Grading Pre-Inspection
|
8/3/2017
|
Partial Inspection
|
GREGORY POMISH
|
|
Posting Pre-Inspection
|
8/3/2017
|
Partial Inspection
|
GREGORY POMISH
|
|
Pre-Inspection
|
8/3/2017
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/22/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/23/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Piling/Pier/Caisson
|
8/23/2017
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/24/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/25/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/17/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
12/20/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
12/27/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/2/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/4/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
1/4/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
1/4/2018
|
Partial Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
1/4/2018
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/5/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
1/10/2018
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/17/2018
|
Approved
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
1/17/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
1/17/2018
|
Partial Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
1/17/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/25/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
1/25/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
1/25/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
1/25/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
2/5/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
2/6/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
2/14/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
2/14/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
2/14/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
2/14/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
2/23/2018
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Rough
|
2/23/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
2/23/2018
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
2/23/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
2/23/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
2/28/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
2/28/2018
|
No Access for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
2/28/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
2/28/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
3/1/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
3/7/2018
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Rough
|
3/7/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
3/7/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
3/7/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
3/7/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
3/9/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
3/12/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
3/15/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
3/15/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
3/15/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
3/15/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
3/15/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
3/20/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
3/27/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
4/16/2018
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/20/2018
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
4/20/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
4/20/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
4/20/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
4/20/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/25/2018
|
Approved
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
4/25/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
4/25/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
4/25/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
4/25/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
4/25/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
4/25/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
4/25/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/26/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
5/1/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
5/2/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
5/3/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
5/4/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
5/4/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
METHANE-Rough
|
5/4/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
5/4/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
5/4/2018
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Methane Barrier
|
6/25/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
6/26/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
6/27/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
6/28/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
6/29/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/5/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
7/5/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
7/5/2018
|
Approved
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/6/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
7/6/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
7/9/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
7/23/2018
|
No Access for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/13/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/23/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
8/23/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
8/23/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
8/23/2018
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
8/23/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
8/28/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
8/28/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
8/28/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
8/28/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
4/5/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
4/8/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
5/10/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
5/10/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
5/10/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
5/10/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
5/10/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
5/10/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
5/14/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
5/22/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/5/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/5/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
6/5/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/3/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
7/3/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/5/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
7/5/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
7/8/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/27/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
10/22/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/22/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
11/13/2019
|
Conditional Approval
|
JONATHAN QUACH
|
|
Green Building Rough
|
11/15/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
11/15/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
11/15/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
11/15/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
11/26/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
12/10/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/26/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
12/27/2019
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
1/7/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
1/7/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
1/7/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
1/7/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/9/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
1/9/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/10/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/13/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
1/13/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
1/13/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
1/13/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
1/13/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
1/13/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
1/15/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/17/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
1/17/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
1/21/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
1/23/2020
|
Approved
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
1/23/2020
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Rough
|
1/23/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
1/23/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
1/23/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
1/23/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/28/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
2/27/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
2/28/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
2/28/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
2/28/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
2/28/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
3/2/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
3/6/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
3/6/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
METHANE-Rough
|
3/6/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
3/6/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
3/6/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
3/25/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
3/25/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
3/25/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
3/25/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
3/25/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
4/3/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
4/7/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
4/13/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
4/15/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
4/17/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/17/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
4/21/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
4/22/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/23/2020
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Rough
|
4/23/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
4/23/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
4/23/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
4/23/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
4/27/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
4/27/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
4/27/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
4/27/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/4/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Fireproofing
|
5/6/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
5/12/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/10/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/17/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
6/17/2020
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
6/18/2020
|
Approved
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/26/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
6/26/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/30/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
6/30/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
7/2/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/7/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
7/8/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/10/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/15/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/16/2020
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/29/2020
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
6/23/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/29/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Drywall Nailing
|
10/13/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Green Building Final
|
12/14/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/17/2022
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
4/6/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
6/16/2022
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Final
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Rough
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
METHANE-Final
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
6/16/2022
|
SGSOV Approved
|
DAVID BURKHEAD
|
|
SUSMP-Std. Urban Storm Water
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
Structural Steel Frame
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
6/16/2022
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
9/27/2022
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
5/10/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
3/14/2024
|
OK to Issue CofO
|
DAVID BURKHEAD
|