911 N TIONE ROAD 90077

Certificate Information: 911 N TIONE ROAD 90077

Application / Permit
15010-30000-04702
Plan Check / Job No.
B15WL06635
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
New three-story single family dwelling with attached garage
Permit Issued
Issued on 5/10/2017
Issuing Office
West Los Angeles
Current Status
CofO Corrected on 2/21/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/31/2015 APPLICANT
Assigned to Plan Check Engineer 1/7/2016 KAVIAN REFAHI
Corrections Issued 1/11/2016 CHRISTINE MAALOUF
Quality Review Completed 1/13/2016 DOUGLAS NAKATANI
Green Plans Picked Up 1/13/2016 APPLICANT
Building Plans Picked Up 1/14/2016 APPLICANT
Applicant returned to address corrections 3/1/2016 CHRISTINE MAALOUF
Applicant returned to address corrections 3/23/2016 CHRISTINE MAALOUF
Applicant returned to address corrections 3/31/2016 CHRISTINE MAALOUF
Applicant returned to address corrections 8/2/2016 DIEGO BAUTISTA
Applicant returned to address corrections 12/21/2016 DIEGO BAUTISTA
Plan Check Approved 3/2/2017 DIEGO BAUTISTA
Issued 5/10/2017 LADBS
CofO in Progress 4/16/2021 CHRISTOPHER WILSON
CofO Issued-Status Void 5/3/2021 VINCENT COTTON
Permit Finaled-Status Void 5/3/2021 VINCENT COTTON
Re-Activate Permit 12/13/2022 DANIEL ORRANTE
Permit Finaled 2/21/2023 DANIEL ORRANTE
CofO Corrected 2/21/2023 DANIEL ORRANTE
Permit Finaled 2/21/2023 DANIEL ORRANTE

Permit Application Clearance Information

GPI Written Notices Cleared 3/23/2016 CHRISTINE MAALOUF
Grading Pre-Inspection Cleared 3/23/2016 CHRISTINE MAALOUF
BHO/Hillside ordinance Cleared 7/8/2016 ERIK MUNOZ
BHO/Hillside ordinance Cleared 7/8/2016 ERIK MUNOZ
BHO/Hillside ordinance Cleared 7/8/2016 ERIK MUNOZ
BHO/Hillside ordinance Cleared 7/8/2016 ERIK MUNOZ
Eng Process Fee Ord 176,300 Cleared 7/8/2016 ERIK MUNOZ
Permit Cleared 7/8/2016 ERIK MUNOZ
Sewer availability Cleared 7/12/2016 RAVIL MANAPOV
Hydrant and Access approval Cleared 8/4/2016 ROBERT DUFF
Low Impact Development Cleared 11/3/2016 SAM NAVID
Grading in hillside Cleared 12/14/2016 CASSANDRA ZWEEP
Roof/Waste drainage to street Cleared 12/14/2016 JOSEPH RHYU
Green Code Cleared 12/15/2016 BRYAN MEYER
Excavation more than 5-ft deep Cleared 12/21/2016 CALOSHA APPROVED
Miscellaneous Cleared 12/29/2016 ANNA VIDAL

Contact Information

Contractor Matt Construction Corporation; Lic. No.: 631020-B 9814 NORWALK BLVD #100      SANTA FE SPRINGS, CA 90670
Engineer Hollingsworth, Robert Alan; Lic. No.: GE2022 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362
Engineer Labib, Youhanna T; Lic. No.: S4549 209 E EL SEGUNDO BLVD      EL SEGUNDO, CA 90245
Engineer Logan, Gene Thomas; Lic. No.: C56724 PO BOX 19075      NEWBURY PARK, CA 91320
Engineer Young, Don Yuk-Man; Lic. No.: C35713 650 SIERRA MADRE VILLA AVE #206      PASADENA, CA 91107
Geologist Hollingsworth, Robert Alan; Lic. No.: EG1265 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 9/28/2017 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 9/29/2017 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/3/2017 Conditional Approval JOEL LAUNCHBAUGH
Piling/Pier/Caisson 10/5/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 10/11/2017 Conditional Approval ANTHONY ANDERSON
PLUMBING-Rough 10/11/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 10/12/2017 Conditional Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 10/18/2017 Conditional Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 10/19/2017 Approved ANTHONY ANDERSON
Footing/Foundation/Slab 10/19/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 10/20/2017 Conditional Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 10/30/2017 Conditional Approval ANTHONY ANDERSON
Reinforced Concrete Frame 11/14/2017 Partial Approval ANTHONY ANDERSON
Special/Order Compliance 11/18/2017 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 11/22/2017 Partial Approval JOEL LAUNCHBAUGH
Reinforced Concrete Frame 11/22/2017 Partial Approval JOEL LAUNCHBAUGH
Reinforced Concrete Frame 12/19/2017 Partial Approval ANTHONY ANDERSON
Piling/Pier/Caisson 1/18/2018 Partial Approval ANTHONY ANDERSON
Piling/Pier/Caisson 1/23/2018 Not Ready for Inspection ANTHONY ANDERSON
Piling/Pier/Caisson 1/25/2018 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 1/26/2018 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 2/1/2018 Partial Approval THOMAS FINNILA
Reinforced Concrete Frame 2/5/2018 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 2/6/2018 Approved ANTHONY ANDERSON
Piling/Pier/Caisson 2/6/2018 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 2/7/2018 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 2/13/2018 Partial Inspection ANTHONY ANDERSON
Piling/Pier/Caisson 2/13/2018 Corrections Issued ANTHONY ANDERSON
Reinforced Concrete Frame 2/16/2018 Partial Approval THOMAS FINNILA
Deputy Reinf. Concrete 2/22/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 2/27/2018 Approved ANTHONY ANDERSON
Footing/Foundation/Slab 3/1/2018 Partial Approval ANTHONY ANDERSON
PLUMBING-Rough 3/20/2018 Partial Approval ANTHONY ANDERSON
Reinforced Concrete Frame 4/2/2018 Partial Approval ANTHONY ANDERSON
Deputy Shotcrete 4/3/2018 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 4/4/2018 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 4/18/2018 Partial Approval JOEL LAUNCHBAUGH
Footing/Foundation/Slab 5/1/2018 Partial Approval JOEL LAUNCHBAUGH
Reinforced Concrete Frame 5/8/2018 Partial Approval ANTHONY ANDERSON
Footing/Foundation/Slab 5/16/2018 Partial Approval DANIEL ORRANTE
Deputy Reinf. Concrete 5/17/2018 Conditional Approval THOMAS FINNILA
Reinforced Concrete Frame 5/23/2018 Partial Approval MATT KELLERMAN
Reinforced Concrete Frame 5/31/2018 Approved JONATHAN HOM
Footing/Foundation/Slab 6/7/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Drilled-In Anchors 6/14/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 6/14/2018 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 6/14/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 6/15/2018 Conditional Approval JOEL LAUNCHBAUGH
Footing/Foundation/Slab 6/20/2018 Not Ready for Inspection MATT KELLERMAN
Reinforced Concrete Frame 6/21/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 6/22/2018 No Result Entered ANTHONY ANDERSON
Deputy Wood Construction 6/22/2018 No Result Entered ANTHONY ANDERSON
Floor/Roof Diaphrgm/Shear Wall 6/25/2018 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 6/27/2018 Partial Approval MATT KELLERMAN
Deputy Drilled-In Anchors 6/28/2018 Conditional Approval MATT KELLERMAN
Deputy Reinf. Concrete 6/28/2018 Conditional Approval MATT KELLERMAN
Deputy Steel/Welding 6/28/2018 Conditional Approval MATT KELLERMAN
Deputy Reinf. Concrete 7/5/2018 No Result Entered ANTHONY ANDERSON
Reinforced Concrete Frame 7/5/2018 Partial Approval THOMAS FINNILA
Deputy Reinf. Concrete 7/6/2018 Conditional Approval MATT KELLERMAN
Deputy Wood Construction 7/9/2018 Partial Approval MATT KELLERMAN
Floor/Roof Diaphrgm/Shear Wall 7/9/2018 Partial Approval MATT KELLERMAN
PLUMBING-Rough 7/12/2018 Not Ready for Inspection VICTOR PUKHALSKY
PLUMBING-Rough 7/16/2018 Partial Approval JENNIFER RABUCHIN
Deputy Reinf. Concrete 7/20/2018 Approved MATT KELLERMAN
Deputy Reinf. Concrete 7/20/2018 Partial Approval MATT KELLERMAN
Reinforced Concrete Frame 7/20/2018 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 7/23/2018 Conditional Approval MATT KELLERMAN
Deputy Steel/Welding 7/23/2018 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 7/24/2018 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 7/30/2018 Not Ready for Inspection MATT KELLERMAN
Floor/Roof Diaphrgm/Shear Wall 8/1/2018 Not Ready for Inspection THOMAS FINNILA
PLUMBING-Rough 8/1/2018 Not Ready for Inspection THOMAS FINNILA
Reinforced Concrete Frame 8/1/2018 Partial Approval THOMAS FINNILA
Deputy Reinf. Concrete 8/2/2018 Approved MATT KELLERMAN
Floor/Roof Diaphrgm/Shear Wall 8/2/2018 Partial Approval MATT KELLERMAN
PLUMBING-Rough 8/2/2018 Partial Approval MATT KELLERMAN
Reinforced Concrete Frame 8/2/2018 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 8/3/2018 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 8/7/2018 Partial Approval MATT KELLERMAN
Reinforced Concrete Frame 8/8/2018 Approved MATT KELLERMAN
Deputy Reinf. Concrete 8/9/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 8/13/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 8/16/2018 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 8/16/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 8/17/2018 No Result Entered ANTHONY ANDERSON
Deputy Steel/Welding 8/17/2018 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 8/23/2018 Approved MATT KELLERMAN
Footing/Foundation/Slab 8/23/2018 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 8/27/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 8/31/2018 Approved MATT KELLERMAN
Reinforced Concrete Frame 9/4/2018 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/6/2018 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 9/6/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/7/2018 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 9/12/2018 Partial Approval CHRISTOPHER WILSON
Deputy Wood Construction 9/12/2018 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 9/12/2018 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 9/12/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/14/2018 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 9/14/2018 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 9/18/2018 Conditional Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 9/19/2018 Partial Approval CHRISTOPHER WILSON
Wood Frame 9/19/2018 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 9/24/2018 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 9/25/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 9/25/2018 Conditional Approval CHRISTOPHER WILSON
Drywall Nailing 9/25/2018 Partial Approval CHRISTOPHER WILSON
Green Building Rough 9/25/2018 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 9/26/2018 Partial Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 9/26/2018 Partial Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 10/3/2018 Corrections Issued CHRISTOPHER WILSON
Reinforced Concrete Frame 10/4/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/5/2018 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 10/11/2018 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 10/11/2018 Conditional Approval CHRISTOPHER WILSON
Wood Frame 10/11/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/12/2018 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 10/16/2018 Partial Approval CHRISTOPHER WILSON
Wood Frame 10/16/2018 Partial Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 10/19/2018 Corrections Issued CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/25/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Shotcrete 10/26/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Wood Construction 11/6/2018 Conditional Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 11/8/2018 Partial Approval CHRISTOPHER WILSON
Green Building Rough 11/8/2018 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 11/8/2018 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 11/8/2018 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 11/16/2018 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 11/28/2018 Conditional Approval CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 11/28/2018 Not Ready for Inspection MATT KELLERMAN
PLUMBING-Rough 11/28/2018 Partial Approval MATT KELLERMAN
Deputy Shotcrete 11/30/2018 Partial Approval MATT KELLERMAN
Deputy Wood Construction 12/5/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 12/7/2018 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 12/10/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 12/14/2018 Partial Approval MATT KELLERMAN
Interior/Exterior Lathing 12/14/2018 Partial Approval CHRISTOPHER WILSON
Deputy Wood Construction 12/20/2018 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 12/20/2018 Partial Approval CHRISTOPHER WILSON
Green Building Rough 12/20/2018 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 12/20/2018 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 12/26/2018 Conditional Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 12/27/2018 Partial Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 12/27/2018 Partial Approval CHRISTOPHER WILSON
Green Building Rough 12/27/2018 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 12/27/2018 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Wood Construction 1/17/2019 Conditional Approval CHRISTOPHER WILSON
Insulation 1/18/2019 Partial Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 1/22/2019 Partial Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 1/24/2019 Corrections Issued CHRISTOPHER WILSON
Green Building Rough 1/24/2019 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 1/24/2019 Partial Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 1/28/2019 Partial Approval CHRISTOPHER WILSON
Gas Test 1/28/2019 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 1/28/2019 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 1/28/2019 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 1/30/2019 Partial Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 1/30/2019 Partial Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 1/30/2019 Partial Inspection CHRISTOPHER WILSON
Green Building Rough 1/30/2019 Partial Inspection CHRISTOPHER WILSON
HVAC-Rough 1/30/2019 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 1/30/2019 Partial Inspection CHRISTOPHER WILSON
Structural Steel Frame 1/30/2019 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 1/30/2019 Partial Inspection CHRISTOPHER WILSON
Wood Frame 1/30/2019 Partial Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 1/31/2019 Partial Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 1/31/2019 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 1/31/2019 Partial Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 2/4/2019 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 2/4/2019 Partial Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 2/4/2019 Partial Inspection CHRISTOPHER WILSON
Reinforced Masonry Frame 2/4/2019 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 2/4/2019 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 2/8/2019 Partial Approval MATT KELLERMAN
Excavation/Setback/Form/Re-Bar 2/8/2019 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 2/8/2019 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 2/11/2019 Conditional Approval CHRISTOPHER WILSON
HVAC-Rough 2/11/2019 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 2/12/2019 Partial Approval CHRISTOPHER WILSON
Insulation 2/12/2019 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 2/12/2019 Partial Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 2/25/2019 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 2/25/2019 Partial Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 3/6/2019 Partial Approval CHRISTOPHER WILSON
Wood Frame 3/11/2019 Partial Approval CHRISTOPHER WILSON
Insulation 3/13/2019 Partial Inspection CHRISTOPHER WILSON
Insulation 3/18/2019 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 3/20/2019 Partial Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 3/20/2019 Partial Inspection CHRISTOPHER WILSON
Green Building Rough 3/20/2019 Partial Inspection CHRISTOPHER WILSON
HVAC-Rough 3/20/2019 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 3/20/2019 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 3/20/2019 Partial Inspection CHRISTOPHER WILSON
Wood Frame 3/20/2019 Partial Inspection CHRISTOPHER WILSON
Drywall Nailing 3/22/2019 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 3/22/2019 Partial Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 3/27/2019 Partial Approval CHRISTOPHER WILSON
Green Building Rough 3/27/2019 Partial Approval CHRISTOPHER WILSON
Structural Steel Frame 3/27/2019 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 3/27/2019 Partial Inspection CHRISTOPHER WILSON
Wood Frame 3/27/2019 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/3/2019 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 4/3/2019 Partial Approval CHRISTOPHER WILSON
Green Building Rough 4/3/2019 Partial Inspection CHRISTOPHER WILSON
Structural Steel Frame 4/3/2019 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 4/3/2019 Partial Inspection CHRISTOPHER WILSON
Wood Frame 4/3/2019 Partial Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 4/5/2019 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 4/5/2019 Corrections Issued CHRISTOPHER WILSON
Insulation 4/10/2019 Partial Approval ROBERT SHELLY
Green Building Rough 4/15/2019 Partial Inspection CHRISTOPHER WILSON
Structural Steel Frame 4/15/2019 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 4/15/2019 Partial Inspection CHRISTOPHER WILSON
Wood Frame 4/15/2019 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 4/18/2019 Partial Approval MICHAEL TEMPLE
HVAC-Rough 4/18/2019 Partial Approval MICHAEL TEMPLE
Drywall Nailing 4/24/2019 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 4/24/2019 Corrections Issued CHRISTOPHER WILSON
Insulation 4/24/2019 Partial Inspection CHRISTOPHER WILSON
Deputy Wood Construction 4/26/2019 Conditional Approval CHRISTOPHER WILSON
HVAC-Rough 4/29/2019 Partial Approval CHRISTOPHER WILSON
Insulation 4/29/2019 Partial Inspection CHRISTOPHER WILSON
Wood Frame 4/29/2019 Partial Approval CHRISTOPHER WILSON
Insulation 5/1/2019 Partial Inspection CHRISTOPHER WILSON
HVAC-Rough 5/3/2019 Partial Approval CHRISTOPHER WILSON
Insulation 5/3/2019 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 5/3/2019 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 5/6/2019 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 5/6/2019 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 5/6/2019 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 5/14/2019 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 5/16/2019 Partial Approval CHRISTOPHER WILSON
Insulation 5/22/2019 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/29/2019 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 5/29/2019 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 6/5/2019 Partial Approval CHRISTOPHER WILSON
Green Building Rough 6/5/2019 Partial Inspection CHRISTOPHER WILSON
HVAC-Rough 6/5/2019 Corrections Issued CHRISTOPHER WILSON
Insulation 6/5/2019 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 6/6/2019 Partial Approval CHRISTOPHER WILSON
Shower Pan 6/6/2019 Partial Inspection CHRISTOPHER WILSON
Drywall Nailing 6/13/2019 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 6/13/2019 Partial Inspection CHRISTOPHER WILSON
Green Building Rough 6/13/2019 Partial Inspection CHRISTOPHER WILSON
HVAC-Rough 6/13/2019 Partial Inspection CHRISTOPHER WILSON
Rough-Elec/Plmb/HVAC 6/14/2019 Partial Approval CHRISTOPHER WILSON
Insulation 6/19/2019 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 6/26/2019 Partial Approval CHRISTOPHER WILSON
Green Building Rough 6/26/2019 Partial Inspection CHRISTOPHER WILSON
Drywall Nailing 7/10/2019 Partial Inspection CHRISTOPHER WILSON
Green Building Rough 7/10/2019 Partial Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 7/10/2019 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 7/16/2019 Order to Comply Issued CHRISTOPHER WILSON
Green Building Rough 7/16/2019 Approved CHRISTOPHER WILSON
Interior/Exterior Lathing 7/26/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 7/31/2019 Partial Approval MICHAEL TEMPLE
Sewer 8/6/2019 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 8/21/2019 Partial Approval DAVID FEILER
PLUMBING-Rough 8/21/2019 Partial Approval DAVID FEILER
HVAC-Rough 9/4/2019 Partial Approval CHRISTOPHER WILSON
Shower Pan 9/4/2019 Approved CHRISTOPHER WILSON
Gas Test 9/9/2019 Approved CARLOS MATAMOROS
Interior/Exterior Lathing 9/9/2019 Partial Approval CARLOS MATAMOROS
Reinforced Masonry Frame 9/9/2019 Partial Approval CARLOS MATAMOROS
PLUMBING-Rough 9/24/2019 Partial Approval MATT KELLERMAN
SGSOV-Seismic Gas S/O Valve 9/24/2019 SGSOV Approved MATT KELLERMAN
ELECTRICAL-Rough 9/30/2019 Partial Approval MATT KELLERMAN
HVAC-Rough 9/30/2019 Not Ready for Inspection MATT KELLERMAN
HVAC-Rough 10/2/2019 Not Ready for Inspection MATT KELLERMAN
Drywall Nailing 10/9/2019 Partial Approval GERMAN RODRIGUEZ MENDOZA
Shower Pan 10/9/2019 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Shower Pan 10/17/2019 Partial Approval GERMAN RODRIGUEZ MENDOZA
Shower Pan 10/28/2019 Not Ready for Inspection MATT KELLERMAN
Shower Pan 11/5/2019 Approved MATT KELLERMAN
Drywall Nailing 11/14/2019 Not Ready for Inspection MATT KELLERMAN
Drywall Nailing 11/26/2019 Partial Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 11/27/2019 No Access for Inspection CHRISTOPHER DELLEFIELD
Interior/Exterior Lathing 12/3/2019 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 12/10/2019 Partial Approval GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 12/10/2019 Partial Approval GERMAN RODRIGUEZ MENDOZA
Drywall Nailing 1/7/2020 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 1/21/2020 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 1/29/2020 Partial Approval MATT KELLERMAN
HVAC-Rough 1/29/2020 Not Ready for Inspection MATT KELLERMAN
HVAC-Rough 2/3/2020 Partial Approval CHRISTOPHER WILSON
Insulation 2/3/2020 Partial Approval CHRISTOPHER WILSON
Service/Power Release 2/18/2020 Not Ready for Inspection MATT KELLERMAN
Service/Power Release 3/31/2020 Approved MATT KELLERMAN
Gas Test 7/8/2020 Not Ready for Inspection MATT KELLERMAN
BUILDING-Rough-Frame 8/7/2020 Approved CHRISTOPHER WILSON
Drywall Nailing 8/7/2020 Approved CHRISTOPHER WILSON
Final 8/7/2020 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 8/7/2020 Approved CHRISTOPHER WILSON
Green Building Final 8/7/2020 Not Ready for Inspection CHRISTOPHER WILSON
Smoke Detectors 8/7/2020 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 8/7/2020 Approved CHRISTOPHER WILSON
Verify Sprinkler Sign Off 8/7/2020 Approved CHRISTOPHER WILSON
Final 9/2/2020 Corrections Issued CHRISTOPHER WILSON
Green Building Final 9/2/2020 Not Ready for Inspection CHRISTOPHER WILSON
Smoke Detectors 9/2/2020 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Final 9/22/2020 Partial Approval MATT KELLERMAN
HVAC-Final 10/23/2020 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 10/23/2020 Approved CHRISTOPHER WILSON
PLUMBING-Final 11/2/2020 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Final 11/10/2020 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Final 11/10/2020 Approved CHRISTOPHER WILSON
ELECTRICAL-Final 11/16/2020 Approved CHRISTOPHER WILSON
HVAC-Final 11/20/2020 Approved CHRISTOPHER WILSON
Final 2/26/2021 Corrections Issued CHRISTOPHER WILSON
Green Building Final 2/26/2021 Approved CHRISTOPHER WILSON
Smoke Detectors 2/26/2021 Approved CHRISTOPHER WILSON
Final 3/3/2021 Corrections Issued CHRISTOPHER WILSON
Final 3/22/2021 Not Ready for Inspection CHRISTOPHER WILSON
Final 3/31/2021 Partial Approval MATT KELLERMAN