505 N SILVER LAKE BLVD 90026

Certificate Information: 505 N SILVER LAKE BLVD 90026

Application / Permit
16010-10000-04182
Plan Check / Job No.
B16LA14313
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 60 UNIT APARTMENT BUILDING. 5 STORIES, 2 BASEMENT LEVELS. TYPE IIIA OVER TYPE IA BASEMENT.
Permit Issued
Issued on 1/6/2020
Issuing Office
South Los Angeles
Current Status
CofO Issued on 8/4/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/16/2016 APPLICANT
Assigned to Plan Check Engineer 10/13/2016 ROSHANAK VARJAVAND
Disabled Access Plans Picked Up 10/13/2016 APPLICANT
Green Plans Picked Up 10/27/2016 APPLICANT
Corrections Issued 12/12/2016 ROSHANAK VARJAVAND
Quality Review Completed 12/19/2016 DAVID CHANG
Applicant returned to address corrections 1/18/2017 ROSHANAK VARJAVAND
Applicant returned to address corrections 3/16/2017 ROSHANAK VARJAVAND
Applicant returned to address corrections 3/23/2017 ROSHANAK VARJAVAND
Applicant returned to address corrections 3/19/2018 TEODORO DIAZ RODRIGUEZ
Applicant returned to address corrections 1/24/2019 TEODORO DIAZ RODRIGUEZ
Applicant returned to address corrections 1/31/2019 TEODORO DIAZ RODRIGUEZ
Plan Check Approved 12/19/2019 TEODORO DIAZ RODRIGUEZ
Issued 1/6/2020 LADBS
Building Plans Picked Up 9/22/2021 APPLICANT
TCO Issued (Expire Date: 11-30-2022) 6/3/2022 TED RIES
CofO in Progress 7/18/2022 TED RIES
CofO in Progress 7/22/2022 TED RIES
Permit Finaled 8/4/2022 TED RIES
CofO Issued 8/4/2022 TED RIES
Permit Finaled 8/4/2022 TED RIES

Permit Application Clearance Information

Address approval Cleared 7/27/2018 NAZILA NOORIFAR
Highway dedication Cleared 7/27/2018 NAZILA NOORIFAR
Miscellaneous Cleared 7/27/2018 IVORY CHAMBESHI
Permit Cleared 7/27/2018 NAZILA NOORIFAR
Site Plan review Cleared 7/27/2018 IVORY CHAMBESHI
ZA Case Cleared 7/27/2018 IVORY CHAMBESHI
ZA Case Cleared 7/27/2018 IVORY CHAMBESHI
Eng Process Fee Ord 176,300 Cleared 7/30/2018 MICHAEL CASTILLO
Certificate of Compliance Cleared 7/31/2018 BRIAN CARR
Encroachment in public way Cleared 9/5/2018 KARAN PATEL
Sewer availability Cleared 11/27/2018 NAZILA NOORIFAR
Hydrant and Access approval Cleared 12/3/2018 JOHN CONNEALLY
Driveway location Cleared 12/5/2018 COLLINS ALLAN
Comm Cor/Mini-Mall Cleared 12/13/2018 MOTOUMI SASAKI
Comm Cor/Mini-Mall Cleared 12/13/2018 MOTOUMI SASAKI
Comm Cor/Mini-Mall Cleared 12/13/2018 MOTOUMI SASAKI
Fire Marshall Fire Life Safety Cleared 12/19/2018 MENOA AGHAJANI
Green Code Cleared 1/3/2019 JOHN KLARIN
Building over 3-story or 36-ft Cleared 1/8/2019 CALOSHA APPROVED
DAS Clearance Cleared 1/8/2019 ROSHANAK VARJAVAND
Excavation more than 5-ft deep Cleared 1/8/2019 CALOSHA APPROVED
GPI Written Notices Cleared 1/8/2019 ROSHANAK VARJAVAND
Grading Pre-Inspection Cleared 1/8/2019 ROSHANAK VARJAVAND
Low Impact Development Cleared 1/29/2019 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 1/29/2019 JEANETTE VONG
Work Adjacent to Public Way Cleared 2/26/2019 BOK GOH
DCP conditions approval Cleared 3/14/2019 KENNETH LE
Density Bonus 12.22.A.31 Cleared 3/14/2019 KENNETH LE
Frnt yard landscape/Water mgmt Cleared 8/29/2019 SOPHIE GABEL-SCHEINBAU
Miscellaneous Cleared 8/29/2019 SOPHIE GABEL-SCHEINBAU
Opn space landscape/Water mgmt Cleared 8/29/2019 SOPHIE GABEL-SCHEINBAU

Contact Information

Architect Pinto,, Michael T; Lic. No.: C27097 837 N. SPRING ST. 3RD FL.      LOS ANGELES, CA 90042
Contractor Khair A J Construction Inc; Lic. No.: 846902-B 8228 SUNSET BLVD 2ND FLOOR      WEST HOLLYWOOD, CA 90046
Engineer Ekwueme,, Chukwuma Ganiru; Lic. No.: S4416 707 WILSHIRE BLVD STE 4450      LOS ANGELES, CA 90017

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Masonry Wall/Backfill 1/14/2020 Partial Approval DAVID BURKHEAD
Masonry Wall/Backfill 1/17/2020 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 1/23/2020 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 1/27/2020 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 1/29/2020 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Barrier 1/29/2020 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Subgrade 1/29/2020 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 1/30/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 2/4/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 2/6/2020 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Barrier 2/6/2020 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Subgrade 2/6/2020 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 2/12/2020 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 2/25/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/2/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/2/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/3/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/4/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/4/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/5/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/9/2020 Conditional Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 3/9/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/12/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/13/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/13/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/18/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/18/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/19/2020 Approved DANIEL MC AULIFFE
Masonry Wall/Backfill 3/19/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/20/2020 Approved DANIEL MC AULIFFE
Masonry Wall/Backfill 3/20/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/23/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/25/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/26/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 3/27/2020 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 3/31/2020 Approved DANIEL MC AULIFFE
Green Building Rough 3/31/2020 Partial Approval DANIEL MC AULIFFE
METHANE-Rough 3/31/2020 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 3/31/2020 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 3/31/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Shotcrete 4/1/2020 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/1/2020 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/13/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/8/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 5/8/2020 Partial Inspection DANIEL MC AULIFFE
METHANE-Barrier 5/8/2020 Approved DANIEL MC AULIFFE
METHANE-Subgrade 5/8/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 5/20/2020 Partial Approval DANIEL MC AULIFFE
Green Building Rough 5/20/2020 Approved DANIEL MC AULIFFE
METHANE-Rough 5/20/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 5/20/2020 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 5/20/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/29/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 6/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/18/2020 Conditional Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 6/19/2020 Approved DANIEL MC AULIFFE
Wood Frame 6/19/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 6/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 7/13/2020 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 7/15/2020 Partial Approval DANIEL MC AULIFFE
Wood Frame 7/15/2020 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 7/16/2020 Conditional Approval DANIEL MC AULIFFE
Wood Frame 8/5/2020 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 8/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/24/2020 Conditional Approval DANIEL MC AULIFFE
Wood Frame 8/28/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 8/31/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/1/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/1/2020 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/2/2020 Conditional Approval DANIEL MC AULIFFE
Wood Frame 9/2/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 9/3/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/4/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 9/9/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/10/2020 Conditional Approval DANIEL MC AULIFFE
Pre-Inspection 9/10/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 9/11/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 9/28/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/29/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/30/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/1/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/2/2020 Conditional Approval DANIEL MC AULIFFE
Wood Frame 10/13/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 10/14/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 10/14/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/15/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 10/15/2020 Approved DANIEL MC AULIFFE
Wood Frame 10/15/2020 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 10/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 10/22/2020 Conditional Approval DANIEL MC AULIFFE
Wood Frame 10/22/2020 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/28/2020 Approved DANIEL MC AULIFFE
Wood Frame 10/28/2020 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/29/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/30/2020 Conditional Approval DANIEL MC AULIFFE
Wood Frame 11/4/2020 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/5/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 11/5/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 11/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/10/2020 Approved DANIEL MC AULIFFE
Deputy Wood Construction 11/10/2020 Approved DANIEL MC AULIFFE
Deputy Wood Construction 11/12/2020 Approved DANIEL MC AULIFFE
Wood Frame 11/12/2020 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 11/13/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 11/18/2020 Conditional Approval DANIEL MC AULIFFE
Wood Frame 12/2/2020 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 12/4/2020 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 12/8/2020 Partial Approval DANIEL MC AULIFFE
Wood Frame 12/22/2020 Partial Inspection DANIEL MC AULIFFE
Wood Frame 12/30/2020 Partial Approval DANIEL MC AULIFFE
Insulation 1/11/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 1/13/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 1/15/2021 Partial Approval DANIEL MC AULIFFE
Wood Frame 1/19/2021 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 1/20/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 1/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 1/25/2021 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 1/25/2021 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 1/29/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 1/29/2021 Partial Approval DANIEL MC AULIFFE
Insulation 1/29/2021 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 2/3/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 2/3/2021 Partial Inspection DANIEL MC AULIFFE
Wood Frame 2/3/2021 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 2/4/2021 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/4/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/9/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 2/9/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/11/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/12/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 2/19/2021 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 3/16/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 3/17/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/17/2021 Partial Approval DANIEL MC AULIFFE
Insulation 3/23/2021 Partial Approval DANIEL MC AULIFFE
Insulation 4/1/2021 Corrections Issued DANIEL MC AULIFFE
Light Gage Steel Frame 4/6/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 4/8/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/8/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 4/12/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 4/14/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 4/21/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 4/28/2021 Partial Approval DANIEL MC AULIFFE
Insulation 4/28/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 5/3/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/10/2021 Approved DANIEL MC AULIFFE
Insulation 5/10/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/10/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/11/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/12/2021 Conditional Approval DANIEL MC AULIFFE
Insulation 5/12/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 5/12/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/14/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/18/2021 Approved DANIEL MC AULIFFE
Masonry Wall/Backfill 5/18/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/19/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 5/19/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/25/2021 Approved DANIEL MC AULIFFE
Insulation 5/25/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/26/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/26/2021 Conditional Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 5/26/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 6/1/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/10/2021 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 6/10/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 6/10/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 6/23/2021 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 6/24/2021 Conditional Approval DANIEL MC AULIFFE
Wood Frame 6/24/2021 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 6/29/2021 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 7/6/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 7/9/2021 Not Ready for Inspection DANIEL MC AULIFFE
Drywall Nailing 7/12/2021 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 7/15/2021 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 7/21/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 7/28/2021 Corrections Issued DANIEL MC AULIFFE
Light Gage Steel Frame 7/29/2021 Partial Approval DANIEL MC AULIFFE
Insulation 8/3/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 8/12/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 8/31/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 9/3/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/13/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/14/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 10/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/20/2021 Conditional Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 10/20/2021 Partial Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 11/2/2021 Partial Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 11/5/2021 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 11/29/2021 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 12/3/2021 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 12/21/2021 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 1/25/2022 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 2/7/2022 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 2/18/2022 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 2/23/2022 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/1/2022 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/3/2022 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/7/2022 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/7/2022 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/8/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/9/2022 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/9/2022 Not Ready for Inspection DANIEL MC AULIFFE
Special/Order Compliance 3/18/2022 Partial Inspection EDWIN GREGORYONA
Special/Order Compliance 3/23/2022 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/29/2022 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/1/2022 Partial Approval DANIEL MC AULIFFE
Special/Order Compliance 4/1/2022 Partial Inspection DANIEL MC AULIFFE
Special/Order Compliance 4/5/2022 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/13/2022 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 4/13/2022 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/15/2022 Not Ready for Inspection DANIEL MC AULIFFE
Special/Order Compliance 4/18/2022 Partial Inspection DANIEL MC AULIFFE
Drywall Nailing 4/22/2022 Partial Inspection DANIEL MC AULIFFE
Final 4/22/2022 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 4/22/2022 Partial Inspection DANIEL MC AULIFFE
Green Building Final 4/22/2022 Approved DANIEL MC AULIFFE
Reinforced Masonry Frame 4/22/2022 Partial Approval DANIEL MC AULIFFE
SGSOV-Seismic Gas S/O Valve 4/22/2022 SGSOV Approved DANIEL MC AULIFFE
Smoke Detectors 4/22/2022 Approved DANIEL MC AULIFFE
Special/Order Compliance 4/22/2022 Partial Inspection DANIEL MC AULIFFE
Structural Steel Frame 4/22/2022 Approved DANIEL MC AULIFFE
Wood Frame 4/22/2022 Approved DANIEL MC AULIFFE
Pre-Inspection 4/26/2022 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/3/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/3/2022 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 5/3/2022 Approved DAVID BURKHEAD
Special/Order Compliance 5/4/2022 Approved DAVID BURKHEAD
Special/Order Compliance 5/5/2022 Approved TED RIES
Special/Order Compliance 5/10/2022 Approved TED RIES
Special/Order Compliance 5/13/2022 Approved TED RIES
Interior/Exterior Lathing 5/19/2022 Partial Approval TED RIES
Special/Order Compliance 5/25/2022 Partial Approval TED RIES
Drywall Nailing 6/30/2022 Not Ready for Inspection DAVID BURKHEAD
Final 6/30/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 6/30/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 6/30/2022 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 6/30/2022 Approved DAVID BURKHEAD
Drywall Nailing 7/12/2022 Approved TED RIES
Final 7/12/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 7/12/2022 Approved TED RIES
Reinforced Masonry Frame 7/12/2022 Approved TED RIES
Final 7/19/2022 Conditional Approval TED RIES
Final 7/22/2022 OK to Issue CofO TED RIES