Special/Order Compliance
|
1/30/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Pre-Inspection
|
3/19/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
3/27/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
3/28/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
3/29/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
3/29/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
3/29/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
4/1/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
4/1/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
4/1/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/4/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/10/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
4/10/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
4/10/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
4/10/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/11/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
4/12/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/12/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/15/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/16/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/17/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
4/17/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
4/17/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
4/17/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
4/17/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Pre-Inspection
|
4/18/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
4/23/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
4/23/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
4/23/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
4/24/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
4/24/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
4/25/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
4/27/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
4/27/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
4/27/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
4/29/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
4/29/2019
|
Off-Hour Fees Due
|
|
|
Green Building Rough
|
4/29/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
4/29/2019
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
4/29/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
4/29/2019
|
Off-Hour Fees Due
|
|
|
Verify Sprinkler Sign Off
|
4/29/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
4/30/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
5/3/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
5/3/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
5/3/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
5/6/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/7/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
5/7/2019
|
Corrections Issued
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
5/8/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
5/8/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/9/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
5/9/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
5/9/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
5/13/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
5/13/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
5/14/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
5/15/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
5/17/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
5/17/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
5/17/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
5/20/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
5/21/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Reinforced Masonry Frame
|
5/21/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
5/23/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
5/23/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
5/24/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
5/28/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
5/29/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
5/29/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
5/29/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/30/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
5/30/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
6/6/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
6/7/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
6/7/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/10/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Reinforced Masonry Frame
|
6/10/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/11/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/11/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
6/11/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
6/12/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/13/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Piling/Pier/Caisson
|
6/13/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
6/17/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
6/17/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
6/18/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
6/19/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
6/20/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
6/20/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
6/26/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
6/26/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
7/9/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
7/9/2019
|
Partial Inspection
|
TED RIES
|
|
Piling/Pier/Caisson
|
7/10/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
7/16/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
7/16/2019
|
Partial Approval
|
TED RIES
|
|
Excavation/Setback/Form/Re-Bar
|
7/18/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
7/18/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
7/18/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
7/25/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
7/25/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
7/31/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
7/31/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
8/7/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
8/7/2019
|
Partial Approval
|
TED RIES
|
|
Footing/Foundation/Slab
|
8/8/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Excavation/Setback/Form/Re-Bar
|
8/9/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
8/14/2019
|
Partial Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
8/14/2019
|
Partial Inspection
|
TED RIES
|
|
Excavation/Setback/Form/Re-Bar
|
8/15/2019
|
Partial Approval
|
TED RIES
|
|
Piling/Pier/Caisson
|
8/19/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
8/23/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
8/23/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
8/30/2019
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
9/3/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
9/3/2019
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
9/4/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
9/4/2019
|
Approved
|
TED RIES
|
|
Green Building Rough
|
9/4/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
9/4/2019
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
9/4/2019
|
Partial Inspection
|
TED RIES
|
|
Deputy Reinf. Concrete
|
9/5/2019
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
9/10/2019
|
Approved
|
TED RIES
|
|
Green Building Rough
|
9/10/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
9/10/2019
|
Partial Inspection
|
TED RIES
|
|
Deputy Reinf. Concrete
|
9/11/2019
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
9/12/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
9/12/2019
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
9/17/2019
|
Approved
|
TED RIES
|
|
Green Building Rough
|
9/17/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
9/17/2019
|
Conditional Approval
|
TED RIES
|
|
Wood Frame
|
9/17/2019
|
Partial Inspection
|
TED RIES
|
|
Deputy Reinf. Concrete
|
9/18/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
9/25/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
9/25/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
9/26/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
9/27/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
9/27/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
9/30/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
10/3/2019
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
10/7/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
10/7/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
10/7/2019
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
10/7/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Wood Frame
|
10/7/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
10/8/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
10/9/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
10/10/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
10/16/2019
|
Approved
|
TED RIES
|
|
Masonry Wall/Backfill
|
10/16/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
10/17/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
10/17/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
10/18/2019
|
Approved
|
TED RIES
|
|
Green Building Rough
|
10/18/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
10/18/2019
|
Partial Inspection
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/19/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
10/21/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
10/21/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
10/22/2019
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
10/24/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
10/24/2019
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/24/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
10/28/2019
|
Approved
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
10/29/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
10/29/2019
|
Approved
|
TED RIES
|
|
Green Building Rough
|
10/29/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
10/29/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
10/30/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
11/5/2019
|
Approved
|
DERRICK SPENCER
|
|
Drywall Nailing
|
11/6/2019
|
Partial Inspection
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/6/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
11/7/2019
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/7/2019
|
Partial Inspection
|
TED RIES
|
|
Deputy Reinf. Concrete
|
11/12/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
11/14/2019
|
Approved
|
TED RIES
|
|
Drywall Nailing
|
11/18/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
11/19/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
11/19/2019
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/19/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
11/21/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
11/21/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
11/25/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
11/25/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
11/26/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
11/27/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
12/3/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
12/4/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
12/4/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
12/5/2019
|
Approved
|
TED RIES
|
|
Reinforced Masonry Frame
|
12/5/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
12/6/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
12/6/2019
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/6/2019
|
Partial Approval
|
TED RIES
|
|
Structural Steel Frame
|
12/6/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/9/2019
|
Partial Approval
|
TED RIES
|
|
Masonry Wall/Backfill
|
12/9/2019
|
Partial Approval
|
TED RIES
|
|
Structural Steel Frame
|
12/9/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
12/10/2019
|
Approved
|
TED RIES
|
|
Insulation
|
12/11/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
12/13/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
12/13/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
12/13/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
12/17/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
12/18/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
12/18/2019
|
Approved
|
TED RIES
|
|
Wood Frame
|
12/18/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
12/19/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
12/19/2019
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/19/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
12/19/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Light Gage Steel Frame
|
12/19/2019
|
Partial Inspection
|
TED RIES
|
|
Wood Frame
|
12/19/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
12/20/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
12/20/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
12/23/2019
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
12/27/2019
|
Approved
|
TED RIES
|
|
Drywall Nailing
|
12/30/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/30/2019
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
12/30/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Insulation
|
12/30/2019
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
12/30/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
12/31/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
1/3/2020
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
1/6/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
1/7/2020
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/7/2020
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
1/7/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
1/7/2020
|
Corrections Issued
|
TED RIES
|
|
Deputy Wood Construction
|
1/9/2020
|
Approved
|
TED RIES
|
|
Drywall Nailing
|
1/9/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
1/9/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
1/10/2020
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
1/13/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
1/13/2020
|
Approved
|
TED RIES
|
|
Insulation
|
1/13/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
1/14/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
1/14/2020
|
Approved
|
TED RIES
|
|
Insulation
|
1/14/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
1/15/2020
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
1/16/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
1/16/2020
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/16/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Green Building Rough
|
1/16/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
1/16/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
1/17/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
1/17/2020
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/17/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
1/17/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
1/21/2020
|
Partial Inspection
|
TED RIES
|
|
Drywall Nailing
|
1/22/2020
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
1/22/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Insulation
|
1/22/2020
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
1/22/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Fireproofing
|
1/24/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
1/24/2020
|
Approved
|
TED RIES
|
|
Insulation
|
1/24/2020
|
Partial Inspection
|
TED RIES
|
|
Deputy Wood Construction
|
1/27/2020
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/28/2020
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
1/28/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
1/28/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Fireproofing
|
2/4/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
2/4/2020
|
Approved
|
TED RIES
|
|
Green Building Rough
|
2/4/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Insulation
|
2/4/2020
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
2/4/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Fireproofing
|
2/5/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
2/5/2020
|
Approved
|
TED RIES
|
|
Deputy Fireproofing
|
2/6/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Fireproofing
|
2/7/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
2/7/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
2/7/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
2/11/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
2/12/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Insulation
|
2/13/2020
|
Partial Inspection
|
TED RIES
|
|
Deputy Wood Construction
|
2/14/2020
|
Approved
|
TED RIES
|
|
Insulation
|
2/18/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
2/19/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
2/21/2020
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/25/2020
|
Partial Inspection
|
TED RIES
|
|
Insulation
|
2/25/2020
|
Partial Inspection
|
TED RIES
|
|
Deputy Wood Construction
|
2/26/2020
|
Approved
|
TED RIES
|
|
Green Building Rough
|
2/28/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
2/28/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
2/28/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
3/3/2020
|
Approved
|
TED RIES
|
|
Green Building Rough
|
3/3/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Insulation
|
3/3/2020
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
3/3/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
3/4/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
3/9/2020
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
3/10/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
3/10/2020
|
Approved
|
TED RIES
|
|
Green Building Rough
|
3/10/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Insulation
|
3/10/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
3/10/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
3/10/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Drywall Nailing
|
3/11/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
3/11/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
3/12/2020
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
3/12/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
3/12/2020
|
Approved
|
TED RIES
|
|
Insulation
|
3/13/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
3/16/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
3/16/2020
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
3/17/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
3/17/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/18/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/18/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
3/18/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
3/18/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
3/18/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
3/18/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
3/19/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/23/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Green Building Rough
|
3/23/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Insulation
|
3/23/2020
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
3/23/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
3/23/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Deputy Wood Construction
|
3/26/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
3/27/2020
|
Approved
|
TED RIES
|
|
Drywall Nailing
|
4/1/2020
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
4/1/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Insulation
|
4/1/2020
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
4/1/2020
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
4/1/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
4/3/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
4/6/2020
|
Approved
|
TED RIES
|
|
Green Building Rough
|
4/7/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Insulation
|
4/7/2020
|
Partial Inspection
|
TED RIES
|
|
Wood Frame
|
4/7/2020
|
Partial Inspection
|
TED RIES
|
|
Drywall Nailing
|
4/8/2020
|
Partial Inspection
|
TED RIES
|
|
Green Building Rough
|
4/8/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Insulation
|
4/8/2020
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
4/8/2020
|
Partial Inspection
|
TED RIES
|
|
Deputy Wood Construction
|
4/9/2020
|
Approved
|
TED RIES
|
|
Insulation
|
4/10/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
4/13/2020
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/13/2020
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
4/13/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
4/13/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
4/16/2020
|
Partial Approval
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/16/2020
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
4/16/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
4/16/2020
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
4/16/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
4/17/2020
|
Approved
|
TED RIES
|
|
Deputy Wood Construction
|
4/22/2020
|
Approved
|
TED RIES
|
|
Drywall Nailing
|
4/22/2020
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
4/22/2020
|
Conditional Approval
|
TED RIES
|
|
Insulation
|
4/22/2020
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
4/22/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
4/24/2020
|
Approved
|
TED RIES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/29/2020
|
Partial Inspection
|
TED RIES
|
|
Green Building Rough
|
4/29/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Insulation
|
4/29/2020
|
Partial Inspection
|
TED RIES
|
|
Interior/Exterior Lathing
|
4/29/2020
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
4/29/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
5/11/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Green Building Rough
|
5/11/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Insulation
|
5/11/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Wood Frame
|
5/11/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Special/Order Compliance
|
5/12/2020
|
Approved
|
TED RIES
|
|
Insulation
|
5/13/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Wood Construction
|
5/14/2020
|
Approved
|
TED RIES
|
|
Green Building Rough
|
5/18/2020
|
Partial Inspection
|
TED RIES
|
|
Wood Frame
|
5/18/2020
|
Partial Inspection
|
TED RIES
|
|
Drywall Nailing
|
5/21/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
5/21/2020
|
Partial Inspection
|
TED RIES
|
|
Insulation
|
5/26/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
5/28/2020
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
5/28/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
6/2/2020
|
Partial Inspection
|
TED RIES
|
|
Insulation
|
6/2/2020
|
Partial Inspection
|
TED RIES
|
|
Drywall Nailing
|
6/3/2020
|
Partial Inspection
|
TED RIES
|
|
Insulation
|
6/3/2020
|
Partial Inspection
|
TED RIES
|
|
Drywall Nailing
|
6/8/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
6/8/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
6/15/2020
|
Partial Inspection
|
TED RIES
|
|
Insulation
|
6/15/2020
|
Partial Inspection
|
TED RIES
|
|
Drywall Nailing
|
6/22/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
6/30/2020
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
6/30/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
7/2/2020
|
Partial Inspection
|
TED RIES
|
|
Drywall Nailing
|
7/14/2020
|
Partial Approval
|
TED RIES
|
|
T-Bar Ceiling
|
7/14/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
7/22/2020
|
Partial Inspection
|
TED RIES
|
|
Interior/Exterior Lathing
|
7/22/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
7/29/2020
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
7/29/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
7/31/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
8/3/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
8/4/2020
|
Partial Inspection
|
TED RIES
|
|
Insulation
|
8/4/2020
|
Partial Inspection
|
TED RIES
|
|
Interior/Exterior Lathing
|
8/4/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
8/5/2020
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
8/5/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/6/2020
|
Conditional Approval
|
TED RIES
|
|
Drywall Nailing
|
8/6/2020
|
Partial Inspection
|
TED RIES
|
|
Insulation
|
8/6/2020
|
Partial Inspection
|
TED RIES
|
|
Interior/Exterior Lathing
|
8/6/2020
|
Partial Inspection
|
TED RIES
|
|
Light Gage Steel Frame
|
8/6/2020
|
Partial Inspection
|
TED RIES
|
|
Drywall Nailing
|
8/10/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
8/10/2020
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
8/10/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/11/2020
|
Approved
|
TED RIES
|
|
Drywall Nailing
|
8/11/2020
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
8/11/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
8/12/2020
|
Partial Inspection
|
TED RIES
|
|
Insulation
|
8/12/2020
|
Partial Inspection
|
TED RIES
|
|
Interior/Exterior Lathing
|
8/12/2020
|
Partial Inspection
|
TED RIES
|
|
Drywall Nailing
|
8/13/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
8/13/2020
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
8/13/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
8/21/2020
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
8/21/2020
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
8/21/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Shotcrete
|
8/25/2020
|
Conditional Approval
|
TED RIES
|
|
Drywall Nailing
|
8/25/2020
|
Partial Approval
|
TED RIES
|
|
Green Building Rough
|
8/25/2020
|
Approved
|
TED RIES
|
|
Reinforced Concrete Frame
|
8/25/2020
|
Partial Approval
|
TED RIES
|
|
Deputy Shotcrete
|
8/26/2020
|
Conditional Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
8/31/2020
|
Partial Approval
|
TED RIES
|
|
Interior/Exterior Lathing
|
9/8/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
9/10/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
9/16/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
9/16/2020
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
9/16/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
9/18/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
9/18/2020
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
9/18/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
9/23/2020
|
Partial Approval
|
TED RIES
|
|
Insulation
|
9/23/2020
|
Partial Approval
|
TED RIES
|
|
Excavation/Setback/Form/Re-Bar
|
9/26/2020
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
9/30/2020
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
10/2/2020
|
Partial Approval
|
TED RIES
|
|
Pre-Inspection
|
10/6/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Light Gage Steel Frame
|
10/7/2020
|
Partial Inspection
|
TED RIES
|
|
Light Gage Steel Frame
|
10/15/2020
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
10/17/2020
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
10/20/2020
|
Partial Approval
|
TED RIES
|
|
Special/Order Compliance
|
10/31/2020
|
Partial Approval
|
TED RIES
|
|
Green Building Final
|
11/17/2020
|
Approved
|
TED RIES
|
|
SGSOV-Seismic Gas S/O Valve
|
11/20/2020
|
SGSOV Not Ready
|
TED RIES
|
|
Verify Rec and Parks Fee Memo
|
11/23/2020
|
Approved
|
TED RIES
|
|
Special/Order Compliance
|
11/24/2020
|
No Access for Inspection
|
TED RIES
|
|
SGSOV-Seismic Gas S/O Valve
|
11/30/2020
|
SGSOV Not Ready
|
TED RIES
|
|
Final
|
3/22/2021
|
OK to Issue CofO
|
TED RIES
|
|
Footing/Foundation/Slab
|
3/22/2021
|
Approved
|
TED RIES
|
|
Reinforced Concrete Frame
|
3/22/2021
|
Approved
|
TED RIES
|
|
SGSOV-Seismic Gas S/O Valve
|
3/22/2021
|
SGSOV Approved
|
TED RIES
|
|
Smoke Detectors
|
3/22/2021
|
Approved
|
TED RIES
|
|
Wood Frame
|
3/22/2021
|
Approved
|
TED RIES
|