5750 W HOLLYWOOD BLVD 90028

Certificate Information: 5750 W HOLLYWOOD BLVD 90028

Application / Permit
16010-10000-05275
Plan Check / Job No.
B16LA18071
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
PROPOSED 7 STORY MIXED USE BUILDING WITH 161 APARTMENT UNITS, TWO LEVEL BASEMENT GARAGE AND TWO LEVEL ABOVE GROUND GARAGE AND RETAI with 5 STORIES OF TYPE IIIA ABOVE. EXTERIOR WINDOW WALLS, STEEL STAIRS, GUARDRAILS, PT SLABS, ELEV SUPPORT RAILS, EXTERIOR METAL STUD FRAMING ARE DEFERRED ITEMS. SEPARATE PERMNIT/SUBMITTAL REQUIRED.
Permit Issued
Issued on 6/12/2018
Issuing Office
Metro
Current Status
CofO Issued on 5/19/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/25/2017 APPLICANT
Assigned to Plan Check Engineer 3/2/2017 JOHN VASQUEZ
Corrections Issued 3/8/2017 JOHN VASQUEZ
Quality Review Completed 3/8/2017 JOHN VASQUEZ
Building Plans Picked Up 3/9/2017 APPLICANT
Applicant returned to address corrections 6/28/2017 JOHN VASQUEZ
Applicant returned to address corrections 12/27/2017 JOHN VASQUEZ
Applicant returned to address corrections 1/8/2018 JOHN VASQUEZ
Applicant returned to address corrections 4/4/2018 JOHN VASQUEZ
Applicant returned to address corrections 5/22/2018 JOHN VASQUEZ
Applicant returned to address corrections 5/29/2018 JOHN VASQUEZ
Applicant returned to address corrections 6/4/2018 JOHN VASQUEZ
Applicant returned to address corrections 6/6/2018 JOHN VASQUEZ
Plan Check Approved 6/12/2018 JOHN VASQUEZ
Issued 6/12/2018 LADBS
TCO Issued (Expire Date: 04-30-2022) 11/1/2021 ERNESTO CORRAL
TCO Issued (Expire Date: 10-25-2022) 4/28/2022 TERRY HERR
CofO in Progress 5/17/2022 DAVID BURKHEAD
Permit Finaled 5/19/2022 TERRY HERR
CofO Issued 5/19/2022 TERRY HERR
Permit Finaled 5/19/2022 TERRY HERR

Permit Application Clearance Information

Address approval Cleared 3/13/2017 RAVIL MANAPOV
Eng Process Fee Ord 176,300 Cleared 3/13/2017 RAVIL MANAPOV
Highway dedication Cleared 5/25/2017 RAVIL MANAPOV
Driveway location Cleared 10/27/2017 TAIMOUR TANAVOLI
Internal circulation Cleared 10/27/2017 TAIMOUR TANAVOLI
Hydrant and Access approval Cleared 10/30/2017 ROBERT DUFF
Sewer availability Cleared 1/3/2018 RAVIL MANAPOV
Bicycle Parking Cleared 1/31/2018 JAMES KHO
Encroachment in public way Cleared 1/31/2018 JAMES KHO
Historic monument Cleared 5/10/2018 LAMBERT GIESSINGER
DAS Clearance Cleared 5/15/2018 JOHN VASQUEZ
DCP conditions approval Cleared 5/15/2018 DORIS KWOK
Housing density bonus Cleared 5/15/2018 DORIS KWOK
Green Code Cleared 5/18/2018 DONALD CRICHLOW
Low Impact Development Cleared 5/25/2018 SAM NAVID
Stormwater Pollution Mitigatn Cleared 5/25/2018 SAM NAVID
"Q" conditions Cleared 5/29/2018 SEAN VEAL
Building over 3-story or 36-ft Cleared 5/29/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 5/29/2018 CALOSHA APPROVED
Frnt yard landscape/Water mgmt Cleared 5/29/2018 SEAN VEAL
Miscellaneous Cleared 5/29/2018 SEAN VEAL
Miscellaneous Cleared 5/29/2018 SEAN VEAL
Opn space landscape/Water mgmt Cleared 5/29/2018 SEAN VEAL
Site Plan review Cleared 5/29/2018 SEAN VEAL
Specific Plan Cleared 5/29/2018 SEAN VEAL
Historical monument Cleared 5/31/2018 JIM URQUHART
Project located in CRA area Cleared 5/31/2018 JIM URQUHART
Project located in CRA area Cleared 5/31/2018 JIM URQUHART
Roof/Waste drainage to street Cleared 5/31/2018 ZEMAMU GEBREWOLD
Permit Cleared 6/1/2018 ZEMAMU GEBREWOLD
Fire Marshall Fire Life Safety Cleared 6/4/2018 MENOA AGHAJANI
Miscellaneous Cleared 6/4/2018 SEAN VEAL
Construction near power lines Cleared 6/7/2018 RIDWAN HARDY
Construction within easement Cleared 6/7/2018 RIDWAN HARDY
Metro Rail approval Cleared 6/7/2018 JOHN VASQUEZ
Work Adjacent to Public Way Cleared 6/12/2018 HOK CHI CHIU

Contact Information

Architect Castillo, Richard Eugene; Lic. No.: C22674 514 LAGUNA CANYON WAY      BREA, CA 92821
Contractor Owner-Builder       ,
Engineer Lehmkuhl, Eric Thomas; Lic. No.: S3406 4335 DEL MONTE AVE      SAN DIEGO, CA 92107

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/17/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/29/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 11/2/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 12/4/2018 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 12/12/2018 Partial Approval KATY RAMIREZ
Footing/Foundation/Slab 12/21/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 1/23/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/24/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/25/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/28/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/29/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/30/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 1/30/2019 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 1/30/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 1/31/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/7/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/8/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/11/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/12/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/13/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/14/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/15/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 2/15/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 2/19/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/19/2019 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 2/19/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 2/20/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/20/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/21/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/21/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 2/21/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 2/22/2019 Conditional Approval TED RIES
Deputy Shotcrete 2/22/2019 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/25/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/25/2019 Approved JEFF BYTHEWAY
Green Building Rough 2/25/2019 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 2/25/2019 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 2/25/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 2/26/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/26/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 2/26/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 2/27/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/27/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/28/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/28/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/1/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 3/1/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/4/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 3/4/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/4/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 3/5/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 3/5/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/7/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/7/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 3/8/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 3/8/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/11/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/11/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 3/12/2019 Approved TED RIES
Deputy Reinf. Concrete 3/13/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 3/14/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/14/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/14/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 3/15/2019 Approved JEFF BYTHEWAY
Green Building Rough 3/15/2019 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 3/15/2019 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 3/15/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 3/18/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/19/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/20/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/21/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/22/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/22/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 3/26/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 3/27/2019 Approved TED RIES
Deputy Reinf. Concrete 3/27/2019 Approved TED RIES
Deputy Drilled-In Anchors 3/28/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/28/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 3/29/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/29/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/29/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/1/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/1/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/2/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/2/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/2/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/3/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/3/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/3/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/4/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/4/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 4/5/2019 Approved TED RIES
Excavation/Setback/Form/Re-Bar 4/5/2019 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 4/6/2019 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/8/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 4/8/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/8/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/9/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 4/9/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/10/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/10/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 4/10/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/11/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/11/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/12/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/12/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/15/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/15/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/16/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/16/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/16/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/17/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/17/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/18/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/19/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/19/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/22/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/22/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/23/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/23/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 4/24/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/24/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/25/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/25/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/26/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/26/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/29/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/29/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/30/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/30/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/1/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/1/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/1/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/2/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/3/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/6/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 5/6/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/6/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/6/2019 Partial Approval JEFF BYTHEWAY
Reinforced Masonry Frame 5/6/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/7/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 5/7/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/7/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/7/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/8/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/8/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/8/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/9/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/9/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/10/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/10/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/10/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/13/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/14/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/15/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/15/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 5/16/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/16/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 5/17/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/17/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 5/20/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/20/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/21/2019 Approved TED RIES
Deputy Steel/Welding 5/21/2019 Approved TED RIES
Deputy Drilled-In Anchors 5/22/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/22/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/22/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/22/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 5/23/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/23/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/23/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 5/23/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/24/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/24/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/28/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/28/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Shotcrete 5/29/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 5/29/2019 Partial Approval JEFF BYTHEWAY
Reinforced Masonry Frame 5/29/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/30/2019 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 5/30/2019 Approved TED RIES
Deputy Shotcrete 5/30/2019 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 5/30/2019 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 5/31/2019 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 5/31/2019 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 5/31/2019 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/3/2019 Approved JEFF BYTHEWAY
Deputy Shotcrete 6/3/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/4/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/5/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 6/5/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 6/5/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/6/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 6/6/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/7/2019 Partial Approval JAMES POWERS
Masonry Wall/Backfill 6/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/10/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 6/10/2019 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 6/10/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/11/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 6/11/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/12/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 6/12/2019 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 6/12/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/13/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 6/13/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/14/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/17/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/18/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/18/2019 Approved JEFF BYTHEWAY
Special/Order Compliance 6/18/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/19/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/19/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/20/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/20/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/21/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/21/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/24/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/24/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/25/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/25/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/26/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/27/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/27/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 6/27/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/28/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/28/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/1/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/2/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/3/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/3/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 7/3/2019 Conditional Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/5/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/5/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 7/5/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/8/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/9/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 7/9/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 7/10/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 7/10/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/11/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/11/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 7/11/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/12/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/12/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/15/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/15/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 7/15/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/16/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/16/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/17/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/17/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/18/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/18/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/22/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/22/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/23/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/23/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/24/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/24/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/25/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/25/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 7/26/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/26/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 7/26/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/29/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/30/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/30/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/31/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/31/2019 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/31/2019 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/1/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/1/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 8/1/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/2/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/2/2019 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/2/2019 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/5/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/5/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/6/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/6/2019 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/6/2019 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/7/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/7/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/8/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/8/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/9/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/9/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/12/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/12/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/12/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/12/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/13/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/13/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/13/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/14/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/14/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/14/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/14/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/15/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/15/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/16/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/16/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/16/2019 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 8/16/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/19/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/19/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/19/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 8/19/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/20/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/20/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/20/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/20/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/21/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/21/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/21/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/21/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/22/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/22/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/22/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/22/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/23/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/23/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/23/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/23/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/26/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/26/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/26/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/27/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/27/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/27/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/27/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 8/28/2019 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/28/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/28/2019 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/28/2019 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/29/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/29/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 8/30/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/3/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/4/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 9/5/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/5/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/5/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 9/5/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/6/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/6/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 9/9/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/9/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/9/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 9/9/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/10/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/10/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/11/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/11/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/12/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/12/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/13/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/13/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 9/13/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/16/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/16/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/17/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/17/2019 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 9/17/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/18/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/18/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/19/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/19/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/20/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/20/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 9/20/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/23/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/23/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 9/23/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/24/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 9/24/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/25/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 9/25/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/26/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/26/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/27/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/27/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/30/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 9/30/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/1/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/1/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 10/1/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/2/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/2/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/3/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/3/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/4/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/4/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 10/4/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/7/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/7/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/8/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 10/9/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/9/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/9/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/9/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/10/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/10/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/11/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/11/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 10/15/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/15/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/17/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/17/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 10/17/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/18/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/18/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/21/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/21/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/22/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/22/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/23/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/23/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/24/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/24/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/24/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 10/25/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/25/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/25/2019 Approved JEFF BYTHEWAY
Drywall Nailing 10/25/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/28/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/28/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/29/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/29/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 10/29/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/30/2019 Approved JEFF BYTHEWAY
Drywall Nailing 10/31/2019 Partial Approval JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 10/31/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 11/1/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/1/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/4/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 11/4/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 11/5/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/6/2019 Approved JEFF BYTHEWAY
Special/Order Compliance 11/7/2019 Approved DAVID BURKHEAD
Special/Order Compliance 11/7/2019 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 11/13/2019 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 11/21/2019 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/21/2019 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 11/22/2019 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/22/2019 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/25/2019 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/26/2019 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/26/2019 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 11/26/2019 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/27/2019 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/27/2019 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 12/2/2019 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/2/2019 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/3/2019 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/4/2019 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/5/2019 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/6/2019 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/6/2019 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/6/2019 Partial Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 12/9/2019 Conditional Approval DAVID BURKHEAD
Wood Frame 12/9/2019 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 12/10/2019 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 12/10/2019 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 12/10/2019 Partial Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 12/11/2019 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/11/2019 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/12/2019 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/12/2019 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/13/2019 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/13/2019 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/16/2019 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/16/2019 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/17/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 12/17/2019 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/17/2019 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 12/17/2019 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 12/17/2019 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/17/2019 Partial Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 12/18/2019 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/18/2019 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/18/2019 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/19/2019 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/19/2019 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/19/2019 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/19/2019 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/19/2019 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/20/2019 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/20/2019 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/23/2019 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 12/24/2019 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 12/26/2019 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 12/27/2019 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/27/2019 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/30/2019 Partial Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/3/2020 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 1/6/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/6/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 1/7/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/8/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 1/8/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/8/2020 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 1/9/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/10/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/14/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/15/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 1/15/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/15/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/15/2020 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 1/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/17/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 1/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/22/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 1/22/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/22/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 1/23/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 1/24/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/24/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 1/24/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 1/24/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 1/27/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/27/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/28/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 1/28/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/28/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 1/29/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/29/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 1/30/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/30/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 1/31/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/31/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 2/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 2/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/4/2020 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/4/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 2/5/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/5/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/5/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/5/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/5/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 2/7/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/7/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/7/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/7/2020 Approved DAVID BURKHEAD
Deputy Wood Construction 2/7/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/7/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 2/10/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/10/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/10/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 2/11/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/11/2020 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/11/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/12/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/12/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/12/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/12/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 2/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/14/2020 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/14/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/19/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/19/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/19/2020 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 2/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/20/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/20/2020 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/21/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 2/24/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/25/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/26/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/26/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/26/2020 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 2/27/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/28/2020 Conditional Approval DAVID BURKHEAD
Insulation 2/28/2020 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 3/2/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/5/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 3/5/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/5/2020 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 3/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 3/6/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 3/6/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 3/9/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 3/9/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/10/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/12/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 3/12/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/13/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/13/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/17/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 3/18/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/23/2020 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/26/2020 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/31/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 4/1/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 4/3/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 4/15/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/15/2020 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 4/20/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/20/2020 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 5/5/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/5/2020 Partial Approval DAVID BURKHEAD
Wall Anchors 5/12/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 5/26/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 5/28/2020 Conditional Approval DANIEL MC AULIFFE
Wall Anchors 6/3/2020 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/4/2020 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 6/5/2020 Approved DAVID BURKHEAD
Deputy Wood Construction 6/8/2020 Conditional Approval DAVID BURKHEAD
Wood Frame 6/8/2020 Corrections Issued DAVID BURKHEAD
Insulation 6/10/2020 Partial Approval DAVID BURKHEAD
Wall Anchors 6/10/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 6/11/2020 Conditional Approval DAVID BURKHEAD
Wall Anchors 6/11/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 6/12/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/12/2020 Partial Approval DAVID BURKHEAD
Insulation 6/16/2020 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/17/2020 Conditional Approval DAVID BURKHEAD
Wall Anchors 6/17/2020 Partial Inspection DAVID BURKHEAD
Insulation 6/18/2020 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/22/2020 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 6/24/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/24/2020 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 6/26/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 6/26/2020 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/29/2020 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/30/2020 Partial Approval DAVID BURKHEAD
Wall Anchors 6/30/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 7/2/2020 Approved DAVID BURKHEAD
Wall Anchors 7/2/2020 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/7/2020 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/8/2020 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 7/9/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/9/2020 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 7/14/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/14/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 7/15/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 7/16/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/16/2020 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/17/2020 Partial Approval DAVID BURKHEAD
Insulation 7/21/2020 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 7/23/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/23/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 7/27/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/28/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 7/28/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 7/29/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/30/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 7/30/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 7/31/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/3/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 8/5/2020 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/5/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 8/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 8/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/7/2020 Conditional Approval DAVID BURKHEAD
Wall Anchors 8/7/2020 Approved DAVID BURKHEAD
Insulation 8/14/2020 Partial Approval DAVID BURKHEAD
Insulation 8/18/2020 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 8/19/2020 Conditional Approval DAVID BURKHEAD
Insulation 8/20/2020 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 8/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 8/24/2020 Conditional Approval DAVID BURKHEAD
Insulation 8/24/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 8/25/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/26/2020 Conditional Approval DAVID BURKHEAD
Insulation 8/26/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 8/27/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/28/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/31/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/1/2020 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 9/1/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 9/2/2020 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 9/2/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 9/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 9/4/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/4/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 9/11/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 9/11/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/11/2020 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 9/14/2020 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 9/16/2020 Conditional Approval DANIEL MC AULIFFE
Wood Frame 9/16/2020 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/18/2020 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 9/24/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/24/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 10/13/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 10/14/2020 Approved DAVID BURKHEAD
Wood Frame 10/20/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 10/22/2020 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 10/23/2020 Partial Inspection DAVID BURKHEAD
Insulation 10/26/2020 Partial Inspection DAVID BURKHEAD
Insulation 10/28/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 11/5/2020 Partial Approval DAVID BURKHEAD
Insulation 11/6/2020 Not Ready for Inspection DAVID BURKHEAD
Insulation 11/9/2020 Partial Approval DAVID BURKHEAD
Wood Frame 11/10/2020 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 11/13/2020 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 11/20/2020 Partial Approval DANIEL MC AULIFFE
Insulation 12/4/2020 Partial Approval DAVID BURKHEAD
Insulation 12/7/2020 Partial Approval DAVID BURKHEAD
Insulation 12/9/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 12/10/2020 Partial Approval DAVID BURKHEAD
Insulation 12/11/2020 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 12/14/2020 Partial Approval DAVID BURKHEAD
Insulation 12/21/2020 Not Ready for Inspection DANIEL MC AULIFFE
Wood Frame 12/22/2020 Partial Inspection DAVID BURKHEAD
Insulation 12/23/2020 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/24/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/4/2021 Partial Approval DAVID BURKHEAD
Insulation 1/6/2021 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 1/12/2021 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 1/12/2021 Approved DAVID BURKHEAD
Light Gage Steel Frame 1/14/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/15/2021 Partial Approval DAVID BURKHEAD
Insulation 1/22/2021 Partial Approval DAVID BURKHEAD
Wood Frame 1/22/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/25/2021 Partial Approval DAVID BURKHEAD
Insulation 1/26/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 1/29/2021 Partial Approval DAVID BURKHEAD
Insulation 2/3/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 2/12/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 2/16/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 2/17/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 2/19/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/4/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/5/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/10/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/11/2021 Partial Approval DAVID BURKHEAD
Insulation 3/12/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 3/12/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/15/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/16/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 3/16/2021 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 3/30/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 4/7/2021 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 4/9/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/13/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/21/2021 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 4/23/2021 Partial Approval DAVID BURKHEAD
Wood Frame 4/26/2021 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 4/28/2021 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 4/29/2021 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 4/30/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 5/6/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 5/7/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/11/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/13/2021 Partial Approval DAVID BURKHEAD
Green Building Rough 5/17/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 5/17/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 5/17/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/24/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/1/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/2/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/8/2021 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/10/2021 Partial Approval DAVID BURKHEAD
Masonry Wall/Backfill 6/18/2021 Partial Inspection DAVID BURKHEAD
Deputy Shotcrete 7/22/2021 Conditional Approval DAVID BURKHEAD
Pre-Inspection 7/26/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 7/27/2021 Partial Inspection RUSSELL BONVOULOIR
Pre-Inspection 8/23/2021 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 9/13/2021 Partial Inspection DAVID BURKHEAD
Final 9/14/2021 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 9/14/2021 Approved DAVID BURKHEAD
Green Building Final 9/14/2021 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 9/14/2021 Approved DAVID BURKHEAD
Pre-Inspection 9/14/2021 Corrections Issued DAVID BURKHEAD
Reinforced Concrete Frame 9/14/2021 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 9/14/2021 Partial Approval DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 9/14/2021 SGSOV Approved DAVID BURKHEAD
SUSMP-Std. Urban Storm Water 9/14/2021 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 9/14/2021 Not Ready for Inspection DAVID BURKHEAD
Posting Pre-Inspection 9/15/2021 Approved DAVID BURKHEAD
Pre-Inspection 9/15/2021 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 9/15/2021 Partial Inspection DAVID BURKHEAD
T-Bar Ceiling 9/15/2021 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 9/17/2021 Partial Inspection DAVID BURKHEAD
Final 9/20/2021 Partial Inspection DAVID BURKHEAD
Green Building Final 9/20/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/20/2021 Partial Inspection DAVID BURKHEAD
Reinforced Masonry Frame 9/20/2021 Partial Inspection DAVID BURKHEAD
SUSMP-Std. Urban Storm Water 9/20/2021 Approved DAVID BURKHEAD
Smoke Detectors 9/20/2021 Approved DAVID BURKHEAD
Special/Order Compliance 9/20/2021 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 9/20/2021 Partial Approval DAVID BURKHEAD
Special/Order Compliance 9/21/2021 Corrections Issued DAVID BURKHEAD
Special/Order Compliance 9/22/2021 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 9/23/2021 Partial Inspection DAVID BURKHEAD
Final 9/27/2021 Partial Inspection DAVID BURKHEAD
Green Building Final 9/27/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/27/2021 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 9/27/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 9/27/2021 Partial Approval DAVID BURKHEAD
Special/Order Compliance 9/28/2021 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 9/29/2021 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 9/30/2021 Corrections Issued DAVID BURKHEAD
Final 10/5/2021 Partial Inspection DAVID BURKHEAD
Green Building Final 10/5/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/5/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 10/5/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/5/2021 Approved DAVID BURKHEAD
Special/Order Compliance 10/13/2021 Approved ERNESTO CORRAL
Final 10/20/2021 Partial Inspection DANIEL MC AULIFFE
Green Building Final 10/20/2021 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 10/20/2021 Partial Inspection DANIEL MC AULIFFE
Reinforced Masonry Frame 10/20/2021 Partial Inspection DANIEL MC AULIFFE
Final 10/27/2021 Partial Inspection DAVID BURKHEAD
Green Building Final 10/27/2021 Approved DAVID BURKHEAD
Reinforced Concrete Frame 10/27/2021 Approved DAVID BURKHEAD
Reinforced Masonry Frame 10/27/2021 Approved DAVID BURKHEAD
Special/Order Compliance 10/28/2021 Partial Inspection DAVID BURKHEAD
Final 11/1/2021 OK for TCO DAVID BURKHEAD
Final 12/7/2021 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 4/6/2022 Approved DAVID BURKHEAD