1500 S GRANVILLE AVE 90025

Certificate Information: 1500 S GRANVILLE AVE 90025

Application / Permit
16010-10000-04258
Plan Check / Job No.
B16LA14632
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 5 STORY MIXED USE APT. BUILDING: 4 STORY TYPE V-A ,154 RESIDENTIAL UNITS OVER 1 STORY TYPE I-A ,RETAIL & RESTAURANT OVER 2 LEVELS SUBTERRANEAN PARKING GARAGE . (35% Density Bonus, sixteen (16) very low income units per 12.22.A.25)
Permit Issued
Issued on 10/5/2018
Issuing Office
Metro
Current Status
CofO Issued on 3/31/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/28/2016 APPLICANT
Assigned to Plan Check Engineer 10/13/2016 GARO TELMI
Green Plans Picked Up 10/24/2016 APPLICANT
Disabled Access Plans Picked Up 10/28/2016 APPLICANT
Corrections Issued 11/1/2016 GARO TELMI
Quality Review Completed 11/10/2016 JOHN FRANCIA
Building Plans Picked Up 11/17/2016 APPLICANT
Applicant returned to address corrections 2/22/2017 GARO TELMI
Applicant returned to address corrections 4/5/2017 GARO TELMI
Applicant returned to address corrections 7/6/2017 GARO TELMI
Applicant returned to address corrections 8/1/2017 GARO TELMI
Applicant returned to address corrections 8/1/2018 GARO TELMI
Applicant returned to address corrections 9/14/2018 GARO TELMI
Applicant returned to address corrections 9/18/2018 GARO TELMI
Applicant returned to address corrections 9/26/2018 GARO TELMI
Plan Check Approved 9/28/2018 GARO TELMI
Issued 10/5/2018 LADBS
TCO Issued (Expire Date: 05-29-2021) 11/30/2020 TED RIES
CofO in Progress 3/23/2021 TED RIES
Permit Finaled 3/31/2021 HENRY BAGHDASSARIAN
CofO Issued 3/31/2021 HENRY BAGHDASSARIAN
Permit Finaled 3/31/2021 HENRY BAGHDASSARIAN

Permit Application Clearance Information

Address approval Cleared 5/3/2017 RAVIL MANAPOV
Certificate of Compliance Cleared 5/3/2017 SARAH GOLDMAN
ZA Case Cleared 5/3/2017 SARAH GOLDMAN
Encroachment in public way Cleared 6/7/2017 JACOB BIGLER
Eng Process Fee Ord 176,300 Cleared 7/28/2017 CARLA VALLADARES
Sewer availability Cleared 7/28/2017 CARLA VALLADARES
Highway dedication Cleared 9/5/2017 MAHELET GEBEYHU
Building over 3-story or 36-ft Cleared 9/20/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 9/20/2017 CALOSHA APPROVED
Hydrant and Access approval Cleared 9/29/2017 JOHN CONNEALLY
Fire Marshall Fire Life Safety Cleared 11/15/2017 MENOA AGHAJANI
DCP conditions approval Cleared 1/4/2018 RICHARD TRUONG
DCP conditions approval Cleared 1/4/2018 RICHARD TRUONG
Housing density bonus Cleared 1/4/2018 RICHARD TRUONG
Miscellaneous Cleared 1/19/2018 CHEN ZHANG
Permit Cleared 1/19/2018 CHEN ZHANG
Roof/Waste drainage to street Cleared 1/19/2018 CHEN ZHANG
CPC Cleared 1/23/2018 ERIC CLAROS
Comm Cor/Mini-Mall Cleared 1/23/2018 ERIC CLAROS
Comm Cor/Mini-Mall Cleared 1/23/2018 ERIC CLAROS
Miscellaneous Cleared 1/23/2018 ERIC CLAROS
Miscellaneous Cleared 1/23/2018 ERIC CLAROS
Miscellaneous Cleared 1/23/2018 ERIC CLAROS
Miscellaneous Cleared 1/23/2018 ERIC CLAROS
Opn space landscape/Water mgmt Cleared 1/23/2018 ERIC CLAROS
Site Plan review Cleared 1/23/2018 ERIC CLAROS
Low Impact Development Cleared 1/24/2018 MARTIN FRAGOSO
Stormwater Pollution Mitigatn Cleared 1/24/2018 MARTIN FRAGOSO
Green Code Cleared 2/5/2018 JOHN KLARIN
Work Adjacent to Public Way Cleared 3/20/2018 KRISTEN LY
Construction near power lines Cleared 7/12/2018 RIDWAN HARDY
DAS Clearance Cleared 9/13/2018 EDDIE GARIN
CPC Cleared 9/14/2018 ERIC CLAROS
Driveway location Cleared 9/14/2018 CLIVE GRAWE
Internal circulation Cleared 9/14/2018 CLIVE GRAWE
Miscellaneous Cleared 9/14/2018 ERIC CLAROS
Miscellaneous Cleared 9/14/2018 ERIC CLAROS
Site Plan review Cleared 9/14/2018 ERIC CLAROS
Specific Plan Cleared 9/14/2018 CLIVE GRAWE
Specific Plan Cleared 9/14/2018 CLIVE GRAWE
ZI Cleared 9/14/2018 ERIC CLAROS
DCP conditions approval Cleared 9/17/2018 RICHARD TRUONG
Density Bonus 12.22.A.25 Cleared 9/17/2018 RICHARD TRUONG
CPC Cleared 10/4/2018 ERIC CLAROS

Contact Information

Architect O'Herlihy, Lorcan Patrick; Lic. No.: C24245 1537 LA CIENEGA BLVD      LOS ANGELES, CA 90035
Contractor Suffolk Construction Company Inc; Lic. No.: 751099-B 525 MARKET STREET STE 2850      SAN FRANCISCO, CA 94105
Engineer , ; Lic. No.: C75121 319 MAIN ST.      EL SEGUNDO, CA 90245
Engineer , ; Lic. No.: C79694 3303 N. SAN FERNANDO BLVD.   100    BURBANK, CA 91504
Engineer , ; Lic. No.: S5421 319 MAIN ST      EL SEGUNDO, CA 90245
Engineer 3505, Cadillse Ave; Lic. No.: L6281 BUILDING 108      COTA MESA, CA 92626
Engineer Young, Don Yuk-Man; Lic. No.: C35713 650 SIERRA MADRE VILLA AVE #206      PASADENA, CA 91107

Inspector Information

DANIEL VARNUM, (310) 914-3914 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Special/Order Compliance 1/30/2019 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 3/19/2019 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/27/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/28/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/29/2019 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/29/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 3/29/2019 Not Ready for Inspection DANIEL MC AULIFFE
Green Building Rough 4/1/2019 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 4/1/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 4/1/2019 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/4/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/10/2019 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 4/10/2019 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 4/10/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 4/10/2019 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/11/2019 Conditional Approval TONY HARTONO
Deputy Reinf. Concrete 4/12/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/12/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/15/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/16/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/17/2019 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 4/17/2019 Not Ready for Inspection DANIEL MC AULIFFE
Green Building Rough 4/17/2019 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 4/17/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 4/17/2019 Not Ready for Inspection DANIEL MC AULIFFE
Pre-Inspection 4/18/2019 Partial Approval DANIEL MC AULIFFE
Green Building Rough 4/23/2019 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 4/23/2019 Not Ready for Inspection DANIEL MC AULIFFE
Verify Sprinkler Sign Off 4/23/2019 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/24/2019 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 4/24/2019 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 4/25/2019 Partial Inspection DANIEL MC AULIFFE
Green Building Rough 4/27/2019 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 4/27/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 4/27/2019 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 4/29/2019 Not Ready for Inspection DANIEL MC AULIFFE
Green Building Rough 4/29/2019 Off-Hour Fees Due
Green Building Rough 4/29/2019 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 4/29/2019 Off-Hour Fees Due
Reinforced Concrete Frame 4/29/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 4/29/2019 Off-Hour Fees Due
Verify Sprinkler Sign Off 4/29/2019 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/30/2019 Partial Approval DANIEL MC AULIFFE
Green Building Rough 5/3/2019 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 5/3/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 5/3/2019 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 5/6/2019 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/7/2019 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/7/2019 Corrections Issued DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 5/8/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 5/8/2019 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/9/2019 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 5/9/2019 Partial Approval DANIEL MC AULIFFE
Green Building Rough 5/9/2019 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 5/13/2019 Partial Inspection DANIEL MC AULIFFE
Verify Sprinkler Sign Off 5/13/2019 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 5/14/2019 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/15/2019 Partial Approval DANIEL MC AULIFFE
Green Building Rough 5/17/2019 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 5/17/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 5/17/2019 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 5/20/2019 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/21/2019 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 5/21/2019 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/23/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 5/23/2019 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/24/2019 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/28/2019 Not Ready for Inspection DANIEL MC AULIFFE
Green Building Rough 5/29/2019 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 5/29/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 5/29/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/30/2019 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 5/30/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 6/6/2019 Partial Inspection DANIEL MC AULIFFE
Green Building Rough 6/7/2019 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 6/7/2019 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/10/2019 Approved DANIEL MC AULIFFE
Reinforced Masonry Frame 6/10/2019 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/11/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/11/2019 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 6/11/2019 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 6/12/2019 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/13/2019 Approved DANIEL MC AULIFFE
Piling/Pier/Caisson 6/13/2019 Approved DANIEL MC AULIFFE
Green Building Rough 6/17/2019 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 6/17/2019 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 6/18/2019 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 6/19/2019 Partial Approval TED RIES
Green Building Rough 6/20/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 6/20/2019 Partial Approval TED RIES
Green Building Rough 6/26/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 6/26/2019 Partial Approval TED RIES
Green Building Rough 7/9/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/9/2019 Partial Inspection TED RIES
Piling/Pier/Caisson 7/10/2019 Partial Approval TED RIES
Green Building Rough 7/16/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/16/2019 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 7/18/2019 Partial Approval TED RIES
Green Building Rough 7/18/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/18/2019 Partial Approval TED RIES
Green Building Rough 7/25/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/25/2019 Partial Approval TED RIES
Green Building Rough 7/31/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/31/2019 Partial Approval TED RIES
Green Building Rough 8/7/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 8/7/2019 Partial Approval TED RIES
Footing/Foundation/Slab 8/8/2019 Not Ready for Inspection TED RIES
Excavation/Setback/Form/Re-Bar 8/9/2019 Partial Approval TED RIES
Green Building Rough 8/14/2019 Partial Inspection TED RIES
Reinforced Concrete Frame 8/14/2019 Partial Inspection TED RIES
Excavation/Setback/Form/Re-Bar 8/15/2019 Partial Approval TED RIES
Piling/Pier/Caisson 8/19/2019 Partial Approval TED RIES
Green Building Rough 8/23/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 8/23/2019 Partial Approval TED RIES
Deputy Wood Construction 8/30/2019 Approved TED RIES
Deputy Reinf. Concrete 9/3/2019 Approved TED RIES
Deputy Wood Construction 9/3/2019 Approved TED RIES
Deputy Reinf. Concrete 9/4/2019 Approved TED RIES
Deputy Wood Construction 9/4/2019 Approved TED RIES
Green Building Rough 9/4/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 9/4/2019 Partial Approval TED RIES
Wood Frame 9/4/2019 Partial Inspection TED RIES
Deputy Reinf. Concrete 9/5/2019 Approved TED RIES
Deputy Reinf. Concrete 9/10/2019 Approved TED RIES
Green Building Rough 9/10/2019 Not Ready for Inspection TED RIES
Wood Frame 9/10/2019 Partial Inspection TED RIES
Deputy Reinf. Concrete 9/11/2019 Approved TED RIES
Deputy Reinf. Concrete 9/12/2019 Approved TED RIES
Deputy Wood Construction 9/12/2019 Approved TED RIES
Deputy Reinf. Concrete 9/17/2019 Approved TED RIES
Green Building Rough 9/17/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 9/17/2019 Conditional Approval TED RIES
Wood Frame 9/17/2019 Partial Inspection TED RIES
Deputy Reinf. Concrete 9/18/2019 Approved TED RIES
Deputy Steel/Welding 9/25/2019 Approved TED RIES
Deputy Wood Construction 9/25/2019 Approved TED RIES
Deputy Steel/Welding 9/26/2019 Approved TED RIES
Deputy Steel/Welding 9/27/2019 Approved TED RIES
Deputy Wood Construction 9/27/2019 Approved TED RIES
Deputy Wood Construction 9/30/2019 Approved TED RIES
Deputy Wood Construction 10/3/2019 Approved TED RIES
Deputy Reinf. Concrete 10/7/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 10/7/2019 Approved DERRICK SPENCER
Deputy Wood Construction 10/7/2019 Approved DERRICK SPENCER
Green Building Rough 10/7/2019 Not Ready for Inspection DERRICK SPENCER
Wood Frame 10/7/2019 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 10/8/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 10/9/2019 Approved DERRICK SPENCER
Deputy Wood Construction 10/10/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 10/16/2019 Approved TED RIES
Masonry Wall/Backfill 10/16/2019 Partial Approval TED RIES
Deputy Steel/Welding 10/17/2019 Approved TED RIES
Deputy Wood Construction 10/17/2019 Approved TED RIES
Deputy Steel/Welding 10/18/2019 Approved TED RIES
Green Building Rough 10/18/2019 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 10/18/2019 Partial Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 10/19/2019 Partial Approval TED RIES
Deputy Reinf. Concrete 10/21/2019 Approved TED RIES
Deputy Wood Construction 10/21/2019 Approved TED RIES
Deputy Wood Construction 10/22/2019 Approved TED RIES
Deputy Reinf. Concrete 10/24/2019 Approved TED RIES
Deputy Wood Construction 10/24/2019 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 10/24/2019 Partial Approval TED RIES
Deputy Reinf. Concrete 10/28/2019 Approved TED RIES
Deputy Drilled-In Anchors 10/29/2019 Approved TED RIES
Deputy Wood Construction 10/29/2019 Approved TED RIES
Green Building Rough 10/29/2019 Not Ready for Inspection TED RIES
Wood Frame 10/29/2019 Partial Approval TED RIES
Deputy Steel/Welding 10/30/2019 Approved TED RIES
Deputy Wood Construction 11/5/2019 Approved DERRICK SPENCER
Drywall Nailing 11/6/2019 Partial Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 11/6/2019 Partial Approval TED RIES
Deputy Wood Construction 11/7/2019 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 11/7/2019 Partial Inspection TED RIES
Deputy Reinf. Concrete 11/12/2019 Approved TED RIES
Deputy Wood Construction 11/14/2019 Approved TED RIES
Drywall Nailing 11/18/2019 Partial Approval TED RIES
Deputy Reinf. Concrete 11/19/2019 Approved TED RIES
Deputy Wood Construction 11/19/2019 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 11/19/2019 Partial Approval TED RIES
Deputy Reinf. Concrete 11/21/2019 Approved TED RIES
Deputy Wood Construction 11/21/2019 Approved TED RIES
Deputy Steel/Welding 11/25/2019 Approved TED RIES
Deputy Wood Construction 11/25/2019 Approved TED RIES
Deputy Steel/Welding 11/26/2019 Approved TED RIES
Deputy Steel/Welding 11/27/2019 Approved TED RIES
Deputy Wood Construction 12/3/2019 Approved TED RIES
Deputy Steel/Welding 12/4/2019 Approved TED RIES
Deputy Wood Construction 12/4/2019 Approved TED RIES
Deputy Steel/Welding 12/5/2019 Approved TED RIES
Reinforced Masonry Frame 12/5/2019 Partial Approval TED RIES
Deputy Steel/Welding 12/6/2019 Approved TED RIES
Deputy Wood Construction 12/6/2019 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 12/6/2019 Partial Approval TED RIES
Structural Steel Frame 12/6/2019 Not Ready for Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 12/9/2019 Partial Approval TED RIES
Masonry Wall/Backfill 12/9/2019 Partial Approval TED RIES
Structural Steel Frame 12/9/2019 Partial Approval TED RIES
Deputy Wood Construction 12/10/2019 Approved TED RIES
Insulation 12/11/2019 Partial Approval TED RIES
Deputy Wood Construction 12/13/2019 Approved JEFF BYTHEWAY
Green Building Rough 12/13/2019 Not Ready for Inspection JEFF BYTHEWAY
Wood Frame 12/13/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Steel/Welding 12/17/2019 Approved TED RIES
Deputy Steel/Welding 12/18/2019 Approved TED RIES
Deputy Wood Construction 12/18/2019 Approved TED RIES
Wood Frame 12/18/2019 Partial Approval TED RIES
Deputy Steel/Welding 12/19/2019 Approved TED RIES
Deputy Wood Construction 12/19/2019 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 12/19/2019 Partial Approval TED RIES
Green Building Rough 12/19/2019 Not Ready for Inspection TED RIES
Light Gage Steel Frame 12/19/2019 Partial Inspection TED RIES
Wood Frame 12/19/2019 Partial Approval TED RIES
Deputy Steel/Welding 12/20/2019 Approved JEFF BYTHEWAY
Deputy Wood Construction 12/20/2019 Approved JEFF BYTHEWAY
Deputy Wood Construction 12/23/2019 Approved TED RIES
Deputy Wood Construction 12/27/2019 Approved TED RIES
Drywall Nailing 12/30/2019 Not Ready for Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 12/30/2019 Partial Approval TED RIES
Green Building Rough 12/30/2019 Not Ready for Inspection TED RIES
Insulation 12/30/2019 Not Ready for Inspection TED RIES
Wood Frame 12/30/2019 Partial Approval TED RIES
Deputy Wood Construction 12/31/2019 Approved DERRICK SPENCER
Deputy Wood Construction 1/3/2020 Approved DERRICK SPENCER
Pre-Inspection 1/6/2020 Partial Approval TED RIES
Deputy Wood Construction 1/7/2020 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 1/7/2020 Partial Approval TED RIES
Green Building Rough 1/7/2020 Not Ready for Inspection TED RIES
Wood Frame 1/7/2020 Corrections Issued TED RIES
Deputy Wood Construction 1/9/2020 Approved TED RIES
Drywall Nailing 1/9/2020 Not Ready for Inspection TED RIES
Wood Frame 1/9/2020 Partial Approval TED RIES
Deputy Wood Construction 1/10/2020 Approved TED RIES
Deputy Steel/Welding 1/13/2020 Approved TED RIES
Deputy Wood Construction 1/13/2020 Approved TED RIES
Insulation 1/13/2020 Partial Approval TED RIES
Deputy Steel/Welding 1/14/2020 Approved TED RIES
Deputy Wood Construction 1/14/2020 Approved TED RIES
Insulation 1/14/2020 Partial Approval TED RIES
Deputy Steel/Welding 1/15/2020 Approved TED RIES
Deputy Steel/Welding 1/16/2020 Approved TED RIES
Deputy Wood Construction 1/16/2020 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 1/16/2020 Not Ready for Inspection TED RIES
Green Building Rough 1/16/2020 Not Ready for Inspection TED RIES
Wood Frame 1/16/2020 Partial Approval TED RIES
Deputy Steel/Welding 1/17/2020 Approved TED RIES
Deputy Wood Construction 1/17/2020 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 1/17/2020 Partial Approval TED RIES
Insulation 1/17/2020 Partial Approval TED RIES
Insulation 1/21/2020 Partial Inspection TED RIES
Drywall Nailing 1/22/2020 Partial Approval TED RIES
Green Building Rough 1/22/2020 Not Ready for Inspection TED RIES
Insulation 1/22/2020 Partial Approval TED RIES
Wood Frame 1/22/2020 Partial Approval TED RIES
Deputy Fireproofing 1/24/2020 Approved TED RIES
Deputy Wood Construction 1/24/2020 Approved TED RIES
Insulation 1/24/2020 Partial Inspection TED RIES
Deputy Wood Construction 1/27/2020 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 1/28/2020 Partial Approval TED RIES
Green Building Rough 1/28/2020 Not Ready for Inspection TED RIES
Wood Frame 1/28/2020 Partial Approval TED RIES
Deputy Fireproofing 2/4/2020 Approved TED RIES
Deputy Wood Construction 2/4/2020 Approved TED RIES
Green Building Rough 2/4/2020 Not Ready for Inspection TED RIES
Insulation 2/4/2020 Partial Approval TED RIES
Wood Frame 2/4/2020 Partial Approval TED RIES
Deputy Fireproofing 2/5/2020 Approved TED RIES
Deputy Wood Construction 2/5/2020 Approved TED RIES
Deputy Fireproofing 2/6/2020 Approved JEFF BYTHEWAY
Deputy Fireproofing 2/7/2020 Approved JEFF BYTHEWAY
Drywall Nailing 2/7/2020 Not Ready for Inspection JEFF BYTHEWAY
Insulation 2/7/2020 Not Ready for Inspection JEFF BYTHEWAY
Green Building Rough 2/11/2020 Not Ready for Inspection JEFF BYTHEWAY
Deputy Wood Construction 2/12/2020 Approved JEFF BYTHEWAY
Insulation 2/13/2020 Partial Inspection TED RIES
Deputy Wood Construction 2/14/2020 Approved TED RIES
Insulation 2/18/2020 Partial Approval TED RIES
Insulation 2/19/2020 Not Ready for Inspection DERRICK SPENCER
Deputy Wood Construction 2/21/2020 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 2/25/2020 Partial Inspection TED RIES
Insulation 2/25/2020 Partial Inspection TED RIES
Deputy Wood Construction 2/26/2020 Approved TED RIES
Green Building Rough 2/28/2020 Not Ready for Inspection JAMES POWERS
Insulation 2/28/2020 Not Ready for Inspection JAMES POWERS
Wood Frame 2/28/2020 Not Ready for Inspection JAMES POWERS
Deputy Wood Construction 3/3/2020 Approved TED RIES
Green Building Rough 3/3/2020 Not Ready for Inspection TED RIES
Insulation 3/3/2020 Partial Approval TED RIES
Wood Frame 3/3/2020 Partial Approval TED RIES
Insulation 3/4/2020 Partial Approval TED RIES
Deputy Wood Construction 3/9/2020 Approved TED RIES
Deputy Reinf. Concrete 3/10/2020 Approved TED RIES
Deputy Wood Construction 3/10/2020 Approved TED RIES
Green Building Rough 3/10/2020 Not Ready for Inspection TED RIES
Insulation 3/10/2020 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 3/10/2020 Not Ready for Inspection TED RIES
Wood Frame 3/10/2020 Not Ready for Inspection TED RIES
Drywall Nailing 3/11/2020 Partial Approval TED RIES
Insulation 3/11/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 3/12/2020 Approved TED RIES
Deputy Reinf. Concrete 3/12/2020 Approved TED RIES
Deputy Wood Construction 3/12/2020 Approved TED RIES
Insulation 3/13/2020 Partial Approval TED RIES
Deputy Reinf. Concrete 3/16/2020 Approved TED RIES
Deputy Wood Construction 3/16/2020 Approved TED RIES
Deputy Reinf. Concrete 3/17/2020 Approved JEFF BYTHEWAY
Deputy Wood Construction 3/17/2020 Approved JEFF BYTHEWAY
Drywall Nailing 3/18/2020 Not Ready for Inspection JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 3/18/2020 Not Ready for Inspection JEFF BYTHEWAY
Green Building Rough 3/18/2020 Not Ready for Inspection JEFF BYTHEWAY
Insulation 3/18/2020 Not Ready for Inspection JEFF BYTHEWAY
Light Gage Steel Frame 3/18/2020 Not Ready for Inspection JEFF BYTHEWAY
Wood Frame 3/18/2020 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 3/19/2020 Approved JEFF BYTHEWAY
Drywall Nailing 3/23/2020 Not Ready for Inspection TED RIES
Green Building Rough 3/23/2020 Not Ready for Inspection TED RIES
Insulation 3/23/2020 Partial Approval TED RIES
Interior/Exterior Lathing 3/23/2020 Not Ready for Inspection TED RIES
Wood Frame 3/23/2020 Not Ready for Inspection TED RIES
Deputy Wood Construction 3/26/2020 Approved TED RIES
Deputy Wood Construction 3/27/2020 Approved TED RIES
Drywall Nailing 4/1/2020 Partial Approval TED RIES
Green Building Rough 4/1/2020 Not Ready for Inspection TED RIES
Insulation 4/1/2020 Partial Approval TED RIES
Light Gage Steel Frame 4/1/2020 Partial Approval TED RIES
Wood Frame 4/1/2020 Partial Approval TED RIES
Deputy Wood Construction 4/3/2020 Approved TED RIES
Deputy Wood Construction 4/6/2020 Approved TED RIES
Green Building Rough 4/7/2020 Not Ready for Inspection TED RIES
Insulation 4/7/2020 Partial Inspection TED RIES
Wood Frame 4/7/2020 Partial Inspection TED RIES
Drywall Nailing 4/8/2020 Partial Inspection TED RIES
Green Building Rough 4/8/2020 Not Ready for Inspection TED RIES
Insulation 4/8/2020 Partial Approval TED RIES
Wood Frame 4/8/2020 Partial Inspection TED RIES
Deputy Wood Construction 4/9/2020 Approved TED RIES
Insulation 4/10/2020 Partial Approval TED RIES
Deputy Wood Construction 4/13/2020 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 4/13/2020 Partial Approval TED RIES
Green Building Rough 4/13/2020 Not Ready for Inspection TED RIES
Wood Frame 4/13/2020 Partial Approval TED RIES
Drywall Nailing 4/16/2020 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 4/16/2020 Partial Approval TED RIES
Green Building Rough 4/16/2020 Partial Approval TED RIES
Insulation 4/16/2020 Partial Approval TED RIES
Wood Frame 4/16/2020 Partial Approval TED RIES
Deputy Wood Construction 4/17/2020 Approved TED RIES
Deputy Wood Construction 4/22/2020 Approved TED RIES
Drywall Nailing 4/22/2020 Partial Approval TED RIES
Green Building Rough 4/22/2020 Conditional Approval TED RIES
Insulation 4/22/2020 Partial Approval TED RIES
Wood Frame 4/22/2020 Partial Approval TED RIES
Deputy Wood Construction 4/24/2020 Approved TED RIES
Floor/Roof Diaphrgm/Shear Wall 4/29/2020 Partial Inspection TED RIES
Green Building Rough 4/29/2020 Not Ready for Inspection TED RIES
Insulation 4/29/2020 Partial Inspection TED RIES
Interior/Exterior Lathing 4/29/2020 Partial Approval TED RIES
Wood Frame 4/29/2020 Partial Approval TED RIES
Drywall Nailing 5/11/2020 Not Ready for Inspection TED RIES
Green Building Rough 5/11/2020 Not Ready for Inspection TED RIES
Insulation 5/11/2020 Not Ready for Inspection TED RIES
Wood Frame 5/11/2020 Not Ready for Inspection TED RIES
Special/Order Compliance 5/12/2020 Approved TED RIES
Insulation 5/13/2020 Partial Approval TED RIES
Deputy Wood Construction 5/14/2020 Approved TED RIES
Green Building Rough 5/18/2020 Partial Inspection TED RIES
Wood Frame 5/18/2020 Partial Inspection TED RIES
Drywall Nailing 5/21/2020 Partial Approval TED RIES
Insulation 5/21/2020 Partial Inspection TED RIES
Insulation 5/26/2020 Partial Approval TED RIES
Insulation 5/28/2020 Partial Approval TED RIES
Interior/Exterior Lathing 5/28/2020 Partial Approval TED RIES
Drywall Nailing 6/2/2020 Partial Inspection TED RIES
Insulation 6/2/2020 Partial Inspection TED RIES
Drywall Nailing 6/3/2020 Partial Inspection TED RIES
Insulation 6/3/2020 Partial Inspection TED RIES
Drywall Nailing 6/8/2020 Partial Approval TED RIES
Insulation 6/8/2020 Partial Approval TED RIES
Drywall Nailing 6/15/2020 Partial Inspection TED RIES
Insulation 6/15/2020 Partial Inspection TED RIES
Drywall Nailing 6/22/2020 Partial Approval TED RIES
Drywall Nailing 6/30/2020 Partial Approval TED RIES
Light Gage Steel Frame 6/30/2020 Partial Approval TED RIES
Drywall Nailing 7/2/2020 Partial Inspection TED RIES
Drywall Nailing 7/14/2020 Partial Approval TED RIES
T-Bar Ceiling 7/14/2020 Partial Approval TED RIES
Drywall Nailing 7/22/2020 Partial Inspection TED RIES
Interior/Exterior Lathing 7/22/2020 Partial Approval TED RIES
Drywall Nailing 7/29/2020 Partial Approval TED RIES
Interior/Exterior Lathing 7/29/2020 Partial Approval TED RIES
Insulation 7/31/2020 Partial Approval TED RIES
Insulation 8/3/2020 Partial Approval TED RIES
Drywall Nailing 8/4/2020 Partial Inspection TED RIES
Insulation 8/4/2020 Partial Inspection TED RIES
Interior/Exterior Lathing 8/4/2020 Partial Approval TED RIES
Drywall Nailing 8/5/2020 Partial Approval TED RIES
Interior/Exterior Lathing 8/5/2020 Partial Approval TED RIES
Deputy Reinf. Concrete 8/6/2020 Conditional Approval TED RIES
Drywall Nailing 8/6/2020 Partial Inspection TED RIES
Insulation 8/6/2020 Partial Inspection TED RIES
Interior/Exterior Lathing 8/6/2020 Partial Inspection TED RIES
Light Gage Steel Frame 8/6/2020 Partial Inspection TED RIES
Drywall Nailing 8/10/2020 Partial Approval TED RIES
Insulation 8/10/2020 Partial Approval TED RIES
Interior/Exterior Lathing 8/10/2020 Partial Approval TED RIES
Deputy Reinf. Concrete 8/11/2020 Approved TED RIES
Drywall Nailing 8/11/2020 Partial Approval TED RIES
Interior/Exterior Lathing 8/11/2020 Partial Approval TED RIES
Drywall Nailing 8/12/2020 Partial Inspection TED RIES
Insulation 8/12/2020 Partial Inspection TED RIES
Interior/Exterior Lathing 8/12/2020 Partial Inspection TED RIES
Drywall Nailing 8/13/2020 Partial Approval TED RIES
Insulation 8/13/2020 Partial Approval TED RIES
Interior/Exterior Lathing 8/13/2020 Partial Approval TED RIES
Drywall Nailing 8/21/2020 Partial Approval TED RIES
Interior/Exterior Lathing 8/21/2020 Partial Approval TED RIES
Light Gage Steel Frame 8/21/2020 Partial Approval TED RIES
Deputy Shotcrete 8/25/2020 Conditional Approval TED RIES
Drywall Nailing 8/25/2020 Partial Approval TED RIES
Green Building Rough 8/25/2020 Approved TED RIES
Reinforced Concrete Frame 8/25/2020 Partial Approval TED RIES
Deputy Shotcrete 8/26/2020 Conditional Approval TED RIES
Interior/Exterior Lathing 8/31/2020 Partial Approval TED RIES
Interior/Exterior Lathing 9/8/2020 Partial Approval TED RIES
Drywall Nailing 9/10/2020 Partial Approval TED RIES
Drywall Nailing 9/16/2020 Partial Approval TED RIES
Insulation 9/16/2020 Partial Approval TED RIES
Light Gage Steel Frame 9/16/2020 Partial Approval TED RIES
Drywall Nailing 9/18/2020 Partial Approval TED RIES
Insulation 9/18/2020 Partial Approval TED RIES
Light Gage Steel Frame 9/18/2020 Partial Approval TED RIES
Drywall Nailing 9/23/2020 Partial Approval TED RIES
Insulation 9/23/2020 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 9/26/2020 Partial Approval TED RIES
Drywall Nailing 9/30/2020 Partial Approval TED RIES
Light Gage Steel Frame 10/2/2020 Partial Approval TED RIES
Pre-Inspection 10/6/2020 Not Ready for Inspection TED RIES
Light Gage Steel Frame 10/7/2020 Partial Inspection TED RIES
Light Gage Steel Frame 10/15/2020 Partial Approval TED RIES
Light Gage Steel Frame 10/17/2020 Partial Approval TED RIES
Light Gage Steel Frame 10/20/2020 Partial Approval TED RIES
Special/Order Compliance 10/31/2020 Partial Approval TED RIES
Green Building Final 11/17/2020 Approved TED RIES
SGSOV-Seismic Gas S/O Valve 11/20/2020 SGSOV Not Ready TED RIES
Verify Rec and Parks Fee Memo 11/23/2020 Approved TED RIES
Special/Order Compliance 11/24/2020 No Access for Inspection TED RIES
SGSOV-Seismic Gas S/O Valve 11/30/2020 SGSOV Not Ready TED RIES
Final 3/22/2021 OK to Issue CofO TED RIES
Footing/Foundation/Slab 3/22/2021 Approved TED RIES
Reinforced Concrete Frame 3/22/2021 Approved TED RIES
SGSOV-Seismic Gas S/O Valve 3/22/2021 SGSOV Approved TED RIES
Smoke Detectors 3/22/2021 Approved TED RIES
Wood Frame 3/22/2021 Approved TED RIES