2500 W WILSHIRE BLVD 90057

Certificate Information: 2500 W WILSHIRE BLVD 90057

Application / Permit
15016-10000-15343
Plan Check / Job No.
B15LA10135
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
ADAPTIVE REUSE CONVERSION OF AN EXISTING 13-STORY OFFICE BUILDING TO A 13-STORY MIXED USE RESIDENTIAL BUILDING WITH 248 RESIDENTIAL UNITS AND GROUND FLOOR COMMERICAL RETAIL SPACE. FULL COMPLIANCE WITH THE NON-DUCTILE CONCRETE RETROFIT ORDINANCE NO. 183893 WITH 75% SEISMIC DESIGN LEVEL.
Permit Issued
Issued on 7/27/2018
Issuing Office
Metro
Current Status
Issued on 7/27/2018
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/4/2015 APPLICANT
Disabled Access Plans Picked Up 8/19/2015 APPLICANT
Assigned to Plan Check Engineer 8/28/2015 EUGENE BARBEAU
Corrections Issued 9/10/2015 EUGENE BARBEAU
Reviewed by Supervisor 9/30/2015 JOHN VASQUEZ
Building Plans Picked Up 10/2/2015 APPLICANT
Applicant returned to address corrections 11/18/2015 EUGENE BARBEAU
Applicant returned to address corrections 11/19/2015 EUGENE BARBEAU
Applicant returned to address corrections 3/12/2018 EUGENE BARBEAU
Plan Check Approved 6/27/2018 EUGENE BARBEAU
Issued 7/27/2018 LADBS

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 1/12/2016 ADRIAN HERNANDEZ
Project located in CRA area Cleared 7/6/2016 JIM URQUHART
DAS Clearance Cleared 11/7/2017 SHINE LIN
Address approval Cleared 2/22/2018 MICHAEL CASTILLO
Hydrant and Access approval Cleared 2/22/2018 ROBERT DUFF
Sewer availability Cleared 2/22/2018 MICHAEL CASTILLO
Metro Rail approval Cleared 4/10/2018 EUGENE BARBEAU
Green Code Cleared 6/12/2018 JOHN KLARIN
Fire Marshall Fire Life Safety Cleared 6/15/2018 ANDREW KO
Frnt yard landscape/Water mgmt Cleared 6/19/2018 NORA DRESSER
Opn space landscape/Water mgmt Cleared 6/19/2018 NORA DRESSER
Site Plan review Cleared 6/19/2018 NORA DRESSER
ZA Case Cleared 6/19/2018 NORA DRESSER

Contact Information

Architect Kim, Seong Bae; Lic. No.: C23320 3450 WILSHIRE BLVD SUITE 1000      LOS ANGELES, CA 90010
Contractor Philmont Management Inc; Lic. No.: 808686-B 3450 WILSHIRE BLVD #850      LOS ANGELES, CA 90010
Engineer Lee, Sang Youck; Lic. No.: S3821 3531 BROOKHILL ST      GLENDALE, CA 91214

Inspector Information

DANIEL COLLINS, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
KATY RAMIREZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/15/2019 Approved JOEY BUCHANAN
Pre-Inspection 1/15/2019 Partial Approval JAMES POWERS
Pre-Inspection 1/15/2019 Partial Approval KATY RAMIREZ
Pre-Inspection 1/15/2019 Partial Inspection DANIEL COLLINS
Deputy Reinf. Concrete 4/8/2019 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 4/11/2019 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 4/12/2019 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 4/15/2019 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 4/16/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 9/17/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 9/18/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 9/19/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 9/20/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 9/23/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 9/24/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 9/24/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 9/25/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 9/26/2019 Conditional Approval JONATHAN QUACH
Deputy Grading 9/27/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 9/30/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/1/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/2/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/3/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/3/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/3/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/4/2019 Conditional Approval KATY RAMIREZ
Deputy Grading 10/7/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/8/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/9/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/10/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/11/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/15/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/16/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/17/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/18/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/21/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/22/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/23/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/24/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/25/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/28/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/29/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/30/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 10/31/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/1/2019 Conditional Approval GRANT WOODS
Deputy Grading 11/4/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/5/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/6/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/7/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/8/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/12/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/13/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/14/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/15/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/18/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/19/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/20/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/21/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/22/2019 Conditional Approval RONALD PACHECO
Deputy Grading 11/25/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/26/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 11/27/2019 Conditional Approval KATY RAMIREZ
Deputy Grading 12/2/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 12/3/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 12/4/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 12/5/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 12/6/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 1/28/2020 Partial Inspection DANIEL COLLINS
Deputy Reinf. Concrete 1/29/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/30/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/31/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/4/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 2/6/2020 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 2/10/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/13/2020 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 2/13/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/14/2020 Conditional Approval KATY RAMIREZ
Green Building Rough 4/13/2020 Approved DANIEL COLLINS
METHANE-Rough 4/13/2020 Approved DANIEL COLLINS
Reinforced Concrete Frame 4/13/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 5/6/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 5/21/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 6/2/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 6/12/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 7/8/2020 Partial Approval DANIEL COLLINS
Reinforced Masonry Frame 7/20/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 8/4/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 8/19/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 8/25/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/26/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 8/27/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 9/8/2020 Conditional Approval DANIEL COLLINS
Pre-Inspection 9/21/2020 Partial Inspection DANIEL COLLINS
Insulation 10/5/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 10/22/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 11/2/2020 Partial Approval DANIEL COLLINS
Insulation 11/2/2020 Partial Approval DANIEL COLLINS
Insulation 11/19/2020 Partial Approval DANIEL COLLINS
Insulation 11/24/2020 Not Ready for Inspection DANIEL COLLINS
Insulation 11/25/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 11/25/2020 Partial Approval DANIEL COLLINS
Deputy Fireproofing 12/2/2020 Conditional Approval DANIEL COLLINS
Insulation 12/8/2020 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 12/8/2020 Partial Approval DANIEL COLLINS
Insulation 12/10/2020 Partial Approval DANIEL COLLINS
Insulation 12/31/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 1/8/2021 Partial Approval DANIEL COLLINS
Insulation 1/8/2021 Partial Approval DANIEL COLLINS
Insulation 1/19/2021 Partial Approval DANIEL COLLINS
Insulation 1/21/2021 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 1/21/2021 Partial Approval DANIEL COLLINS
Insulation 1/28/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 2/4/2021 Partial Approval DANIEL COLLINS
Insulation 2/10/2021 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 2/12/2021 Conditional Approval KATY RAMIREZ
Drywall Nailing 2/17/2021 Partial Approval TIMOTHY BUXTON
Insulation 2/18/2021 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 2/18/2021 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/23/2021 Conditional Approval DANIEL COLLINS
Insulation 3/1/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 3/3/2021 Partial Approval DANIEL COLLINS
Insulation 3/3/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 3/10/2021 Partial Approval DANIEL COLLINS
Pre-Inspection 3/10/2021 Partial Inspection DANIEL COLLINS
T-Bar Ceiling 3/16/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 3/18/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 3/24/2021 Partial Approval DANIEL COLLINS
Insulation 3/24/2021 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 3/31/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 4/13/2021 Partial Approval DANIEL COLLINS
Insulation 4/13/2021 Partial Approval DANIEL COLLINS
T-Bar Ceiling 4/15/2021 Partial Approval DANIEL COLLINS
T-Bar Ceiling 4/21/2021 Conditional Approval DANIEL COLLINS
Drywall Nailing 5/3/2021 Partial Approval DANIEL COLLINS
Insulation 5/3/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 5/5/2021 Partial Approval DANIEL COLLINS
Insulation 5/5/2021 Partial Approval DANIEL COLLINS
T-Bar Ceiling 5/17/2021 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/19/2021 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/21/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 5/25/2021 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/27/2021 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/1/2021 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/7/2021 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/8/2021 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/11/2021 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/14/2021 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 6/17/2021 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/18/2021 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/22/2021 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 6/25/2021 Conditional Approval DANIEL COLLINS
Insulation 6/28/2021 Partial Approval DANIEL COLLINS
T-Bar Ceiling 6/28/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 7/1/2021 Partial Approval DANIEL COLLINS
Insulation 7/1/2021 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/8/2021 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/9/2021 Conditional Approval DANIEL COLLINS
T-Bar Ceiling 7/12/2021 Partial Approval DANIEL COLLINS
Drywall Nailing 7/20/2021 Partial Approval DANIEL COLLINS
T-Bar Ceiling 7/20/2021 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/29/2021 Conditional Approval BRUCE CAMPBELL
Deputy Drilled-In Anchors 8/11/2021 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/16/2021 Conditional Approval TIMOTHY BUXTON
Drywall Nailing 8/17/2021 Partial Approval JONATHAN QUACH
Footing/Foundation/Slab 8/17/2021 Partial Approval JONATHAN QUACH
Deputy Reinf. Concrete 8/20/2021 Conditional Approval TIMOTHY BUXTON
Drywall Nailing 8/30/2021 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 8/30/2021 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/31/2021 Conditional Approval TIMOTHY BUXTON
Structural Steel Frame 9/1/2021 Partial Approval DANIEL COLLINS
T-Bar Ceiling 9/1/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/7/2021 Conditional Approval JONATHAN QUACH
Drywall Nailing 9/8/2021 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/9/2021 Conditional Approval DANIEL COLLINS
T-Bar Ceiling 9/21/2021 Not Ready for Inspection JONATHAN QUACH
Drywall Nailing 9/23/2021 Partial Approval TIMOTHY BUXTON
T-Bar Ceiling 9/23/2021 Partial Approval TIMOTHY BUXTON
Deputy Drilled-In Anchors 9/30/2021 Conditional Approval TIMOTHY BUXTON
Drywall Nailing 9/30/2021 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 9/30/2021 Partial Approval TIMOTHY BUXTON