Deputy Reinf. Concrete
|
9/28/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
9/29/2017
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
10/3/2017
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Piling/Pier/Caisson
|
10/5/2017
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
10/11/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
PLUMBING-Rough
|
10/11/2017
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
10/12/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
10/18/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
10/19/2017
|
Approved
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
10/19/2017
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
10/20/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
10/30/2017
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Reinforced Concrete Frame
|
11/14/2017
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Special/Order Compliance
|
11/18/2017
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
11/22/2017
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Reinforced Concrete Frame
|
11/22/2017
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Reinforced Concrete Frame
|
12/19/2017
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Piling/Pier/Caisson
|
1/18/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Piling/Pier/Caisson
|
1/23/2018
|
Not Ready for Inspection
|
ANTHONY ANDERSON
|
|
Piling/Pier/Caisson
|
1/25/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
1/26/2018
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
2/1/2018
|
Partial Approval
|
THOMAS FINNILA
|
|
Reinforced Concrete Frame
|
2/5/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
2/6/2018
|
Approved
|
ANTHONY ANDERSON
|
|
Piling/Pier/Caisson
|
2/6/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Reinf. Concrete
|
2/7/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/13/2018
|
Partial Inspection
|
ANTHONY ANDERSON
|
|
Piling/Pier/Caisson
|
2/13/2018
|
Corrections Issued
|
ANTHONY ANDERSON
|
|
Reinforced Concrete Frame
|
2/16/2018
|
Partial Approval
|
THOMAS FINNILA
|
|
Deputy Reinf. Concrete
|
2/22/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Reinf. Concrete
|
2/27/2018
|
Approved
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
3/1/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
PLUMBING-Rough
|
3/20/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Reinforced Concrete Frame
|
4/2/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Deputy Shotcrete
|
4/3/2018
|
Conditional Approval
|
ANTHONY ANDERSON
|
|
Deputy Shotcrete
|
4/4/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
4/18/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Footing/Foundation/Slab
|
5/1/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Reinforced Concrete Frame
|
5/8/2018
|
Partial Approval
|
ANTHONY ANDERSON
|
|
Footing/Foundation/Slab
|
5/16/2018
|
Partial Approval
|
DANIEL ORRANTE
|
|
Deputy Reinf. Concrete
|
5/17/2018
|
Conditional Approval
|
THOMAS FINNILA
|
|
Reinforced Concrete Frame
|
5/23/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Reinforced Concrete Frame
|
5/31/2018
|
Approved
|
JONATHAN HOM
|
|
Footing/Foundation/Slab
|
6/7/2018
|
Partial Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Drilled-In Anchors
|
6/14/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/14/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
6/14/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/15/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Footing/Foundation/Slab
|
6/20/2018
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Reinforced Concrete Frame
|
6/21/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
6/22/2018
|
No Result Entered
|
ANTHONY ANDERSON
|
|
Deputy Wood Construction
|
6/22/2018
|
No Result Entered
|
ANTHONY ANDERSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/25/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
6/27/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Drilled-In Anchors
|
6/28/2018
|
Conditional Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
6/28/2018
|
Conditional Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
6/28/2018
|
Conditional Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
7/5/2018
|
No Result Entered
|
ANTHONY ANDERSON
|
|
Reinforced Concrete Frame
|
7/5/2018
|
Partial Approval
|
THOMAS FINNILA
|
|
Deputy Reinf. Concrete
|
7/6/2018
|
Conditional Approval
|
MATT KELLERMAN
|
|
Deputy Wood Construction
|
7/9/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/9/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
PLUMBING-Rough
|
7/12/2018
|
Not Ready for Inspection
|
VICTOR PUKHALSKY
|
|
PLUMBING-Rough
|
7/16/2018
|
Partial Approval
|
JENNIFER RABUCHIN
|
|
Deputy Reinf. Concrete
|
7/20/2018
|
Approved
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
7/20/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Reinforced Concrete Frame
|
7/20/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
7/23/2018
|
Conditional Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
7/23/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
7/24/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
7/30/2018
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/1/2018
|
Not Ready for Inspection
|
THOMAS FINNILA
|
|
PLUMBING-Rough
|
8/1/2018
|
Not Ready for Inspection
|
THOMAS FINNILA
|
|
Reinforced Concrete Frame
|
8/1/2018
|
Partial Approval
|
THOMAS FINNILA
|
|
Deputy Reinf. Concrete
|
8/2/2018
|
Approved
|
MATT KELLERMAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/2/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
PLUMBING-Rough
|
8/2/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Reinforced Concrete Frame
|
8/2/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
8/3/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
8/7/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Reinforced Concrete Frame
|
8/8/2018
|
Approved
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
8/9/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Reinf. Concrete
|
8/13/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
8/16/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
8/16/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
8/17/2018
|
No Result Entered
|
ANTHONY ANDERSON
|
|
Deputy Steel/Welding
|
8/17/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
8/23/2018
|
Approved
|
MATT KELLERMAN
|
|
Footing/Foundation/Slab
|
8/23/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
8/27/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
8/31/2018
|
Approved
|
MATT KELLERMAN
|
|
Reinforced Concrete Frame
|
9/4/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
9/6/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
9/6/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
9/7/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
9/12/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
9/12/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/12/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
9/12/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
9/14/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
9/14/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
9/18/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/19/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
9/19/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
9/24/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
9/25/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Steel/Welding
|
9/25/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
9/25/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
9/25/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
9/26/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
9/26/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
10/3/2018
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
10/4/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
10/5/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
10/11/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
10/11/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
10/11/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
10/12/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
10/16/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
10/16/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
10/19/2018
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
10/25/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
10/26/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
11/6/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
11/8/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
11/8/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
11/8/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
11/8/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
11/16/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Reinf. Concrete
|
11/28/2018
|
Conditional Approval
|
CARLOS MATAMOROS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/28/2018
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
PLUMBING-Rough
|
11/28/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Shotcrete
|
11/30/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Wood Construction
|
12/5/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Reinf. Concrete
|
12/7/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Deputy Steel/Welding
|
12/10/2018
|
Conditional Approval
|
JOEL LAUNCHBAUGH
|
|
Deputy Steel/Welding
|
12/14/2018
|
Partial Approval
|
MATT KELLERMAN
|
|
Interior/Exterior Lathing
|
12/14/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
12/20/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/20/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
12/20/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
12/20/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
12/26/2018
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
12/27/2018
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/27/2018
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
12/27/2018
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
12/27/2018
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
1/17/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
1/18/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/22/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
1/24/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
1/24/2019
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
1/24/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
1/28/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Gas Test
|
1/28/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
1/28/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
1/28/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
1/30/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
1/30/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/30/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
1/30/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
1/30/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
1/30/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
1/30/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
1/30/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
1/30/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
1/31/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/31/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
1/31/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
2/4/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
2/4/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Concrete Frame
|
2/4/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Reinforced Masonry Frame
|
2/4/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
2/4/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
2/8/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/8/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
2/8/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
2/11/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
2/11/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
2/12/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
2/12/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
2/12/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
2/25/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
2/25/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
3/6/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
3/11/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
3/13/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Insulation
|
3/18/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
3/20/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
3/20/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
3/20/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
3/20/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
3/20/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
3/20/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
3/20/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
3/22/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/22/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
3/27/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
3/27/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
3/27/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
3/27/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
3/27/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
4/3/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
4/3/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
4/3/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
4/3/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
4/3/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
4/3/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
4/5/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
4/5/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Insulation
|
4/10/2019
|
Partial Approval
|
ROBERT SHELLY
|
|
Green Building Rough
|
4/15/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
4/15/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
4/15/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
4/15/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
4/18/2019
|
Partial Approval
|
MICHAEL TEMPLE
|
|
HVAC-Rough
|
4/18/2019
|
Partial Approval
|
MICHAEL TEMPLE
|
|
Drywall Nailing
|
4/24/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
4/24/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Insulation
|
4/24/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
4/26/2019
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
4/29/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
4/29/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Wood Frame
|
4/29/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
5/1/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
5/3/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
5/3/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/3/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
5/6/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
5/6/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
5/6/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
5/14/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/16/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
5/22/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
5/29/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
5/29/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
6/5/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
6/5/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
6/5/2019
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Insulation
|
6/5/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
6/6/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
6/6/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
6/13/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
6/13/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
6/13/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
6/13/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Rough-Elec/Plmb/HVAC
|
6/14/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
6/19/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
6/26/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
6/26/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
7/10/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
7/10/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
7/10/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
7/16/2019
|
Order to Comply Issued
|
CHRISTOPHER WILSON
|
|
Green Building Rough
|
7/16/2019
|
Approved
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
7/26/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
7/31/2019
|
Partial Approval
|
MICHAEL TEMPLE
|
|
Sewer
|
8/6/2019
|
Approved
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
8/21/2019
|
Partial Approval
|
DAVID FEILER
|
|
PLUMBING-Rough
|
8/21/2019
|
Partial Approval
|
DAVID FEILER
|
|
HVAC-Rough
|
9/4/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Shower Pan
|
9/4/2019
|
Approved
|
CHRISTOPHER WILSON
|
|
Gas Test
|
9/9/2019
|
Approved
|
CARLOS MATAMOROS
|
|
Interior/Exterior Lathing
|
9/9/2019
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Reinforced Masonry Frame
|
9/9/2019
|
Partial Approval
|
CARLOS MATAMOROS
|
|
PLUMBING-Rough
|
9/24/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
SGSOV-Seismic Gas S/O Valve
|
9/24/2019
|
SGSOV Approved
|
MATT KELLERMAN
|
|
ELECTRICAL-Rough
|
9/30/2019
|
Partial Approval
|
MATT KELLERMAN
|
|
HVAC-Rough
|
9/30/2019
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
HVAC-Rough
|
10/2/2019
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Drywall Nailing
|
10/9/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Shower Pan
|
10/9/2019
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Shower Pan
|
10/17/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Shower Pan
|
10/28/2019
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Shower Pan
|
11/5/2019
|
Approved
|
MATT KELLERMAN
|
|
Drywall Nailing
|
11/14/2019
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Drywall Nailing
|
11/26/2019
|
Partial Inspection
|
CHRISTOPHER WILSON
|
|
Interior/Exterior Lathing
|
11/27/2019
|
No Access for Inspection
|
CHRISTOPHER DELLEFIELD
|
|
Interior/Exterior Lathing
|
12/3/2019
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
12/10/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
PLUMBING-Rough
|
12/10/2019
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Drywall Nailing
|
1/7/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
1/21/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
1/29/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
HVAC-Rough
|
1/29/2020
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
HVAC-Rough
|
2/3/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Insulation
|
2/3/2020
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Service/Power Release
|
2/18/2020
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
Service/Power Release
|
3/31/2020
|
Approved
|
MATT KELLERMAN
|
|
Gas Test
|
7/8/2020
|
Not Ready for Inspection
|
MATT KELLERMAN
|
|
BUILDING-Rough-Frame
|
8/7/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
8/7/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
8/7/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Footing/Foundation/Slab
|
8/7/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
8/7/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
8/7/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Structural Steel Frame
|
8/7/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
Verify Sprinkler Sign Off
|
8/7/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
9/2/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
9/2/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
9/2/2020
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
9/22/2020
|
Partial Approval
|
MATT KELLERMAN
|
|
HVAC-Final
|
10/23/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
HVAC-Rough
|
10/23/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
11/2/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
11/10/2020
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
PLUMBING-Final
|
11/10/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Final
|
11/16/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
HVAC-Final
|
11/20/2020
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
2/26/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Green Building Final
|
2/26/2021
|
Approved
|
CHRISTOPHER WILSON
|
|
Smoke Detectors
|
2/26/2021
|
Approved
|
CHRISTOPHER WILSON
|
|
Final
|
3/3/2021
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Final
|
3/22/2021
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Final
|
3/31/2021
|
Partial Approval
|
MATT KELLERMAN
|