Pre-Inspection
|
10/13/2017
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
4/12/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/25/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
4/25/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
4/26/2018
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
4/26/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
4/26/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/27/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/14/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
5/14/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/15/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/16/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
5/16/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Piling/Pier/Caisson
|
5/16/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/17/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
5/17/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
5/17/2018
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
5/17/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
5/17/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/18/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
5/18/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/22/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
5/22/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
5/22/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/23/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
5/23/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/24/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
5/24/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
5/24/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/25/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
5/25/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/31/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
6/1/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
6/5/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
6/5/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
6/5/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
6/5/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Pre-Inspection
|
6/6/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/7/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/8/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
6/8/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/12/2018
|
No Result Entered
|
DANIEL MC AULIFF
|
|
Deputy Shotcrete
|
6/12/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
6/12/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/13/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/14/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/15/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
6/15/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
6/20/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Drilled-In Anchors
|
6/21/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
6/22/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/25/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
6/28/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
7/3/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
7/31/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
8/1/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
8/2/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Reinforced Masonry Frame
|
8/9/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
8/13/2018
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
8/28/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
9/5/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
9/5/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
9/5/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
9/5/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
9/6/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
9/6/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
9/12/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
9/13/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
9/13/2018
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Masonry Frame
|
9/13/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
9/13/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
9/14/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
9/19/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
9/19/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
9/20/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
9/21/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
9/24/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
9/25/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
9/26/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
9/26/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
9/27/2018
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
9/28/2018
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
10/3/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
10/4/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
10/4/2018
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
10/5/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
10/5/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
10/12/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
10/15/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
10/15/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
10/16/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
11/2/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
11/2/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
11/2/2018
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
11/2/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
11/6/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
11/6/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
11/8/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
11/8/2018
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
11/14/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
11/15/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
11/16/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
11/16/2018
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
11/19/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
11/19/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
11/20/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
11/27/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
11/28/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
11/28/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
11/29/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
11/29/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
11/30/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
12/3/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
12/3/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Reinforced Masonry Frame
|
12/3/2018
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
12/3/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
12/4/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
12/5/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/7/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
12/7/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
12/7/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
12/11/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
12/11/2018
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
12/12/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Masonry Wall/Backfill
|
12/12/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
12/14/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
12/19/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
12/19/2018
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
12/21/2018
|
Approved
|
DANIEL MC AULIFFE
|
|
Reinforced Masonry Frame
|
12/21/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
12/24/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
12/28/2018
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
1/21/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
1/24/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
1/29/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
2/4/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
2/8/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
2/12/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
2/20/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
2/20/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
2/21/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
2/27/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
2/28/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
3/1/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Masonry Wall/Backfill
|
3/1/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
3/14/2019
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
3/14/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
3/27/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
4/5/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
4/5/2019
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
4/16/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
4/22/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
4/24/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/2/2019
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
5/22/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
5/24/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
5/30/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
6/18/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Drilled-In Anchors
|
6/25/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Steel/Welding
|
6/25/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Steel/Welding
|
6/26/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Wood Frame
|
6/28/2019
|
Corrections Issued
|
TED RIES
|
|
Deputy Steel/Welding
|
7/2/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Wood Construction
|
7/5/2019
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
7/5/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
7/9/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Steel/Welding
|
7/9/2019
|
Conditional Approval
|
JASON BORUTA
|
|
Wood Frame
|
7/9/2019
|
Corrections Issued
|
TONY HARTONO
|
|
Deputy Steel/Welding
|
7/10/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Wood Construction
|
7/11/2019
|
Approved
|
NICK LAROCCA
|
|
Structural Steel Frame
|
7/11/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Special/Order Compliance
|
7/18/2019
|
Corrections Issued
|
SORIN CIRSTOIU
|
|
Wood Frame
|
7/18/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Wood Frame
|
8/2/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/6/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
8/6/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
8/14/2019
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
8/15/2019
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Masonry
|
8/16/2019
|
Approved
|
TONY HARTONO
|
|
Drywall Nailing
|
8/16/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
8/16/2019
|
Partial Approval
|
TONY HARTONO
|
|
Special/Order Compliance
|
8/16/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Wood Frame
|
8/16/2019
|
Partial Approval
|
TONY HARTONO
|
|
Drywall Nailing
|
8/23/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
8/23/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
9/4/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
9/11/2019
|
Partial Inspection
|
NICK LAROCCA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/18/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
9/23/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
9/25/2019
|
Approved
|
TONY HARTONO
|
|
Masonry Wall/Backfill
|
9/25/2019
|
Approved
|
JASON BORUTA
|
|
Pre-Inspection
|
9/25/2019
|
Approved
|
ALAN NOVAK
|
|
Pre-Inspection
|
9/25/2019
|
Approved
|
JASON BORUTA
|
|
Special/Order Compliance
|
9/25/2019
|
Corrections Issued
|
TONY HARTONO
|
|
Special/Order Compliance
|
9/25/2019
|
Partial Inspection
|
JOHN DODGE
|
|
Special/Order Compliance
|
9/25/2019
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
9/25/2019
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/30/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
10/3/2019
|
Partial Approval
|
TONY HARTONO
|
|
Drywall Nailing
|
10/11/2019
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/11/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
10/16/2019
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/18/2019
|
Partial Approval
|
TONY HARTONO
|
|
Wood Frame
|
10/22/2019
|
Partial Approval
|
TONY HARTONO
|
|
Wood Frame
|
10/25/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
10/29/2019
|
Approved
|
DERRICK SPENCER
|
|
Masonry Wall/Backfill
|
10/29/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
11/19/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
11/21/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
11/22/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
12/18/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
1/6/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
1/10/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
2/4/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Insulation
|
2/11/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
2/19/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
2/19/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
3/17/2020
|
Approved
|
DERRICK SPENCER
|
|
Insulation
|
3/17/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
3/17/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
3/23/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Insulation
|
3/27/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
3/27/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
4/17/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Insulation
|
4/17/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Insulation
|
4/21/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
4/21/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
4/29/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
4/29/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
5/5/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
5/6/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
5/12/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
5/12/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
5/14/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
5/14/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
5/18/2020
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
6/16/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
6/23/2020
|
Approved
|
DERRICK SPENCER
|
|
Masonry Wall/Backfill
|
9/22/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
9/22/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
10/13/2020
|
Approved
|
DERRICK SPENCER
|
|
Drywall Nailing
|
10/23/2020
|
Partial Approval
|
JOHN DODGE
|
|
Drywall Nailing
|
12/17/2020
|
Approved
|
DERRICK SPENCER
|
|
T-Bar Ceiling
|
12/17/2020
|
Partial Approval
|
DERRICK SPENCER
|
|
Grading Pre-Inspection
|
1/6/2021
|
Approved
|
DERRICK SPENCER
|
|
Masonry Wall/Backfill
|
2/11/2021
|
Approved
|
DERRICK SPENCER
|
|
Final
|
5/19/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
5/19/2021
|
Approved
|
DERRICK SPENCER
|
|
Green Building Final
|
5/19/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
5/19/2021
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
5/19/2021
|
Approved
|
DERRICK SPENCER
|
|
SGSOV-Seismic Gas S/O Valve
|
5/19/2021
|
SGSOV Approved
|
DERRICK SPENCER
|
|
Smoke Detectors
|
5/19/2021
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
5/19/2021
|
Approved
|
DERRICK SPENCER
|
|
Final
|
6/17/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Green Building Final
|
6/17/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Final
|
9/16/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Green Building Final
|
9/16/2021
|
Approved
|
DERRICK SPENCER
|
|
Final
|
9/22/2021
|
Partial Approval
|
DERRICK SPENCER
|
|
Verify Rec and Parks Fee Memo
|
10/5/2021
|
Approved
|
DERRICK SPENCER
|
|
Final
|
10/26/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Final
|
11/23/2021
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Final
|
1/7/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Final
|
3/30/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
4/12/2022
|
Partial Inspection
|
DAVID TSAU
|
|
Final
|
5/4/2022
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
5/4/2022
|
Approved
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
11/30/2022
|
Approved
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
6/21/2023
|
Approved
|
DERRICK SPENCER
|
|
Final
|
9/1/2023
|
OK to Issue CofO
|
DERRICK SPENCER
|