214 S BRISTOL AVE 90049

Certificate Information: 214 S BRISTOL AVE 90049

Application / Permit
15014-10000-04173
Plan Check / Job No.
B15LA12843
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Irregular shape 1st story additions of 58'-8 1/4" x 22'-0" with basement, 77'-1 3/4" x 21'- 1/4", 18'-8 1/4" x 5'- 1/4" and 17'-1" x 5'-1/2"; and irregular shape 2nd floor additions of 21'-9 3/4" x 18'-2", 8'-6" x 8'-6", and 58'-4 1/4" x 5'-1/2" to existing 2- story single family dwelling to add (2-) new 2- car garages, new bedroom with bathroom, study room, and expand kitchen, living room and dining area on the 1st floor; add (1-) new bedroom with bathroom and walk-in closet, expand master bedroom with master bathroom and walk-in closets, and expand (2-) additional bedrooms with bathroom on the 2nd floor; and expand existing basement to provide rec-room area. All work per engineering plans. The proposed structure shall be fully sprinklered per NFPA-13D requirements. See comments.
Permit Issued
Issued on 9/22/2016
Issuing Office
Metro
Current Status
Issued on 9/22/2016
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/11/2015 APPLICANT
Green Plans Picked Up 9/28/2015 APPLICANT
Assigned to Plan Check Engineer 10/1/2015 ARMEN SARKISIAN
Corrections Issued 10/6/2015 ARMEN SARKISIAN
Quality Review Completed 10/7/2015 STEVEN KIM
Building Plans Picked Up 10/7/2015 APPLICANT
Applicant returned to address corrections 12/9/2015 ARMEN SARKISIAN
Applicant returned to address corrections 1/4/2016 ARMEN SARKISIAN
Applicant returned to address corrections 1/22/2016 ARMEN SARKISIAN
Applicant returned to address corrections 2/10/2016 ARMEN SARKISIAN
Applicant returned to address corrections 3/15/2016 ARMEN SARKISIAN
Applicant returned to address corrections 3/31/2016 ARMEN SARKISIAN
Plan Check Approved 5/18/2016 ARMEN SARKISIAN
Issued 9/22/2016 LADBS

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 12/22/2015 SHANNON CAMPBELL
Sewer availability Cleared 12/22/2015 SHANNON CAMPBELL
Low Impact Development Cleared 3/11/2016 MICHAEL SCADUTO
Hydrant and Access approval Cleared 3/21/2016 ROBERT DUFF
Permit Cleared 3/31/2016 RICHARD SOUTHERLAND
Roof/Waste drainage to street Cleared 3/31/2016 RICHARD SOUTHERLAND
Green Code Cleared 5/16/2016 MARCUS LEVIAS

Contact Information

Contractor Discovery Builders California Inc; Lic. No.: 915336-B 14605 N 73RD STREET      SCOTTSDALE, AZ 85260
Engineer Shah, Kamal Rajendra; Lic. No.: C46200 28039 SMYTH DR STE 200      VALENCIA, CA 91355

Inspector Information

HERBERT GIRON, (310) 914-3891 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 12/28/2016 Corrections Issued DAVID KOSKI
Footing/Foundation/Slab 2/8/2017 Partial Approval DAVID KOSKI
Footing/Foundation/Slab 2/15/2017 Partial Approval DAVID KOSKI
PLUMBING-Rough 2/17/2017 Partial Approval JOHN LUMB
Footing/Foundation/Slab 3/16/2017 Partial Approval DAVID KOSKI
Deputy Reinf. Concrete 3/17/2017 Approved DAVID KOSKI
ELECTRICAL-Rough 4/13/2017 Partial Approval DAVID KOSKI
Footing/Foundation/Slab 4/13/2017 Partial Approval DAVID KOSKI
Footing/Foundation/Slab 5/3/2017 Partial Inspection DAVID KOSKI
PLUMBING-Rough 5/3/2017 Partial Inspection DAVID KOSKI
Deputy Reinf. Concrete 5/4/2017 Conditional Approval DAVID KOSKI
Underground Mechanical 5/18/2017 Partial Inspection DAVID KOSKI
Underground Mechanical 5/23/2017 Approved DAVID KOSKI
Footing/Foundation/Slab 6/13/2017 Conditional Approval RICHARD STEINBACH
Footing/Foundation/Slab 7/7/2017 Partial Approval JOHN LUMB
Green Building Rough 7/7/2017 Not Ready for Inspection JOHN LUMB
Structural Steel Frame 7/7/2017 Not Ready for Inspection JOHN LUMB
Footing/Foundation/Slab 7/11/2017 Partial Approval RICHARD STEINBACH
Green Building Rough 7/11/2017 Not Ready for Inspection RICHARD STEINBACH
Structural Steel Frame 7/11/2017 Partial Approval RICHARD STEINBACH
Sewer 8/10/2017 Partial Approval KENNETH NAGLE
Footing/Foundation/Slab 8/14/2017 Partial Approval JOHN LUMB
Footing/Foundation/Slab 8/22/2017 Partial Approval JOHN LUMB
Underground Mechanical 8/28/2017 Partial Approval JOHN LUMB
Footing/Foundation/Slab 8/31/2017 Partial Approval DANIEL ORRANTE
Gas Test 8/31/2017 Approved DANIEL ORRANTE
Footing/Foundation/Slab 12/7/2017 Partial Approval RICHARD STEINBACH
Sewer 12/7/2017 Partial Approval RICHARD STEINBACH
Floor/Roof Diaphrgm/Shear Wall 12/18/2017 Partial Approval RICHARD STEINBACH
Floor/Roof Diaphrgm/Shear Wall 6/5/2018 Partial Approval VINCENT SCIPIONI
PLUMBING-Rough 6/25/2018 Not Ready for Inspection VINCENT SCIPIONI
PLUMBING-Rough 8/1/2018 Not Ready for Inspection VINCENT SCIPIONI
PLUMBING-Rough 8/29/2018 No Access for Inspection DANIEL ORRANTE
ELECTRICAL-Rough 9/7/2018 Partial Approval VINCENT SCIPIONI
PLUMBING-Rough 9/11/2018 Partial Inspection VINCENT SCIPIONI
ELECTRICAL-Rough 9/19/2018 Partial Approval VINCENT SCIPIONI
Floor/Roof Diaphrgm/Shear Wall 10/1/2018 Conditional Approval MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 10/4/2018 Partial Approval RICHARD STEINBACH
Footing/Foundation/Slab 10/4/2018 Partial Approval RICHARD STEINBACH
Shower Pan 11/7/2018 Partial Approval MICHAEL PELHAM
BUILDING-Rough-Frame 1/29/2019 No Access for Inspection KENNETH NAGLE
Floor/Roof Diaphrgm/Shear Wall 1/29/2019 Not Ready for Inspection KENNETH NAGLE
Green Building Rough 1/29/2019 Not Ready for Inspection KENNETH NAGLE
HVAC-Rough 1/29/2019 Corrections Issued KENNETH NAGLE
Verify Sprinkler Sign Off 1/29/2019 Not Ready for Inspection KENNETH NAGLE
Green Building Rough 2/8/2019 Not Ready for Inspection ANDREW NAVE
HVAC-Rough 2/8/2019 Partial Inspection ANDREW NAVE
PLUMBING-Rough 2/8/2019 Not Ready for Inspection ANDREW NAVE
Verify Sprinkler Sign Off 2/8/2019 Approved ANDREW NAVE
BUILDING-Rough-Frame 2/11/2019 Corrections Issued DANIEL ORRANTE
Floor/Roof Diaphrgm/Shear Wall 2/11/2019 Partial Approval DANIEL ORRANTE
Insulation 2/22/2019 Partial Approval KENNETH NAGLE
Rough-Elec/Plmb/HVAC 2/22/2019 Partial Approval KENNETH NAGLE
BUILDING-Rough-Frame 3/8/2019 Partial Approval RICHARD STEINBACH
Drywall Nailing 3/8/2019 Partial Approval RICHARD STEINBACH
Green Building Rough 3/8/2019 Approved RICHARD STEINBACH
BUILDING-Rough-Frame 3/18/2019 Partial Approval RICHARD STEINBACH
Insulation 3/21/2019 Not Ready for Inspection RICHARD STEINBACH
BUILDING-Rough-Frame 4/3/2019 Partial Approval KENNETH NAGLE
Insulation 4/3/2019 Partial Approval KENNETH NAGLE
Interior/Exterior Lathing 5/31/2019 Not Ready for Inspection TIM CHRISTENSEN
Interior/Exterior Lathing 6/5/2019 Not Ready for Inspection MICHAEL TEMPLE
BUILDING-Rough-Frame 6/11/2019 Approved RICHARD STEINBACH
HVAC-Rough 6/11/2019 Approved RICHARD STEINBACH
Interior/Exterior Lathing 6/11/2019 Partial Approval RICHARD STEINBACH
PLUMBING-Rough 6/11/2019 Approved RICHARD STEINBACH
Interior/Exterior Lathing 6/14/2019 Approved MICHAEL TEMPLE
Insulation 6/24/2019 Approved TIM CHRISTENSEN
Drywall Nailing 7/3/2019 Partial Approval MICHAEL TEMPLE
Gas Test 1/29/2020 Approved MICHAEL TEMPLE
Underground Mechanical 2/13/2020 Partial Approval TIM CHRISTENSEN
ELECTRICAL-Rough 8/7/2020 Partial Inspection GERMAN RODRIGUEZ MENDOZA
Service/Power Release 9/29/2020 Approved ROBERT SHELLY
ELECTRICAL-Final 10/2/2020 Not Ready for Inspection JOHN KIDWELL
HVAC-Final 10/2/2020 Not Ready for Inspection JOHN KIDWELL
PLUMBING-Final 10/2/2020 Not Ready for Inspection JOHN KIDWELL
ELECTRICAL-Final 10/6/2020 Corrections Issued TIM CHRISTENSEN
PLUMBING-Final 10/6/2020 Corrections Issued TIM CHRISTENSEN
ELECTRICAL-Final 10/8/2020 Approved JOHN KIDWELL
PLUMBING-Final 10/8/2020 Approved JOHN KIDWELL
HVAC-Final 10/26/2020 Corrections Issued ANDREW NAVE
Special/Order Compliance 3/7/2025 Corrections Issued KENNETH NAGLE
Drywall Nailing 8/8/2025 Approved HERBERT GIRON
Final 8/8/2025 Corrections Issued HERBERT GIRON
Footing/Foundation/Slab 8/8/2025 Approved HERBERT GIRON
Green Building Final 8/8/2025 Approved HERBERT GIRON
HVAC-Final 8/8/2025 Corrections Issued HERBERT GIRON
Reinforced Concrete Frame 8/8/2025 Approved HERBERT GIRON
SGSOV-Seismic Gas S/O Valve 8/8/2025 SGSOV Not Ready HERBERT GIRON
Smoke Detectors 8/8/2025 Approved HERBERT GIRON
Structural Steel Frame 8/8/2025 Approved HERBERT GIRON