Rough 2/27/2020 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 2/27/2020 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 2/27/2020 Not Ready for Inspection LARRY ARNICK
Deputy Fireproofing 2/28/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 3/2/2020 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 3/5/2020 Not Ready for Inspection LARRY ARNICK
Deputy Fireproofing 3/10/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 3/11/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 3/12/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 3/13/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 3/16/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/18/2020 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 3/18/2020 Partial Approval TIMOTHY BUXTON
Deputy Drilled-In Anchors 3/19/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/19/2020 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 3/31/2020 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 4/23/2020 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 4/24/2020 Partial Approval LARRY ARNICK
Drywall Nailing 5/7/2020 Partial Approval LARRY ARNICK
Light Gage Steel Frame 5/7/2020 Partial Approval LARRY ARNICK
Green Building Rough 5/12/2020 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 5/13/2020 Not Ready for Inspection LARRY ARNICK
Insulation 5/20/2020 Partial Approval LARRY ARNICK
Drywall Nailing 5/29/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/1/2020 Conditional Approval ERNESTO CORRAL
Drywall Nailing 6/3/2020 Partial Approval JONATHAN QUACH
Green Building Rough 6/3/2020 Not Ready for Inspection JONATHAN QUACH
Deputy Drilled-In Anchors 6/4/2020 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 6/4/2020 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 6/18/2020 Partial Approval LARRY ARNICK
Drywall Nailing 6/23/2020 Partial Approval LARRY ARNICK
Green Building Rough 6/23/2020 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 6/25/2020 Partial Approval LARRY ARNICK
Green Building Rough 6/25/2020 Not Ready for Inspection LARRY ARNICK
Deputy Fireproofing 7/23/2020 Conditional Approval LARRY ARNICK
Interior/Exterior Lathing 7/23/2020 Approved LARRY ARNICK
Light Gage Steel Frame 7/27/2020 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 7/28/2020 Partial Approval LARRY ARNICK
Deputy Fireproofing 7/29/2020 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 8/3/2020 Partial Approval LARRY ARNICK
Light Gage Steel Frame 8/13/2020 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 8/24/2020 Approved LARRY ARNICK
Interior/Exterior Lathing 8/25/2020 Not Ready for Inspection LARRY ARNICK
T-Bar Ceiling 9/16/2020 Partial Approval LARRY ARNICK
T-Bar Ceiling 10/1/2020 Partial Approval LARRY ARNICK
Special/Order Compliance 10/9/2020 Partial Inspection LARRY ARNICK
Light Gage Steel Frame 11/16/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/17/2020 Partial Inspection EDWIN GREGORYONA
Special/Order Compliance 11/18/2020 Approved EDWIN GREGORYONA
Green Building Rough 12/4/2020 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 12/4/2020 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/4/2020 Approved EDWIN GREGORYONA
Drywall Nailing 12/24/2020 Not Ready for Inspection LARRY ARNICK
Final 12/24/2020 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 12/24/2020 Approved LARRY ARNICK
Green Building Final 12/24/2020 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 12/24/2020 Approved LARRY ARNICK
Reinforced Masonry Frame 12/24/2020 Approved LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 12/24/2020 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 12/24/2020 Not Ready for Inspection LARRY ARNICK
Structural Steel Frame 12/24/2020 Approved LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/8/2021 Approved LARRY ARNICK
Posting Pre-Inspection 1/28/2021 Partial Inspection LARRY ARNICK
Drywall Nailing 3/5/2021 Approved EDWIN GREGORYONA
Final 3/5/2021 Partial Inspection EDWIN GREGORYONA
Green Building Final 3/5/2021 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 3/5/2021 SGSOV Approved EDWIN GREGORYONA
Smoke Detectors 3/5/2021 Approved EDWIN GREGORYONA
Final 4/5/2021 Partial Inspection EDWIN GREGORYONA
Final 6/16/2021 Conditional Approval EDWIN GREGORYONA
Final 6/21/2021 Conditional Approval EDWIN GREGORYONA