Footing/Foundation/Slab
|
12/28/2017
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
1/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Verify Sprinkler Sign Off
|
1/17/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
1/18/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
1/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
1/24/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
1/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
1/26/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/29/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
1/31/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
2/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
2/9/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Pre-Stress Concrete
|
2/21/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
2/21/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
2/22/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
2/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
2/26/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Pre-Stress Concrete
|
2/27/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
3/5/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
3/6/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
3/6/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Shotcrete
|
3/6/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Pre-Stress Concrete
|
3/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
3/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
3/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
3/7/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
3/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
3/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
3/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
3/8/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
3/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
3/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
3/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
3/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
3/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
3/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
3/16/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
3/20/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
3/21/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Insulation
|
3/30/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
3/30/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
4/2/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/3/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/3/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/4/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
4/5/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/5/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/5/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
4/6/2018
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Masonry
|
4/6/2018
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Shotcrete
|
4/6/2018
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Pre-Stress Concrete
|
4/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
4/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
4/11/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/11/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/11/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/11/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
4/11/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
4/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/12/2018
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
4/13/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/13/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/13/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
4/16/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/16/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/16/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
4/16/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/18/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
4/19/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/19/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/19/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/19/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/19/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
4/20/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/20/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/20/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/20/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
4/21/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
4/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/23/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
4/23/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
4/24/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/24/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/24/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/24/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
4/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
5/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
5/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
5/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
5/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
5/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
5/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
5/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
5/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
5/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
5/9/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
5/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
5/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
5/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
5/11/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Pre-Stress Concrete
|
5/11/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
5/11/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Masonry
|
5/11/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Shotcrete
|
5/11/2018
|
Conditional Approval
|
TED RIES
|
|
Reinforced Concrete Frame
|
5/18/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
5/21/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
5/25/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
5/29/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/4/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
6/4/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/7/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/8/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/14/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/15/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
6/19/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/19/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/22/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/29/2018
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
7/11/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/13/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
7/13/2018
|
Partial Inspection
|
FRED WOHLFARTH
|
|
Reinforced Concrete Frame
|
7/16/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/19/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/20/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/25/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/26/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
8/3/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
8/13/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
8/14/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/16/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/29/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
8/29/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
9/4/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
9/4/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/11/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/12/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
9/19/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/1/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
10/2/2018
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
10/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
10/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
10/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/19/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
10/22/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/30/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/6/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/14/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
11/14/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/26/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
12/4/2018
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/4/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
12/5/2018
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
12/11/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/18/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/22/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/15/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/26/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/28/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
2/28/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
3/6/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
3/8/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
3/14/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
3/14/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
3/21/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/28/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/1/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/15/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/18/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
4/18/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/23/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
5/10/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
5/15/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
5/16/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Wood Frame
|
5/22/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
5/29/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
6/3/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/12/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/18/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
6/27/2019
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
7/2/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
7/10/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/11/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Wood Frame
|
7/17/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
7/25/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
8/6/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
8/30/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
9/18/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
10/18/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
11/4/2019
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
11/13/2019
|
Approved
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/13/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
11/18/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/17/2019
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
1/7/2020
|
Approved
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
1/28/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/30/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/30/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/7/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
2/14/2020
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
2/19/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
2/26/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
3/5/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
3/18/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
3/19/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
4/17/2020
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
5/12/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
7/24/2020
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
7/24/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/24/2020
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
7/24/2020
|
Approved
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
7/24/2020
|
SGSOV Approved
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
7/24/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/24/2020
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
7/28/2020
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/11/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/12/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/13/2020
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/18/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
8/19/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
8/19/2020
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/20/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
8/21/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/24/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
8/25/2020
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/27/2020
|
Approved
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
9/10/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
10/22/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
10/29/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
11/12/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
11/13/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
11/16/2020
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
11/19/2020
|
OK to Issue CofO
|
DAVID BURKHEAD
|