|
Deputy Reinf. Concrete
|
10/26/2018
|
Approved
|
NICK LAROCCA
|
|
Deputy Methane Barrier
|
3/6/2019
|
Conditional Approval
|
NICK LAROCCA
|
|
Deputy Methane Barrier
|
3/18/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Methane Barrier
|
3/21/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/22/2019
|
Conditional Approval
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
3/22/2019
|
Partial Approval
|
NICK LAROCCA
|
|
METHANE-Barrier
|
3/22/2019
|
Partial Approval
|
NICK LAROCCA
|
|
METHANE-Subgrade
|
3/22/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/26/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Methane Barrier
|
3/28/2019
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
3/28/2019
|
Partial Approval
|
NICK LAROCCA
|
|
METHANE-Barrier
|
3/28/2019
|
Partial Approval
|
NICK LAROCCA
|
|
METHANE-Subgrade
|
3/28/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
3/29/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
3/29/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Methane Barrier
|
4/2/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/2/2019
|
Approved
|
NICK LAROCCA
|
|
Green Building Rough
|
4/2/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
4/2/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
4/2/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/3/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
4/3/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/4/2019
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
4/4/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/5/2019
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
4/5/2019
|
Partial Approval
|
NICK LAROCCA
|
|
METHANE-Barrier
|
4/5/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
METHANE-Subgrade
|
4/5/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/8/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/8/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
4/8/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/9/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/9/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
4/9/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
4/9/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/10/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/10/2019
|
Approved
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
4/10/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/11/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/11/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
4/11/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
4/11/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
METHANE-Barrier
|
4/11/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
METHANE-Subgrade
|
4/11/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/12/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/12/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
4/12/2019
|
Partial Approval
|
NICK LAROCCA
|
|
METHANE-Rough
|
4/15/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
4/15/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/16/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/16/2019
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
4/16/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
4/16/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Methane Barrier
|
4/17/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/17/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/17/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
4/17/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/18/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
4/18/2019
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/18/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
4/18/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
4/18/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/19/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/19/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
4/19/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
4/19/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/22/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/22/2019
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
4/22/2019
|
Partial Approval
|
NICK LAROCCA
|
|
METHANE-Barrier
|
4/22/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Subgrade
|
4/22/2019
|
Approved
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
4/22/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/23/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/23/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
4/23/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/24/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/24/2019
|
Approved
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
4/24/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/25/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/25/2019
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
4/25/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/26/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/26/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
4/26/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Masonry Wall/Backfill
|
4/26/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
4/26/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
4/29/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/29/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/29/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
4/30/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
4/30/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
4/30/2019
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
4/30/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/1/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/1/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
5/1/2019
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
5/1/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
5/1/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/2/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/2/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
5/2/2019
|
Approved
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
5/2/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/3/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/3/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
5/3/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
5/3/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
5/6/2019
|
No Access for Inspection
|
ALAN NOVAK
|
|
METHANE-Rough
|
5/6/2019
|
No Access for Inspection
|
ALAN NOVAK
|
|
Reinforced Concrete Frame
|
5/6/2019
|
No Access for Inspection
|
ALAN NOVAK
|
|
Deputy Pre-Stress Concrete
|
5/7/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/7/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
5/7/2019
|
Approved
|
NICK LAROCCA
|
|
Drywall Nailing
|
5/7/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
5/7/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
5/7/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Wood Frame
|
5/7/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/8/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/8/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
5/8/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
5/8/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
5/8/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/9/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/9/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
5/9/2019
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
5/9/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Masonry Wall/Backfill
|
5/9/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/10/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/10/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
5/10/2019
|
Approved
|
NICK LAROCCA
|
|
Masonry Wall/Backfill
|
5/10/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/13/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/13/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
5/13/2019
|
Approved
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
5/13/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/14/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/14/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
5/14/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
5/14/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
5/14/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/15/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/15/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
5/15/2019
|
Approved
|
NICK LAROCCA
|
|
Masonry Wall/Backfill
|
5/15/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/16/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/16/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
5/16/2019
|
Conditional Approval
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
5/16/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/17/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
5/17/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
5/17/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
5/17/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Pre-Stress Concrete
|
5/20/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
5/20/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/21/2019
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
5/21/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/22/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
5/22/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
5/22/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
5/22/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/23/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/23/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
5/23/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Reinforced Masonry Frame
|
5/23/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
5/24/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
5/28/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/29/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/29/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Steel/Welding
|
5/29/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
5/29/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/30/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/30/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Steel/Welding
|
5/30/2019
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
5/30/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
5/31/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
5/31/2019
|
Approved
|
NICK LAROCCA
|
|
Structural Steel Frame
|
5/31/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/3/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/3/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Steel/Welding
|
6/3/2019
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
6/3/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
6/4/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/4/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/4/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
6/4/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
6/4/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
6/4/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
6/5/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Pre-Stress Concrete
|
6/5/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
6/5/2019
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
6/5/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Drilled-In Anchors
|
6/6/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Pre-Stress Concrete
|
6/6/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
6/6/2019
|
Approved
|
TONY HARTONO
|
|
Piling/Pier/Caisson
|
6/6/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Drilled-In Anchors
|
6/7/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Pre-Stress Concrete
|
6/7/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
6/7/2019
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
6/7/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
6/10/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
6/10/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
6/10/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
6/10/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/11/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/11/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
6/11/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/12/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/12/2019
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
6/12/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/13/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/13/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
6/13/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/14/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/14/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
6/14/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/17/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/17/2019
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
6/17/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/18/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/18/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
6/18/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/19/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/19/2019
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
6/19/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/20/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/20/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
6/20/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/21/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/21/2019
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
6/21/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
6/24/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/24/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
6/24/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
6/24/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
6/25/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
6/26/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
6/27/2019
|
Partial Approval
|
NICK LAROCCA
|
|
METHANE-Rough
|
6/28/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
6/28/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
7/1/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/2/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/2/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/3/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/3/2019
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
7/3/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/5/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
7/5/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/8/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/8/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
7/8/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/9/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/9/2019
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
7/9/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/10/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/10/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Steel/Welding
|
7/10/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
7/10/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/11/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/11/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Steel/Welding
|
7/11/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
7/11/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
7/11/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/12/2019
|
No Access for Inspection
|
TED RIES
|
|
Deputy Reinf. Concrete
|
7/12/2019
|
No Access for Inspection
|
TED RIES
|
|
Deputy Pre-Stress Concrete
|
7/15/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/15/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
7/15/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/16/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/16/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
7/16/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
7/16/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/17/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/17/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
7/17/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/18/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/18/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Steel/Welding
|
7/18/2019
|
Approved
|
NICK LAROCCA
|
|
Piling/Pier/Caisson
|
7/18/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/19/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/19/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Pre-Stress Concrete
|
7/22/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/22/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
7/22/2019
|
Partial Approval
|
NICK LAROCCA
|
|
METHANE-Rough
|
7/23/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
7/23/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/24/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
7/24/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Deputy Steel/Welding
|
7/25/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
7/25/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
7/26/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
7/29/2019
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/31/2019
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
8/1/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
8/5/2019
|
Approved
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
8/8/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
8/9/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
8/15/2019
|
Approved
|
NICK LAROCCA
|
|
Excavation/Setback/Form/Re-Bar
|
8/15/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
8/19/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
8/21/2019
|
Approved
|
NICK LAROCCA
|
|
Drywall Nailing
|
8/21/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Insulation
|
8/21/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
8/26/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Light Gage Steel Frame
|
8/26/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Structural Steel Frame
|
8/27/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
8/28/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
8/28/2019
|
Approved
|
NICK LAROCCA
|
|
Light Gage Steel Frame
|
8/29/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
METHANE-Rough
|
8/29/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
8/29/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Structural Steel Frame
|
9/3/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
9/5/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
9/5/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
9/9/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
9/13/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
9/17/2019
|
Approved
|
NICK LAROCCA
|
|
Light Gage Steel Frame
|
9/17/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Drywall Nailing
|
9/18/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Insulation
|
10/10/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
10/16/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Drilled-In Anchors
|
10/21/2019
|
Approved
|
DERRICK SPENCER
|
|
METHANE-Rough
|
10/21/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
10/21/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
10/24/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
11/4/2019
|
Approved
|
NICK LAROCCA
|
|
Drywall Nailing
|
11/8/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Interior/Exterior Lathing
|
11/18/2019
|
Approved
|
NICK LAROCCA
|
|
METHANE-Rough
|
11/27/2019
|
Approved
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
11/27/2019
|
Approved
|
NICK LAROCCA
|
|
Drywall Nailing
|
12/2/2019
|
Approved
|
NICK LAROCCA
|
|
Light Gage Steel Frame
|
12/5/2019
|
Approved
|
NICK LAROCCA
|
|
Insulation
|
12/6/2019
|
Approved
|
NICK LAROCCA
|
|
Insulation
|
12/9/2019
|
Approved
|
NICK LAROCCA
|
|
T-Bar Ceiling
|
1/21/2020
|
Approved
|
NICK LAROCCA
|
|
Deputy Methane Barrier
|
1/22/2020
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
2/24/2020
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
2/25/2020
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
3/23/2020
|
Approved
|
NICK LAROCCA
|
|
Final
|
4/23/2020
|
OK to Issue CofO
|
NICK LAROCCA
|
|
Footing/Foundation/Slab
|
4/23/2020
|
Approved
|
NICK LAROCCA
|
|
Green Building Final
|
4/23/2020
|
Approved
|
NICK LAROCCA
|
|
Insulation
|
4/23/2020
|
Approved
|
NICK LAROCCA
|
|
SGSOV-Seismic Gas S/O Valve
|
4/23/2020
|
SGSOV Approved
|
NICK LAROCCA
|
|
Smoke Detectors
|
4/23/2020
|
Approved
|
NICK LAROCCA
|
|
Special/Order Compliance
|
11/10/2020
|
Approved
|
NICK LAROCCA
|
|
Special/Order Compliance
|
5/19/2021
|
Approved
|
NICK LAROCCA
|