5731 W LEXINGTON AVE 90038

Certificate Information: 5731 W LEXINGTON AVE 90038

Application / Permit
16010-10000-04148
Plan Check / Job No.
B16LA14147
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 4 STORY 9 UNIT APARTMENT BUILDING WITH OPEN GARAGE AT GRADE LEVEL
Permit Issued
Issued on 1/3/2018
Issuing Office
Metro
Current Status
CofO Issued on 5/27/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/14/2016 APPLICANT
Assigned to Plan Check Engineer 9/29/2016 DEAN LEE
Corrections Issued 10/5/2016 DEAN LEE
Quality Review Completed 10/27/2016 WING SUEN
Building Plans Picked Up 11/21/2016 APPLICANT
Disabled Access Plans Picked Up 1/18/2017 APPLICANT
Green Plans Picked Up 1/18/2017 APPLICANT
Applicant returned to address corrections 2/24/2017 DEAN LEE
Applicant returned to address corrections 7/21/2017 DEAN LEE
Applicant returned to address corrections 7/28/2017 DEAN LEE
Applicant returned to address corrections 9/7/2017 DEAN LEE
Applicant returned to address corrections 9/13/2017 DEAN LEE
Applicant returned to address corrections 10/19/2017 DEAN LEE
Applicant returned to address corrections 11/1/2017 DEAN LEE
Plan Check Approved 11/9/2017 DEAN LEE
Issued 1/3/2018 LADBS
CofO in Progress 5/26/2021 DANIEL MC AULIFFE
Permit Finaled 5/27/2021 TERRY HERR
CofO Issued 5/27/2021 TERRY HERR
Permit Finaled 5/27/2021 TERRY HERR

Permit Application Clearance Information

Address approval Cleared 11/23/2016 ROCHELLE DUNGCA
Eng Process Fee Ord 176,300 Cleared 12/2/2016 ALFREDO JARA
Highway dedication Cleared 12/2/2016 ALFREDO JARA
Hydrant and Access approval Cleared 12/2/2016 JOHN CONNEALLY
Permit Cleared 12/2/2016 ALFREDO JARA
Sewer availability Cleared 12/2/2016 ALFREDO JARA
Work Adjacent to Public Way Cleared 12/8/2016 RAVIL MANAPOV
Building over 3-story or 36-ft Cleared 12/30/2016 CALOSHA APPROVED
Specific Plan Cleared 1/23/2017 COLLINS ALLAN
Low Impact Development Cleared 6/20/2017 MARTIN FRAGOSO
Green Code Cleared 6/22/2017 DONALD CRICHLOW
Encroachment in public way Cleared 7/12/2017 JACOB BIGLER
Roof/Waste drainage to street Cleared 7/13/2017 ALFREDO JARA
Project located in CRA area Cleared 7/19/2017 CRAIG BULLOCK
DAS Clearance Cleared 8/18/2017 WAI LAU
Opn space landscape/Water mgmt Cleared 9/7/2017 TREVOR MARTIN

Contact Information

Architect Hurtado, Jesus Jr; Lic. No.: C29969 1310 S MCDONNELL AVENUE      LOS ANGELES, CA 90022
Contractor Torres Iidefonso; Lic. No.: 1021044-B 5215 1/2 SANTA ANA STREET      CUDAHY, CA 90201
Engineer Carpenter, Lauren D; Lic. No.: S2511 350 S FIGUEROA ST 400      LOS ANGELES, CA 90071
Engineer Espino, Manuel A; Lic. No.: C55526 12109 WOODRUFF AVE      DOWNEY, CA 90241

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/17/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 2/7/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 2/8/2018 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 2/9/2018 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 3/13/2018 No Access for Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 3/14/2018 Partial Approval TED RIES
Deputy Reinf. Concrete 3/29/2018 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 3/29/2018 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 4/13/2018 Partial Approval TED RIES
Deputy Reinf. Concrete 4/17/2018 Conditional Approval TED RIES
Deputy Steel/Welding 5/8/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/22/2018 Conditional Approval TED RIES
Deputy Steel/Welding 5/24/2018 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 7/2/2018 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 7/10/2018 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 8/16/2018 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 10/9/2018 Corrections Issued TED RIES
Excavation/Setback/Form/Re-Bar 10/16/2018 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 11/9/2018 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 11/14/2018 Not Ready for Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 11/20/2018 Partial Approval TED RIES
Deputy Wood Construction 11/21/2018 Approved TED RIES
Excavation/Setback/Form/Re-Bar 11/21/2018 Partial Approval TED RIES
Masonry Wall/Backfill 11/30/2018 Not Ready for Inspection JEFF BYTHEWAY
Masonry Wall/Backfill 12/4/2018 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 12/20/2018 Partial Approval TED RIES
Masonry Wall/Backfill 12/20/2018 Corrections Issued TED RIES
Floor/Roof Diaphrgm/Shear Wall 12/31/2018 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 1/10/2019 Conditional Approval TED RIES
Deputy Wood Construction 1/29/2019 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 2/8/2019 Partial Approval TED RIES
Masonry Wall/Backfill 3/6/2019 Corrections Issued TED RIES
Green Building Rough 4/10/2019 Partial Inspection TED RIES
Reinforced Concrete Frame 4/10/2019 Partial Inspection TED RIES
Verify Sprinkler Sign Off 4/10/2019 Partial Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 5/31/2019 Partial Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 6/14/2019 Partial Inspection TED RIES
Drywall Nailing 7/10/2019 Not Ready for Inspection DANIEL MC AULIFFE
Green Building Rough 7/10/2019 Partial Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 7/19/2019 Partial Approval DANIEL MC AULIFFE
Insulation 8/9/2019 Corrections Issued DANIEL MC AULIFFE
Insulation 8/13/2019 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 9/4/2019 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 9/26/2019 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/11/2019 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/16/2019 Partial Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/1/2019 Partial Inspection DANIEL MC AULIFFE
Insulation 11/5/2019 Partial Approval DANIEL MC AULIFFE
Insulation 11/7/2019 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/12/2019 Partial Inspection DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 11/15/2019 Approved DANIEL MC AULIFFE
Insulation 11/15/2019 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 11/25/2019 Partial Inspection EDWIN GREGORYONA
Green Building Rough 11/25/2019 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 11/25/2019 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 11/26/2019 Partial Approval DANIEL MC AULIFFE
Wood Frame 11/26/2019 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 11/27/2019 Not Ready for Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 12/2/2019 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 12/4/2019 Partial Approval DANIEL MC AULIFFE
T-Bar Ceiling 12/11/2019 Not Ready for Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 12/12/2019 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/23/2019 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 1/6/2020 Partial Inspection DANIEL MC AULIFFE
T-Bar Ceiling 1/24/2020 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 2/11/2020 Partial Approval DANIEL MC AULIFFE
Wood Frame 2/28/2020 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/5/2020 Partial Inspection DANIEL MC AULIFFE
Drywall Nailing 3/20/2020 Partial Approval DANIEL MC AULIFFE
Green Building Rough 3/20/2020 Approved DANIEL MC AULIFFE
Grading Pre-Inspection 5/29/2020 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 6/10/2020 Approved DANIEL MC AULIFFE
Grading Pre-Inspection 6/12/2020 Partial Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 6/17/2020 Approved DANIEL MC AULIFFE
Drywall Nailing 7/22/2020 Approved DANIEL MC AULIFFE
Final 7/22/2020 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 7/22/2020 Not Ready for Inspection DANIEL MC AULIFFE
Green Building Final 7/22/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/22/2020 Partial Approval DANIEL MC AULIFFE
SGSOV-Seismic Gas S/O Valve 7/22/2020 SGSOV Not Ready DANIEL MC AULIFFE
Smoke Detectors 7/22/2020 Approved DANIEL MC AULIFFE
Verify Sprinkler Sign Off 7/22/2020 Approved DANIEL MC AULIFFE
Wood Frame 7/22/2020 Approved DANIEL MC AULIFFE
Masonry Wall/Backfill 7/28/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/31/2020 Partial Approval DANIEL MC AULIFFE
Final 10/7/2020 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 10/7/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 10/7/2020 Approved DANIEL MC AULIFFE
SGSOV-Seismic Gas S/O Valve 10/7/2020 SGSOV Approved DANIEL MC AULIFFE
Final 11/4/2020 Not Ready for Inspection DANIEL MC AULIFFE
Final 11/23/2020 Not Ready for Inspection DANIEL MC AULIFFE
Final 2/25/2021 Conditional Approval DANIEL MC AULIFFE
Final 5/19/2021 Conditional Approval DANIEL MC AULIFFE
Final 5/25/2021 Conditional Approval DANIEL MC AULIFFE