8500 W BEVERLY BLVD 90048

Certificate Information: 8500 W BEVERLY BLVD 90048

Application / Permit
15016-10000-28423
Plan Check / Job No.
B15LA18030
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
EXTERIOR & INTERIOR RENOVATION OF AN (E) 8 STORY MALL . NO CHANGE IN USE .
Permit Issued
Issued on 4/19/2016
Issuing Office
Metro
Current Status
Permit Finaled on 1/7/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/28/2015 APPLICANT
Assigned to Plan Check Engineer 1/15/2016 GARO TELMI
Green Plans Picked Up 1/21/2016 APPLICANT
Corrections Issued 1/25/2016 GARO TELMI
Quality Review Completed 1/29/2016 JOHN VASQUEZ
Building Plans Picked Up 1/29/2016 APPLICANT
Disabled Access Plans Picked Up 2/5/2016 APPLICANT
Applicant returned to address corrections 2/19/2016 GARO TELMI
Applicant returned to address corrections 2/26/2016 GARO TELMI
Applicant returned to address corrections 3/4/2016 GARO TELMI
Applicant returned to address corrections 3/8/2016 GARO TELMI
Plan Check Approved 4/1/2016 GARO TELMI
Issued 4/19/2016 LADBS
Permit Finaled 1/7/2025 WINSTON DUNNING

Permit Application Clearance Information

Bicycle Parking Cleared 2/5/2016 JAMES KHO
Encroachment in public way Cleared 2/5/2016 JAMES KHO
Eng Process Fee Ord 176,300 Cleared 2/5/2016 VALENTINO PUEBLOS
Miscellaneous Cleared 2/5/2016 TERRY PHAN
Permit Cleared 2/5/2016 TERRY PHAN
Work Adjacent to Public Way Cleared 2/5/2016 DAVID PEREZ
ZA Case Cleared 2/5/2016 ULISES GONZALEZ
Internal circulation Cleared 2/10/2016 COLLINS ALLAN
Green Code Cleared 3/8/2016 DONALD CRICHLOW
Building over 3-story or 36-ft Cleared 3/15/2016 CALOSHA APPROVED
Low Impact Development Cleared 3/22/2016 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 3/24/2016 ARNULFO NUNO
Fire Marshall Fire Life Safety Cleared 3/30/2016 SUSIE ADAMIAN
DAS Clearance Cleared 3/31/2016 EDDIE GARIN
Food establishment approval Cleared 4/1/2016 LACDHS APPROVED

Contact Information

Architect Carroll, Gene A; Lic. No.: C32144 400 GALLERIA OFFICENTRE SUITE 555      SOUTHFIELD, MI 48034
Engineer Ludwig, Charles Adam; Lic. No.: S4455 3432 45TH AVE SW      SEATTLE, WA 98116

Inspector Information

IAN BLINN, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI
CHRISTOPHER BLACKWOOD, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Fireproofing 7/27/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/27/2016 Conditional Approval GREGORY POMISH
Deputy Fireproofing 7/29/2016 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 8/5/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/23/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/24/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/25/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/26/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/30/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/31/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/1/2016 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 9/1/2016 Partial Approval GREGORY POMISH
Structural Steel Frame 9/1/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 9/2/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/6/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/7/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/7/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/8/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/8/2016 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 9/8/2016 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 9/9/2016 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 9/9/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/9/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/9/2016 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/12/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/12/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/12/2016 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/13/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/13/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/13/2016 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/14/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/14/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/14/2016 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 9/14/2016 Partial Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 9/15/2016 Conditional Approval DAVID BURKHEAD
Deputy Grading 9/15/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/15/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/15/2016 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/16/2016 Conditional Approval GREGORY POMISH
Deputy Grading 9/16/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/16/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/16/2016 Conditional Approval GREGORY POMISH
Structural Steel Frame 9/16/2016 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/19/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/19/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/19/2016 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/20/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/20/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/20/2016 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/21/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/21/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/21/2016 Conditional Approval DAVID BURKHEAD
Insulation 9/21/2016 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 9/21/2016 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/22/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/22/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/22/2016 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 9/22/2016 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/23/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/23/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/23/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/26/2016 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 9/26/2016 Partial Approval GREGORY POMISH
Deputy Fireproofing 9/27/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/27/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/27/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/28/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/28/2016 Conditional Approval DAVID BURKHEAD
Insulation 9/28/2016 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 9/28/2016 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 9/29/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/30/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/3/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/4/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/4/2016 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 10/4/2016 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/5/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/5/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/6/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/6/2016 Conditional Approval GREGORY POMISH
Insulation 10/6/2016 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 10/6/2016 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/7/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/7/2016 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/11/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/11/2016 Conditional Approval DAVID BURKHEAD
Drywall Nailing 10/11/2016 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 10/12/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/12/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/12/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/12/2016 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 10/12/2016 Partial Approval DAVID BURKHEAD
Structural Steel Frame 10/12/2016 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 10/13/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/13/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/13/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/13/2016 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/14/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/14/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/14/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/14/2016 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/17/2016 Conditional Approval GREGORY POMISH
Deputy Grading 10/17/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/17/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/17/2016 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 10/17/2016 Partial Approval GREGORY POMISH
Deputy Fireproofing 10/18/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/18/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/18/2016 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/19/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/19/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/19/2016 Conditional Approval GREGORY POMISH
Drywall Nailing 10/19/2016 Partial Approval GREGORY POMISH
Light Gage Steel Frame 10/19/2016 Partial Inspection GREGORY POMISH
Deputy Fireproofing 10/20/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/20/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/20/2016 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/21/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/21/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/24/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/24/2016 Conditional Approval GREGORY POMISH
Interior/Exterior Lathing 10/24/2016 Partial Approval GREGORY POMISH
Structural Steel Frame 10/24/2016 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/25/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/25/2016 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/26/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/26/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/26/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/27/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/27/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/28/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/28/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/31/2016 Conditional Approval GREGORY POMISH
Drywall Nailing 11/2/2016 Partial Inspection GREGORY POMISH
Drywall Nailing 11/4/2016 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 11/7/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/7/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/7/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/7/2016 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/8/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/8/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/8/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/8/2016 Conditional Approval GREGORY POMISH
Structural Steel Frame 11/8/2016 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/9/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/9/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/9/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/9/2016 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 11/9/2016 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 11/10/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/10/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 11/10/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/10/2016 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/14/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/14/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/14/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/14/2016 Conditional Approval GREGORY POMISH
T-Bar Ceiling 11/14/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/15/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/15/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/15/2016 Conditional Approval GREGORY POMISH
Structural Steel Frame 11/15/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/16/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/16/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/16/2016 Conditional Approval GREGORY POMISH
T-Bar Ceiling 11/16/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/17/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/17/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/17/2016 Conditional Approval GREGORY POMISH
Drywall Nailing 11/17/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/18/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/18/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/18/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/21/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/21/2016 Conditional Approval GREGORY POMISH
Drywall Nailing 11/21/2016 Partial Approval GREGORY POMISH
Light Gage Steel Frame 11/21/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/22/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/22/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/23/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/23/2016 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 11/23/2016 Partial Approval GREGORY POMISH
Structural Steel Frame 11/23/2016 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/28/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/28/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/29/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/29/2016 Conditional Approval GREGORY POMISH
T-Bar Ceiling 11/29/2016 Partial Approval GREGORY POMISH
Structural Steel Frame 11/30/2016 Partial Approval GREGORY POMISH
Deputy Steel/Welding 12/1/2016 Conditional Approval GREGORY POMISH
Drywall Nailing 12/1/2016 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/1/2016 Partial Approval GREGORY POMISH
Structural Steel Frame 12/1/2016 Partial Inspection GREGORY POMISH
Deputy Steel/Welding 12/6/2016 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 12/6/2016 Partial Inspection GREGORY POMISH
T-Bar Ceiling 12/6/2016 Partial Approval GREGORY POMISH
Deputy Steel/Welding 12/7/2016 Conditional Approval GREGORY POMISH
Drywall Nailing 12/7/2016 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/7/2016 Partial Approval GREGORY POMISH
Deputy Steel/Welding 12/8/2016 Conditional Approval GREGORY POMISH
Drywall Nailing 12/8/2016 Partial Inspection GREGORY POMISH
Deputy Steel/Welding 12/9/2016 Conditional Approval GREGORY POMISH
Drywall Nailing 12/9/2016 Partial Approval GREGORY POMISH
Drywall Nailing 12/13/2016 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/13/2016 Partial Approval GREGORY POMISH
T-Bar Ceiling 12/13/2016 Partial Approval GREGORY POMISH
Drywall Nailing 12/16/2016 Partial Approval JOEY BUCHANAN
Deputy Steel/Welding 12/19/2016 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/19/2016 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/19/2016 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 12/20/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/21/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/22/2016 Conditional Approval GREGORY POMISH
Drywall Nailing 12/22/2016 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/22/2016 Partial Approval GREGORY POMISH
Deputy Steel/Welding 12/23/2016 Conditional Approval GREGORY POMISH
Drywall Nailing 12/28/2016 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/28/2016 Partial Inspection GREGORY POMISH
T-Bar Ceiling 1/3/2017 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 1/4/2017 Partial Approval GREGORY POMISH
Structural Steel Frame 1/4/2017 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 1/5/2017 Partial Inspection GREGORY POMISH
Structural Steel Frame 1/5/2017 Partial Approval GREGORY POMISH
Deputy Fireproofing 1/6/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/6/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 1/6/2017 Partial Approval GREGORY POMISH
T-Bar Ceiling 1/6/2017 Partial Inspection GREGORY POMISH
Deputy Fireproofing 1/9/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/9/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 1/10/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/10/2017 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 1/10/2017 Partial Inspection GREGORY POMISH
Deputy Fireproofing 1/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/13/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/13/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 1/13/2017 Partial Inspection GREGORY POMISH
Deputy Steel/Welding 1/17/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 1/17/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/17/2017 Partial Approval GREGORY POMISH
Deputy Steel/Welding 1/18/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/19/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/20/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 1/20/2017 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/20/2017 Partial Approval DAVID BURKHEAD
Structural Steel Frame 1/20/2017 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 1/23/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/24/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/25/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 1/25/2017 Partial Inspection GREGORY POMISH
Structural Steel Frame 1/25/2017 Partial Inspection GREGORY POMISH
Deputy Steel/Welding 1/26/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/27/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/30/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/31/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/1/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 2/1/2017 Partial Inspection GREGORY POMISH
Deputy Steel/Welding 2/2/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/3/2017 Conditional Approval GREGORY POMISH
Structural Steel Frame 2/3/2017 Partial Inspection GREGORY POMISH
Deputy Steel/Welding 2/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/7/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/7/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 2/8/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/8/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 2/8/2017 Partial Approval GREGORY POMISH
Deputy Other (see comments) 2/9/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/9/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 2/10/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/10/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 2/13/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/13/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/14/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/14/2017 Conditional Approval GREGORY POMISH
Structural Steel Frame 2/14/2017 Partial Approval GREGORY POMISH
T-Bar Ceiling 2/14/2017 Partial Approval GREGORY POMISH
Deputy Fireproofing 2/15/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/15/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/16/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/16/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/17/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 2/18/2017 Off-Hour Fees Due
Drywall Nailing 2/18/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/21/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/21/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/22/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 2/22/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/22/2017 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 2/22/2017 Partial Approval GREGORY POMISH
Structural Steel Frame 2/22/2017 Partial Approval GREGORY POMISH
Deputy Fireproofing 2/23/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 2/23/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/23/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 2/23/2017 Partial Inspection GREGORY POMISH
Deputy Fireproofing 2/24/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 2/24/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/24/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 2/24/2017 Partial Approval GREGORY POMISH
Deputy Fireproofing 2/27/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 2/27/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/27/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 2/27/2017 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 2/27/2017 Not Ready for Inspection GREGORY POMISH
T-Bar Ceiling 2/27/2017 Partial Inspection GREGORY POMISH
Deputy Fireproofing 2/28/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 2/28/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/28/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 2/28/2017 Partial Inspection GREGORY POMISH
Deputy Fireproofing 3/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/1/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 3/1/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 3/2/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 3/2/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/2/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/3/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 3/3/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/3/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/6/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 3/6/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/6/2017 Conditional Approval GREGORY POMISH
Drywall Nailing 3/6/2017 Partial Inspection GREGORY POMISH
Deputy Fireproofing 3/7/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 3/7/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/7/2017 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 3/7/2017 Partial Inspection GREGORY POMISH
Deputy Fireproofing 3/8/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 3/8/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/8/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/9/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/9/2017 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/9/2017 Partial Approval GREGORY POMISH
Light Gage Steel Frame 3/9/2017 Partial Approval GREGORY POMISH
Deputy Fireproofing 3/10/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/10/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 3/14/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/14/2017 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/14/2017 Partial Approval GREGORY POMISH
Deputy Fireproofing 3/15/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/15/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 3/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/16/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 3/16/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 3/17/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/17/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 3/20/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/20/2017 Conditional Approval GREGORY POMISH
Structural Steel Frame 3/20/2017 Partial Approval GREGORY POMISH
Deputy Fireproofing 3/21/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 3/21/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/21/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/22/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/22/2017 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/22/2017 Partial Approval GREGORY POMISH
Structural Steel Frame 3/22/2017 Partial Approval GREGORY POMISH
Deputy Fireproofing 3/23/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/23/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/29/2017 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 3/29/2017 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/29/2017 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 3/29/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 3/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/30/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 3/30/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 3/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/31/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 3/31/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 4/3/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/3/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/3/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 4/3/2017 Partial Approval DAVID BURKHEAD
Structural Steel Frame 4/3/2017 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 4/3/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 4/4/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/4/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/4/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/4/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 4/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/5/2017 Conditional Approval DAVID BURKHEAD
Structural Steel Frame 4/5/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 4/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/7/2017 Conditional Approval DAVID BURKHEAD
Structural Steel Frame 4/7/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 4/10/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/10/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/10/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 4/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/12/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 4/12/2017 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 4/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/14/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/14/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 4/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/18/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/18/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/18/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 4/18/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 4/18/2017 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 4/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/20/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/20/2017 Partial Approval DAVID BURKHEAD
Structural Steel Frame 4/20/2017 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 4/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/25/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/25/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/25/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 4/25/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 4/25/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 4/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/28/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 4/28/2017 Partial Approval DAVID BURKHEAD
Structural Steel Frame 4/28/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/1/2017 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 5/1/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/1/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 5/2/2017 Partial Approval FELIX CEBALLOS
Deputy Other (see comments) 5/2/2017 Partial Approval FELIX CEBALLOS
Deputy Steel/Welding 5/2/2017 Partial Approval FELIX CEBALLOS
Interior/Exterior Lathing 5/2/2017 Approved FELIX CEBALLOS
Light Gage Steel Frame 5/2/2017 Approved FELIX CEBALLOS
Structural Steel Frame 5/2/2017 Approved FELIX CEBALLOS
Deputy Fireproofing 5/3/2017 No Access for Inspection JEFFREY FULTON
Deputy Other (see comments) 5/3/2017 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 5/3/2017 Conditional Approval JEFFREY FULTON
Drywall Nailing 5/3/2017 Partial Inspection JEFFREY FULTON
Deputy Fireproofing 5/4/2017 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 5/4/2017 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/4/2017 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/4/2017 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 5/4/2017 Partial Inspection EDWIN GREGORYONA
Deputy Fireproofing 5/5/2017 Partial Approval JONATHAN QUACH
Deputy Other (see comments) 5/5/2017 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 5/5/2017 Partial Approval JONATHAN QUACH
Light Gage Steel Frame 5/5/2017 Partial Approval JONATHAN QUACH
Deputy Fireproofing 5/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/8/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/8/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 5/9/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/9/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/9/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 5/9/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/10/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/10/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/10/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/10/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/11/2017 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 5/11/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/12/2017 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/12/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/15/2017 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 5/15/2017 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 5/15/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/17/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/17/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/18/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/18/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/18/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/18/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/19/2017 Conditional Approval DAVID BURKHEAD
Structural Steel Frame 5/19/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/22/2017 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/22/2017 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 5/22/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 5/23/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/23/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/25/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/25/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/25/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/26/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/26/2017 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 5/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/30/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/30/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 5/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/31/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/31/2017 Partial Approval DAVID BURKHEAD
Structural Steel Frame 5/31/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/2/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/2/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/2/2017 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/2/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/5/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 6/5/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 6/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/6/2017 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/6/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 6/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/7/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/7/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/9/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/9/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/9/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/9/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/9/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/12/2017 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 6/12/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/12/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/13/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 6/13/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/14/2017 Conditional Approval DAVID BURKHEAD
Structural Steel Frame 6/14/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/15/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/15/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/16/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 6/16/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/19/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 6/19/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 6/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/21/2017 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/21/2017 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/21/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/22/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/22/2017 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/22/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/23/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/23/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/23/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/23/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/23/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/27/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/27/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/27/2017 Approved DAVID BURKHEAD
Deputy Other (see comments) 6/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/30/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/30/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/30/2017 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 7/3/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/3/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 7/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/6/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/6/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/6/2017 Partial Inspection DAVID BURKHEAD
Deputy Other (see comments) 7/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/10/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/10/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/11/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 7/11/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 7/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/12/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 7/12/2017 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 7/12/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 7/13/2017 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 7/13/2017 Approved JONATHAN QUACH
Deputy Steel/Welding 7/13/2017 Partial Approval JONATHAN QUACH
Deputy Other (see comments) 7/14/2017 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 7/14/2017 Partial Approval JONATHAN QUACH
Green Building Rough 7/14/2017 Partial Inspection WILLIAM ROSE
Interior/Exterior Lathing 7/14/2017 Partial Inspection JONATHAN QUACH
Deputy Other (see comments) 7/17/2017 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 7/17/2017 Partial Approval JONATHAN QUACH
Deputy Other (see comments) 7/18/2017 Conditional Approval AJA COLLAY
Deputy Steel/Welding 7/18/2017 Conditional Approval AJA COLLAY
Drywall Nailing 7/18/2017 Partial Approval AJA COLLAY
Light Gage Steel Frame 7/18/2017 Partial Approval AJA COLLAY
Deputy Other (see comments) 7/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/19/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/19/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Other (see comments) 7/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/20/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 7/20/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 7/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/21/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 7/21/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 7/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/25/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/25/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/25/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/25/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 7/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/26/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/26/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/26/2017 Partial Inspection DAVID BURKHEAD
Deputy Other (see comments) 7/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/27/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/27/2017 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/27/2017 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 7/27/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 7/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/28/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/28/2017 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 7/28/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 7/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/1/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 8/1/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 8/2/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/2/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/3/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/3/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 8/3/2017 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/3/2017 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/3/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 8/4/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/4/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 8/4/2017 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/4/2017 Partial Approval DAVID BURKHEAD
Structural Steel Frame 8/4/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 8/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/7/2017 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/7/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/7/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 8/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/8/2017 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/8/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 8/9/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/9/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/10/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/10/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/10/2017 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/10/2017 Not Ready for Inspection DAVID BURKHEAD
Structural Steel Frame 8/10/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 8/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/11/2017 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/11/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 8/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/14/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/14/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 8/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/15/2017 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 8/15/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/15/2017 Corrections Issued DAVID BURKHEAD
Deputy Fireproofing 8/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/16/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/16/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 8/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/17/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/17/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 8/18/2017 Partial Approval JONATHAN QUACH
Deputy Other (see comments) 8/18/2017 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 8/18/2017 Partial Approval JONATHAN QUACH
Deputy Other (see comments) 8/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/21/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/21/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 8/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/23/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/23/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/23/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 8/23/2017 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 8/23/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/23/2017 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 8/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/25/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/25/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 8/28/2017 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 8/28/2017 Partial Approval JONATHAN QUACH
Deputy Fireproofing 8/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/29/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 8/29/2017 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 8/29/2017 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/29/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 8/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/31/2017 Conditional Approval DAVID BURKHEAD
Green Building Rough 8/31/2017 Approved WILLIAM ROSE
Deputy Fireproofing 9/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 9/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/5/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 9/5/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 9/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/6/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/6/2017 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 9/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 9/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/8/2017 Conditional Approval DAVID BURKHEAD
Structural Steel Frame 9/8/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 9/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 9/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/12/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 9/12/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 9/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 9/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 9/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/15/2017 Approved DAVID BURKHEAD
Deputy Steel/Welding 9/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/18/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/18/2017 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 9/18/2017 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/18/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 9/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 9/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/20/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/20/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/20/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 9/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/21/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/21/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 9/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/22/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/22/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 9/25/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/25/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/25/2017 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 9/25/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/25/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 9/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 9/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 9/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/28/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/28/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 9/29/2017 Partial Approval JONATHAN QUACH
Deputy Other (see comments) 9/29/2017 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 9/29/2017 Partial Approval JONATHAN QUACH
Drywall Nailing 9/29/2017 Partial Inspection JONATHAN QUACH
Deputy Fireproofing 10/2/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/2/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/2/2017 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 10/2/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 10/3/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/3/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/3/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/4/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/4/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/4/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/10/2017 Partial Approval JONATHAN QUACH
Deputy Other (see comments) 10/10/2017 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 10/10/2017 Partial Approval JONATHAN QUACH
Deputy Fireproofing 10/11/2017 Partial Approval JONATHAN QUACH
Deputy Other (see comments) 10/11/2017 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 10/11/2017 Partial Approval JONATHAN QUACH
Drywall Nailing 10/11/2017 Partial Inspection JONATHAN QUACH
Footing/Foundation/Slab 10/11/2017 Partial Inspection JONATHAN QUACH
Light Gage Steel Frame 10/11/2017 Partial Inspection JONATHAN QUACH
Deputy Fireproofing 10/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/12/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 10/12/2017 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/12/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/12/2017 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 10/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/13/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 10/13/2017 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 10/13/2017 Partial Approval DAVID BURKHEAD
Structural Steel Frame 10/13/2017 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 10/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/16/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 10/16/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 10/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/17/2017 Conditional Approval DAVID BURKHEAD
Structural Steel Frame 10/17/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 10/18/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/18/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/18/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 10/18/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/18/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 10/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/23/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/23/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/23/2017 Conditional Approval DAVID BURKHEAD
Insulation 10/23/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 10/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/24/2017 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/24/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 10/25/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/25/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/25/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/26/2017 Conditional Approval DAVID BURKHEAD
Insulation 10/26/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 10/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/27/2017 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/27/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 10/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 10/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/31/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 10/31/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/31/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 11/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 11/2/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/2/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/2/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 11/2/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 11/3/2017 Conditional Approval DAVID BURKHEAD
Deputy Grading 11/3/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/3/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/3/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 11/3/2017 Partial Approval DAVID BURKHEAD
Deputy Grading 11/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 11/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/7/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 11/7/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 11/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 11/9/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/9/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/9/2017 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/9/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 11/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 11/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Grading 11/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/14/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 11/14/2017 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 11/14/2017 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 11/14/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 11/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/15/2017 Conditional Approval DAVID BURKHEAD
Structural Steel Frame 11/15/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 11/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/16/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 11/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/17/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/21/2017 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 11/21/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 11/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/22/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 11/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 11/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/28/2017 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 11/28/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 11/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/29/2017 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 11/29/2017 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/29/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 11/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/30/2017 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 11/30/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 12/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/4/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/4/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/4/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/5/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/7/2017 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 12/7/2017 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 12/7/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 12/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/8/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/12/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 12/12/2017 No Access for Inspection DAVID BURKHEAD
Deputy Fireproofing 12/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/13/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 12/13/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 12/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/15/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 12/15/2017 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 12/18/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/18/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/18/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/19/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/19/2017 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/19/2017 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 12/19/2017 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 12/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/27/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/28/2017 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 12/28/2017 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 12/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 12/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/3/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/3/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/3/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 1/3/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 1/4/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/4/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/4/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/8/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 1/8/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 1/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/10/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/10/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/10/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/11/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/11/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/16/2018 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/16/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/16/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 1/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/19/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 1/19/2018 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 1/19/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/19/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 1/22/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/22/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/22/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Grading 1/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Grading 1/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/24/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 1/24/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 1/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 1/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/26/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 1/26/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 1/29/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/29/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 1/29/2018 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 1/29/2018 Partial Approval DAVID BURKHEAD
Pre-Inspection 1/29/2018 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 1/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/30/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 1/30/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 1/31/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 1/31/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/31/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 2/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/1/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 2/1/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/1/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/2/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 2/2/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/5/2018 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/5/2018 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 2/5/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 2/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 2/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/7/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 2/7/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/8/2018 Conditional Approval DAVID BURKHEAD
Final 2/8/2018 Partial Inspection DAVID BURKHEAD
Green Building Final 2/8/2018 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 2/8/2018 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 2/8/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 2/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/9/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 2/9/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/12/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 2/12/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/13/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/13/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/13/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 2/13/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/14/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 2/14/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/14/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 2/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/16/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 2/16/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/16/2018 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 2/16/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 2/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/21/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 2/21/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 2/21/2018 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 2/21/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/22/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/22/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/22/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 2/22/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/23/2018 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 2/23/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/26/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 2/26/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/27/2018 Conditional Approval DAVID BURKHEAD
T-Bar Ceiling 2/27/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 2/28/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 2/28/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/28/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 2/28/2018 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 3/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/1/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 3/1/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 3/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/2/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 3/2/2018 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 3/2/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/2/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 3/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/5/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 3/5/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 3/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/6/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 3/6/2018 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 3/6/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 3/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/7/2018 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 3/7/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 3/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 3/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/12/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 3/12/2018 Partial Approval DAVID BURKHEAD
Structural Steel Frame 3/12/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 3/13/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/13/2018 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 3/13/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 3/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/14/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 3/14/2018 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/14/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 3/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/15/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 3/15/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 3/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/16/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 3/16/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 3/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 3/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 3/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 3/22/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/22/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/22/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 3/22/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 3/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 3/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/27/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 3/27/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 3/28/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/28/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 3/29/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/29/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 3/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 3/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/3/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/3/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/4/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/4/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/4/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/9/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/9/2018 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 4/10/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/10/2018 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 4/11/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/13/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/13/2018 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/13/2018 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/18/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/18/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 4/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/26/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/26/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 4/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/27/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 4/27/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 4/27/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 4/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 4/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/1/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 5/1/2018 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/1/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/3/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/3/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/3/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/4/2018 Conditional Approval JEFFREY FULTON
Deputy Other (see comments) 5/4/2018 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 5/4/2018 Conditional Approval JEFFREY FULTON
Interior/Exterior Lathing 5/4/2018 Partial Inspection JEFFREY FULTON
Deputy Other (see comments) 5/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/10/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/10/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/11/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/11/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/11/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/15/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 5/15/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/18/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 5/18/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/18/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/22/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/22/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/24/2018 Conditional Approval DAVID BURKHEAD
Insulation 5/24/2018 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/24/2018 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 5/24/2018 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 5/25/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/25/2018 Conditional Approval LARRY ARNICK
Deputy Other (see comments) 5/29/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/29/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/30/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 5/30/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 5/31/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 5/31/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/31/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/4/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/4/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/4/2018 Conditional Approval DAVID BURKHEAD
Insulation 6/4/2018 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 6/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/8/2018 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 6/8/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/11/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/11/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/13/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/13/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/19/2018 Conditional Approval LARRY ARNICK
Deputy Other (see comments) 6/19/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 6/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/20/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 6/20/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/22/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/22/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/22/2018 Partial Inspection DAVID BURKHEAD
Drywall Nailing 6/25/2018 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/25/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 6/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/26/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/26/2018 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 6/26/2018 Partial Approval DAVID BURKHEAD
Insulation 6/26/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 6/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/27/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 6/27/2018 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 6/28/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/28/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/28/2018 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 6/29/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 6/29/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/29/2018 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/29/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 7/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/2/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/2/2018 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 7/3/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/3/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/3/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 7/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/5/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/5/2018 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 7/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 7/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/9/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 7/9/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Fireproofing 7/10/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/10/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/10/2018 Off-Hour Fees Due
Drywall Nailing 7/10/2018 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/10/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 7/11/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/11/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 7/11/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 7/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/12/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/12/2018 Partial Inspection DAVID BURKHEAD
Deputy Fireproofing 7/13/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/13/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/13/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/13/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 7/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 7/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 7/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 7/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/19/2018 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 7/19/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 7/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/23/2018 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 7/23/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 7/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 7/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 7/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 7/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 7/31/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/31/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/1/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/2/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 8/6/2018 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 8/6/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/6/2018 Partial Approval DAVID BURKHEAD
Wall Anchors 8/6/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 8/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/10/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/10/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/10/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/13/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/13/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/13/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Other (see comments) 8/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/14/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 8/14/2018 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/14/2018 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 8/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/17/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 8/17/2018 Partial Inspection DAVID BURKHEAD
Deputy Other (see comments) 8/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/20/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/20/2018 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 8/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/21/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/22/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/22/2018 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 8/22/2018 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 8/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/24/2018 Approved DAVID BURKHEAD
Deputy Other (see comments) 8/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/27/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 8/27/2018 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 8/28/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/28/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/29/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/29/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 8/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/4/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/5/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 9/5/2018 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Other (see comments) 9/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/10/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/10/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/11/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/11/2018 Conditional Approval DAVID BURKHEAD
Insulation 9/11/2018 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/13/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/13/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/14/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/18/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 9/18/2018 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/19/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/19/2018 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/19/2018 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/20/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/20/2018 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/21/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 9/21/2018 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/24/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/24/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 9/24/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/25/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/25/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 9/25/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 9/25/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/26/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/26/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/27/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/27/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 9/27/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/28/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/28/2018 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 10/1/2018 Conditional Approval CHARLENE BUSTAMANTE
Deputy Reinf. Masonry 10/1/2018 Conditional Approval CHARLENE BUSTAMANTE
Interior/Exterior Lathing 10/1/2018 Approved CHARLENE BUSTAMANTE
Deputy Other (see comments) 10/2/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/2/2018 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 10/3/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/3/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/4/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/4/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/5/2018 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 10/5/2018 Conditional Approval SORIN CIRSTOIU
Deputy Fireproofing 10/10/2018 Conditional Approval CHARLENE BUSTAMANTE
Deputy Fireproofing 10/11/2018 Conditional Approval CHARLENE BUSTAMANTE
Deputy Fireproofing 10/12/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/15/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/16/2018 Approved DAVID BURKHEAD
Deputy Fireproofing 10/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/19/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/26/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 11/1/2018 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 11/28/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 11/29/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 11/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/3/2018 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/3/2018 Partial Approval DAVID BURKHEAD
Special/Order Compliance 1/22/2019 Approved DAVID BURKHEAD
Deputy Reinf. Concrete 5/15/2019 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 6/21/2019 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/25/2019 Partial Inspection DAVID BURKHEAD
Deputy Methane Barrier 7/26/2019 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/5/2019 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/6/2019 Partial Approval DAVID BURKHEAD
Deputy Methane Barrier 9/11/2019 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 9/12/2019 Approved DAVID BURKHEAD
Deputy Methane Barrier 10/10/2019 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 1/17/2020 Partial Approval JONATHAN QUACH
Insulation 2/13/2020 Partial Approval JONATHAN QUACH
Insulation 10/7/2020 Approved JONATHAN QUACH
Drywall Nailing 4/1/2021 Conditional Approval DANIEL VARNUM
Light Gage Steel Frame 4/1/2021 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 4/7/2021 Approved DARRYL ARNOLD
Light Gage Steel Frame 4/7/2021 Off-Hour Fees Due
Light Gage Steel Frame 4/13/2021 Off-Hour Fees Due
Light Gage Steel Frame 4/13/2021 Partial Approval TIMOTHY BUXTON
Drywall Nailing 5/11/2021 Partial Approval LEOPOLDO MENDOZA
Drywall Nailing 5/13/2021 Partial Approval LANNY MERRICK
Pre-Inspection 1/6/2022 Approved DAVID BURKHEAD
Final 1/7/2025 Permit Finaled WINSTON DUNNING
Green Building Final 1/7/2025 Approved WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 1/7/2025 SGSOV Gas Company WINSTON DUNNING
Smoke Detectors 1/7/2025 Approved WINSTON DUNNING