417 N MANSFIELD AVE 90036

Certificate Information: 417 N MANSFIELD AVE 90036

Application / Permit
16010-10000-01569
Plan Check / Job No.
B16LA05548
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW TWO- STORY SINGLE FAMILY DWELLING WITH ATTACHED 2- CAR GARAGE .
Permit Issued
Issued on 10/14/2016
Issuing Office
Metro
Current Status
CofO Issued on 10/4/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/18/2016 APPLICANT
Green Plans Picked Up 5/27/2016 APPLICANT
Assigned to Plan Check Engineer 6/9/2016 GEORGE BANNING
Corrections Issued 6/15/2016 GEORGE BANNING
Quality Review Completed 6/27/2016 HOK CHI CHIU
Building Plans Picked Up 6/29/2016 APPLICANT
Plan Check Approved 9/6/2016 GEORGE BANNING
Issued 10/14/2016 LADBS
CofO in Progress 10/3/2023 SCOTT FINNILA
Permit Finaled 10/4/2023 DEROLD HAUFF
CofO Issued 10/4/2023 DEROLD HAUFF
Permit Finaled 10/4/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 7/1/2016 VALENTINO PUEBLOS
Eng Process Fee Ord 176,300 Cleared 7/1/2016 VALENTINO PUEBLOS
Hydrant and Access approval Cleared 7/1/2016 ROBERT DUFF
Roof/Waste drainage to street Cleared 7/1/2016 VALENTINO PUEBLOS
Sewer availability Cleared 7/1/2016 VALENTINO PUEBLOS
Disturb/Remove Protected Trees Cleared 7/21/2016 ADRIAN SANCHEZ
Green Code Cleared 8/30/2016 ALDO UBAU
Low Impact Development Cleared 8/30/2016 SAM NAVID

Contact Information

Contractor Owner-Builder       ,
Engineer Benichou, Ety; Lic. No.: S5263 600 S CURSON AVE 311      LOS ANGELES, CA 90036
Engineer Smith, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065

Inspector Information

RONNIE MINDANAO, (213) 202-3252 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/9/2018 Approved DANNY TOLENTINO
Excavation/Setback/Form/Re-Bar 4/18/2019 Not Ready for Inspection PIERRE VEGA
Footing/Foundation/Slab 5/9/2019 Partial Approval PIERRE VEGA
METHANE-Barrier 5/9/2019 Not Ready for Inspection PIERRE VEGA
METHANE-Subgrade 5/9/2019 Approved PIERRE VEGA
Protected Tree Letter 5/9/2019 Not Ready for Inspection PIERRE VEGA
METHANE-Barrier 6/11/2019 Approved DANIEL GONZALEZ
METHANE-Rough 6/11/2019 Approved DANIEL GONZALEZ
ELECTRICAL-Rough 6/20/2019 Partial Approval DANIEL GONZALEZ
Footing/Foundation/Slab 6/20/2019 Conditional Approval DANIEL GONZALEZ
Footing/Foundation/Slab 7/10/2019 Approved DANIEL GONZALEZ
Protected Tree Letter 7/10/2019 Approved DANIEL GONZALEZ
Deputy Reinf. Concrete 7/31/2019 No Access for Inspection DANIEL GONZALEZ
Deputy Steel/Welding 8/16/2019 No Access for Inspection DANIEL GONZALEZ
Floor/Roof Diaphrgm/Shear Wall 8/20/2019 Conditional Approval DANIEL GONZALEZ
Floor/Roof Diaphrgm/Shear Wall 9/4/2019 Not Ready for Inspection PIERRE VEGA
Floor/Roof Diaphrgm/Shear Wall 9/9/2019 Conditional Approval DANIEL GONZALEZ
Deputy Drilled-In Anchors 8/12/2020 Approved ARTHUR SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 11/30/2020 Partial Approval JOSEPH MCGARRY
Deputy Wood Construction 12/14/2020 No Access for Inspection ELMER BLAND
Floor/Roof Diaphrgm/Shear Wall 12/14/2020 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 5/17/2021 No Access for Inspection ELMER BLAND
Structural Steel Frame 5/28/2021 Approved CHRIS CHRISTENSEN
ELECTRICAL-Rough 6/11/2021 Approved CHRIS CHRISTENSEN
HVAC-Rough 6/11/2021 Approved CHRIS CHRISTENSEN
PLUMBING-Rough 6/11/2021 Approved CHRIS CHRISTENSEN
Interior/Exterior Lathing 7/14/2021 Partial Approval JOSEPH MCGARRY
BUILDING-Rough-Frame 7/16/2021 Conditional Approval JOSEPH MCGARRY
Green Building Rough 7/16/2021 Not Ready for Inspection JOSEPH MCGARRY
Verify Sprinkler Sign Off 7/16/2021 Approved JOSEPH MCGARRY
Insulation 7/22/2021 Corrections Issued SCOTT FINNILA
Insulation 7/26/2021 Approved ARTHUR SARGSYAN
Shower Pan 8/6/2021 Approved ARTHUR SARGSYAN
Drywall Nailing 8/13/2021 Approved ARTHUR SARGSYAN
Green Building Rough 8/13/2021 Approved ARTHUR SARGSYAN
Shower Pan 10/6/2021 Approved ARTHUR SARGSYAN
HVAC-Final 4/7/2022 No Access for Inspection ARTHUR SARGSYAN
ELECTRICAL-Final 5/18/2022 Corrections Issued JOSEPH MCGARRY
HVAC-Final 5/18/2022 Corrections Issued JOSEPH MCGARRY
ELECTRICAL-Final 5/20/2022 Not Ready for Inspection ADAM ESCOTO
HVAC-Final 5/20/2022 Not Ready for Inspection ADAM ESCOTO
ELECTRICAL-Final 6/13/2022 Approved ADAM ESCOTO
HVAC-Final 6/13/2022 Approved ADAM ESCOTO
PLUMBING-Final 6/13/2022 Approved ADAM ESCOTO
Service/Power Release 7/1/2022 Approved ADAM ESCOTO
BUILDING-Rough-Frame 8/26/2022 Conditional Approval MICHAEL LEWIS
Final 8/26/2022 Corrections Issued MICHAEL LEWIS
Green Building Final 8/26/2022 Partial Approval MICHAEL LEWIS
SGSOV-Seismic Gas S/O Valve 8/26/2022 SGSOV Not Ready MICHAEL LEWIS
Smoke Detectors 8/26/2022 Approved MICHAEL LEWIS
BUILDING-Rough-Frame 9/6/2022 Conditional Approval JOSEPH MCGARRY
Final 9/6/2022 Corrections Issued JOSEPH MCGARRY
Green Building Final 9/6/2022 Approved JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 9/6/2022 SGSOV Approved JOSEPH MCGARRY
BUILDING-Rough-Frame 9/20/2022 Approved JOSEPH MCGARRY
Final 9/20/2022 Corrections Issued JOSEPH MCGARRY
Final 10/6/2022 Not Ready for Inspection JOSEPH MCGARRY
Final 10/20/2022 Partial Inspection MICHAEL LEWIS
Final 1/6/2023 Corrections Issued RICHARD DOCKUS
Final 10/3/2023 OK to Issue CofO SCOTT FINNILA