11007 W BELLAGIO PL 90077

Certificate Information: 11007 W BELLAGIO PL 90077

Application / Permit
15014-10000-02169
Plan Check / Job No.
B15LA06913
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
MAJOR REMODEL TO (E) 2-STORY BUILDING TO RECONFIGURE ALL INTERIOR SPACES. 1 WALL AT THE NORTH SIDE TO REMAIN (L=18'-9"). ADDITION TO FIRST AND SECOND FLOORS AND ADDITION OF A (N) THIRD FLOOR.
Permit Issued
Issued on 5/16/2017
Issuing Office
Valley
Current Status
CofO Issued on 2/28/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/18/2015 APPLICANT
Assigned to Plan Check Engineer 6/4/2015 SARAH YOUSSEF
Green Plans Picked Up 6/9/2015 APPLICANT
Corrections Issued 6/12/2015 SARAH YOUSSEF
Quality Review Completed 6/16/2015 JOHN FRANCIA
Building Plans Picked Up 6/16/2015 APPLICANT
Applicant returned to address corrections 7/28/2015 SARAH YOUSSEF
Applicant returned to address corrections 8/24/2015 SARAH YOUSSEF
Applicant returned to address corrections 5/26/2016 SARAH YOUSSEF
Applicant returned to address corrections 6/17/2016 SARAH YOUSSEF
Applicant returned to address corrections 11/29/2016 SARAH YOUSSEF
Applicant returned to address corrections 5/9/2017 SARAH YOUSSEF
Plan Check Approved 5/16/2017 SARAH YOUSSEF
Issued 5/16/2017 LADBS
CofO in Progress 2/4/2022 CARLOS MATAMOROS
CofO in Progress 2/4/2022 CARLOS MATAMOROS
Permit Finaled 2/28/2022 DANIEL ORRANTE
CofO Issued 2/28/2022 DANIEL ORRANTE
Permit Finaled 2/28/2022 DANIEL ORRANTE

Permit Application Clearance Information

Green Code Cleared 10/20/2015 MARCUS LEVIAS
Distance to fire station Cleared 10/28/2015 ROBERT DUFF
BHO/Hillside ordinance Cleared 12/2/2015 ARNULFO NUNO
BHO/Hillside ordinance Cleared 12/2/2015 ARNULFO NUNO
BHO/Hillside ordinance Cleared 12/2/2015 ARNULFO NUNO
Eng Process Fee Ord 176,300 Cleared 12/2/2015 ARNULFO NUNO
Permit Cleared 12/2/2015 ARNULFO NUNO
Sewer availability Cleared 12/2/2015 ARNULFO NUNO
Frnt yard landscape/Water mgmt Cleared 5/19/2016 ERIC CLAROS
Low Impact Development Cleared 5/19/2016 SAM NAVID
ZA Case Cleared 5/19/2016 ERIC CLAROS
ZI Cleared 5/19/2016 ERIC CLAROS
ZI Cleared 5/19/2016 ERIC CLAROS
BHO/Hillside ordinance Cleared 6/14/2016 SEVAK ISAKHAYAN
Hydrant and Access approval Cleared 6/14/2016 ROBERT DUFF
Roof/Waste drainage to street Cleared 6/14/2016 SEVAK ISAKHAYAN
Excavation more than 5-ft deep Cleared 5/9/2017 CALOSHA APPROVED
GPI Written Notices Cleared 5/9/2017 BRIAN OLSON
Grading Pre-Inspection Cleared 5/9/2017 BRIAN OLSON
Disturb/Remove Protected Trees Cleared 5/15/2017 LUIS TORRES

Contact Information

Architect Kovac, Jerry Michael; Lic. No.: C19390 2330 PONTIUS AVENUE SUITE 202      LOS ANGELES, CA 90064
Contractor Rjc Builders Inc; Lic. No.: 740011-B 3509 W 6TH STREET      LOS ANGELES, CA 90020
Engineer Polon, Gordon Leonard; Lic. No.: C28564 709 19TH STREET      SANTA MONICA, CA 90402
Geologist Daugherty, Daniel Thomas; Lic. No.: EG2569 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362

Inspector Information

EVAN COOPER, (310) 914-3861 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/22/2017 Approved THOMAS FINNILA
PLUMBING-Rough 11/16/2017 Partial Approval THOMAS FINNILA
PLUMBING-Rough 12/5/2017 Partial Approval DANIEL ORRANTE
PLUMBING-Rough 12/7/2017 No Access for Inspection THOMAS FINNILA
PLUMBING-Rough 12/8/2017 Partial Approval THOMAS FINNILA
Deputy Reinf. Concrete 12/27/2017 Conditional Approval THOMAS FINNILA
Excavation/Setback/Form/Re-Bar 1/30/2018 Partial Approval THOMAS FINNILA
Excavation/Setback/Form/Re-Bar 2/22/2018 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/3/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/5/2018 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 4/5/2018 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/25/2018 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 5/2/2018 Partial Approval ANTHONY ANDERSON
Deputy Steel/Welding 5/17/2018 Conditional Approval RYAN MCGILL
Underground Mechanical 6/6/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 6/7/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 6/12/2018 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/22/2018 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 6/22/2018 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 7/3/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 7/10/2018 Approved CHRISTOPHER WILSON
Deputy Reinf. Concrete 7/11/2018 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 7/20/2018 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 8/16/2018 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 8/21/2018 Partial Approval JOEL LAUNCHBAUGH
Underground Mechanical 8/21/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 8/22/2018 Conditional Approval JOEL LAUNCHBAUGH
Reinforced Concrete Frame 9/5/2018 Partial Approval JOEL LAUNCHBAUGH
Footing/Foundation/Slab 9/12/2018 Partial Approval JOEL LAUNCHBAUGH
Underground Mechanical 9/20/2018 Partial Approval JOHN LUMB
Footing/Foundation/Slab 10/9/2018 Partial Approval JOEL LAUNCHBAUGH
Reinforced Concrete Frame 10/23/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/31/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 11/1/2018 Conditional Approval JOEL LAUNCHBAUGH
Footing/Foundation/Slab 11/1/2018 Partial Approval JOEL LAUNCHBAUGH
Piling/Pier/Caisson 11/1/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 11/2/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 11/2/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 11/13/2018 Conditional Approval JOEL LAUNCHBAUGH
Footing/Foundation/Slab 11/19/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 11/20/2018 Conditional Approval JOEL LAUNCHBAUGH
Excavation/Setback/Form/Re-Bar 12/4/2018 Partial Inspection JOEL LAUNCHBAUGH
Footing/Foundation/Slab 12/4/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 12/7/2018 Conditional Approval JOEL LAUNCHBAUGH
Excavation/Setback/Form/Re-Bar 12/14/2018 Not Ready for Inspection MATT KELLERMAN
Footing/Foundation/Slab 12/14/2018 Not Ready for Inspection MATT KELLERMAN
PLUMBING-Rough 12/14/2018 Not Ready for Inspection MATT KELLERMAN
Footing/Foundation/Slab 12/18/2018 Partial Approval JOEL LAUNCHBAUGH
Underground Mechanical 12/18/2018 Partial Approval JOEL LAUNCHBAUGH
Underground Mechanical 1/10/2019 Partial Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 1/24/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 1/25/2019 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 1/28/2019 Conditional Approval CARLOS MATAMOROS
Deputy Steel/Welding 1/30/2019 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 2/1/2019 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 2/12/2019 Conditional Approval CARLOS MATAMOROS
Deputy Steel/Welding 2/13/2019 Conditional Approval CARLOS MATAMOROS
Deputy Steel/Welding 2/14/2019 Conditional Approval CARLOS MATAMOROS
Deputy Steel/Welding 2/15/2019 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 2/19/2019 Conditional Approval ANTHONY MCDOWALL
Deputy Steel/Welding 2/25/2019 Conditional Approval ANTHONY MCDOWALL
Deputy Steel/Welding 2/26/2019 Conditional Approval ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 2/26/2019 Approved ANTHONY MCDOWALL
Deputy Steel/Welding 2/27/2019 Conditional Approval ANTHONY MCDOWALL
Deputy Steel/Welding 4/1/2019 Conditional Approval ANTHONY MCDOWALL
Deputy Steel/Welding 4/5/2019 Conditional Approval ANTHONY MCDOWALL
Floor/Roof Diaphrgm/Shear Wall 4/16/2019 Partial Approval ANTHONY MCDOWALL
Floor/Roof Diaphrgm/Shear Wall 4/24/2019 Partial Approval ANTHONY MCDOWALL
Deputy Wood Construction 7/11/2019 Conditional Approval ANTHONY MCDOWALL
Floor/Roof Diaphrgm/Shear Wall 7/12/2019 Partial Approval JUAN VALENZUELA
Deputy Reinf. Concrete 9/27/2019 Conditional Approval ANTHONY MCDOWALL
Drywall Nailing 9/30/2019 Partial Approval ANTHONY MCDOWALL
Green Building Rough 9/30/2019 Not Ready for Inspection ANTHONY MCDOWALL
Wood Frame 1/2/2020 Partial Approval CARLOS MATAMOROS
PLUMBING-Rough 3/13/2020 Partial Inspection GERMAN RODRIGUEZ MENDOZA
ELECTRICAL-Rough 3/16/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 3/16/2020 Partial Approval GERMAN RODRIGUEZ MENDOZA
Gas Test 3/31/2020 Approved CARLOS MATAMOROS
PLUMBING-Rough 3/31/2020 Approved CARLOS MATAMOROS
Pre-Inspection 9/1/2020 Partial Approval CARLOS MATAMOROS
ELECTRICAL-Rough 10/14/2020 Partial Approval CARLOS MATAMOROS
Gas Test 10/14/2020 Approved CARLOS MATAMOROS
PLUMBING-Rough 10/14/2020 Approved CARLOS MATAMOROS
Sewer 10/14/2020 Approved CARLOS MATAMOROS
Shower Pan 10/14/2020 Approved CARLOS MATAMOROS
Underground Mechanical 10/14/2020 Partial Approval CARLOS MATAMOROS
Underground Mechanical 10/15/2020 Partial Approval CARLOS MATAMOROS
BUILDING-Rough-Frame 10/20/2020 Not Ready for Inspection CARLOS MATAMOROS
Green Building Rough 10/20/2020 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Rough 10/20/2020 Partial Approval CARLOS MATAMOROS
Shower Pan 10/20/2020 Partial Approval CARLOS MATAMOROS
Verify Sprinkler Sign Off 10/20/2020 Approved CARLOS MATAMOROS
BUILDING-Rough-Frame 10/22/2020 Partial Approval CARLOS MATAMOROS
Insulation 10/29/2020 Corrections Issued CARLOS MATAMOROS
ELECTRICAL-Rough 11/6/2020 Not Ready for Inspection CARLOS MATAMOROS
Excavation/Setback/Form/Re-Bar 11/9/2020 Partial Approval CARLOS MATAMOROS
HVAC-Rough 11/9/2020 Not Ready for Inspection CARLOS MATAMOROS
BUILDING-Rough-Frame 11/12/2020 Partial Approval CARLOS MATAMOROS
Green Building Rough 11/12/2020 Partial Approval CARLOS MATAMOROS
HVAC-Rough 11/12/2020 Partial Approval CARLOS MATAMOROS
Interior/Exterior Lathing 11/12/2020 Not Ready for Inspection CARLOS MATAMOROS
Insulation 11/17/2020 Partial Approval CARLOS MATAMOROS
Interior/Exterior Lathing 11/17/2020 Partial Approval CARLOS MATAMOROS
Excavation/Setback/Form/Re-Bar 11/23/2020 Not Ready for Inspection ANTHONY MCDOWALL
Insulation 11/23/2020 Partial Approval ANTHONY MCDOWALL
Gas Test 12/3/2020 Approved CARLOS MATAMOROS
Interior/Exterior Lathing 12/7/2020 Partial Approval CARLOS MATAMOROS
Drywall Nailing 12/10/2020 Partial Approval CARLOS MATAMOROS
Green Building Rough 12/10/2020 Approved CARLOS MATAMOROS
ELECTRICAL-Rough 1/27/2021 Partial Approval CARLOS MATAMOROS
HVAC-Rough 1/27/2021 Partial Approval CARLOS MATAMOROS
Interior/Exterior Lathing 1/27/2021 Partial Approval CARLOS MATAMOROS
ELECTRICAL-Rough 2/17/2021 Partial Approval CARLOS MATAMOROS
HVAC-Rough 2/17/2021 Not Ready for Inspection CARLOS MATAMOROS
Underground Mechanical 2/17/2021 Partial Approval CARLOS MATAMOROS
HVAC-Rough 2/24/2021 Not Ready for Inspection CARLOS MATAMOROS
BUILDING-Rough-Frame 3/2/2021 Approved CARLOS MATAMOROS
HVAC-Rough 3/5/2021 Partial Approval CARLOS MATAMOROS
Interior/Exterior Lathing 3/15/2021 Partial Approval CARLOS MATAMOROS
HVAC-Rough 3/24/2021 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Rough 4/13/2021 Approved CARLOS MATAMOROS
Interior/Exterior Lathing 4/20/2021 Approved CARLOS MATAMOROS
Underground Mechanical 6/3/2021 Approved CARLOS MATAMOROS
ELECTRICAL-Rough 6/24/2021 Not Ready for Inspection CARLOS MATAMOROS
ELECTRICAL-Rough 7/29/2021 Approved CARLOS MATAMOROS
Interior/Exterior Lathing 8/3/2021 Partial Approval KRISTEN CAUSEY
BUILDING-Rough-Frame 8/5/2021 Approved CARLOS MATAMOROS
ELECTRICAL-Final 8/5/2021 Not Ready for Inspection CARLOS MATAMOROS
Interior/Exterior Lathing 8/5/2021 Approved CARLOS MATAMOROS
HVAC-Final 8/11/2021 Approved CARLOS MATAMOROS
Service/Power Release 8/25/2021 Approved CARLOS MATAMOROS
Special/Order Compliance 10/25/2021 Corrections Issued CARLOS MATAMOROS
Excavation/Setback/Form/Re-Bar 10/28/2021 Not Ready for Inspection CARLOS MATAMOROS
Special/Order Compliance 10/28/2021 Partial Approval CARLOS MATAMOROS
Excavation/Setback/Form/Re-Bar 10/29/2021 Not Ready for Inspection CARLOS MATAMOROS
Service/Power Release 10/29/2021 Approved CARLOS MATAMOROS
Service/Power Release 11/4/2021 Approved CARLOS MATAMOROS
PLUMBING-Final 11/17/2021 Partial Approval CARLOS MATAMOROS
ELECTRICAL-Final 11/19/2021 Partial Approval CARLOS MATAMOROS
HVAC-Final 11/19/2021 Partial Approval CARLOS MATAMOROS
HVAC-Final 12/7/2021 Partial Approval CARLOS MATAMOROS
PLUMBING-Final 12/7/2021 Partial Approval CARLOS MATAMOROS
HVAC-Final 12/9/2021 Approved CARLOS MATAMOROS
Service/Power Release 12/9/2021 Approved CARLOS MATAMOROS
Service/Power Release 12/13/2021 Approved CARLOS MATAMOROS
ELECTRICAL-Final 12/16/2021 Not Ready for Inspection CARLOS MATAMOROS
Green Building Final 12/17/2021 Approved CARLOS MATAMOROS
PLUMBING-Final 12/17/2021 Approved CARLOS MATAMOROS
ELECTRICAL-Final 1/4/2022 Not Ready for Inspection CARLOS MATAMOROS
ELECTRICAL-Final 1/7/2022 Partial Approval CARLOS MATAMOROS
ELECTRICAL-Rough 1/10/2022 Corrections Issued BRENDAN LOONEY
SGSOV-Seismic Gas S/O Valve 1/10/2022 SGSOV Not Ready BRENDAN LOONEY
ELECTRICAL-Final 1/12/2022 Conditional Approval CARLOS MATAMOROS
Drywall Nailing 1/19/2022 Approved CARLOS MATAMOROS
Final 1/19/2022 Corrections Issued CARLOS MATAMOROS
Footing/Foundation/Slab 1/19/2022 Approved CARLOS MATAMOROS
Reinforced Concrete Frame 1/19/2022 Approved CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 1/19/2022 SGSOV Not Ready CARLOS MATAMOROS
Smoke Detectors 1/19/2022 Corrections Issued CARLOS MATAMOROS
ELECTRICAL-Final 2/2/2022 Approved CARLOS MATAMOROS
Final 2/2/2022 OK to Issue CofO CARLOS MATAMOROS
Gas Test 2/2/2022 Approved CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 2/2/2022 SGSOV Approved CARLOS MATAMOROS
Smoke Detectors 2/2/2022 Approved CARLOS MATAMOROS