Deputy Reinf. Concrete
|
3/5/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/6/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/7/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
3/7/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/8/2018
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
3/8/2018
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
3/8/2018
|
Approved
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/9/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/12/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/13/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/14/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
3/15/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/16/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/23/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/27/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/29/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
3/29/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/30/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/18/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/19/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
4/19/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/20/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/24/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
4/25/2018
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
4/25/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/26/2018
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
4/27/2018
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
5/7/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/8/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
5/8/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/9/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/10/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/11/2018
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/14/2018
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/4/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/6/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/7/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/8/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/9/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/10/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/20/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/21/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/22/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/23/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/24/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
9/27/2018
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
9/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/1/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/3/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/4/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/5/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/9/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/10/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/11/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/12/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/15/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/16/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/17/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/18/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/19/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
10/26/2018
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
10/29/2018
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/29/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/30/2018
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/31/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/1/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/7/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/9/2018
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/9/2018
|
Approved
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/14/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/15/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/15/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/16/2018
|
Approved
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
11/19/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
11/20/2018
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
11/21/2018
|
Approved
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
11/26/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/27/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/29/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
11/30/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/10/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/11/2018
|
Approved
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
12/11/2018
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
12/12/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/13/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/14/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/17/2018
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
12/18/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/19/2018
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
12/19/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/20/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/21/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/26/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/27/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/28/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/14/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/25/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/28/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/29/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/30/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
1/30/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/31/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Wood Construction
|
1/31/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
2/1/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
2/4/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
2/5/2019
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/7/2019
|
Approved
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/11/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/26/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/27/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/28/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
3/29/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/1/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/2/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/3/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/4/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/5/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/9/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/10/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/11/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/17/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/19/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
4/29/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
4/30/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
5/1/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
5/2/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/3/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
5/6/2019
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
5/7/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
5/8/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
5/9/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
5/10/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
5/14/2019
|
Approved
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
5/16/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
5/17/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
5/28/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
5/29/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
5/30/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
5/31/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/7/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/10/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/11/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/12/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/13/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/14/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
7/1/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/2/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/3/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/5/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
7/11/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
7/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
7/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
7/17/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Shotcrete
|
7/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
7/19/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/5/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/6/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/8/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/9/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/14/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/14/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
8/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
9/19/2019
|
OK for TCO
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
9/19/2019
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
9/19/2019
|
Approved
|
JAMES POWERS
|
|
Green Building Rough
|
9/19/2019
|
Approved
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
9/19/2019
|
SGSOV No Gas
|
JAMES POWERS
|
|
Smoke Detectors
|
9/19/2019
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/19/2019
|
Approved
|
JAMES POWERS
|
|
Wood Frame
|
9/19/2019
|
Approved
|
JAMES POWERS
|
|
Final
|
10/30/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
2/25/2020
|
OK to Issue CofO
|
JAMES POWERS
|