9228 W HAZEN DR 90210

Certificate Information: 9228 W HAZEN DR 90210

Application / Permit
15016-10000-28374
Plan Check / Job No.
B15LA17991
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL AND ADDITION TO EXISTING 3-STORY SINGLE FAMILY DWELLING WITH TWO CAR ATTACHED GARAGE. FULL INTERIOR AND EXTERIOR REMODEL TO SECOND LEVEL AND ADDITION AND REMODEL ON THE THIRD LEVEL. NEW ROOF STRUCTURE AND STRUCTURAL UPGRADES. NFPA13D FIRE SPRINKLERS ARE REQUIRED
Permit Issued
Issued on 6/27/2017
Issuing Office
Metro
Current Status
CofO Issued on 11/1/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/24/2015 APPLICANT
Assigned to Plan Check Engineer 1/14/2016 ERIC CABRERA
Corrections Issued 1/20/2016 ERIC CABRERA
Quality Review Completed 1/21/2016 LAWRENCE QUIRANTE
Building Plans Picked Up 1/22/2016 APPLICANT
Green Plans Picked Up 2/18/2016 APPLICANT
Plan Check Approved 2/25/2016 ERIC CABRERA
Issued 6/27/2017 LADBS
CofO in Progress 10/16/2024 RAUL BARAJAS
CofO Issued 11/1/2024 DEROLD HAUFF
Permit Finaled 11/1/2024 DEROLD HAUFF

Permit Application Clearance Information

Grading Pre-Inspection Cleared 1/22/2016 BARTON HOLMES
Hydrant and Access approval Cleared 1/22/2016 JOHN CONNEALLY
Specific Plan Cleared 2/16/2016 TOM HENRY
BHO/Hillside ordinance Cleared 2/17/2016 ADRIAN HERNANDEZ
BHO/Hillside ordinance Cleared 2/17/2016 ADRIAN HERNANDEZ
BHO/Hillside ordinance Cleared 2/17/2016 ADRIAN HERNANDEZ
Eng Process Fee Ord 176,300 Cleared 2/17/2016 ADRIAN HERNANDEZ
Highway dedication Cleared 2/17/2016 ADRIAN HERNANDEZ
Low Impact Development Cleared 2/17/2016 MARTIN FRAGOSO
Sewer availability Cleared 2/17/2016 ADRIAN HERNANDEZ
BHO/Hillside ordinance Cleared 2/18/2016 ADRIAN HERNANDEZ
BHO/Hillside ordinance Cleared 2/18/2016 ADRIAN HERNANDEZ
GPI Written Notices Cleared 2/18/2016 ERIC CABRERA
Roof/Waste drainage to street Cleared 2/18/2016 VALENTINO PUEBLOS
ZA Case Cleared 2/18/2016 VINCENT QUITORIANO
Green Code Cleared 2/24/2016 DAVID MATSON

Contact Information

Architect Obermeyer, Andrew William; Lic. No.: C32269 280 W CHANNEL ROAD      SANTA MONICA, CA 90402
Contractor Owner-Builder       ,
Engineer Mills, Garrett Ward; Lic. No.: S5271 1276 E COLORADO BLVD STE 201      PASADENA, CA 91106

Inspector Information

BRENDAN MORELLI, (213) 202-3412 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 12/8/2017 Partial Approval CRAIG VAUGHAN
Pre-Inspection 5/29/2018 Approved RONALD COWAN
Footing/Foundation/Slab 10/11/2018 Not Ready for Inspection RONALD COWAN
Special/Order Compliance 10/21/2019 Corrections Issued RICHARD STEINBACH
Special/Order Compliance 7/1/2020 Not Ready for Inspection BRAD BESCOS
Excavation/Setback/Form/Re-Bar 4/27/2021 Not Ready for Inspection RAUL BARAJAS
Footing/Foundation/Slab 4/27/2021 Not Ready for Inspection RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 4/29/2021 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 5/28/2021 Approved RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 5/28/2021 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 6/1/2021 Conditional Approval RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 6/22/2021 Partial Approval RICHARD STEINBACH
Deputy Wood Construction 7/30/2021 Conditional Approval RICHARD STEINBACH
Excavation/Setback/Form/Re-Bar 8/6/2021 Not Ready for Inspection RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 8/6/2021 Conditional Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 8/11/2021 Partial Approval RICHARD STEINBACH
Underground Mechanical 9/27/2021 Approved RAUL BARAJAS
Deputy Reinf. Concrete 10/26/2021 Conditional Approval RAUL BARAJAS
ELECTRICAL-Rough 1/21/2022 Approved RAUL BARAJAS
HVAC-Rough 1/21/2022 Corrections Issued RAUL BARAJAS
PLUMBING-Rough 1/21/2022 Approved RAUL BARAJAS
HVAC-Rough 2/24/2022 Partial Approval RAUL BARAJAS
Structural Steel Frame 2/24/2022 Approved RAUL BARAJAS
Wood Frame 2/24/2022 Conditional Approval RAUL BARAJAS
Deputy Wood Construction 3/29/2022 Conditional Approval RAUL BARAJAS
BUILDING-Rough-Frame 4/8/2022 Approved RAUL BARAJAS
Green Building Rough 4/8/2022 Approved RAUL BARAJAS
Verify Sprinkler Sign Off 4/8/2022 Approved RAUL BARAJAS
Interior/Exterior Lathing 5/6/2022 Approved RAUL BARAJAS
Shower Pan 7/14/2022 Not Ready for Inspection RAUL BARAJAS
Shower Pan 7/20/2022 Approved RAUL BARAJAS
Insulation 7/29/2022 Approved RAUL BARAJAS
Interior/Exterior Lathing 7/29/2022 Approved RAUL BARAJAS
Drywall Nailing 8/16/2022 Approved RAUL BARAJAS
Gas Test 12/1/2023 Approved RAUL BARAJAS
ELECTRICAL-Final 1/5/2024 Corrections Issued RAUL BARAJAS
HVAC-Final 1/5/2024 Corrections Issued RAUL BARAJAS
ELECTRICAL-Final 1/18/2024 Approved RAUL BARAJAS
HVAC-Final 1/18/2024 Approved RAUL BARAJAS
PLUMBING-Final 4/2/2024 Approved ALIZAH MAYAGOITIA
Final 4/5/2024 Corrections Issued RAUL BARAJAS
Footing/Foundation/Slab 4/5/2024 Approved RAUL BARAJAS
Green Building Final 4/5/2024 Approved RAUL BARAJAS
SGSOV-Seismic Gas S/O Valve 4/5/2024 SGSOV Approved RAUL BARAJAS
Smoke Detectors 4/5/2024 Approved RAUL BARAJAS
Final 5/7/2024 Partial Inspection RAUL BARAJAS
Final 8/16/2024 Partial Inspection RAUL BARAJAS
Final 10/11/2024 Not Ready for Inspection RAUL BARAJAS
Final 10/15/2024 OK to Issue CofO RAUL BARAJAS