Deputy Grading
|
7/13/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
Deputy Grading
|
7/14/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
8/16/2017
|
Partial Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
8/16/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/19/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
9/26/2017
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
9/26/2017
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
9/28/2017
|
Partial Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
10/11/2017
|
Partial Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
10/18/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/23/2017
|
Conditional Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
11/7/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/14/2017
|
Conditional Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
11/14/2017
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
11/17/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/21/2017
|
Conditional Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
11/30/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/7/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/7/2017
|
Conditional Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
12/7/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/8/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/11/2017
|
Conditional Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
12/12/2017
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
12/18/2017
|
Partial Inspection
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
12/19/2017
|
Partial Inspection
|
ERNESTO CORRAL
|
Reinforced Concrete Frame
|
12/21/2017
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
12/28/2017
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
1/11/2018
|
Partial Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
1/17/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/19/2018
|
Conditional Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
1/22/2018
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
1/26/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/30/2018
|
Conditional Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
2/5/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
2/14/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/14/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Excavation/Setback/Form/Re-Bar
|
2/23/2018
|
Partial Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
2/27/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/28/2018
|
Conditional Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
3/1/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/9/2018
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
3/9/2018
|
Not Ready for Inspection
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
3/12/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
3/22/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
3/22/2018
|
Conditional Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
3/27/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/28/2018
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
4/3/2018
|
Partial Approval
|
NICK DANERI
|
Pre-Inspection
|
4/3/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/9/2018
|
Conditional Approval
|
NICK DANERI
|
Pre-Inspection
|
4/9/2018
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/10/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/16/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/17/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/18/2018
|
Conditional Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/20/2018
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/24/2018
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
5/1/2018
|
Partial Approval
|
NICK DANERI
|
Structural Steel Frame
|
5/9/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/10/2018
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
5/14/2018
|
Partial Approval
|
NICK DANERI
|
Reinforced Concrete Frame
|
5/14/2018
|
Partial Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
5/18/2018
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
5/18/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/21/2018
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
5/23/2018
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
5/30/2018
|
Partial Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
6/1/2018
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
6/5/2018
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
6/7/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
6/14/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Light Gage Steel Frame
|
6/22/2018
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Drywall Nailing
|
6/25/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Light Gage Steel Frame
|
6/25/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
Light Gage Steel Frame
|
7/10/2018
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
8/1/2018
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
8/14/2018
|
Partial Approval
|
NICK DANERI
|
Structural Steel Frame
|
9/4/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Shotcrete
|
9/7/2018
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
10/3/2018
|
Partial Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
10/11/2018
|
Not Ready for Inspection
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
10/15/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/16/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
10/16/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/17/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
10/17/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/17/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/18/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
10/18/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
10/18/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
10/19/2018
|
Approved
|
NICK DANERI
|
Pre-Inspection
|
10/23/2018
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
11/6/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/16/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/19/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/19/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/20/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/20/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/21/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/26/2018
|
Conditional Approval
|
NICK DANERI
|
Pre-Inspection
|
11/26/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/28/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/28/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/29/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/29/2018
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
11/29/2018
|
Not Ready for Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
11/30/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/30/2018
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
12/11/2018
|
Not Ready for Inspection
|
NICK DANERI
|
Light Gage Steel Frame
|
12/11/2018
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
12/17/2018
|
Partial Approval
|
NICK DANERI
|
Insulation
|
12/17/2018
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
12/17/2018
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
12/19/2018
|
Partial Approval
|
NICK DANERI
|
Pre-Inspection
|
12/19/2018
|
Partial Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
12/20/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/21/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Shotcrete
|
12/21/2018
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Drilled-In Anchors
|
12/24/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Shotcrete
|
12/24/2018
|
Conditional Approval
|
NICK DANERI
|
Insulation
|
12/28/2018
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
12/28/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/2/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
1/3/2019
|
Conditional Approval
|
WINSTON DUNNING
|
Drywall Nailing
|
1/3/2019
|
Partial Inspection
|
WINSTON DUNNING
|
Floor/Roof Diaphrgm/Shear Wall
|
1/3/2019
|
Partial Approval
|
WINSTON DUNNING
|
Drywall Nailing
|
1/4/2019
|
Partial Approval
|
WINSTON DUNNING
|
Floor/Roof Diaphrgm/Shear Wall
|
1/4/2019
|
Partial Approval
|
WINSTON DUNNING
|
Insulation
|
1/10/2019
|
Partial Approval
|
NICK DANERI
|
Special/Order Compliance
|
1/11/2019
|
Partial Inspection
|
NICK DANERI
|
Drywall Nailing
|
1/18/2019
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
1/18/2019
|
Partial Approval
|
NICK DANERI
|
Pre-Inspection
|
1/18/2019
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
1/22/2019
|
Partial Approval
|
NICK DANERI
|
Pre-Inspection
|
1/22/2019
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
1/30/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
1/30/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Light Gage Steel Frame
|
1/30/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Drywall Nailing
|
1/31/2019
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
1/31/2019
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/1/2019
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
2/4/2019
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
2/6/2019
|
Partial Approval
|
NICK DANERI
|
Pre-Inspection
|
2/6/2019
|
Partial Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
2/8/2019
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
2/12/2019
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
2/14/2019
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
2/14/2019
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
2/15/2019
|
Partial Approval
|
NICK DANERI
|
Masonry Wall/Backfill
|
2/15/2019
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
3/4/2019
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
3/4/2019
|
Partial Approval
|
NICK DANERI
|
Drywall Nailing
|
3/11/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
3/14/2019
|
Partial Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
3/14/2019
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
3/14/2019
|
Partial Approval
|
NICK DANERI
|
Masonry Wall/Backfill
|
3/14/2019
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/15/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Masonry
|
3/15/2019
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
3/18/2019
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
3/18/2019
|
Partial Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
3/22/2019
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
3/22/2019
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/26/2019
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
3/29/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Floor/Roof Diaphrgm/Shear Wall
|
3/29/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Fireproofing
|
4/4/2019
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
4/4/2019
|
Partial Approval
|
NICK DANERI
|
Interior/Exterior Lathing
|
4/4/2019
|
Partial Approval
|
NICK DANERI
|
Deputy Fireproofing
|
4/5/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/9/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
Interior/Exterior Lathing
|
4/9/2019
|
Partial Approval
|
NICK DANERI
|
Deputy Fireproofing
|
4/10/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/10/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Fireproofing
|
4/11/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/11/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Fireproofing
|
4/12/2019
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/12/2019
|
Conditional Approval
|
NICK DANERI
|
Light Gage Steel Frame
|
4/15/2019
|
Partial Approval
|
NICK DANERI
|
Deputy Fireproofing
|
4/16/2019
|
Conditional Approval
|
NICK DANERI
|
Drywall Nailing
|
4/19/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Footing/Foundation/Slab
|
4/19/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Drywall Nailing
|
4/30/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Light Gage Steel Frame
|
4/30/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Drywall Nailing
|
5/2/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Structural Steel Frame
|
5/2/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
5/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Drywall Nailing
|
5/10/2019
|
Partial Approval
|
DANIEL COLLINS
|
Footing/Foundation/Slab
|
5/10/2019
|
Partial Approval
|
DANIEL COLLINS
|
Insulation
|
5/10/2019
|
Partial Approval
|
DANIEL COLLINS
|
Drywall Nailing
|
5/20/2019
|
Partial Approval
|
DANIEL COLLINS
|
Light Gage Steel Frame
|
5/20/2019
|
Partial Approval
|
DANIEL COLLINS
|
Reinforced Masonry Frame
|
5/20/2019
|
Partial Approval
|
DANIEL COLLINS
|
Interior/Exterior Lathing
|
6/11/2019
|
Approved
|
JOEY BUCHANAN
|
Deputy Fireproofing
|
6/27/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Fireproofing
|
6/28/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Masonry
|
9/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Masonry
|
9/10/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Masonry Wall/Backfill
|
9/10/2019
|
Partial Approval
|
DANIEL COLLINS
|
Deputy Reinf. Masonry
|
9/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Masonry
|
9/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Masonry
|
9/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Masonry
|
9/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Masonry
|
9/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Masonry
|
9/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Light Gage Steel Frame
|
9/18/2019
|
Partial Approval
|
DANIEL COLLINS
|
Masonry Wall/Backfill
|
9/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Masonry
|
9/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Reinforced Concrete Frame
|
9/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Masonry
|
9/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Concrete
|
9/24/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Concrete
|
9/25/2019
|
Conditional Approval
|
DANIEL COLLINS
|
Drywall Nailing
|
9/30/2019
|
Partial Approval
|
DANIEL COLLINS
|
Light Gage Steel Frame
|
9/30/2019
|
Partial Approval
|
DANIEL COLLINS
|
Deputy Reinf. Concrete
|
11/1/2019
|
Conditional Approval
|
KATY RAMIREZ
|
Pre-Inspection
|
5/18/2020
|
Partial Inspection
|
DANIEL COLLINS
|
Final
|
6/11/2020
|
Partial Inspection
|
DANIEL COLLINS
|
Green Building Final
|
6/11/2020
|
Approved
|
DANIEL COLLINS
|
SGSOV-Seismic Gas S/O Valve
|
6/11/2020
|
SGSOV No Gas
|
DANIEL COLLINS
|
Smoke Detectors
|
6/11/2020
|
Approved
|
DANIEL COLLINS
|
Final
|
5/4/2021
|
Partial Inspection
|
DANIEL COLLINS
|