2801 W SUNSET PL 90005

Certificate Information: 2801 W SUNSET PL 90005

Application / Permit
16010-10000-04209
Plan Check / Job No.
B16LA14378
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
New 23- story 644 unit type I-A residential tower on top of parking structure with type IIIA 7-story mixed use "Wrap" building containing ground commercial area and residential above per DIR-2016-755-DD-SPR
Permit Issued
Issued on 1/2/2019
Issuing Office
Metro
Current Status
CofO Issued on 9/29/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/21/2016 APPLICANT
Assigned to Plan Check Engineer 10/27/2016 GARO TELMI
Corrections Issued 11/7/2016 GARO TELMI
Quality Review Completed 11/9/2016 JOHN FRANCIA
Building Plans Picked Up 11/16/2016 APPLICANT
Applicant returned to address corrections 1/24/2017 GARO TELMI
Applicant returned to address corrections 7/7/2017 ALLEN MANALANSAN
Applicant returned to address corrections 10/5/2017 ALLEN MANALANSAN
Applicant returned to address corrections 6/7/2018 ALLEN MANALANSAN
Plan Check Approved 1/2/2019 ALLEN MANALANSAN
Issued 1/2/2019 LADBS
TCO Issued (Expire Date: 02-23-2022) 8/27/2021 TERRY HERR
CofO in Progress 9/27/2022 DAVID BURKHEAD
Permit Finaled 9/29/2022 TERRY HERR
CofO Issued 9/29/2022 TERRY HERR
Permit Finaled 9/29/2022 TERRY HERR

Permit Application Clearance Information

Project located in CRA area Cleared 10/4/2017 CRAIG BULLOCK
Address approval Cleared 1/11/2018 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 1/11/2018 STEVE MELGAR
Metro Rail approval Cleared 6/14/2018 GARO TELMI
Internal circulation Cleared 6/28/2018 MOHAMMAD HASAN
Bicycle Parking Cleared 7/25/2018 JOHNATHAN YU
Bicycle Parking Cleared 8/1/2018 KAREN LE
Bicycle Parking Cleared 8/1/2018 KAREN LE
Driveway location Cleared 8/1/2018 MOHAMMAD HASAN
DAS Clearance Cleared 8/2/2018 GARO TELMI
Miscellaneous Cleared 8/2/2018 LINDA MARGARET
Construction near power lines Cleared 8/17/2018 WALTER RAMIREZ
Construction within easement Cleared 8/17/2018 WALTER RAMIREZ
Fire Marshall Fire Life Safety Cleared 8/20/2018 MENOA AGHAJANI
Methane Ordinance Cleared 8/20/2018 WILLIAM JOHNS
Green Code Cleared 8/21/2018 GARO TELMI
Encroachment in public way Cleared 8/24/2018 KAREN LE
Low Impact Development Cleared 8/28/2018 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 8/28/2018 KARAN PATEL
Sewer availability Cleared 8/28/2018 NAZILA NOORIFAR
Stormwater Pollution Mitigatn Cleared 8/28/2018 ANDRES COVARRUBIAS
CPC Cleared 8/31/2018 EDBER MACEDO
Miscellaneous Cleared 8/31/2018 EDBER MACEDO
Miscellaneous Cleared 8/31/2018 EDBER MACEDO
Miscellaneous Cleared 8/31/2018 EDBER MACEDO
Miscellaneous Cleared 8/31/2018 EDBER MACEDO
Opn space landscape/Water mgmt Cleared 8/31/2018 EDBER MACEDO
Site Plan review Cleared 8/31/2018 EDBER MACEDO
ZA Case Cleared 8/31/2018 EDBER MACEDO
Permit Cleared 9/4/2018 ZEMAMU GEBREWOLD
Work Adjacent to Public Way Cleared 9/12/2018 BOK GOH
Hydrant and Access approval Cleared 9/13/2018 GEORGE SUCHAND
Highway dedication Cleared 9/14/2018 NAZILA NOORIFAR
Building over 3-story or 36-ft Cleared 9/17/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 9/17/2018 CALOSHA APPROVED
Flood clearance Cleared 9/17/2018 SYLVIA DHIMDIS

Contact Information

Architect Rich, Michael G; Lic. No.: C28591 5969 VANALDEN AVENUE      TARZANA, CA 91356
Contractor Hunt Construction Group Inc; Lic. No.: 136502-B 7720 N 16TH STREET STE 100      PHOENIX, AZ 85020
Engineer Arriola, Kirby Norman; Lic. No.: C31416 PO BOX 5566      OXNARD, CA 93031
Engineer Tang, Stanley Siu Kei; Lic. No.: C56178 1105 N AVON STREET      BURBANK, CA 91505
Engineer Volnyy, Vladimir A; Lic. No.: S4817 14144 DICKENS ST 218      SHERMAN OAKS, CA 91423
Landscape Architect Hongjoo, Kim; Lic. No.: LA5087 714 WEST OLYMPIC BLVD   STE 700    LOS ANGELES, CA 90015

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/26/2019 Partial Inspection LESLIE TRUJILLO
Deputy Grading 3/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 3/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 3/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 3/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/29/2019 Conditional Approval DANIEL COLLINS
Deputy Methane Barrier 5/2/2019 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 5/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 5/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/10/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/13/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/13/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 5/13/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 5/13/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/14/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/14/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 5/14/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 5/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/16/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 5/16/2019 Partial Approval JAMES POWERS
METHANE-Barrier 5/16/2019 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 5/16/2019 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 5/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 5/20/2019 Partial Approval JAMES POWERS
Deputy Methane Barrier 5/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/21/2019 Partial Approval JAMES POWERS
Deputy Methane Barrier 5/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/24/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/24/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 6/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 6/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/6/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/6/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 6/6/2019 Partial Inspection LESLIE TRUJILLO
METHANE-Subgrade 6/6/2019 Partial Inspection LESLIE TRUJILLO
Deputy Methane Barrier 6/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 6/10/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 6/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 6/12/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/12/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 6/12/2019 Conditional Approval LESLIE TRUJILLO
Piling/Pier/Caisson 6/13/2019 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/14/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 6/14/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 6/14/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/20/2019 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/20/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 6/20/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 6/20/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/21/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/21/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 6/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/25/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/26/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/26/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 6/26/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 6/26/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/2/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/2/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 7/2/2019 Partial Inspection LESLIE TRUJILLO
Deputy Methane Barrier 7/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/3/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/3/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 7/3/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 7/3/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 7/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/9/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/9/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 7/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/10/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/10/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 7/10/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 7/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/11/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/15/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/15/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 7/15/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 7/15/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/16/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/17/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 7/17/2019 Partial Inspection LESLIE TRUJILLO
METHANE-Rough 7/17/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/17/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 7/17/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 7/18/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/18/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 7/18/2019 Partial Inspection LESLIE TRUJILLO
METHANE-Subgrade 7/18/2019 Partial Inspection LESLIE TRUJILLO
Deputy Methane Barrier 7/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/19/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/19/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/23/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/23/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 7/23/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 7/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/24/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/24/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 7/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/26/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 7/27/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/29/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/29/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 7/29/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 7/29/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/30/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/30/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 7/30/2019 Partial Approval LESLIE TRUJILLO
METHANE-Rough 7/30/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 7/30/2019 Not Ready for Inspection LESLIE TRUJILLO
Deputy Methane Barrier 7/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/1/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 8/1/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 8/1/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 8/1/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/7/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 8/7/2019 Partial Inspection LESLIE TRUJILLO
METHANE-Barrier 8/7/2019 Partial Inspection LESLIE TRUJILLO
METHANE-Subgrade 8/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/8/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/8/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 8/8/2019 Partial Inspection LESLIE TRUJILLO
Deputy Methane Barrier 8/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/9/2019 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 8/9/2019 Order to Comply Issued LESLIE TRUJILLO
Deputy Methane Barrier 8/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/12/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 8/12/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 8/12/2019 Conditional Approval LESLIE TRUJILLO
METHANE-Subgrade 8/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/13/2019 Conditional Approval LESLIE TRUJILLO
Wall Anchors 8/13/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/14/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 8/14/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 8/14/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 8/14/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/15/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/15/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 8/15/2019 Partial Inspection LESLIE TRUJILLO
Deputy Methane Barrier 8/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/21/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 8/21/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 8/21/2019 Partial Inspection LESLIE TRUJILLO
METHANE-Subgrade 8/21/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/22/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/22/2019 Off-Hour Fees Due
Green Building Rough 8/22/2019 Off-Hour Fees Due
Deputy Pre-Stress Concrete 8/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/23/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 8/27/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 8/27/2019 Approved LESLIE TRUJILLO
METHANE-Subgrade 8/27/2019 Approved LESLIE TRUJILLO
Deputy Reinf. Concrete 8/28/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 8/29/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 8/29/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/30/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/3/2019 Conditional Approval LESLIE TRUJILLO
METHANE-Rough 9/3/2019 Approved LESLIE TRUJILLO
Reinforced Masonry Frame 9/3/2019 Not Ready for Inspection LESLIE TRUJILLO
Verify Sprinkler Sign Off 9/3/2019 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/4/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 9/4/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/6/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/6/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 9/6/2019 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/9/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/12/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 9/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/13/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 9/13/2019 Not Ready for Inspection LESLIE TRUJILLO
Footing/Foundation/Slab 9/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/17/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 9/17/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/19/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 9/19/2019 Conditional Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 9/19/2019 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/20/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 9/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/24/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 9/24/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 9/24/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 9/24/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/25/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 9/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/27/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/27/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/30/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 9/30/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/2/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/3/2019 Conditional Approval LESLIE TRUJILLO
Wall Anchors 10/3/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/4/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/4/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 10/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/7/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 10/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/9/2019 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 10/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/15/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/16/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/17/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/17/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/18/2019 Partial Approval JAMES POWERS
Green Building Rough 10/18/2019 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 10/18/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/21/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 10/21/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/23/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 10/23/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/23/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 10/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/24/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/24/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/25/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/25/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 10/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/28/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 10/28/2019 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/29/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/29/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/30/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/30/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/31/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 10/31/2019 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/5/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 11/5/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/6/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 11/6/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/7/2019 Conditional Approval LESLIE TRUJILLO
Wall Anchors 11/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/8/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/12/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 11/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/14/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 11/14/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/18/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 11/18/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 11/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/19/2019 Conditional Approval LESLIE TRUJILLO
Wall Anchors 11/19/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/22/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 11/22/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/25/2019 Conditional Approval DANIEL COLLINS
Deputy Pre-Stress Concrete 11/25/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 11/25/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 11/25/2019 Conditional Approval DANIEL COLLINS
Floor/Roof Diaphrgm/Shear Wall 11/25/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 11/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 11/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 11/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/2/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 12/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/5/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 12/5/2019 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 12/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/6/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 12/6/2019 Partial Approval LESLIE TRUJILLO
Wall Anchors 12/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/10/2019 Conditional Approval LESLIE TRUJILLO
Green Building Rough 12/10/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 12/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 12/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 12/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/19/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 12/19/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/26/2019 Conditional Approval LESLIE TRUJILLO
Wall Anchors 12/26/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/27/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/30/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/31/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 1/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/3/2020 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 1/3/2020 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 1/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 1/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 1/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/9/2020 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 1/9/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/14/2020 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 1/14/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/17/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/21/2020 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 1/21/2020 Partial Approval LESLIE TRUJILLO
Green Building Rough 1/21/2020 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/21/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/23/2020 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 1/23/2020 Partial Approval LESLIE TRUJILLO
Wall Anchors 1/23/2020 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 1/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/29/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 1/29/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/30/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/30/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 1/30/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/31/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/31/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 1/31/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/4/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/4/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/4/2020 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 2/4/2020 Partial Approval LESLIE TRUJILLO
Green Building Rough 2/4/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/4/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/5/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/5/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/5/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/6/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/7/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/7/2020 Conditional Approval LESLIE TRUJILLO
Green Building Rough 2/10/2020 Conditional Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 2/10/2020 Conditional Approval LESLIE TRUJILLO
Wood Frame 2/10/2020 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 2/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/12/2020 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 2/12/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/20/2020 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 2/20/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/24/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/25/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/25/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/26/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/26/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/26/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 2/26/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 2/26/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 2/27/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 2/27/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/28/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/28/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 2/28/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 2/28/2020 Partial Inspection DAVID BURKHEAD
Green Building Rough 2/28/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 2/28/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Other (see comments) 3/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 3/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 3/4/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/4/2020 Partial Inspection DAVID BURKHEAD
Green Building Rough 3/4/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 3/4/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Pre-Stress Concrete 3/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 3/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 3/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/9/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/9/2020 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/9/2020 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 3/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/11/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 3/11/2020 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 3/11/2020 Not Ready for Inspection LESLIE TRUJILLO
Green Building Rough 3/11/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/11/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 3/12/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 3/13/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 3/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 3/18/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/19/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 3/19/2020 Conditional Approval LESLIE TRUJILLO
Green Building Rough 3/19/2020 Conditional Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 3/19/2020 Conditional Approval LESLIE TRUJILLO
Wood Frame 3/19/2020 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 3/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 3/20/2020 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 3/20/2020 Corrections Issued LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 3/23/2020 Partial Approval LESLIE TRUJILLO
Green Building Rough 3/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/24/2020 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 3/24/2020 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/24/2020 Not Ready for Inspection LESLIE TRUJILLO
Verify Sprinkler Sign Off 3/24/2020 Conditional Approval LESLIE TRUJILLO
Wood Frame 3/24/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/25/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/25/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/25/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 3/25/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/26/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/26/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/26/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/26/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 3/26/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 3/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/31/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/31/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/31/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 3/31/2020 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 3/31/2020 Not Ready for Inspection LESLIE TRUJILLO
Green Building Rough 3/31/2020 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/31/2020 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/2/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/3/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/3/2020 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 4/3/2020 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/9/2020 Partial Approval LESLIE TRUJILLO
Green Building Rough 4/10/2020 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/10/2020 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 4/10/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/14/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/14/2020 Conditional Approval LESLIE TRUJILLO
Green Building Rough 4/14/2020 Conditional Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 4/14/2020 Conditional Approval LESLIE TRUJILLO
Wood Frame 4/14/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/15/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/16/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/17/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/17/2020 Conditional Approval LESLIE TRUJILLO
Green Building Rough 4/17/2020 Conditional Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 4/17/2020 Conditional Approval LESLIE TRUJILLO
Wood Frame 4/17/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/20/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/20/2020 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/20/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/21/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/22/2020 Conditional Approval LESLIE TRUJILLO
Green Building Rough 4/22/2020 Conditional Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 4/22/2020 Conditional Approval LESLIE TRUJILLO
Deputy Other (see comments) 4/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/23/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/23/2020 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/23/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/24/2020 Conditional Approval RONALD PACHECO
Deputy Wood Construction 4/24/2020 Conditional Approval RONALD PACHECO
Deputy Reinf. Concrete 4/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/27/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/28/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/28/2020 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/28/2020 Partial Approval LESLIE TRUJILLO
Green Building Rough 4/28/2020 Conditional Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 4/28/2020 Conditional Approval LESLIE TRUJILLO
Wood Frame 4/28/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/29/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/29/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/30/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/30/2020 Conditional Approval LESLIE TRUJILLO
Green Building Rough 4/30/2020 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/30/2020 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 4/30/2020 Conditional Approval LESLIE TRUJILLO
Wood Frame 4/30/2020 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 5/1/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 5/5/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/5/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 5/5/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/5/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 5/5/2020 Partial Approval DAVID BURKHEAD
Wall Anchors 5/5/2020 Partial Inspection DAVID BURKHEAD
Wood Frame 5/5/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/6/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 5/6/2020 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 5/6/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/7/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/7/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 5/7/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 5/7/2020 Conditional Approval DAVID BURKHEAD
Insulation 5/7/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 5/7/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 5/7/2020 Partial Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 5/8/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/8/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/8/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 5/8/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/8/2020 Partial Approval DAVID BURKHEAD
Wood Frame 5/8/2020 Partial Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 5/11/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/11/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/11/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 5/11/2020 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/11/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 5/11/2020 Partial Approval DAVID BURKHEAD
Wood Frame 5/11/2020 Partial Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 5/12/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/12/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/12/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/12/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 5/12/2020 Conditional Approval DAVID BURKHEAD
Drywall Nailing 5/12/2020 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/12/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 5/13/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/14/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/14/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/14/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 5/14/2020 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 5/14/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 5/14/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 5/14/2020 Partial Inspection DAVID BURKHEAD
Wood Frame 5/14/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/15/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 5/15/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/15/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/19/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/19/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/19/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 5/20/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 5/20/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 5/20/2020 Conditional Approval DAVID BURKHEAD
Wood Frame 5/20/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 5/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/22/2020 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 5/22/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/22/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 5/22/2020 Conditional Approval ERNESTO CORRAL
Drywall Nailing 5/22/2020 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 5/22/2020 Partial Inspection ERNESTO CORRAL
Wood Frame 5/22/2020 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 5/26/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/26/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/26/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 5/26/2020 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/26/2020 Partial Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 5/26/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/27/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 5/28/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/28/2020 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/28/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/29/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/29/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/29/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 5/29/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 5/29/2020 Partial Approval DAVID BURKHEAD
Wood Frame 5/29/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 6/1/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 6/1/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/1/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 6/2/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 6/2/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/2/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/2/2020 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 6/2/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 6/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 6/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 6/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/3/2020 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/3/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 6/3/2020 Not Ready for Inspection DAVID BURKHEAD
Insulation 6/3/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 6/3/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 6/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 6/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/4/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 6/4/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/4/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 6/5/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/5/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/8/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 6/8/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 6/8/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/9/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/9/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/10/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/10/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 6/10/2020 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 6/10/2020 Partial Approval DAVID BURKHEAD
Wood Frame 6/10/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/11/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/11/2020 Conditional Approval DAVID BURKHEAD
Wood Frame 6/11/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/12/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/12/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/15/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/15/2020 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/15/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 6/15/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/15/2020 Partial Approval DAVID BURKHEAD
Wood Frame 6/15/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/17/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/17/2020 Conditional Approval DAVID BURKHEAD
Insulation 6/17/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 6/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/18/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 6/18/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/18/2020 Partial Approval DAVID BURKHEAD
Wood Frame 6/18/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/19/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/19/2020 Conditional Approval DAVID BURKHEAD
Insulation 6/19/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/19/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/22/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 6/22/2020 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 6/22/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/22/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/22/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 6/23/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/23/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/24/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/24/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 6/24/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/24/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 6/24/2020 Approved DAVID BURKHEAD
Wood Frame 6/24/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 6/25/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/25/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/26/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 6/26/2020 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/26/2020 Partial Inspection DAVID BURKHEAD
Green Building Rough 6/26/2020 Partial Inspection DAVID BURKHEAD
Wood Frame 6/26/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 6/27/2020 Partial Approval NICK DANERI
Reinforced Concrete Frame 6/29/2020 Partial Inspection DAVID BURKHEAD
Wood Frame 6/29/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 6/30/2020 Partial Approval DAVID BURKHEAD
Wood Frame 6/30/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/1/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 7/1/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 7/1/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 7/2/2020 Partial Inspection DAVID BURKHEAD
Wood Frame 7/2/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/6/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 7/7/2020 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 7/7/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/7/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/8/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 7/8/2020 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/8/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/8/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 7/9/2020 Partial Inspection DAVID BURKHEAD
Structural Steel Frame 7/9/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/9/2020 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/10/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 7/13/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 7/13/2020 Partial Inspection DAVID BURKHEAD
Wood Frame 7/13/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/14/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 7/14/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/15/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 7/15/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 7/15/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/15/2020 Partial Approval DAVID BURKHEAD
Wood Frame 7/15/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 7/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/17/2020 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 7/17/2020 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/17/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 7/17/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/17/2020 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/20/2020 Approved DAVID BURKHEAD
Wood Frame 7/20/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 7/21/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 7/21/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/21/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/21/2020 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 7/22/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/22/2020 Partial Approval DAVID BURKHEAD
Wood Frame 7/22/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 7/27/2020 Approved DAVID BURKHEAD
Wood Frame 7/27/2020 Partial Approval DAVID BURKHEAD
Wood Frame 7/28/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/29/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/29/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Methane Barrier 7/30/2020 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 7/30/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/30/2020 Partial Approval DAVID BURKHEAD
Wood Frame 7/31/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/3/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/4/2020 Partial Approval DAVID BURKHEAD
Wood Frame 8/7/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 8/10/2020 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/11/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/12/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 8/12/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/12/2020 Partial Approval DAVID BURKHEAD
Wood Frame 8/12/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/13/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 8/14/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/18/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/19/2020 Conditional Approval DAVID BURKHEAD
Drywall Nailing 8/19/2020 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 8/19/2020 Partial Approval DAVID BURKHEAD
Structural Steel Frame 8/24/2020 Partial Approval DAVID BURKHEAD
Wood Frame 8/24/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/26/2020 Partial Approval DAVID BURKHEAD
Wood Frame 8/26/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/1/2020 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 9/3/2020 Partial Approval DAVID BURKHEAD
Wood Frame 9/4/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/8/2020 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 9/9/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/9/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 9/10/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 9/10/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 9/11/2020 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 9/14/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/15/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/16/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 9/16/2020 Partial Approval DANIEL MC AULIFFE
Insulation 9/16/2020 Partial Approval DANIEL MC AULIFFE
Wood Frame 9/16/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/17/2020 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 9/17/2020 Conditional Approval LANNY MERRICK
Drywall Nailing 9/17/2020 Conditional Approval LANNY MERRICK
Deputy Drilled-In Anchors 9/18/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/21/2020 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/21/2020 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 9/22/2020 Conditional Approval DAVID BURKHEAD
Insulation 9/22/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/22/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 9/22/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/23/2020 Conditional Approval DAVID BURKHEAD
Insulation 9/23/2020 Partial Approval DAVID BURKHEAD
Wood Frame 9/23/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/24/2020 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/24/2020 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/24/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 9/25/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/28/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/28/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/29/2020 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/29/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/30/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/30/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/30/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 10/1/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 10/1/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 10/2/2020 Conditional Approval DAVID BURKHEAD
Drywall Nailing 10/2/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/5/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 10/9/2020 Partial Approval DAVID BURKHEAD
Wood Frame 10/9/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/13/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/15/2020 Partial Approval DAVID BURKHEAD
Special/Order Compliance 10/15/2020 Corrections Issued DAVID BURKHEAD
Wood Frame 10/15/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 10/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/20/2020 Conditional Approval DAVID BURKHEAD
Wood Frame 10/20/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/22/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/26/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/28/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 10/29/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/29/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/29/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 11/2/2020 Partial Approval DAVID BURKHEAD
Deputy Methane Barrier 11/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/6/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/6/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 11/6/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 11/9/2020 Partial Approval DAVID BURKHEAD
Wood Frame 11/17/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/18/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/20/2020 Partial Inspection DANIEL MC AULIFFE
Drywall Nailing 11/23/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/23/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/24/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/24/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 11/24/2020 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 11/24/2020 Approved DAVID BURKHEAD
Drywall Nailing 12/1/2020 Partial Approval DAVID BURKHEAD
Final 12/1/2020 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 12/1/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 12/1/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/1/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 12/1/2020 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 12/1/2020 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 12/1/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/1/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/2/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 12/4/2020 Partial Inspection DAVID BURKHEAD
Wood Frame 12/4/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/9/2020 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 12/9/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/11/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 12/11/2020 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 12/16/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/18/2020 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 12/22/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 12/29/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 1/4/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/5/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/8/2021 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 1/11/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/13/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/15/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/20/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 1/20/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 1/21/2021 Approved DAVID BURKHEAD
Drywall Nailing 1/27/2021 Partial Approval DAVID BURKHEAD
Final 1/27/2021 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 1/27/2021 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 1/27/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/27/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 1/27/2021 Corrections Issued DAVID BURKHEAD
Reinforced Concrete Frame 1/27/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 1/27/2021 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 1/27/2021 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 1/27/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 1/27/2021 Approved DAVID BURKHEAD
Light Gage Steel Frame 2/1/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/3/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 2/3/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/12/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/17/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 2/22/2021 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 2/25/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/2/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 3/3/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/4/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/9/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/11/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/16/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 3/22/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/25/2021 Partial Approval DAVID BURKHEAD
Deputy Methane Barrier 3/31/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 3/31/2021 Partial Approval DAVID BURKHEAD
Deputy Methane Barrier 4/1/2021 Conditional Approval DAVID BURKHEAD
Pre-Inspection 4/5/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 4/7/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/9/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/13/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/14/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 4/15/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 4/16/2021 Corrections Issued DAVID BURKHEAD
Light Gage Steel Frame 4/20/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 4/21/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/22/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/26/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/27/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/29/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 4/30/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/3/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/4/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/5/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/6/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/7/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 5/10/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/13/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 5/26/2021 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/27/2021 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 6/3/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 6/7/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/8/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 6/9/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 6/10/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/15/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/18/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/23/2021 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 6/25/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 7/14/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/21/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/22/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 7/23/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/28/2021 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 8/2/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 8/4/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 8/5/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 8/6/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 8/10/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 8/11/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/17/2021 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 8/18/2021 Approved DAVID BURKHEAD
Final 8/18/2021 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 8/18/2021 Approved DAVID BURKHEAD
Green Building Final 8/18/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/18/2021 Approved DAVID BURKHEAD
Reinforced Masonry Frame 8/18/2021 Approved DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 8/18/2021 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 8/18/2021 Approved DAVID BURKHEAD
Light Gage Steel Frame 8/20/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/24/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 8/24/2021 Corrections Issued DAVID BURKHEAD
Light Gage Steel Frame 8/25/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/26/2021 Partial Inspection DAVID BURKHEAD
Final 8/27/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/9/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/13/2021 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 9/13/2021 Corrections Issued DAVID BURKHEAD
Deputy Drilled-In Anchors 9/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 10/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 10/4/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/4/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 10/25/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 10/27/2021 Partial Approval DAVID BURKHEAD
Special/Order Compliance 1/27/2022 Partial Approval DAVID BURKHEAD
Special/Order Compliance 2/2/2022 Partial Approval DAVID BURKHEAD
Final 2/17/2022 Partial Approval DAVID BURKHEAD
Green Building Final 2/17/2022 Approved DAVID BURKHEAD