9200 S FALMOUTH AVE 90293

Certificate Information: 9200 S FALMOUTH AVE 90293

Application / Permit
16010-10000-03368
Plan Check / Job No.
B16LA11589
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(9) Pumping Plant
Work Description
NEW 57'-4" X 25'-4" PUMP STATION WITH UNDERGROUND WET WELL . AN UNMMANED FACILITY.
Permit Issued
Issued on 9/13/2018
Issuing Office
Metro
Current Status
CofO Issued on 4/9/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/2/2016 APPLICANT
Assigned to Plan Check Engineer 8/4/2016 EDUARDO RODRIGUEZ
Disabled Access Plans Picked Up 8/19/2016 APPLICANT
Corrections Issued 8/25/2016 EDUARDO RODRIGUEZ
Building Plans Picked Up 8/26/2016 APPLICANT
Quality Review Completed 8/31/2016 SUEN LIEU
Applicant returned to address corrections 9/7/2016 EDUARDO RODRIGUEZ
Applicant returned to address corrections 9/14/2016 EDUARDO RODRIGUEZ
Green Plans Picked Up 9/16/2016 APPLICANT
Applicant returned to address corrections 1/18/2017 EDUARDO RODRIGUEZ
Applicant returned to address corrections 3/1/2017 EDUARDO RODRIGUEZ
Applicant returned to address corrections 3/22/2017 EDUARDO RODRIGUEZ
Applicant returned to address corrections 3/29/2017 EDUARDO RODRIGUEZ
Plan Check Approved 3/30/2017 EDUARDO RODRIGUEZ
Issued 9/13/2018 LADBS
CofO in Progress 3/20/2024 NICK LAROCCA
Permit Finaled 4/9/2024 NICK LAROCCA
CofO Issued 4/9/2024 NICK LAROCCA
Permit Finaled 4/9/2024 NICK LAROCCA

Permit Application Clearance Information

Address approval Cleared 9/1/2016 MARYAM AZARBAYJANI
Eng Process Fee Ord 176,300 Cleared 9/1/2016 MARYAM AZARBAYJANI
Highway dedication Cleared 9/1/2016 MARYAM AZARBAYJANI
Miscellaneous Cleared 9/1/2016 MARYAM AZARBAYJANI
Permit Cleared 9/1/2016 MARYAM AZARBAYJANI
Roof/Waste drainage to street Cleared 9/1/2016 MARYAM AZARBAYJANI
Sewer availability Cleared 9/1/2016 MARYAM AZARBAYJANI
Work Adjacent to Public Way Cleared 9/1/2016 MARYAM AZARBAYJANI
ZA Case Cleared 9/7/2016 ERIC CLAROS
ZA Case Cleared 9/7/2016 ERIC CLAROS
Miscellaneous Cleared 9/9/2016 GRACIELA ACOSTA
Hydrant and Access approval Cleared 9/13/2016 JOHN CONNEALLY
City owned building/parcel Cleared 9/14/2016 HAROOT AVANESIAN
Project Permit Cleared 9/14/2016 NOAH MCCOY
Green Code Cleared 9/22/2016 DONALD CRICHLOW
Low Impact Development Cleared 10/7/2016 AMMAR ELTAWIL
DAS Clearance Cleared 3/22/2017 EDDIE GARIN
Excavation more than 5-ft deep Cleared 3/29/2017 CALOSHA APPROVED
GPI Written Notices Cleared 3/29/2017 EDUARDO RODRIGUEZ
Grading Pre-Inspection Cleared 3/29/2017 EDUARDO RODRIGUEZ
Methane Ordinance Cleared 3/29/2017 DOMINIQUE MEDINA
City owned building/parcel Cleared 8/22/2018 HAROOT AVANESIAN
Highway dedication Cleared 8/22/2018 KARAN PATEL
Hydrant and Access approval Cleared 8/22/2018 GILBERT URREA
Methane Ordinance Cleared 8/22/2018 DOMINIQUE MEDINA
Miscellaneous Cleared 8/22/2018 IVORY CHAMBESHI
Miscellaneous Cleared 8/22/2018 KARAN PATEL
Permit Cleared 8/22/2018 KARAN PATEL
Project Permit Cleared 8/22/2018 EDUARDO RODRIGUEZ
Sewer availability Cleared 8/22/2018 KARAN PATEL
ZA Case Cleared 8/22/2018 IVORY CHAMBESHI
ZA Case Cleared 8/22/2018 IVORY CHAMBESHI
DAS Clearance Cleared 8/23/2018 EDUARDO RODRIGUEZ
Green Code Cleared 8/23/2018 EDUARDO RODRIGUEZ
Low Impact Development Cleared 8/23/2018 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 8/23/2018 MICHAEL CASTILLO
Work Adjacent to Public Way Cleared 8/23/2018 KRISTEN LY

Contact Information

Contractor Ohl Usa Inc; Lic. No.: 984140-A 780 THIRD AVENUE 9TH FLOOR      NEW YORK, NY 10017
Engineer Alvarez, Maria M; Lic. No.: C67461 2307 GARDI ST      BRADBURY, CA 91010
Engineer Dolan, Thomas John; Lic. No.: C42030 1756 LAS PALMITAS      SOUTH PASADENA, CA 91030
Engineer Johnson, Ronald Scott; Lic. No.: GE2356 2466 HAAS ST      ESCONDIDO, CA 92025
Engineer Long, Joseph Francis; Lic. No.: C54329 3050 OAKCREST DR      CHINO HILLS, CA 91709
Engineer Scherschel, David Joseph; Lic. No.: S1572 10612 EQUESTRIAN DRIVE      SANTA ANA, CA 92705

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/20/2019 Approved JONATHAN ALLEN
Pre-Inspection 7/2/2019 Conditional Approval ALBERT COMISARI
Deputy Methane Barrier 7/10/2019 Conditional Approval JONATHAN ALLEN
Deputy Methane Barrier 7/11/2019 Conditional Approval ALBERT COMISARI
Deputy Methane Barrier 7/12/2019 Approved JONATHAN ALLEN
METHANE-Barrier 7/12/2019 Approved JONATHAN ALLEN
METHANE-Rough 7/12/2019 Approved JONATHAN ALLEN
METHANE-Subgrade 7/12/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 7/16/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 7/17/2019 Conditional Approval JONATHAN ALLEN
Footing/Foundation/Slab 7/17/2019 Not Ready for Inspection JONATHAN ALLEN
SWPPP-Const. Storm Water 7/17/2019 Completed JONATHAN ALLEN
Deputy Reinf. Concrete 7/18/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 7/19/2019 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 7/19/2019 Not Ready for Inspection JONATHAN ALLEN
Deputy Reinf. Concrete 7/29/2019 Approved JONATHAN ALLEN
Footing/Foundation/Slab 7/29/2019 Partial Approval JONATHAN ALLEN
SWPPP-Const. Storm Water 7/29/2019 Completed JONATHAN ALLEN
Deputy Reinf. Concrete 7/30/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 7/31/2019 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 8/16/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 8/30/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 9/3/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 9/4/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 9/5/2019 Conditional Approval JONATHAN ALLEN
Reinforced Concrete Frame 9/10/2019 Partial Approval ALBERT COMISARI
Deputy Reinf. Concrete 9/19/2019 Conditional Approval ALBERT COMISARI
Green Building Rough 9/19/2019 Conditional Approval ALBERT COMISARI
SWPPP-Const. Storm Water 9/19/2019 Not Required ALBERT COMISARI
Structural Steel Frame 9/19/2019 Partial Approval ALBERT COMISARI
Verify Sprinkler Sign Off 9/19/2019 Not Ready for Inspection ALBERT COMISARI
Deputy Reinf. Concrete 9/23/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 9/25/2019 Approved JONATHAN ALLEN
Reinforced Concrete Frame 9/26/2019 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 9/30/2019 Approved JONATHAN ALLEN
Reinforced Concrete Frame 10/1/2019 Partial Approval ALBERT COMISARI
Deputy Reinf. Concrete 10/9/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 10/10/2019 Conditional Approval ALBERT COMISARI
Reinforced Concrete Frame 10/11/2019 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 10/16/2019 Partial Approval ALBERT COMISARI
Deputy Drilled-In Anchors 11/6/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 11/6/2019 Conditional Approval JONATHAN ALLEN
Reinforced Concrete Frame 11/6/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 11/8/2019 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 11/8/2019 Conditional Approval ALBERT COMISARI
Deputy Other (see comments) 11/12/2019 Conditional Approval ALBERT COMISARI
Deputy Other (see comments) 11/13/2019 Conditional Approval ALBERT COMISARI
Deputy Other (see comments) 11/14/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 11/15/2019 Approved JONATHAN ALLEN
Deputy Other (see comments) 11/15/2019 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 11/18/2019 Conditional Approval ALBERT COMISARI
Deputy Methane Barrier 11/19/2019 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 11/21/2019 Conditional Approval ALBERT COMISARI
Deputy Methane Barrier 12/9/2019 Approved JONATHAN ALLEN
Footing/Foundation/Slab 1/7/2020 Partial Approval ALBERT COMISARI
SWPPP-Const. Storm Water 1/7/2020 Not Required ALBERT COMISARI
Deputy Methane Barrier 1/21/2020 Approved JONATHAN ALLEN
Pre-Inspection 1/27/2020 Not Ready for Inspection JONATHAN ALLEN
Deputy Methane Barrier 1/28/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 3/4/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 3/5/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/6/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 3/16/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 3/17/2020 Conditional Approval ALBERT COMISARI
Footing/Foundation/Slab 3/26/2020 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 4/6/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 4/7/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 4/8/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 4/9/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 4/10/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 4/13/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 4/14/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 4/15/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 4/16/2020 Conditional Approval ALBERT COMISARI
Footing/Foundation/Slab 4/16/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 4/17/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Concrete 5/5/2020 Conditional Approval ALBERT COMISARI
Footing/Foundation/Slab 5/5/2020 Not Ready for Inspection ALBERT COMISARI
Deputy Reinf. Concrete 5/6/2020 Conditional Approval ALBERT COMISARI
Reinforced Concrete Frame 5/6/2020 Partial Approval ALBERT COMISARI
Deputy Reinf. Concrete 5/15/2020 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 6/3/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 7/14/2020 Approved JONATHAN ALLEN
Deputy Steel/Welding 7/15/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 7/16/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 7/17/2020 Approved JONATHAN ALLEN
Deputy Reinf. Masonry 8/31/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 9/1/2020 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Masonry 9/2/2020 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Masonry 9/3/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 9/4/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 9/8/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 9/9/2020 Conditional Approval ALBERT COMISARI
Masonry Wall/Backfill 9/9/2020 Partial Approval ALBERT COMISARI
Deputy Reinf. Masonry 9/10/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 9/11/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 9/14/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 9/15/2020 Conditional Approval ALBERT COMISARI
Masonry Wall/Backfill 9/15/2020 Partial Approval ALBERT COMISARI
Deputy Reinf. Masonry 9/16/2020 Conditional Approval ALBERT COMISARI
Deputy Reinf. Masonry 9/17/2020 Conditional Approval ALBERT COMISARI
Masonry Wall/Backfill 9/17/2020 Partial Approval ALBERT COMISARI
Deputy Reinf. Masonry 9/18/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 9/28/2020 Conditional Approval ALBERT COMISARI
Footing/Foundation/Slab 9/28/2020 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 9/29/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 9/30/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 10/1/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 10/2/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 10/14/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 10/15/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 10/16/2020 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 10/19/2020 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 10/20/2020 Approved JONATHAN ALLEN
Deputy Drilled-In Anchors 10/21/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 10/22/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 10/23/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 11/2/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 11/23/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 11/24/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 11/25/2020 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 11/30/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 12/1/2020 Approved JONATHAN ALLEN
Deputy Steel/Welding 12/2/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 12/3/2020 Approved JONATHAN ALLEN
Deputy Steel/Welding 12/4/2020 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 12/7/2020 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 12/7/2020 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 12/8/2020 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 12/8/2020 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 12/15/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 12/16/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 12/17/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 12/18/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 12/21/2020 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 12/21/2020 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 12/22/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 12/22/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 12/23/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 12/23/2020 Conditional Approval ALBERT COMISARI
Green Building Rough 12/23/2020 Conditional Approval ALBERT COMISARI
SWPPP-Const. Storm Water 12/23/2020 Completed ALBERT COMISARI
Structural Steel Frame 12/23/2020 Conditional Approval ALBERT COMISARI
Verify Sprinkler Sign Off 12/23/2020 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 12/24/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 12/24/2020 Conditional Approval ALBERT COMISARI
Deputy Drilled-In Anchors 12/28/2020 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 12/28/2020 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 12/29/2020 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 12/29/2020 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 12/30/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 12/30/2020 Conditional Approval ALBERT COMISARI
Green Building Rough 12/30/2020 Conditional Approval ALBERT COMISARI
Structural Steel Frame 12/30/2020 Conditional Approval ALBERT COMISARI
Verify Sprinkler Sign Off 12/30/2020 Not Ready for Inspection ALBERT COMISARI
Deputy Drilled-In Anchors 12/31/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 12/31/2020 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 1/20/2021 Conditional Approval ALBERT COMISARI
Deputy Steel/Welding 1/21/2021 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 1/22/2021 Conditional Approval JONATHAN ALLEN
Floor/Roof Diaphrgm/Shear Wall 2/2/2021 Approved ALAN NOVAK
Drywall Nailing 4/29/2022 Approved NICK LAROCCA
Final 4/29/2022 OK to Issue CofO NICK LAROCCA
Footing/Foundation/Slab 4/29/2022 Approved NICK LAROCCA
Green Building Final 4/29/2022 Approved NICK LAROCCA
Green Building Rough 4/29/2022 Approved NICK LAROCCA
Reinforced Masonry Frame 4/29/2022 Approved NICK LAROCCA
SGSOV-Seismic Gas S/O Valve 4/29/2022 SGSOV Approved NICK LAROCCA
SWPPP-Const. Storm Water 4/29/2022 Completed NICK LAROCCA
Smoke Detectors 4/29/2022 Approved NICK LAROCCA
Structural Steel Frame 4/29/2022 Approved NICK LAROCCA
Verify Sprinkler Sign Off 4/29/2022 Approved NICK LAROCCA