|
Pre-Inspection
|
1/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
1/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
1/26/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
1/29/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
1/30/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
1/31/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
2/1/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
2/2/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
2/2/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
2/6/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
2/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
2/7/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
2/8/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
2/13/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Grading
|
2/14/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/14/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Grading
|
2/15/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/15/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
2/15/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Grading
|
2/16/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/16/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Grading
|
2/27/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Grading
|
2/28/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Grading
|
3/1/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Grading
|
3/2/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
4/2/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
4/3/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
4/3/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/4/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/5/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/6/2018
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Grading
|
4/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Grading
|
4/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Grading
|
4/11/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/11/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
4/11/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Deputy Grading
|
4/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
4/12/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
4/12/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/12/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Verify Sprinkler Sign Off
|
4/12/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Grading
|
4/13/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/13/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/16/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
4/16/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/17/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
4/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/18/2018
|
Conditional Approval
|
TED RIES
|
|
Piling/Pier/Caisson
|
4/18/2018
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
4/19/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/20/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
4/20/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
4/23/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/24/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
4/24/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
4/25/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/26/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
4/26/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/27/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/30/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/30/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
4/30/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/1/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/1/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
5/1/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/2/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/2/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
5/2/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/3/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/3/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/4/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
5/4/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
5/4/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
5/9/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/11/2018
|
Conditional Approval
|
TED RIES
|
|
Piling/Pier/Caisson
|
5/11/2018
|
Partial Approval
|
TED RIES
|
|
Piling/Pier/Caisson
|
5/16/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/21/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
5/21/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/22/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/24/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/29/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/30/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
5/30/2018
|
Off-Hour Fees Due
|
|
|
Piling/Pier/Caisson
|
5/30/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
6/1/2018
|
Not Ready for Inspection
|
TED RIES
|
|
Deputy Reinf. Concrete
|
6/4/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
6/4/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/5/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/6/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/11/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
6/11/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/13/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/14/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
6/14/2018
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/15/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/18/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/19/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/20/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
6/20/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/21/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
6/21/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/22/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
6/22/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
6/25/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
6/25/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
6/25/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Verify Sprinkler Sign Off
|
6/25/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/26/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/26/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/27/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/27/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/28/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/29/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
7/3/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/5/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/6/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
7/9/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
7/9/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/11/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
7/12/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/13/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/13/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/16/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
7/16/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/16/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Verify Sprinkler Sign Off
|
7/16/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/17/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
7/17/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/18/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/18/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/19/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/19/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/20/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/20/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
7/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/23/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
7/25/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/26/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
7/26/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
7/26/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
7/27/2018
|
Conditional Approval
|
TED RIES
|
|
Piling/Pier/Caisson
|
7/27/2018
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
7/31/2018
|
Conditional Approval
|
TED RIES
|
|
Piling/Pier/Caisson
|
7/31/2018
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/1/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/2/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/3/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
8/4/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/6/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
8/6/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
8/7/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
8/7/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
8/8/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/10/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
8/10/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/13/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/14/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/15/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
8/15/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
8/15/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/16/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/17/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
8/17/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
8/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
8/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/20/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
8/20/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
8/20/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/21/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/22/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
8/22/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/23/2018
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/24/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
8/27/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
8/28/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
8/28/2018
|
Approved
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
9/4/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
9/4/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
9/4/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
9/4/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
9/5/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
9/5/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
9/6/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
9/6/2018
|
Off-Hour Fees Due
|
|
|
Deputy Reinf. Concrete
|
9/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
9/10/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
9/10/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
9/12/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
9/12/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
9/13/2018
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
9/14/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
9/17/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
9/20/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
9/20/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
9/24/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
9/27/2018
|
Approved
|
TED RIES
|
|
Deputy Pre-Stress Concrete
|
9/28/2018
|
Approved
|
TED RIES
|
|
Deputy Pre-Stress Concrete
|
10/1/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
10/2/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Pre-Stress Concrete
|
10/3/2018
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/3/2018
|
Partial Approval
|
JAMES POWERS
|
|
Piling/Pier/Caisson
|
10/3/2018
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
10/4/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
10/5/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
10/8/2018
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Green Building Rough
|
10/10/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
10/10/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
10/12/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
10/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
10/19/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
10/23/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
10/24/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
10/24/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
10/24/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
10/25/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
10/25/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
10/26/2018
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
10/26/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
11/6/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
11/6/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
11/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
11/7/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/7/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
11/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
11/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
11/8/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/8/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
11/9/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/9/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
11/9/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
11/14/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
11/26/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
11/27/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
11/28/2018
|
Off-Hour Fees Due
|
|
|
Piling/Pier/Caisson
|
11/28/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
11/30/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
12/3/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
12/3/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
12/11/2018
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
12/12/2018
|
Not Ready for Inspection
|
TED RIES
|
|
Deputy Steel/Welding
|
12/13/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
12/13/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
12/14/2018
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
12/17/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
12/26/2018
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
12/31/2018
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Reinforced Concrete Frame
|
1/2/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/3/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/4/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
1/11/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/11/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
1/17/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
1/18/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
1/23/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
1/23/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/23/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
1/23/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
1/24/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
1/24/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/24/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
1/25/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
1/25/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
1/30/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
1/31/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/1/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/5/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
2/6/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/7/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/8/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
2/8/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/11/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
2/11/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
2/11/2019
|
Partial Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
2/12/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/13/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/14/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/15/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/19/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/20/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/21/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/22/2019
|
Conditional Approval
|
TED RIES
|
|
Deputy Steel/Welding
|
2/25/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/26/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
2/26/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/27/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
2/27/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/28/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Pre-Inspection
|
2/28/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/1/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/4/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/5/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/6/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/7/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/8/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/11/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/12/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
3/13/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/14/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/15/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/18/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/19/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
3/19/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/20/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/21/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
3/21/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
3/22/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
3/26/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
4/2/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
4/9/2019
|
Off-Hour Fees Due
|
|
|
Piling/Pier/Caisson
|
4/9/2019
|
Approved
|
HAMID PISHEHVAR
|
|
Piling/Pier/Caisson
|
4/10/2019
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
4/10/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/16/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/17/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Other (see comments)
|
4/26/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/29/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
5/7/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
5/17/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
5/20/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
5/21/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
5/22/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
5/22/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/23/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
5/23/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Piling/Pier/Caisson
|
5/23/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
5/24/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
5/28/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
5/29/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
5/30/2019
|
Approved
|
TED RIES
|
|
Deputy Steel/Welding
|
5/31/2019
|
Approved
|
TED RIES
|
|
Reinforced Concrete Frame
|
6/5/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
6/6/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
6/7/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/11/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
6/12/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
6/20/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
6/24/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
6/25/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
7/3/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
7/3/2019
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
7/11/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
7/12/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Structural Steel Frame
|
7/16/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
7/19/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
7/23/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
7/24/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
7/25/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
7/26/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
7/26/2019
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
7/29/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Steel/Welding
|
7/30/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Steel/Welding
|
7/31/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Steel/Welding
|
8/1/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Steel/Welding
|
8/2/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Steel/Welding
|
8/5/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/6/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Steel/Welding
|
8/7/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/8/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
8/8/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/9/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/12/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/13/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Steel/Welding
|
8/14/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/15/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/16/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/19/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Structural Steel Frame
|
8/19/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/20/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/21/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/21/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
8/21/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/22/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
8/23/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
8/26/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
8/29/2019
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
8/30/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
9/3/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
9/6/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
9/10/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
9/11/2019
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
9/12/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
9/17/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
9/19/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
9/20/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
9/25/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
10/3/2019
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
10/7/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
10/10/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Insulation
|
10/15/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
10/18/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
10/25/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
10/31/2019
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
11/8/2019
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Insulation
|
11/12/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
11/19/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
11/20/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
12/4/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
12/13/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/17/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
12/24/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Grading
|
12/31/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
1/2/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
1/3/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
1/8/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
1/10/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
1/14/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
1/16/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
1/21/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
1/29/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
2/20/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
2/25/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/26/2020
|
Approved
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
3/6/2020
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Insulation
|
3/10/2020
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
3/16/2020
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
3/18/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
3/19/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
3/25/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
3/27/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
4/9/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
4/10/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Grading
|
4/15/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
4/16/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
4/16/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Grading
|
4/17/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
4/20/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
4/21/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
4/22/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
4/23/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
4/23/2020
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Deputy Grading
|
4/24/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
4/27/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Grading
|
4/28/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
4/28/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
4/29/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
4/29/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
4/30/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
5/1/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/1/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
5/7/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
5/7/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/12/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/13/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
5/15/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
5/20/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
6/2/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
6/5/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/12/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
6/18/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
6/22/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
6/22/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
6/23/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
6/24/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/24/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
6/25/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
6/25/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
6/26/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
6/26/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
6/26/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
6/29/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
6/30/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/30/2020
|
Approved
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
7/1/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
7/2/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
7/6/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Special/Order Compliance
|
7/10/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/29/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/31/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
8/7/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
8/24/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
9/1/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
9/9/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
9/11/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
9/16/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/24/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
9/28/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Insulation
|
9/29/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
9/29/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
10/1/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
T-Bar Ceiling
|
10/1/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
10/5/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Steel/Welding
|
10/6/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
10/6/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
10/8/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
10/13/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
10/14/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
10/15/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
10/16/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
10/20/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
10/21/2020
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Drywall Nailing
|
10/26/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
11/2/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
11/5/2020
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
12/2/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
12/4/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
12/7/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/8/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
12/15/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
12/17/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
12/21/2020
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
12/21/2020
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Pre-Inspection
|
12/22/2020
|
Approved
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
12/23/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
1/19/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/19/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
1/26/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
2/3/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
2/11/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/12/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
2/26/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
3/1/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/1/2021
|
Approved
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/9/2021
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
4/9/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
4/9/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
4/30/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/4/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/5/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/6/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/7/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/11/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/13/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
5/19/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/19/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Grading
|
5/20/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/24/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/28/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/2/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/3/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/4/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/7/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/10/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/11/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/15/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/22/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/24/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
6/28/2021
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/1/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
7/2/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/7/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/9/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/14/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
7/15/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/21/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/22/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/23/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
7/24/2021
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
7/24/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/24/2021
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Final
|
7/24/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
7/24/2021
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
7/24/2021
|
Approved
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
7/24/2021
|
SGSOV Approved
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
7/24/2021
|
Approved
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/26/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/28/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Final
|
7/29/2021
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Green Building Final
|
7/29/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
7/31/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
8/2/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
8/3/2021
|
OK for TCO
|
DAVID BURKHEAD
|
|
Green Building Final
|
8/3/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/3/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/4/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
9/28/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
9/28/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/15/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Grading Pre-Inspection
|
11/15/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
1/5/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/19/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Final
|
3/31/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
3/31/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
3/19/2024
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
9/24/2024
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
3/27/2025
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
9/30/2025
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
2/18/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
2/18/2026
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
4/1/2026
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
4/27/2026
|
Corrections Issued
|
DAVID BURKHEAD
|