1541 N WILCOX AVE 90028

Certificate Information: 1541 N WILCOX AVE 90028

Application / Permit
16010-10000-01151
Plan Check / Job No.
B16LA04077
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
10 STORY TYPE IA HIGHRISE HOTEL W/GROUND LEVEL RESTAURANT OVER 3 LEVELS OF TYPE IA SUBTERRANEAN PARKING. RESTAURANT PORTION IS CORE AND SHELL ONLY.
Permit Issued
Issued on 1/10/2018
Issuing Office
Metro
Current Status
Issued on 1/10/2018
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/23/2016 APPLICANT
Disabled Access Plans Picked Up 3/30/2016 APPLICANT
Assigned to Plan Check Engineer 4/14/2016 MINYE PAK
Corrections Issued 6/17/2016 MINYE PAK
Building Plans Picked Up 6/22/2016 APPLICANT
Quality Review Completed 6/23/2016 CHARLES CHANG
Applicant returned to address corrections 7/18/2016 MINYE PAK
Applicant returned to address corrections 8/4/2016 MINYE PAK
Applicant returned to address corrections 10/4/2016 MINYE PAK
Applicant returned to address corrections 10/18/2016 MINYE PAK
Applicant returned to address corrections 11/29/2016 MINYE PAK
Applicant returned to address corrections 1/5/2017 MINYE PAK
Applicant returned to address corrections 1/6/2017 MINYE PAK
Applicant returned to address corrections 1/17/2017 MINYE PAK
Applicant returned to address corrections 1/26/2017 MINYE PAK
Green Plans Picked Up 3/10/2017 APPLICANT
Applicant returned to address corrections 3/28/2017 MINYE PAK
Applicant returned to address corrections 4/10/2017 MINYE PAK
Applicant returned to address corrections 7/25/2017 MINYE PAK
Plan Check Approved 8/29/2017 MINYE PAK
Issued 1/10/2018 LADBS
TCO Issued (Expire Date: 01-31-2022) 8/4/2021 ERNESTO CORRAL
TCO Issued (Expire Date: 09-13-2022) 3/17/2022 TERRY HERR
TCO Issued (Expire Date: 04-15-2024) 10/18/2023 ERNESTO CORRAL
TCO Issued (Expire Date: 10-20-2024) 4/23/2024 ADAM BURGESS
TCO Issued (Expire Date: 04-20-2025) 10/22/2024 ADAM BURGESS
TCO Issued (Expire Date: 10-25-2025) 4/28/2025 ADAM BURGESS
TCO Issued (Expire Date: 04-25-2026) 10/27/2025 ADAM BURGESS
TCO Issued (Expire Date: 10-31-2026) 5/4/2026 ERNESTO CORRAL

Permit Application Clearance Information

Encroachment in public way Cleared 8/2/2016 TERRY PHAN
Work Adjacent to Public Way Cleared 8/2/2016 TERRY PHAN
Address approval Cleared 9/9/2016 ADRIAN SANCHEZ
Bicycle Parking Cleared 9/9/2016 JAMES KHO
Eng Process Fee Ord 176,300 Cleared 9/9/2016 ADRIAN SANCHEZ
Highway dedication Cleared 9/9/2016 JAMES KHO
Driveway location Cleared 9/13/2016 COLLINS ALLAN
Project located in CRA area Cleared 12/6/2016 JIM URQUHART
Sewer availability Cleared 2/1/2017 RAVIL MANAPOV
DAS Clearance Cleared 3/7/2017 SHINE LIN
Green Code Cleared 3/22/2017 DONALD CRICHLOW
Permit Cleared 3/23/2017 ARMENIA AGUILAR
Hydrant and Access approval Cleared 4/5/2017 ROBERT DUFF
Building over 3-story or 36-ft Cleared 6/7/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 6/7/2017 CALOSHA APPROVED
"D" conditions Cleared 7/25/2017 BRIDGETTE WOOTEN
"Q" conditions Cleared 7/25/2017 BRIDGETTE WOOTEN
"T" removal Cleared 7/25/2017 BRIDGETTE WOOTEN
CPC Cleared 7/25/2017 BRIDGETTE WOOTEN
Frnt yard landscape/Water mgmt Cleared 7/25/2017 BRIDGETTE WOOTEN
Site Plan review Cleared 7/25/2017 BRIDGETTE WOOTEN
ZI Cleared 7/25/2017 BRIDGETTE WOOTEN
Fire Marshall Fire Life Safety Cleared 8/9/2017 ANDREW KO
Low Impact Development Cleared 8/29/2017 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 8/29/2017 ARMENIA AGUILAR

Contact Information

Architect Ha, Simon Y; Lic. No.: C31188 7902 LOUISE LANE      LA PALMA, CA 90623
Contractor Suffolk Construction Company Inc; Lic. No.: 751099-B 390 FREMONT STREET      SAN FRANCISCO, CA 94105
Engineer Hoda, Erzen Galip; Lic. No.: S5577 3621 HARBOR BLVD 125      SANTA ANA, CA 92704
Engineer Petroni, Matthew Brian; Lic. No.: C69473 1809 GOODMAN AVE      REDONDO BEACH, CA 90278
Engineer Walter, Scott John; Lic. No.: GE2476 14428 HAMLIN ST STE 200      VAN NUYS, CA 91401

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/23/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/25/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/26/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/29/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/30/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/31/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/1/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/2/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 2/2/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 2/6/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/7/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 2/7/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 2/8/2018 Conditional Approval TED RIES
Deputy Steel/Welding 2/13/2018 Approved JEFF BYTHEWAY
Deputy Grading 2/14/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/14/2018 Approved JEFF BYTHEWAY
Deputy Grading 2/15/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/15/2018 Approved JEFF BYTHEWAY
Pre-Inspection 2/15/2018 Approved JEFF BYTHEWAY
Deputy Grading 2/16/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/16/2018 Approved JEFF BYTHEWAY
Deputy Grading 2/27/2018 Approved JEFF BYTHEWAY
Deputy Grading 2/28/2018 Approved JEFF BYTHEWAY
Deputy Grading 3/1/2018 Conditional Approval TED RIES
Deputy Grading 3/2/2018 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/2/2018 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/3/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 4/3/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/4/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/5/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/6/2018 Partial Approval EDWIN GREGORYONA
Deputy Grading 4/9/2018 Approved JEFF BYTHEWAY
Deputy Grading 4/10/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/10/2018 Approved JEFF BYTHEWAY
Deputy Grading 4/11/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/11/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 4/11/2018 Partial Inspection JEFF BYTHEWAY
Deputy Grading 4/12/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/12/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 4/12/2018 Partial Approval JEFF BYTHEWAY
Green Building Rough 4/12/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 4/12/2018 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 4/12/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Grading 4/13/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/13/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/16/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 4/16/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/17/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 4/17/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/18/2018 Conditional Approval TED RIES
Piling/Pier/Caisson 4/18/2018 Partial Approval TED RIES
Deputy Reinf. Concrete 4/19/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/20/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 4/20/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/23/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 4/23/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 4/24/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 4/24/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/25/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 4/25/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/26/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 4/26/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/27/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/30/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 4/30/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 4/30/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/1/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/1/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 5/1/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/2/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/2/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 5/2/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/3/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/3/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/4/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/4/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 5/4/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/8/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/9/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 5/9/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/10/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/11/2018 Conditional Approval TED RIES
Piling/Pier/Caisson 5/11/2018 Partial Approval TED RIES
Piling/Pier/Caisson 5/16/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/21/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 5/21/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/22/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/23/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/24/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/25/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/29/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/30/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 5/30/2018 Off-Hour Fees Due
Piling/Pier/Caisson 5/30/2018 Partial Approval JEFF BYTHEWAY
Piling/Pier/Caisson 6/1/2018 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 6/4/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 6/4/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/5/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/6/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/7/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/8/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/11/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 6/11/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/12/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/13/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/14/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 6/14/2018 Conditional Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/15/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/18/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/19/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/20/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 6/20/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/21/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 6/21/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/22/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 6/22/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/25/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 6/25/2018 Partial Approval JEFF BYTHEWAY
Green Building Rough 6/25/2018 Not Ready for Inspection JEFF BYTHEWAY
Piling/Pier/Caisson 6/25/2018 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 6/25/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 6/26/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 6/26/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 6/27/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 6/27/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/28/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/29/2018 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/3/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/5/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/6/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/9/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 7/9/2018 Partial Approval JEFF BYTHEWAY
Piling/Pier/Caisson 7/9/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 7/10/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/11/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/12/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 7/12/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/13/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 7/13/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/16/2018 Approved JEFF BYTHEWAY
Green Building Rough 7/16/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 7/16/2018 Not Ready for Inspection JEFF BYTHEWAY
Verify Sprinkler Sign Off 7/16/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/17/2018 Approved JEFF BYTHEWAY
Green Building Rough 7/17/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 7/17/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/18/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 7/18/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/19/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 7/19/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/20/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 7/20/2018 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 7/23/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 7/23/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/25/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/25/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/26/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/26/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 7/26/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 7/27/2018 Conditional Approval TED RIES
Piling/Pier/Caisson 7/27/2018 Partial Approval TED RIES
Deputy Reinf. Concrete 7/31/2018 Conditional Approval TED RIES
Piling/Pier/Caisson 7/31/2018 Partial Approval TED RIES
Deputy Reinf. Concrete 8/1/2018 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/2/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/3/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 8/4/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/6/2018 Approved JEFF BYTHEWAY
Green Building Rough 8/6/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 8/7/2018 Approved JEFF BYTHEWAY
Green Building Rough 8/7/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 8/7/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/8/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 8/8/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/9/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/10/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 8/10/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/13/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/14/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/15/2018 Approved JEFF BYTHEWAY
Green Building Rough 8/15/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 8/15/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/16/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/17/2018 Approved JEFF BYTHEWAY
Green Building Rough 8/17/2018 Not Ready for Inspection JEFF BYTHEWAY
Piling/Pier/Caisson 8/17/2018 Partial Approval JEFF BYTHEWAY
Reinforced Concrete Frame 8/17/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/20/2018 Approved JEFF BYTHEWAY
Green Building Rough 8/20/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 8/20/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/21/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/22/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 8/22/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/23/2018 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/24/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 8/27/2018 Partial Approval JEFF BYTHEWAY
Piling/Pier/Caisson 8/28/2018 Partial Approval JEFF BYTHEWAY
Special/Order Compliance 8/28/2018 Approved KATY RAMIREZ
Deputy Steel/Welding 9/4/2018 Approved JEFF BYTHEWAY
Green Building Rough 9/4/2018 Not Ready for Inspection JEFF BYTHEWAY
Piling/Pier/Caisson 9/4/2018 Partial Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 9/4/2018 Partial Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 9/5/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 9/5/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 9/6/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 9/6/2018 Off-Hour Fees Due
Deputy Reinf. Concrete 9/7/2018 Approved JEFF BYTHEWAY
Green Building Rough 9/10/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 9/10/2018 Partial Approval JEFF BYTHEWAY
Green Building Rough 9/12/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 9/12/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 9/13/2018 Approved TED RIES
Deputy Reinf. Concrete 9/14/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/17/2018 Approved JEFF BYTHEWAY
Green Building Rough 9/20/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 9/20/2018 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 9/24/2018 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 9/27/2018 Approved TED RIES
Deputy Pre-Stress Concrete 9/28/2018 Approved TED RIES
Deputy Pre-Stress Concrete 10/1/2018 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/3/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/3/2018 Partial Approval JAMES POWERS
Piling/Pier/Caisson 10/3/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/5/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 10/8/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 10/10/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 10/10/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 10/12/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 10/17/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 10/19/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/23/2018 Approved JEFF BYTHEWAY
Green Building Rough 10/24/2018 Not Ready for Inspection JEFF BYTHEWAY
Piling/Pier/Caisson 10/24/2018 Partial Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 10/24/2018 Partial Approval JEFF BYTHEWAY
Piling/Pier/Caisson 10/25/2018 Partial Approval JEFF BYTHEWAY
Reinforced Concrete Frame 10/25/2018 Not Ready for Inspection JEFF BYTHEWAY
Green Building Rough 10/26/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 10/26/2018 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 11/6/2018 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 11/6/2018 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 11/7/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 11/7/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 11/7/2018 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 11/8/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 11/8/2018 Approved JEFF BYTHEWAY
Green Building Rough 11/8/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 11/8/2018 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 11/9/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 11/9/2018 Partial Approval JEFF BYTHEWAY
Reinforced Masonry Frame 11/9/2018 Partial Approval JEFF BYTHEWAY
Reinforced Concrete Frame 11/14/2018 Partial Approval JEFF BYTHEWAY
Piling/Pier/Caisson 11/26/2018 Partial Approval JEFF BYTHEWAY
Piling/Pier/Caisson 11/27/2018 Partial Approval JEFF BYTHEWAY
Piling/Pier/Caisson 11/28/2018 Off-Hour Fees Due
Piling/Pier/Caisson 11/28/2018 Partial Approval JEFF BYTHEWAY
Masonry Wall/Backfill 11/30/2018 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 12/3/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 12/3/2018 Partial Approval JEFF BYTHEWAY
Reinforced Concrete Frame 12/11/2018 Partial Inspection JEFF BYTHEWAY
Piling/Pier/Caisson 12/12/2018 Not Ready for Inspection TED RIES
Deputy Steel/Welding 12/13/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 12/13/2018 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 12/14/2018 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 12/17/2018 Partial Approval JEFF BYTHEWAY
Reinforced Masonry Frame 12/26/2018 Partial Approval JEFF BYTHEWAY
Reinforced Concrete Frame 12/31/2018 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/2/2019 Partial Approval JEFF BYTHEWAY
Reinforced Concrete Frame 1/3/2019 Partial Approval JEFF BYTHEWAY
Reinforced Concrete Frame 1/4/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 1/11/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 1/11/2019 Partial Approval JEFF BYTHEWAY
Masonry Wall/Backfill 1/17/2019 Partial Approval JEFF BYTHEWAY
Piling/Pier/Caisson 1/18/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 1/23/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 1/23/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 1/23/2019 Partial Approval JEFF BYTHEWAY
Reinforced Masonry Frame 1/23/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 1/24/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 1/24/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 1/24/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 1/25/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 1/25/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 1/30/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 1/31/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/1/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/5/2019 Approved TED RIES
Deputy Steel/Welding 2/6/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/7/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/8/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 2/8/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 2/11/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 2/11/2019 Partial Approval JEFF BYTHEWAY
Reinforced Concrete Frame 2/11/2019 Partial Approval TED RIES
Deputy Steel/Welding 2/12/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/13/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/14/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/15/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/19/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/20/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/21/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/22/2019 Conditional Approval TED RIES
Deputy Steel/Welding 2/25/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/26/2019 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 2/26/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 2/27/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 2/27/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 2/28/2019 Approved JEFF BYTHEWAY
Pre-Inspection 2/28/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/1/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/4/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/5/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/6/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/7/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/8/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/11/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/12/2019 Approved TED RIES
Deputy Steel/Welding 3/13/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/14/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/15/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/18/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/19/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 3/19/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 3/20/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/21/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 3/21/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Steel/Welding 3/22/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 3/26/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 4/2/2019 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 4/9/2019 Off-Hour Fees Due
Piling/Pier/Caisson 4/9/2019 Approved HAMID PISHEHVAR
Piling/Pier/Caisson 4/10/2019 Off-Hour Fees Due
Reinforced Concrete Frame 4/10/2019 Partial Approval JEFF BYTHEWAY
Reinforced Concrete Frame 4/16/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/17/2019 Approved JEFF BYTHEWAY
Deputy Other (see comments) 4/26/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/29/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 5/7/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 5/17/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 5/20/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/21/2019 Approved TED RIES
Deputy Steel/Welding 5/22/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 5/22/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/23/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/23/2019 Approved JEFF BYTHEWAY
Piling/Pier/Caisson 5/23/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/24/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/28/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/29/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/30/2019 Approved TED RIES
Deputy Steel/Welding 5/31/2019 Approved TED RIES
Reinforced Concrete Frame 6/5/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 6/6/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/7/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/11/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/12/2019 Approved JEFF BYTHEWAY
Light Gage Steel Frame 6/20/2019 Partial Approval JEFF BYTHEWAY
Reinforced Masonry Frame 6/24/2019 Partial Approval JEFF BYTHEWAY
Masonry Wall/Backfill 6/25/2019 Partial Approval JEFF BYTHEWAY
Reinforced Masonry Frame 7/3/2019 Partial Approval JEFF BYTHEWAY
Special/Order Compliance 7/3/2019 Corrections Issued JEFF BYTHEWAY
Deputy Steel/Welding 7/11/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/12/2019 Conditional Approval DANIEL MC AULIFFE
Structural Steel Frame 7/16/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 7/19/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/23/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/24/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/25/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/26/2019 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 7/26/2019 Conditional Approval JEFF BYTHEWAY
Deputy Steel/Welding 7/29/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/30/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/31/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/1/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/2/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/5/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/6/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/7/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/8/2019 Approved JEFF BYTHEWAY
Drywall Nailing 8/8/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 8/9/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/12/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/13/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 8/14/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/15/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/16/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/19/2019 Approved JEFF BYTHEWAY
Structural Steel Frame 8/19/2019 Not Ready for Inspection JEFF BYTHEWAY
Deputy Steel/Welding 8/20/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/21/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/21/2019 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 8/21/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/22/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/23/2019 Approved JEFF BYTHEWAY
Light Gage Steel Frame 8/26/2019 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 8/29/2019 Partial Inspection JEFF BYTHEWAY
Footing/Foundation/Slab 8/30/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 9/3/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 9/6/2019 Partial Approval JEFF BYTHEWAY
Insulation 9/10/2019 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 9/11/2019 Partial Inspection JEFF BYTHEWAY
Masonry Wall/Backfill 9/12/2019 Partial Approval JEFF BYTHEWAY
Insulation 9/17/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 9/19/2019 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 9/20/2019 Not Ready for Inspection JEFF BYTHEWAY
Light Gage Steel Frame 9/25/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 10/3/2019 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 10/7/2019 Partial Approval JEFF BYTHEWAY
Masonry Wall/Backfill 10/10/2019 Partial Approval JEFF BYTHEWAY
Insulation 10/15/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 10/18/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 10/25/2019 Partial Approval JEFF BYTHEWAY
Special/Order Compliance 10/31/2019 Corrections Issued JEFF BYTHEWAY
Drywall Nailing 11/8/2019 Partial Inspection JEFF BYTHEWAY
Insulation 11/12/2019 Partial Approval DAVID BURKHEAD
Masonry Wall/Backfill 11/19/2019 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 11/20/2019 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 12/4/2019 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 12/13/2019 Partial Approval DAVID BURKHEAD
Special/Order Compliance 12/17/2019 Partial Approval DAVID BURKHEAD
Deputy Grading 12/24/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 12/31/2019 Conditional Approval DAVID BURKHEAD
Deputy Grading 1/2/2020 Conditional Approval DAVID BURKHEAD
Deputy Grading 1/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Grading 1/8/2020 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 1/10/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/14/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/16/2020 Partial Approval DAVID BURKHEAD
Masonry Wall/Backfill 1/21/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/29/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/20/2020 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 2/25/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 2/26/2020 Approved DAVID BURKHEAD
Light Gage Steel Frame 3/6/2020 Partial Inspection DANIEL MC AULIFFE
Insulation 3/10/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/16/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 3/18/2020 Not Ready for Inspection DAVID BURKHEAD
Insulation 3/19/2020 Partial Approval DAVID BURKHEAD
Insulation 3/25/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/27/2020 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/9/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 4/10/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Grading 4/15/2020 Conditional Approval DAVID BURKHEAD
Deputy Grading 4/16/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/16/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Grading 4/17/2020 Conditional Approval DAVID BURKHEAD
Deputy Grading 4/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Grading 4/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Grading 4/22/2020 Conditional Approval DAVID BURKHEAD
Deputy Grading 4/23/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/23/2020 Corrections Issued DAVID BURKHEAD
Deputy Grading 4/24/2020 Conditional Approval DAVID BURKHEAD
Deputy Grading 4/27/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 4/28/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/28/2020 Partial Approval DAVID BURKHEAD
Deputy Grading 4/29/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/29/2020 Partial Approval DAVID BURKHEAD
Deputy Grading 4/30/2020 Conditional Approval DAVID BURKHEAD
Deputy Grading 5/1/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/1/2020 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 5/7/2020 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 5/7/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/12/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/13/2020 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 5/15/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 5/20/2020 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 6/2/2020 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 6/5/2020 Partial Inspection DAVID BURKHEAD
Pre-Inspection 6/12/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 6/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/22/2020 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 6/22/2020 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/23/2020 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/24/2020 Conditional Approval DAVID BURKHEAD
Pre-Inspection 6/24/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 6/25/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/25/2020 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/26/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/26/2020 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 6/26/2020 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/29/2020 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/30/2020 Conditional Approval DAVID BURKHEAD
Pre-Inspection 6/30/2020 Approved DAVID BURKHEAD
Deputy Fireproofing 7/1/2020 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 7/2/2020 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 7/6/2020 Conditional Approval DANIEL MC AULIFFE
Special/Order Compliance 7/10/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/29/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/31/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/7/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/24/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/1/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/9/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/11/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/16/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 9/24/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 9/28/2020 Conditional Approval DAVID BURKHEAD
Insulation 9/29/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/29/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/1/2020 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 10/1/2020 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 10/5/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/6/2020 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 10/6/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/8/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/13/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 10/14/2020 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 10/15/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/16/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 10/20/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/21/2020 Partial Inspection DANIEL MC AULIFFE
Drywall Nailing 10/26/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 11/2/2020 Partial Approval DAVID BURKHEAD
Special/Order Compliance 11/5/2020 Corrections Issued DAVID BURKHEAD
Light Gage Steel Frame 12/2/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/4/2020 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 12/7/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 12/8/2020 Partial Inspection DAVID BURKHEAD
Drywall Nailing 12/15/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 12/17/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 12/21/2020 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/21/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 12/22/2020 Approved DAVID BURKHEAD
Light Gage Steel Frame 12/23/2020 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 1/19/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 1/19/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/26/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/3/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/11/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 2/12/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/26/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 3/1/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 3/1/2021 Approved DAVID BURKHEAD
Pre-Inspection 3/9/2021 Corrections Issued DAVID BURKHEAD
Light Gage Steel Frame 4/9/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 4/9/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 4/30/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/4/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/5/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/6/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/7/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/11/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/13/2021 Partial Approval DAVID BURKHEAD
Deputy Grading 5/19/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/19/2021 Partial Inspection DAVID BURKHEAD
Deputy Grading 5/20/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/24/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/28/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/2/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/3/2021 Partial Approval DAVID BURKHEAD
Pre-Inspection 6/4/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/7/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/10/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/11/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/15/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/22/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/24/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/28/2021 Corrections Issued DAVID BURKHEAD
Light Gage Steel Frame 7/1/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 7/2/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 7/7/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 7/9/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/14/2021 Partial Inspection DAVID BURKHEAD
Drywall Nailing 7/15/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 7/21/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/22/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/23/2021 Partial Inspection DAVID BURKHEAD
Drywall Nailing 7/24/2021 Approved DAVID BURKHEAD
Final 7/24/2021 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 7/24/2021 Approved DAVID BURKHEAD
Green Building Final 7/24/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/24/2021 Approved DAVID BURKHEAD
Reinforced Masonry Frame 7/24/2021 Approved DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 7/24/2021 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 7/24/2021 Approved DAVID BURKHEAD
Light Gage Steel Frame 7/26/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/28/2021 Partial Inspection DANIEL MC AULIFFE
Final 7/29/2021 Corrections Issued DAVID BURKHEAD
Green Building Final 7/29/2021 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 7/31/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/2/2021 Partial Inspection DAVID BURKHEAD
Final 8/3/2021 OK for TCO DAVID BURKHEAD
Green Building Final 8/3/2021 Conditional Approval DAVID BURKHEAD
Special/Order Compliance 8/3/2021 Partial Approval DAVID BURKHEAD
Special/Order Compliance 8/4/2021 Partial Inspection DAVID BURKHEAD
Final 9/28/2021 Partial Inspection DAVID BURKHEAD
Green Building Final 9/28/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/15/2021 Not Ready for Inspection DAVID BURKHEAD
Grading Pre-Inspection 11/15/2021 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 1/5/2022 Partial Approval DAVID BURKHEAD
Special/Order Compliance 8/19/2022 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 1/20/2023 Conditional Approval MICHAEL ROSENBERG
Final 3/31/2023 Partial Inspection DAVID BURKHEAD
Green Building Final 3/31/2023 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 3/19/2024 Approved DAVID BURKHEAD
Special/Order Compliance 9/24/2024 Approved DAVID BURKHEAD
Special/Order Compliance 3/27/2025 Approved DAVID BURKHEAD
Special/Order Compliance 9/30/2025 Approved DAVID BURKHEAD
Final 2/18/2026 Partial Inspection DAVID BURKHEAD
Green Building Final 2/18/2026 Approved DAVID BURKHEAD
Special/Order Compliance 4/1/2026 Approved DAVID BURKHEAD
Special/Order Compliance 4/27/2026 Corrections Issued DAVID BURKHEAD