Footing/Foundation/Slab
|
6/12/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
6/13/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
6/16/2017
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/22/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
6/26/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/14/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/17/2017
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/20/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
7/20/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
7/25/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/2/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
8/2/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/3/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
8/3/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/9/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
8/9/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
8/9/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/10/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/10/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/11/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/14/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/15/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
8/15/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
8/15/2017
|
No Access for Inspection
|
KATHRYN BUTTERWORTH
|
|
Reinforced Concrete Frame
|
8/15/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
8/15/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/16/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/17/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/18/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
8/21/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/21/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/21/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
8/22/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/22/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/22/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
8/23/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/23/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/23/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
8/23/2017
|
Not Ready for Inspection
|
KATHRYN BUTTERWORTH
|
|
Reinforced Concrete Frame
|
8/23/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
8/23/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
8/24/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/24/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/24/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
8/25/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/25/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/25/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/28/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
8/28/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/29/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/29/2017
|
Partial Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
8/29/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
8/29/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
8/29/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/30/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/30/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/31/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
8/31/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
8/31/2017
|
Not Ready for Inspection
|
KATHRYN BUTTERWORTH
|
|
Reinforced Concrete Frame
|
8/31/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
8/31/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
9/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/7/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/13/2017
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
9/14/2017
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
9/14/2017
|
Not Ready for Inspection
|
WILLIAM ROSE
|
|
Reinforced Concrete Frame
|
9/14/2017
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
9/14/2017
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
9/15/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/18/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
9/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/20/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
9/20/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
9/20/2017
|
Not Ready for Inspection
|
KATHRYN BUTTERWORTH
|
|
Reinforced Concrete Frame
|
9/20/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
9/20/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/21/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
9/21/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
9/21/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/22/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
9/22/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
9/22/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
9/22/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/26/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
9/26/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
9/26/2017
|
Not Ready for Inspection
|
KATHRYN BUTTERWORTH
|
|
Reinforced Concrete Frame
|
9/26/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
9/26/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/27/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
9/27/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
9/27/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/28/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
9/28/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
9/28/2017
|
Not Ready for Inspection
|
KATHRYN BUTTERWORTH
|
|
Reinforced Concrete Frame
|
9/28/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
9/28/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/29/2017
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
9/29/2017
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
10/2/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
10/2/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/3/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
10/3/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
10/3/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/4/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
10/4/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
10/4/2017
|
Not Ready for Inspection
|
KATHRYN BUTTERWORTH
|
|
Reinforced Concrete Frame
|
10/4/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
10/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
10/5/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/6/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
10/6/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
10/6/2017
|
Not Ready for Inspection
|
KATHRYN BUTTERWORTH
|
|
Reinforced Concrete Frame
|
10/6/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/10/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/11/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
10/11/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
10/12/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
10/13/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/20/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
10/20/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/24/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
10/26/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
10/27/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
10/30/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
10/31/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
11/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
11/1/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/2/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
11/2/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/3/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
11/3/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
11/3/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/7/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
11/8/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
11/9/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
11/14/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/16/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
11/16/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/17/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
11/17/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/20/2017
|
No Access for Inspection
|
JEFFREY FULTON
|
|
Deputy Shotcrete
|
11/20/2017
|
No Access for Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
11/21/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
11/21/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
Reinforced Concrete Frame
|
11/21/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
11/22/2017
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Shotcrete
|
11/22/2017
|
Approved
|
SAKO AGHAZARIAN
|
|
Reinforced Masonry Frame
|
11/22/2017
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
11/28/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
11/28/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
11/28/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
11/28/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/29/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
11/29/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/30/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
11/30/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
11/30/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
12/1/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
12/1/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/4/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
12/4/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
12/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/5/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
12/5/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
12/6/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/6/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
12/6/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
12/7/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/7/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
12/7/2017
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
12/8/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/8/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
12/8/2017
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
12/9/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/13/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
12/13/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/14/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/15/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
12/15/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
12/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
12/19/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
12/19/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
12/20/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/20/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
1/4/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
1/11/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/11/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
1/11/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
1/12/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/12/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
1/16/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/16/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
1/16/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
1/17/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/17/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
1/18/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/18/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/19/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
1/19/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Structural Steel Frame
|
1/20/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
1/23/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/23/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
1/23/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
1/24/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/24/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/29/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
1/29/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/1/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/2/2018
|
Conditional Approval
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
2/5/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
2/6/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/7/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Structural Steel Frame
|
2/7/2018
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/8/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
2/8/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/9/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Wood Frame
|
2/9/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
2/13/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
2/14/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Wood Frame
|
2/21/2018
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
3/5/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
3/6/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
3/12/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
3/14/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
3/19/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
4/9/2018
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
|
Reinforced Masonry Frame
|
4/10/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
4/11/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Drywall Nailing
|
4/12/2018
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
4/13/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
4/18/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
4/30/2018
|
Corrections Issued
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
5/8/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
5/8/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
5/9/2018
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
5/14/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
5/24/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
5/25/2018
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
5/30/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
6/13/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
6/22/2018
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
6/26/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
6/28/2018
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/29/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
7/3/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/10/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/13/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
7/13/2018
|
Partial Inspection
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
7/19/2018
|
Partial Approval
|
LARRY ARNICK
|
|
Wood Frame
|
7/24/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
7/26/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
8/1/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
8/3/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
8/6/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
8/9/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Piling/Pier/Caisson
|
8/10/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
8/15/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
8/20/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
8/20/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
8/27/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
8/28/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
8/29/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/11/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/11/2018
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/13/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
9/13/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/14/2018
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/19/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/21/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/5/2018
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
10/11/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
10/11/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
10/22/2018
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
10/31/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
11/2/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
11/2/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
11/13/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
11/16/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
11/21/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Wood Frame
|
11/27/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
11/28/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
11/29/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
12/11/2018
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Interior/Exterior Lathing
|
12/11/2018
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Drywall Nailing
|
12/14/2018
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
12/21/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
1/2/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
1/2/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
1/2/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
1/2/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
1/2/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
1/3/2019
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
1/3/2019
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
1/4/2019
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
1/8/2019
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
1/8/2019
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
1/16/2019
|
Partial Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
1/18/2019
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
Reinforced Concrete Frame
|
1/18/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Verify Sprinkler Sign Off
|
1/18/2019
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
Insulation
|
1/28/2019
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
1/31/2019
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
2/8/2019
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
2/20/2019
|
Partial Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
2/20/2019
|
Approved
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
2/20/2019
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
2/20/2019
|
Approved
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
3/7/2019
|
Conditional Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
3/18/2019
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
4/1/2019
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
4/8/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
4/10/2019
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
4/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
4/17/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
4/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
4/23/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
4/24/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
4/26/2019
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
4/30/2019
|
Approved
|
HAMID PISHEHVAR
|
|
Wood Frame
|
5/2/2019
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Masonry Wall/Backfill
|
5/14/2019
|
Partial Approval
|
JAMES POWERS
|
|
Verify Rec and Parks Fee Memo
|
5/21/2019
|
Partial Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
5/29/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
5/31/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
6/4/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
6/5/2019
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
6/14/2019
|
Approved
|
LARRY ARNICK
|
|
Verify Rec and Parks Fee Memo
|
6/18/2019
|
Partial Inspection
|
LARRY ARNICK
|
|
Final
|
7/26/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
7/26/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
7/26/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
7/26/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
7/26/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
7/26/2019
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
7/26/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
7/30/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
7/30/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
7/30/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
7/30/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
7/30/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
7/30/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
7/30/2019
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
7/30/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Final
|
9/25/2019
|
Approved
|
LARRY ARNICK
|
|
Final
|
10/25/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
10/25/2019
|
Approved
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
10/25/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
10/25/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
10/25/2019
|
SGSOV Not Ready
|
LARRY ARNICK
|
|
Smoke Detectors
|
10/25/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
10/29/2019
|
Partial Inspection
|
LARRY ARNICK
|
|
Final
|
10/31/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
10/31/2019
|
Approved
|
LARRY ARNICK
|
|
Reinforced Masonry Frame
|
10/31/2019
|
Approved
|
LARRY ARNICK
|
|
SGSOV-Seismic Gas S/O Valve
|
10/31/2019
|
SGSOV Approved
|
LARRY ARNICK
|
|
Smoke Detectors
|
10/31/2019
|
Approved
|
LARRY ARNICK
|
|
Pre-Inspection
|
11/1/2019
|
Partial Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
11/2/2019
|
Partial Approval
|
LARRY ARNICK
|
|
Final
|
11/4/2019
|
Partial Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
11/5/2019
|
Partial Inspection
|
LARRY ARNICK
|
|
Verify Rec and Parks Fee Memo
|
11/6/2019
|
Partial Inspection
|
LARRY ARNICK
|
|
Final
|
11/7/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
11/15/2019
|
Partial Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
11/18/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Final
|
11/25/2019
|
Partial Approval
|
LARRY ARNICK
|