Pre-Inspection
|
6/22/2017
|
Approved
|
THOMAS FINNILA
|
|
PLUMBING-Rough
|
11/16/2017
|
Partial Approval
|
THOMAS FINNILA
|
|
PLUMBING-Rough
|
12/5/2017
|
Partial Approval
|
DANIEL ORRANTE
|
|
PLUMBING-Rough
|
12/7/2017
|
No Access for Inspection
|
THOMAS FINNILA
|
|
PLUMBING-Rough
|
12/8/2017
|
Partial Approval
|
THOMAS FINNILA
|
|
Deputy Reinf. Concrete
|
12/27/2017
|
Conditional Approval
|
THOMAS FINNILA
|
|
Excavation/Setback/Form/Re-Bar
|
1/30/2018
|
Partial Approval
|
THOMAS FINNILA
|
|
Excavation/Setback/Form/Re-Bar
|
2/22/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/3/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
4/5/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
4/5/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/25/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/2/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Steel/Welding
|
5/17/2018
|
Conditional Approval
|
RYAN MCGILL
|
|
Underground Mechanical
|
6/6/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/7/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/12/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
6/22/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
6/22/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
7/3/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
7/10/2018
|
Approved
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
7/11/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/20/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Underground Mechanical
|
8/16/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
8/21/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Underground Mechanical
|
8/21/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Reinf. Concrete
|
8/22/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Reinforced Concrete Frame
|
9/5/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Footing/Foundation/Slab
|
9/12/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Underground Mechanical
|
9/20/2018
|
Partial Approval
|
JOHN LUMB
|
|
Footing/Foundation/Slab
|
10/9/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Reinforced Concrete Frame
|
10/23/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Steel/Welding
|
10/31/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Steel/Welding
|
11/1/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Footing/Foundation/Slab
|
11/1/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Piling/Pier/Caisson
|
11/1/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Reinf. Concrete
|
11/2/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Steel/Welding
|
11/2/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Steel/Welding
|
11/13/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Footing/Foundation/Slab
|
11/19/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Reinf. Concrete
|
11/20/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Excavation/Setback/Form/Re-Bar
|
12/4/2018
|
Partial Inspection
|
JOEL LAUNCHBAUGH
|
|
Footing/Foundation/Slab
|
12/4/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Steel/Welding
|
12/7/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Excavation/Setback/Form/Re-Bar
|
12/14/2018
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
12/14/2018
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
PLUMBING-Rough
|
12/14/2018
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
12/18/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Underground Mechanical
|
12/18/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Underground Mechanical
|
1/10/2019
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Steel/Welding
|
1/24/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
1/25/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
1/28/2019
|
Conditional Approval
|
CARLOS MATAMOROS
|
|
Deputy Steel/Welding
|
1/30/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
2/1/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
2/12/2019
|
Conditional Approval
|
CARLOS MATAMOROS
|
|
Deputy Steel/Welding
|
2/13/2019
|
Conditional Approval
|
CARLOS MATAMOROS
|
|
Deputy Steel/Welding
|
2/14/2019
|
Conditional Approval
|
CARLOS MATAMOROS
|
|
Deputy Steel/Welding
|
2/15/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
2/19/2019
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
Deputy Steel/Welding
|
2/25/2019
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
Deputy Steel/Welding
|
2/26/2019
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
Excavation/Setback/Form/Re-Bar
|
2/26/2019
|
Approved
|
ANTHONY MCDOWALL
|
|
Deputy Steel/Welding
|
2/27/2019
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
Deputy Steel/Welding
|
4/1/2019
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
Deputy Steel/Welding
|
4/5/2019
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/16/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/24/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Deputy Wood Construction
|
7/11/2019
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/12/2019
|
Partial Approval
|
JUAN VALENZUELA
|
|
Deputy Reinf. Concrete
|
9/27/2019
|
Conditional Approval
|
ANTHONY MCDOWALL
|
|
Drywall Nailing
|
9/30/2019
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Green Building Rough
|
9/30/2019
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Wood Frame
|
1/2/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
PLUMBING-Rough
|
3/13/2020
|
Partial Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
ELECTRICAL-Rough
|
3/16/2020
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
PLUMBING-Rough
|
3/16/2020
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Gas Test
|
3/31/2020
|
Approved
|
CARLOS MATAMOROS
|
|
PLUMBING-Rough
|
3/31/2020
|
Approved
|
CARLOS MATAMOROS
|
|
Pre-Inspection
|
9/1/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
10/14/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Gas Test
|
10/14/2020
|
Approved
|
CARLOS MATAMOROS
|
|
PLUMBING-Rough
|
10/14/2020
|
Approved
|
CARLOS MATAMOROS
|
|
Sewer
|
10/14/2020
|
Approved
|
CARLOS MATAMOROS
|
|
Shower Pan
|
10/14/2020
|
Approved
|
CARLOS MATAMOROS
|
|
Underground Mechanical
|
10/14/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Underground Mechanical
|
10/15/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
BUILDING-Rough-Frame
|
10/20/2020
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Green Building Rough
|
10/20/2020
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
HVAC-Rough
|
10/20/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Shower Pan
|
10/20/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Verify Sprinkler Sign Off
|
10/20/2020
|
Approved
|
CARLOS MATAMOROS
|
|
BUILDING-Rough-Frame
|
10/22/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Insulation
|
10/29/2020
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
11/6/2020
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Excavation/Setback/Form/Re-Bar
|
11/9/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
HVAC-Rough
|
11/9/2020
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
BUILDING-Rough-Frame
|
11/12/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Green Building Rough
|
11/12/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
HVAC-Rough
|
11/12/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
11/12/2020
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Insulation
|
11/17/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
11/17/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Excavation/Setback/Form/Re-Bar
|
11/23/2020
|
Not Ready for Inspection
|
ANTHONY MCDOWALL
|
|
Insulation
|
11/23/2020
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Gas Test
|
12/3/2020
|
Approved
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
12/7/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Drywall Nailing
|
12/10/2020
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Green Building Rough
|
12/10/2020
|
Approved
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
1/27/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
HVAC-Rough
|
1/27/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
1/27/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
2/17/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
HVAC-Rough
|
2/17/2021
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Underground Mechanical
|
2/17/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
HVAC-Rough
|
2/24/2021
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
BUILDING-Rough-Frame
|
3/2/2021
|
Approved
|
CARLOS MATAMOROS
|
|
HVAC-Rough
|
3/5/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
3/15/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
HVAC-Rough
|
3/24/2021
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
HVAC-Rough
|
4/13/2021
|
Approved
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
4/20/2021
|
Approved
|
CARLOS MATAMOROS
|
|
Underground Mechanical
|
6/3/2021
|
Approved
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
6/24/2021
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
7/29/2021
|
Approved
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
8/3/2021
|
Partial Approval
|
KRISTEN CAUSEY
|
|
BUILDING-Rough-Frame
|
8/5/2021
|
Approved
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Final
|
8/5/2021
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
8/5/2021
|
Approved
|
CARLOS MATAMOROS
|
|
HVAC-Final
|
8/11/2021
|
Approved
|
CARLOS MATAMOROS
|
|
Service/Power Release
|
8/25/2021
|
Approved
|
CARLOS MATAMOROS
|
|
Special/Order Compliance
|
10/25/2021
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
Excavation/Setback/Form/Re-Bar
|
10/28/2021
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Special/Order Compliance
|
10/28/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Excavation/Setback/Form/Re-Bar
|
10/29/2021
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Service/Power Release
|
10/29/2021
|
Approved
|
CARLOS MATAMOROS
|
|
Service/Power Release
|
11/4/2021
|
Approved
|
CARLOS MATAMOROS
|
|
PLUMBING-Final
|
11/17/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Final
|
11/19/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
HVAC-Final
|
11/19/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
HVAC-Final
|
12/7/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
PLUMBING-Final
|
12/7/2021
|
Partial Approval
|
CARLOS MATAMOROS
|
|
HVAC-Final
|
12/9/2021
|
Approved
|
CARLOS MATAMOROS
|
|
Service/Power Release
|
12/9/2021
|
Approved
|
CARLOS MATAMOROS
|
|
Service/Power Release
|
12/13/2021
|
Approved
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Final
|
12/16/2021
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Green Building Final
|
12/17/2021
|
Approved
|
CARLOS MATAMOROS
|
|
PLUMBING-Final
|
12/17/2021
|
Approved
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Final
|
1/4/2022
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Final
|
1/7/2022
|
Partial Approval
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
1/10/2022
|
Corrections Issued
|
BRENDAN LOONEY
|
|
SGSOV-Seismic Gas S/O Valve
|
1/10/2022
|
SGSOV Not Ready
|
BRENDAN LOONEY
|
|
ELECTRICAL-Final
|
1/12/2022
|
Conditional Approval
|
CARLOS MATAMOROS
|
|
Drywall Nailing
|
1/19/2022
|
Approved
|
CARLOS MATAMOROS
|
|
Final
|
1/19/2022
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
Footing/Foundation/Slab
|
1/19/2022
|
Approved
|
CARLOS MATAMOROS
|
|
Reinforced Concrete Frame
|
1/19/2022
|
Approved
|
CARLOS MATAMOROS
|
|
SGSOV-Seismic Gas S/O Valve
|
1/19/2022
|
SGSOV Not Ready
|
CARLOS MATAMOROS
|
|
Smoke Detectors
|
1/19/2022
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Final
|
2/2/2022
|
Approved
|
CARLOS MATAMOROS
|
|
Final
|
2/2/2022
|
OK to Issue CofO
|
CARLOS MATAMOROS
|
|
Gas Test
|
2/2/2022
|
Approved
|
CARLOS MATAMOROS
|
|
SGSOV-Seismic Gas S/O Valve
|
2/2/2022
|
SGSOV Approved
|
CARLOS MATAMOROS
|
|
Smoke Detectors
|
2/2/2022
|
Approved
|
CARLOS MATAMOROS
|