700 S MANHATTAN PL 1-160 90005

Certificate Information: 700 S MANHATTAN PL 1-160 90005

Application / Permit
16010-10000-00611
Plan Check / Job No.
B16LA01959
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 7-STORY, 5 LEVEL TYPE III-A OVER 2 LEVEL TYPE I-A 160 UNIT MIXED USE APARTMENT BUILDING OVER 2 LEVEL TYPE I-A SUBTERRANEAN PARKING GARAGE ( UTILIZING A 35% AFFORDABLE DENSITY BONUS (11% VERY LOW INCOME UNITS) WITH GROUND LEVEL RETAIL & RESTAURANT & PARKING & 2 LEVEL SUBTERRANEAN PARKING GARAGE).
Permit Issued
Issued on 5/24/2017
Issuing Office
Metro
Current Status
CofO Issued on 3/25/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/22/2016 APPLICANT
Assigned to Plan Check Engineer 3/10/2016 GARO TELMI
Corrections Issued 3/15/2016 GARO TELMI
Quality Review Completed 3/16/2016 BILL STUTSMAN
Building Plans Picked Up 3/17/2016 APPLICANT
Applicant returned to address corrections 9/20/2016 GARO TELMI
Applicant returned to address corrections 12/2/2016 GARO TELMI
Applicant returned to address corrections 12/9/2016 GARO TELMI
Applicant returned to address corrections 2/16/2017 GARO TELMI
Plan Check Approved 3/9/2017 GARO TELMI
Issued 5/24/2017 LADBS
TCO Issued (Expire Date: 05-23-2020) 11/25/2019 DAVID TSAU
CofO in Progress 3/2/2020 LARRY ARNICK
Permit Finaled 3/25/2020 TERRY HERR
CofO Issued 3/25/2020 TERRY HERR
Permit Finaled 3/25/2020 TERRY HERR

Permit Application Clearance Information

Address approval Cleared 5/24/2016 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 5/24/2016 ADRIAN SANCHEZ
Highway dedication Cleared 5/24/2016 ADRIAN SANCHEZ
Housing density bonus Cleared 7/19/2016 ALFREDA MASTERS
Construction near power lines Cleared 8/26/2016 WALTER RAMIREZ
Excavation more than 5-ft deep Cleared 9/20/2016 CALOSHA APPROVED
Hydrant and Access approval Cleared 9/28/2016 ROBERT DUFF
Driveway location Cleared 10/13/2016 COLLINS ALLAN
Internal circulation Cleared 10/13/2016 COLLINS ALLAN
Food Service Establishment Cleared 11/1/2016 PAWAN VERMA
Project located in CRA area Cleared 11/16/2016 JIM URQUHART
Permit Cleared 11/30/2016 ARMENIA AGUILAR
Miscellaneous Cleared 12/1/2016 JUSTIN BILOW
Sewer availability Cleared 12/1/2016 CELINA MORENO
ZA Case Cleared 12/1/2016 JUSTIN BILOW
ZA Case Cleared 12/1/2016 JUSTIN BILOW
ZI Cleared 12/1/2016 JUSTIN BILOW
Low Impact Development Cleared 1/5/2017 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 1/5/2017 ARMENIA AGUILAR
Green Code Cleared 1/10/2017 GARO TELMI
DAS Clearance Cleared 2/3/2017 GARO TELMI
Fire Marshall Fire Life Safety Cleared 2/8/2017 SUSIE ADAMIAN
DCP conditions approval Cleared 2/16/2017 MARITES CUNANAN
Work Adjacent to Public Way Cleared 2/17/2017 ROCHELLE DUNGCA
Encroachment in public way Cleared 2/21/2017 JAMES KHO
Frnt yard landscape/Water mgmt Cleared 2/22/2017 ERIC CLAROS
Miscellaneous Cleared 2/22/2017 ERIC CLAROS
Miscellaneous Cleared 2/22/2017 ERIC CLAROS
Opn space landscape/Water mgmt Cleared 2/22/2017 ERIC CLAROS
Site Plan review Cleared 2/22/2017 ERIC CLAROS
Building over 3-story or 36-ft Cleared 3/9/2017 CALOSHA APPROVED

Contact Information

Architect Getman, Donald Booth; Lic. No.: C11352 811 WILSHIRE BLVD SUITE 820      LOS ANGELES, CA 90017
Engineer Chamberlain, Craig Morgan; Lic. No.: S4588 1466 5TH ST      MANHATTAN BEACH, CA 90266
Engineer Choi, Michael; Lic. No.: C67851 1221 N ORANGE DR 117      LOS ANGELES, CA 90038
Engineer Cook, Daniel Stevens; Lic. No.: L4964 913 RIDGE HEIGHTS DRIVE      FALLBROOK, CA 92028
Engineer Kim, Paul Sungkyo; Lic. No.: GE2066 21266 E SUNDANCE ST      WALNUT, CA 91789
Engineer Salter, David R; Lic. No.: C69911 2323 28TH ST      SANTA MONICA, CA 90405

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 6/12/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 6/13/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 6/16/2017 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/22/2017 Not Ready for Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 6/26/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 7/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/17/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/19/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/20/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 7/20/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 7/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/2/2017 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/2/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/3/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 8/3/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 8/9/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 8/9/2017 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 8/9/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/10/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/10/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/11/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/14/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/15/2017 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/15/2017 Partial Approval GREGORY POMISH
Green Building Rough 8/15/2017 No Access for Inspection KATHRYN BUTTERWORTH
Reinforced Concrete Frame 8/15/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 8/15/2017 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 8/16/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/17/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/18/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/21/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/21/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/22/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/22/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/22/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/23/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/23/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/23/2017 Conditional Approval GREGORY POMISH
Green Building Rough 8/23/2017 Not Ready for Inspection KATHRYN BUTTERWORTH
Reinforced Concrete Frame 8/23/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 8/23/2017 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 8/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/24/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/24/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/25/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/28/2017 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/28/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 8/29/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/29/2017 Partial Approval JONATHAN QUACH
Deputy Shotcrete 8/29/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 8/29/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 8/29/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/30/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/30/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/31/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/31/2017 Conditional Approval GREGORY POMISH
Green Building Rough 8/31/2017 Not Ready for Inspection KATHRYN BUTTERWORTH
Reinforced Concrete Frame 8/31/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 8/31/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 9/1/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/1/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/13/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 9/14/2017 Conditional Approval NICK DANERI
Green Building Rough 9/14/2017 Not Ready for Inspection WILLIAM ROSE
Reinforced Concrete Frame 9/14/2017 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 9/14/2017 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 9/15/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/18/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/19/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/19/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/20/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/20/2017 Conditional Approval GREGORY POMISH
Green Building Rough 9/20/2017 Not Ready for Inspection KATHRYN BUTTERWORTH
Reinforced Concrete Frame 9/20/2017 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 9/20/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 9/21/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/21/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 9/21/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 9/22/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/22/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 9/22/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 9/22/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 9/26/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/26/2017 Conditional Approval GREGORY POMISH
Green Building Rough 9/26/2017 Not Ready for Inspection KATHRYN BUTTERWORTH
Reinforced Concrete Frame 9/26/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 9/26/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 9/27/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/27/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 9/27/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 9/28/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/28/2017 Conditional Approval GREGORY POMISH
Green Building Rough 9/28/2017 Not Ready for Inspection KATHRYN BUTTERWORTH
Reinforced Concrete Frame 9/28/2017 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 9/28/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 9/29/2017 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 9/29/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/2/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/2/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/3/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/3/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 10/3/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/4/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/4/2017 Conditional Approval GREGORY POMISH
Green Building Rough 10/4/2017 Not Ready for Inspection KATHRYN BUTTERWORTH
Reinforced Concrete Frame 10/4/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/5/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/5/2017 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/5/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/6/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/6/2017 Conditional Approval GREGORY POMISH
Green Building Rough 10/6/2017 Not Ready for Inspection KATHRYN BUTTERWORTH
Reinforced Concrete Frame 10/6/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/11/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 10/11/2017 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 10/12/2017 Not Ready for Inspection GREGORY POMISH
Footing/Foundation/Slab 10/13/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/20/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 10/20/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/24/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/26/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/27/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/30/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 10/31/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/1/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/1/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 11/1/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/2/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/2/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/3/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/3/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 11/3/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/7/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 11/8/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 11/9/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 11/14/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/16/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/16/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/17/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/20/2017 No Access for Inspection JEFFREY FULTON
Deputy Shotcrete 11/20/2017 No Access for Inspection JEFFREY FULTON
Deputy Reinf. Concrete 11/21/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 11/21/2017 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 11/21/2017 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/22/2017 Approved SAKO AGHAZARIAN
Deputy Shotcrete 11/22/2017 Approved SAKO AGHAZARIAN
Reinforced Masonry Frame 11/22/2017 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 11/28/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/28/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 11/28/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 11/28/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/29/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/29/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/30/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/30/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 11/30/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/1/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/1/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 12/1/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/4/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/4/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/5/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/5/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 12/5/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/6/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 12/6/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/7/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 12/7/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 12/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/8/2017 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/8/2017 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 12/9/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/13/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 12/13/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/15/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 12/15/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/19/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/19/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 12/19/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 12/19/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/20/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 1/4/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/11/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/11/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 1/11/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/12/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/12/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/16/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/16/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 1/16/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/17/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/17/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/18/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/18/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/19/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 1/19/2018 Not Ready for Inspection GREGORY POMISH
Structural Steel Frame 1/20/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/23/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/23/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 1/23/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/24/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/24/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/29/2018 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 1/29/2018 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/1/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/2/2018 Conditional Approval JEFFREY FULTON
Reinforced Masonry Frame 2/5/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 2/6/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/7/2018 Conditional Approval GREGORY POMISH
Structural Steel Frame 2/7/2018 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 2/8/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 2/8/2018 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 2/9/2018 Conditional Approval GREGORY POMISH
Wood Frame 2/9/2018 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 2/13/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/14/2018 Conditional Approval GREGORY POMISH
Wood Frame 2/21/2018 Partial Inspection GREGORY POMISH
Wood Frame 3/5/2018 Not Ready for Inspection GREGORY POMISH
Wood Frame 3/6/2018 Partial Approval GREGORY POMISH
Wood Frame 3/12/2018 Partial Approval GREGORY POMISH
Wood Frame 3/14/2018 Not Ready for Inspection GREGORY POMISH
Wood Frame 3/19/2018 Partial Approval GREGORY POMISH
Wood Frame 4/9/2018 Not Ready for Inspection LESLIE TRUJILLO
Reinforced Masonry Frame 4/10/2018 Partial Approval GREGORY POMISH
Wood Frame 4/11/2018 Partial Inspection ERNESTO CORRAL
Drywall Nailing 4/12/2018 Partial Inspection GREGORY POMISH
Wood Frame 4/13/2018 Partial Approval GREGORY POMISH
Wood Frame 4/18/2018 Partial Approval GREGORY POMISH
Wood Frame 4/30/2018 Corrections Issued GREGORY POMISH
Footing/Foundation/Slab 5/8/2018 Not Ready for Inspection GREGORY POMISH
Wood Frame 5/8/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/9/2018 Partial Inspection GREGORY POMISH
Wood Frame 5/14/2018 Partial Approval GREGORY POMISH
Drywall Nailing 5/24/2018 Partial Approval GREGORY POMISH
Drywall Nailing 5/25/2018 Partial Inspection GREGORY POMISH
Wood Frame 5/30/2018 Partial Approval GREGORY POMISH
Wood Frame 6/13/2018 Partial Approval GREGORY POMISH
Wood Frame 6/22/2018 Not Ready for Inspection LARRY ARNICK
Wood Frame 6/26/2018 Partial Approval GREGORY POMISH
Wood Frame 6/28/2018 Partial Inspection GREGORY POMISH
Insulation 6/29/2018 Partial Approval GREGORY POMISH
Wood Frame 7/3/2018 Not Ready for Inspection GREGORY POMISH
Wood Frame 7/10/2018 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 7/13/2018 Partial Approval GREGORY POMISH
Insulation 7/13/2018 Partial Inspection GREGORY POMISH
Masonry Wall/Backfill 7/19/2018 Partial Approval LARRY ARNICK
Wood Frame 7/24/2018 Partial Approval GREGORY POMISH
Masonry Wall/Backfill 7/26/2018 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 8/1/2018 Partial Approval GREGORY POMISH
Wood Frame 8/3/2018 Partial Approval GREGORY POMISH
Wood Frame 8/6/2018 Partial Approval GREGORY POMISH
Wood Frame 8/9/2018 Partial Approval GREGORY POMISH
Piling/Pier/Caisson 8/10/2018 Partial Approval GREGORY POMISH
Wood Frame 8/15/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 8/20/2018 Partial Approval GREGORY POMISH
Wood Frame 8/20/2018 Not Ready for Inspection GREGORY POMISH
Wood Frame 8/27/2018 Partial Approval GREGORY POMISH
Wood Frame 8/28/2018 Not Ready for Inspection GREGORY POMISH
Wood Frame 8/29/2018 Partial Approval GREGORY POMISH
Drywall Nailing 9/11/2018 Not Ready for Inspection GREGORY POMISH
Wood Frame 9/11/2018 Partial Inspection GREGORY POMISH
Drywall Nailing 9/13/2018 Partial Approval GREGORY POMISH
Wood Frame 9/13/2018 Partial Approval GREGORY POMISH
Drywall Nailing 9/14/2018 Partial Inspection GREGORY POMISH
Drywall Nailing 9/19/2018 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 9/21/2018 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 10/5/2018 Partial Approval LARRY ARNICK
Drywall Nailing 10/11/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 10/11/2018 Partial Approval GREGORY POMISH
Wood Frame 10/22/2018 Partial Inspection GREGORY POMISH
Wood Frame 10/31/2018 Partial Approval GREGORY POMISH
Insulation 11/2/2018 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 11/2/2018 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 11/13/2018 Partial Approval GREGORY POMISH
Drywall Nailing 11/16/2018 Partial Approval GREGORY POMISH
Drywall Nailing 11/21/2018 Partial Inspection ERNESTO CORRAL
Wood Frame 11/27/2018 Partial Approval GREGORY POMISH
Wood Frame 11/28/2018 Partial Approval GREGORY POMISH
Insulation 11/29/2018 Partial Approval GREGORY POMISH
Drywall Nailing 12/11/2018 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 12/11/2018 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/14/2018 Partial Approval NICK DANERI
Wood Frame 12/21/2018 Partial Approval GREGORY POMISH
Drywall Nailing 1/2/2019 Not Ready for Inspection GREGORY POMISH
Green Building Rough 1/2/2019 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 1/2/2019 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 1/2/2019 Not Ready for Inspection GREGORY POMISH
Wood Frame 1/2/2019 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 1/3/2019 Partial Approval GREGORY POMISH
Wood Frame 1/3/2019 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 1/4/2019 Partial Approval GREGORY POMISH
Drywall Nailing 1/8/2019 Partial Approval GREGORY POMISH
Insulation 1/8/2019 Not Ready for Inspection GREGORY POMISH
Wood Frame 1/16/2019 Partial Approval GREGORY POMISH
Green Building Rough 1/18/2019 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 1/18/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 1/18/2019 Not Ready for Inspection ERNESTO CORRAL
Insulation 1/28/2019 Partial Approval GREGORY POMISH
Drywall Nailing 1/31/2019 Partial Approval GREGORY POMISH
Insulation 2/8/2019 Partial Approval GREGORY POMISH
Drywall Nailing 2/20/2019 Partial Approval GREGORY POMISH
Green Building Rough 2/20/2019 Approved GREGORY POMISH
Reinforced Concrete Frame 2/20/2019 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 2/20/2019 Approved GREGORY POMISH
Light Gage Steel Frame 3/7/2019 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 3/18/2019 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/1/2019 Partial Approval LARRY ARNICK
Light Gage Steel Frame 4/8/2019 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 4/10/2019 Partial Approval LARRY ARNICK
Insulation 4/12/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 4/17/2019 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 4/18/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 4/23/2019 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 4/24/2019 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 4/26/2019 Partial Approval LARRY ARNICK
Light Gage Steel Frame 4/30/2019 Approved HAMID PISHEHVAR
Wood Frame 5/2/2019 Not Ready for Inspection DERRICK SPENCER
Masonry Wall/Backfill 5/14/2019 Partial Approval JAMES POWERS
Verify Rec and Parks Fee Memo 5/21/2019 Partial Inspection LARRY ARNICK
Light Gage Steel Frame 5/29/2019 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 5/31/2019 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/4/2019 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 6/5/2019 Partial Approval LARRY ARNICK
Light Gage Steel Frame 6/14/2019 Approved LARRY ARNICK
Verify Rec and Parks Fee Memo 6/18/2019 Partial Inspection LARRY ARNICK
Final 7/26/2019 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 7/26/2019 Not Ready for Inspection LARRY ARNICK
Green Building Final 7/26/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 7/26/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 7/26/2019 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 7/26/2019 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 7/26/2019 Not Ready for Inspection LARRY ARNICK
Final 7/30/2019 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 7/30/2019 Not Ready for Inspection LARRY ARNICK
Green Building Final 7/30/2019 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 7/30/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 7/30/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 7/30/2019 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 7/30/2019 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 7/30/2019 Not Ready for Inspection LARRY ARNICK
Green Building Final 9/25/2019 Approved LARRY ARNICK
Final 10/25/2019 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 10/25/2019 Approved LARRY ARNICK
Reinforced Concrete Frame 10/25/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 10/25/2019 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 10/25/2019 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 10/25/2019 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 10/29/2019 Partial Inspection LARRY ARNICK
Final 10/31/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 10/31/2019 Approved LARRY ARNICK
Reinforced Masonry Frame 10/31/2019 Approved LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 10/31/2019 SGSOV Approved LARRY ARNICK
Smoke Detectors 10/31/2019 Approved LARRY ARNICK
Pre-Inspection 11/1/2019 Partial Inspection LARRY ARNICK
Special/Order Compliance 11/2/2019 Partial Approval LARRY ARNICK
Final 11/4/2019 Partial Inspection LARRY ARNICK
Special/Order Compliance 11/5/2019 Partial Inspection LARRY ARNICK
Verify Rec and Parks Fee Memo 11/6/2019 Partial Inspection LARRY ARNICK
Final 11/7/2019 Not Ready for Inspection LARRY ARNICK
Final 11/15/2019 Partial Inspection LARRY ARNICK
Special/Order Compliance 11/18/2019 Not Ready for Inspection LARRY ARNICK
Final 11/25/2019 Partial Approval LARRY ARNICK