Deputy Reinf. Concrete
|
12/13/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
12/19/2017
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
12/19/2017
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
12/19/2017
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Verify Sprinkler Sign Off
|
12/19/2017
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
12/20/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
12/20/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
12/20/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
12/21/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
12/21/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
12/21/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
12/22/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
12/22/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
12/22/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
12/26/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
12/26/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
12/26/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
12/27/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
12/27/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
12/27/2017
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
12/28/2017
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
12/28/2017
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Verify Sprinkler Sign Off
|
12/28/2017
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
1/4/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
1/4/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/4/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Verify Sprinkler Sign Off
|
1/4/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
1/8/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/8/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
1/8/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
1/11/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/11/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
1/11/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
1/17/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
1/18/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
1/23/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
1/23/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
1/26/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
1/26/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
2/14/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
2/14/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
2/19/2018
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
2/19/2018
|
Off-Hour Fees Due
|
|
|
Deputy Reinf. Concrete
|
2/28/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
3/15/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/20/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
3/29/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/29/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/30/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/30/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/4/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/5/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/5/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
4/5/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/6/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/6/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
4/6/2018
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
4/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/9/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/9/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
4/9/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/10/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/10/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
4/10/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/11/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/13/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/13/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/16/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/16/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/17/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/18/2018
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
4/19/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/20/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/24/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/24/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/26/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/26/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/27/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/2/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
5/9/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
5/9/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
5/11/2018
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
5/14/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
5/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
5/18/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/25/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
5/25/2018
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/30/2018
|
Partial Approval
|
TED RIES
|
|
Wood Frame
|
6/6/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
6/8/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/8/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
6/11/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
6/12/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
6/14/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
6/20/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
6/26/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/6/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/12/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
7/20/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
7/26/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/3/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
8/3/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
8/8/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
8/16/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
9/26/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
9/26/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/28/2018
|
Not Ready for Inspection
|
TED RIES
|
|
Drywall Nailing
|
10/10/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
10/10/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
10/11/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
10/11/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
10/12/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
10/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Wood Frame
|
10/12/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
10/15/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
10/16/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
10/17/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
10/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
10/18/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
10/19/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
10/23/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
10/24/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
10/26/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
10/26/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
11/5/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
11/5/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
11/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Insulation
|
11/7/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Wood Frame
|
11/7/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
11/14/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
11/20/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/4/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Wood Frame
|
12/4/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
12/26/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
1/9/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
1/15/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
1/24/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Wood Frame
|
1/24/2019
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
1/25/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/25/2019
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
1/29/2019
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
2/1/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
2/7/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
2/19/2019
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
2/20/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
3/20/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
4/3/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
5/6/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
6/6/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/1/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
7/10/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Interior/Exterior Lathing
|
7/11/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
8/9/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Final
|
8/28/2019
|
Off-Hour Fees Due
|
|
|
Footing/Foundation/Slab
|
8/28/2019
|
Off-Hour Fees Due
|
|
|
Green Building Final
|
8/28/2019
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
8/28/2019
|
Off-Hour Fees Due
|
|
|
Reinforced Masonry Frame
|
8/28/2019
|
Off-Hour Fees Due
|
|
|
SGSOV-Seismic Gas S/O Valve
|
8/28/2019
|
Off-Hour Fees Due
|
|
|
Smoke Detectors
|
8/28/2019
|
Off-Hour Fees Due
|
|
|
Final
|
8/29/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
8/29/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Final
|
8/29/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
8/29/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
8/29/2019
|
Approved
|
JEFF BYTHEWAY
|
|
SGSOV-Seismic Gas S/O Valve
|
8/29/2019
|
SGSOV Approved
|
JEFF BYTHEWAY
|
|
Smoke Detectors
|
8/29/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
9/20/2019
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
10/2/2019
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
10/18/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Final
|
10/31/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Green Building Final
|
10/31/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
11/1/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Special/Order Compliance
|
11/4/2019
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
11/6/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
11/8/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
11/8/2019
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
11/13/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
11/18/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
11/19/2019
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
11/23/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
11/23/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
12/2/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/2/2019
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/4/2019
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
12/18/2019
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
12/18/2019
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
3/19/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
3/19/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
4/28/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
4/28/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
5/6/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
5/6/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Final
|
5/7/2020
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
5/8/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
5/29/2020
|
OK to Issue CofO
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
5/29/2020
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
6/10/2020
|
Approved
|
DAVID BURKHEAD
|