Posting Pre-Inspection
|
12/12/2019
|
Partial Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
12/12/2019
|
Partial Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
12/12/2019
|
Partial Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
9/10/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
9/14/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
9/20/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Excavation/Setback/Form/Re-Bar
|
9/21/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
9/24/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
9/29/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/4/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/6/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/25/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/28/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
11/3/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Excavation/Setback/Form/Re-Bar
|
11/8/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
11/9/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
11/12/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
11/13/2021
|
Off-Hour Fees Due
|
|
|
Excavation/Setback/Form/Re-Bar
|
11/15/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
11/15/2021
|
Approved
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
11/18/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
11/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
11/24/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
11/30/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
12/1/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
12/23/2021
|
No Access for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
12/27/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
1/11/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
1/18/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
1/21/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
1/24/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
1/25/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
1/28/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
2/3/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
3/3/2022
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
3/4/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
3/17/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Masonry Wall/Backfill
|
3/29/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
4/13/2022
|
Approved
|
EDWIN GREGORYONA
|
|
Wood Frame
|
4/25/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Wood Construction
|
5/9/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/9/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
5/10/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
5/18/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Other (see comments)
|
5/19/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Steel/Welding
|
5/19/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Other (see comments)
|
5/20/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
5/20/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Other (see comments)
|
5/23/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Steel/Welding
|
5/23/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/23/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Other (see comments)
|
5/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Steel/Welding
|
5/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Other (see comments)
|
5/25/2022
|
Conditional Approval
|
TERRY HERR
|
|
Deputy Steel/Welding
|
5/25/2022
|
Conditional Approval
|
TERRY HERR
|
|
Excavation/Setback/Form/Re-Bar
|
6/1/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
6/8/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
6/14/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
6/29/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Structural Steel Frame
|
6/29/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
6/29/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
7/5/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/8/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
7/14/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
7/14/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
7/14/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
7/15/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/6/2022
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
9/12/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
9/20/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
9/23/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
10/17/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/29/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
11/29/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
12/19/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Pre-Inspection
|
12/19/2022
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
12/19/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
12/21/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
12/21/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
1/18/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
2/1/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
2/1/2023
|
Approved
|
EDWIN GREGORYONA
|
|
Wood Frame
|
2/1/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
2/9/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
2/13/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
2/13/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
2/15/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
2/23/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
2/24/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
2/27/2023
|
Not Ready for Inspection
|
JAIME RIOS
|
|
Drywall Nailing
|
3/1/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
3/3/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
3/8/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
3/10/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
3/29/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/11/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
4/14/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
4/14/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
4/14/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
4/17/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/17/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
4/17/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
4/17/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
4/17/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
4/18/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2023
|
No Access for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
4/18/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
4/18/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
4/20/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
4/20/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
4/26/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
4/26/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
5/9/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/9/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
5/12/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/12/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
5/18/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
5/18/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/18/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Insulation
|
5/24/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/24/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
5/24/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Insulation
|
5/25/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/25/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
5/25/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
6/5/2023
|
Partial Approval
|
TIMOTHY POWELL
|
|
Insulation
|
6/6/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
6/6/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
6/6/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
6/8/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
6/8/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
6/8/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
6/9/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
6/9/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
6/9/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
6/9/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
6/12/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
6/12/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
6/13/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
6/13/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
6/13/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
6/21/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/21/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
6/21/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/22/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Insulation
|
6/22/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
6/22/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Drywall Nailing
|
6/23/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/23/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
6/27/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Insulation
|
6/27/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
6/27/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
6/27/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/10/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
7/10/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/17/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
7/17/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Structural Steel Frame
|
7/17/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/20/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
7/20/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
7/20/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Structural Steel Frame
|
7/20/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/27/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
7/27/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
7/27/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/31/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
7/31/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
7/31/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/11/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
8/11/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/14/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
8/14/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
8/14/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
8/18/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
8/18/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Masonry Wall/Backfill
|
8/18/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
8/21/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
8/21/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Masonry Frame
|
8/21/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
8/21/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/25/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
8/25/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
8/25/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
8/25/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
8/25/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/28/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
8/28/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
8/28/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/31/2023
|
Not Ready for Inspection
|
ADAM BURGESS
|
|
Light Gage Steel Frame
|
8/31/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
9/1/2023
|
No Access for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/1/2023
|
No Access for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
9/6/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
9/6/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/6/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
9/8/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
9/8/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/8/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
9/12/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
9/12/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
9/12/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
9/12/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/15/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
9/15/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
9/15/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
9/15/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/19/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
9/19/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
9/19/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
9/19/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/25/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/25/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
9/27/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/27/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
9/29/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
9/29/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/29/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/2/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
10/2/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/2/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/3/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
10/3/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/3/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/4/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
10/4/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/4/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/11/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
10/11/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/11/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/12/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
10/12/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/12/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Structural Steel Frame
|
10/12/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/17/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
10/17/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
10/17/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
10/17/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
10/17/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
10/17/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/19/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
10/19/2023
|
Approved
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
10/19/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/19/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
10/19/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
10/19/2023
|
Approved
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/20/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
10/20/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/20/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/24/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/24/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/25/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/25/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
10/25/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/25/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
10/25/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/26/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/26/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
10/26/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/26/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
11/3/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/3/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/3/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Masonry Wall/Backfill
|
11/3/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/6/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/6/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
11/6/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
11/7/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/7/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/7/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
11/13/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/13/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/13/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
11/15/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/15/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/15/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
11/17/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/17/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/17/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
11/20/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/20/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/20/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
11/21/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/21/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/21/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
2/9/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
2/14/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
2/29/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/3/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
5/15/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
5/17/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
5/30/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
5/30/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
6/7/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
6/11/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
6/14/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
6/26/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
7/16/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
7/16/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/1/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Reinforced Masonry Frame
|
8/1/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/19/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
8/19/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
8/27/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
8/29/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/3/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
9/3/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
9/4/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/6/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
9/12/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/20/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
9/20/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/24/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
9/24/2024
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
9/25/2024
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
10/10/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/24/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Structural Steel Frame
|
11/4/2024
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/6/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Interior/Exterior Lathing
|
11/13/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/15/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
11/22/2024
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
1/13/2025
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
2/10/2025
|
Approved
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
2/11/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
2/20/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
3/5/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
4/9/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
12/9/2025
|
Approved
|
EDWIN GREGORYONA
|
|
Final
|
1/5/2026
|
OK to Issue CofO
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
1/5/2026
|
Approved
|
EDWIN GREGORYONA
|
|
Green Building Final
|
1/5/2026
|
Approved
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
1/5/2026
|
Approved
|
EDWIN GREGORYONA
|
|
Reinforced Masonry Frame
|
1/5/2026
|
Approved
|
EDWIN GREGORYONA
|
|
SGSOV-Seismic Gas S/O Valve
|
1/5/2026
|
SGSOV Approved
|
EDWIN GREGORYONA
|
|
Smoke Detectors
|
1/5/2026
|
Approved
|
EDWIN GREGORYONA
|