2939 N GLENDOWER AVE 90027

Certificate Information: 2939 N GLENDOWER AVE 90027

Application / Permit
16010-10000-03489
Plan Check / Job No.
B16LA12015
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONSTRUCT NEW 3 STORY SINGLE FAMILY DWELLING OVER 1 LEVEL BASEMENT WITH ATTACHED GARAGE
Permit Issued
Issued on 1/25/2018
Issuing Office
Metro
Current Status
Issued on 1/25/2018
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/9/2016 APPLICANT
Assigned to Plan Check Engineer 9/1/2016 XIAOZHE ZHANG
Green Plans Picked Up 9/9/2016 APPLICANT
Corrections Issued 9/15/2016 XIAOZHE ZHANG
Quality Review Completed 10/11/2016 WING SUEN
Building Plans Picked Up 10/12/2016 APPLICANT
Applicant returned to address corrections 12/20/2016 XIAOZHE ZHANG
Applicant returned to address corrections 2/7/2017 XIAOZHE ZHANG
Applicant returned to address corrections 11/17/2017 XIAOZHE ZHANG
Applicant returned to address corrections 1/19/2018 XIAOZHE ZHANG
Plan Check Approved 1/25/2018 XIAOZHE ZHANG
Issued 1/25/2018 LADBS

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 10/18/2016 ARNULFO NUNO
BHO/Hillside ordinance Cleared 10/18/2016 ARNULFO NUNO
BHO/Hillside ordinance Cleared 10/18/2016 ARNULFO NUNO
Permit Cleared 10/18/2016 ARNULFO NUNO
Sewer availability Cleared 10/18/2016 ARNULFO NUNO
Hydrant and Access approval Cleared 10/19/2016 JOHN CONNEALLY
Eng Process Fee Ord 176,300 Cleared 10/27/2016 RAVIL MANAPOV
Construction within easement Cleared 2/14/2017 OSCAR CASTRO
GPI Written Notices Cleared 6/14/2017 XIAOZHE ZHANG
Grading Pre-Inspection Cleared 6/14/2017 XIAOZHE ZHANG
Address approval Cleared 6/15/2017 FATIMA GUERRA
Roof/Waste drainage to street Cleared 7/12/2017 CRISTIAN GUERRERO
Green Code Cleared 7/20/2017 DONALD CRICHLOW
Disturb/Remove Protected Trees Cleared 12/18/2017 ADRIAN SANCHEZ
Low Impact Development Cleared 1/4/2018 RYAN HUDSON
Stormwater Pollution Mitigatn Cleared 1/4/2018 RYAN HUDSON
Work Adjacent to Public Way Cleared 1/10/2018 BOK GOH
Excavation more than 5-ft deep Cleared 1/19/2018 CALOSHA APPROVED
Miscellaneous Cleared 1/22/2018 CRISTIAN GUERRERO
Building over 3-story or 36-ft Cleared 1/25/2018 CALOSHA APPROVED

Contact Information

Contractor Boswell Construction Inc; Lic. No.: 934480-B 17071 VENTURA BLVD STE 201      ENCINO, CA 91316
Engineer Baad, Katherine Firestone; Lic. No.: C64669 5232 ZAKON RD      TORRANCE, CA 90505

Inspector Information

ENRIQUE MIRELES, (213) 202-3438 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 12/16/2019 Approved BRAD BESCOS
Deputy Reinf. Concrete 3/26/2020 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 5/18/2020 Partial Approval JOSEPH MCGARRY
Sewer 7/28/2020 Partial Approval ARTHUR SARGSYAN
Excavation/Setback/Form/Re-Bar 8/7/2020 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 8/24/2020 Partial Approval ARTHUR SARGSYAN
Excavation/Setback/Form/Re-Bar 8/28/2020 Partial Approval JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 2/10/2021 Not Ready for Inspection JOSEPH MCGARRY
Footing/Foundation/Slab 2/10/2021 Not Ready for Inspection JOSEPH MCGARRY
PLUMBING-Rough 2/10/2021 Not Ready for Inspection JOSEPH MCGARRY
Protected Tree Letter 2/10/2021 Not Ready for Inspection JOSEPH MCGARRY
Footing/Foundation/Slab 2/24/2021 Partial Approval JOSEPH MCGARRY
Protected Tree Letter 2/24/2021 Not Ready for Inspection JOSEPH MCGARRY
Deputy Reinf. Concrete 2/26/2021 Conditional Approval THOMAS LOGRASSO
Deputy Reinf. Concrete 3/1/2021 Conditional Approval THOMAS LOGRASSO
Footing/Foundation/Slab 3/17/2021 Partial Approval JOSEPH MCGARRY
Protected Tree Letter 3/17/2021 Not Ready for Inspection JOSEPH MCGARRY
Green Building Rough 3/26/2021 Not Ready for Inspection JOSEPH MCGARRY
Reinforced Concrete Frame 3/26/2021 Partial Approval JOSEPH MCGARRY
Verify Sprinkler Sign Off 3/26/2021 Not Ready for Inspection JOSEPH MCGARRY
Deputy Reinf. Concrete 3/31/2021 Partial Approval JOSEPH MCGARRY
Deputy Shotcrete 3/31/2021 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 4/6/2021 Corrections Issued HAMIK HARTOUNIAN
Protected Tree Letter 4/6/2021 Approved HAMIK HARTOUNIAN
Footing/Foundation/Slab 4/14/2021 Partial Approval HAMIK HARTOUNIAN
PLUMBING-Rough 4/21/2021 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 5/7/2021 No Access for Inspection ELMER BLAND
Pool Piping 6/9/2021 Not Ready for Inspection JOSEPH MCGARRY
Deputy Reinf. Concrete 6/10/2021 Conditional Approval THOMAS LOGRASSO
Deputy Reinf. Concrete 6/14/2021 Conditional Approval WILLIAM WREN
Deputy Shotcrete 6/14/2021 Conditional Approval WILLIAM WREN
Deputy Shotcrete 6/15/2021 Approved JOSEPH MCGARRY
Footing/Foundation/Slab 6/15/2021 Partial Inspection JOSEPH MCGARRY
Green Building Rough 6/15/2021 Not Ready for Inspection JOSEPH MCGARRY
Reinforced Concrete Frame 6/15/2021 Conditional Approval JOSEPH MCGARRY
Verify Sprinkler Sign Off 6/15/2021 Not Ready for Inspection JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 6/22/2021 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 6/22/2021 Partial Approval JOSEPH MCGARRY
Reinforced Concrete Frame 6/22/2021 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 6/28/2021 Approved RONALD KIDWELL
Green Building Rough 7/2/2021 Not Ready for Inspection JOSEPH MCGARRY
Reinforced Concrete Frame 7/2/2021 Partial Approval JOSEPH MCGARRY
Verify Sprinkler Sign Off 7/2/2021 Not Ready for Inspection JOSEPH MCGARRY
Footing/Foundation/Slab 7/22/2021 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 7/23/2021 Partial Approval JOSEPH MCGARRY
Green Building Rough 8/5/2021 Not Ready for Inspection JOSEPH MCGARRY
Reinforced Concrete Frame 8/5/2021 Partial Approval JOSEPH MCGARRY
Special/Order Compliance 8/5/2021 Corrections Issued JOSEPH MCGARRY
Verify Sprinkler Sign Off 8/5/2021 Not Ready for Inspection JOSEPH MCGARRY
Deputy Reinf. Concrete 8/23/2021 Conditional Approval CHARLES BOGHOSKHAN
Green Building Rough 10/12/2021 Not Ready for Inspection JOSEPH MCGARRY
Reinforced Concrete Frame 10/12/2021 Partial Approval JOSEPH MCGARRY
Verify Sprinkler Sign Off 10/12/2021 Not Ready for Inspection JOSEPH MCGARRY
Rough-Elec/Plmb/HVAC 10/19/2021 Partial Approval CHRIS CHRISTENSEN
Deputy Reinf. Concrete 11/4/2021 Partial Approval JOSEPH MCGARRY
Green Building Rough 11/4/2021 Not Ready for Inspection JOSEPH MCGARRY
Pre-Gunite 11/4/2021 Approved JOSEPH MCGARRY
Reinforced Concrete Frame 11/4/2021 Partial Approval JOSEPH MCGARRY
Verify Sprinkler Sign Off 11/4/2021 Not Ready for Inspection JOSEPH MCGARRY
Pre-Gunite 11/5/2021 Approved JOSEPH MCGARRY
Deputy Reinf. Concrete 11/8/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 11/22/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 11/23/2021 Conditional Approval CHRIS CHRISTENSEN
Deputy Steel/Welding 11/24/2021 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 11/29/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 11/29/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 11/30/2021 Approved JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 11/30/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 12/1/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 12/2/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 12/3/2021 Conditional Approval ADAM ESCOTO
Deputy Steel/Welding 12/6/2021 Corrections Issued LILIANA PORTILLO
Deputy Steel/Welding 12/7/2021 Approved ARTHUR SARGSYAN
Deputy Steel/Welding 12/13/2021 Conditional Approval CRAIG DAVIS
Deputy Steel/Welding 12/16/2021 Approved ARTHUR SARGSYAN
Deputy Steel/Welding 12/17/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 12/21/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 12/22/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 12/23/2021 No Access for Inspection JOSEPH MCGARRY
Deputy Steel/Welding 12/27/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 12/28/2021 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 1/12/2022 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 1/25/2022 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 1/27/2022 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 1/28/2022 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 2/2/2022 Approved JOSEPH MCGARRY
Deputy Steel/Welding 2/3/2022 Approved JOSEPH MCGARRY
Deputy Steel/Welding 2/4/2022 Partial Approval JOSEPH MCGARRY
BUILDING-Rough-Frame 2/11/2022 Partial Approval CRAIG DAVIS
Green Building Rough 2/11/2022 Not Ready for Inspection CRAIG DAVIS
Structural Steel Frame 2/11/2022 Partial Inspection CRAIG DAVIS
Verify Sprinkler Sign Off 2/11/2022 Not Ready for Inspection CRAIG DAVIS
Deputy Reinf. Concrete 2/17/2022 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 3/31/2022 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 5/5/2022 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 5/9/2022 No Access for Inspection JOSEPH MCGARRY
Footing/Foundation/Slab 5/9/2022 Conditional Approval JOSEPH MCGARRY
Deputy Drilled-In Anchors 6/28/2022 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 6/28/2022 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 6/30/2022 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 7/29/2022 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 8/22/2022 Partial Approval JOSEPH MCGARRY
Deputy Other (see comments) 8/25/2022 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 8/26/2022 Partial Approval JOSEPH MCGARRY
Deputy Shotcrete 8/26/2022 Partial Approval JOSEPH MCGARRY
Deputy Other (see comments) 9/13/2022 Partial Approval JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 9/13/2022 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 9/15/2022 Conditional Approval ALIZAH MAYAGOITIA
Special/Order Compliance 9/16/2022 Corrections Issued JOSEPH MCGARRY
Deputy Wood Construction 11/3/2022 Partial Approval JOSEPH MCGARRY
Deputy Wood Construction 11/18/2022 Partial Approval JOSEPH MCGARRY
Deputy Wood Construction 11/28/2022 Conditional Approval RICHARD DOCKUS
BUILDING-Rough-Frame 12/1/2022 Not Ready for Inspection JOSEPH MCGARRY
Deputy Wood Construction 12/1/2022 Approved JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 12/1/2022 Partial Approval JOSEPH MCGARRY
Green Building Rough 12/1/2022 Not Ready for Inspection JOSEPH MCGARRY
Verify Sprinkler Sign Off 12/1/2022 Not Ready for Inspection JOSEPH MCGARRY
Wood Frame 12/1/2022 Not Ready for Inspection JOSEPH MCGARRY
Green Building Rough 2/13/2023 Not Ready for Inspection HAMIK HARTOUNIAN
Structural Steel Frame 2/13/2023 Not Ready for Inspection HAMIK HARTOUNIAN
Verify Sprinkler Sign Off 2/13/2023 Not Ready for Inspection HAMIK HARTOUNIAN
Green Building Rough 2/23/2023 Not Ready for Inspection JOSEPH MCGARRY
Structural Steel Frame 2/23/2023 Conditional Approval JOSEPH MCGARRY
Verify Sprinkler Sign Off 2/23/2023 Not Ready for Inspection JOSEPH MCGARRY
Pre-Inspection 3/28/2023 Corrections Issued DONALD CRICHLOW
Pre-Inspection 8/8/2023 Corrections Issued JOSEPH MCGARRY
Interior/Exterior Lathing 11/22/2023 Not Ready for Inspection JOSEPH MCGARRY
Pre-Inspection 11/28/2023 Partial Approval JOSEPH MCGARRY
Interior/Exterior Lathing 12/6/2023 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 2/1/2024 Partial Approval JEFFREY MEAD
PLUMBING-Rough 2/2/2024 Not Ready for Inspection LILIANA PORTILLO
HVAC-Rough 2/8/2024 Conditional Approval ALIZAH MAYAGOITIA
PLUMBING-Rough 2/23/2024 Partial Approval BRENDAN MORELLI
ELECTRICAL-Rough 3/7/2024 Approved ENRIQUE MIRELES
PLUMBING-Rough 4/17/2024 Not Ready for Inspection ENRIQUE MIRELES
Excavation/Setback/Form/Re-Bar 5/2/2024 Partial Approval JEFFREY MEAD
Gas Test 6/12/2024 Partial Approval JEFFREY MEAD
Excavation/Setback/Form/Re-Bar 6/13/2024 Approved ENRIQUE MIRELES
PLUMBING-Rough 6/13/2024 Corrections Issued ENRIQUE MIRELES
HVAC-Rough 6/17/2024 Approved ENRIQUE MIRELES
Deputy Drilled-In Anchors 6/18/2024 Conditional Approval RICHARD DOCKUS
Deputy Drilled-In Anchors 6/21/2024 Approved ENRIQUE MIRELES
PLUMBING-Rough 6/25/2024 Approved RICHARD DOCKUS
Excavation/Setback/Form/Re-Bar 6/28/2024 Approved ENRIQUE MIRELES
Deputy Reinf. Concrete 7/2/2024 Approved ENRIQUE MIRELES
Excavation/Setback/Form/Re-Bar 7/9/2024 Not Ready for Inspection JEFFREY MEAD
Special/Order Compliance 7/9/2024 Corrections Issued JOAQUIN GREENOUGH
Excavation/Setback/Form/Re-Bar 7/10/2024 Corrections Issued ENRIQUE MIRELES
BUILDING-Rough-Frame 7/30/2024 Not Ready for Inspection JOAQUIN GREENOUGH
Footing/Foundation/Slab 7/30/2024 Corrections Issued JOAQUIN GREENOUGH
Green Building Rough 7/30/2024 Approved JOAQUIN GREENOUGH
Verify Sprinkler Sign Off 7/30/2024 Approved JOAQUIN GREENOUGH
BUILDING-Rough-Frame 8/5/2024 Approved JOAQUIN GREENOUGH
Sewer 9/18/2024 Approved ENRIQUE MIRELES
Excavation/Setback/Form/Re-Bar 1/14/2025 Partial Approval JOAQUIN GREENOUGH
Interior/Exterior Lathing 1/22/2025 Approved ENRIQUE MIRELES
Shower Pan 4/7/2025 Partial Approval ALEX COLIN
Drywall Nailing 4/10/2025 Approved ENRIQUE MIRELES
Excavation/Setback/Form/Re-Bar 4/18/2025 Not Ready for Inspection ENRIQUE MIRELES
Shower Pan 4/18/2025 Approved ENRIQUE MIRELES
Deputy Reinf. Concrete 4/23/2025 Conditional Approval SCOTT FINNILA
Excavation/Setback/Form/Re-Bar 4/23/2025 Approved ENRIQUE MIRELES
Deputy Reinf. Concrete 4/25/2025 Approved ENRIQUE MIRELES
Deputy Reinf. Concrete 4/30/2025 Approved ENRIQUE MIRELES
Piling/Pier/Caisson 5/1/2025 Approved ENRIQUE MIRELES
Deputy Reinf. Concrete 5/5/2025 Approved ENRIQUE MIRELES
Drywall Nailing 5/5/2025 Partial Approval ENRIQUE MIRELES
Footing/Foundation/Slab 5/5/2025 Not Ready for Inspection ENRIQUE MIRELES
Green Building Final 5/5/2025 Not Ready for Inspection ENRIQUE MIRELES
Light Gage Steel Frame 5/5/2025 Not Ready for Inspection ENRIQUE MIRELES
Reinforced Concrete Frame 5/5/2025 Not Ready for Inspection ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 5/5/2025 SGSOV Not Ready ENRIQUE MIRELES
SUSMP-Std. Urban Storm Water 5/5/2025 Not Ready for Inspection ENRIQUE MIRELES
Service/Power Release 5/5/2025 Not Ready for Inspection ENRIQUE MIRELES
Smoke Detectors 5/5/2025 Not Ready for Inspection ENRIQUE MIRELES
Structural Steel Frame 5/5/2025 Not Ready for Inspection ENRIQUE MIRELES
Insulation 6/17/2025 Partial Approval ENRIQUE MIRELES
Final 7/17/2025 Not Ready for Inspection OSVALDO PARAMO
Footing/Foundation/Slab 7/17/2025 Partial Inspection OSVALDO PARAMO
Interior/Exterior Lathing 10/15/2025 Approved ENRIQUE MIRELES
Special/Order Compliance 11/7/2025 No Access for Inspection ENRIQUE MIRELES
Excavation/Setback/Form/Re-Bar 1/9/2026 Approved ENRIQUE MIRELES
Deputy Reinf. Concrete 1/12/2026 Approved ENRIQUE MIRELES
Deputy Reinf. Concrete 5/15/2026 Conditional Approval ALEX COLIN
Excavation/Setback/Form/Re-Bar 5/15/2026 Approved JEFFREY MEAD
Deputy Reinf. Concrete 5/19/2026 Approved ENRIQUE MIRELES