Pre-Inspection
|
9/22/2017
|
Approved
|
TONY HARTONO
|
|
Pre-Inspection
|
12/18/2017
|
Approved
|
DERRICK SPENCER
|
|
Deputy Grading
|
12/27/2017
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
12/27/2017
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
12/28/2017
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
12/29/2017
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
1/2/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
1/4/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
1/5/2018
|
Approved
|
DERRICK SPENCER
|
|
SWPPP-Const. Storm Water
|
1/10/2018
|
Completed
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
2/28/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
3/1/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
3/2/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
3/7/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
3/9/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
3/29/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
3/30/2018
|
Approved
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
3/30/2018
|
Partial Approval
|
TONY HARTONO
|
|
METHANE-Barrier
|
3/30/2018
|
Partial Approval
|
TONY HARTONO
|
|
METHANE-Subgrade
|
3/30/2018
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
4/2/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/3/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/4/2018
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/4/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
METHANE-Barrier
|
4/4/2018
|
Approved
|
DERRICK SPENCER
|
|
METHANE-Subgrade
|
4/4/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
4/9/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
4/10/2018
|
Approved
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
4/10/2018
|
Approved
|
JOHN DODGE
|
|
Deputy Shotcrete
|
4/11/2018
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
4/11/2018
|
Not Ready for Inspection
|
JOHN DODGE
|
|
METHANE-Rough
|
4/11/2018
|
Not Ready for Inspection
|
JOHN DODGE
|
|
Reinforced Concrete Frame
|
4/11/2018
|
Partial Approval
|
JOHN DODGE
|
|
Verify Sprinkler Sign Off
|
4/11/2018
|
Not Ready for Inspection
|
JOHN DODGE
|
|
Deputy Shotcrete
|
4/12/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
4/13/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
4/13/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/16/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/17/2018
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/17/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/18/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
4/19/2018
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
4/19/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Rough
|
4/19/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
4/19/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
4/19/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
4/20/2018
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
4/20/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/23/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
4/25/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/26/2018
|
Conditional Approval
|
DAVID TSAU
|
|
Green Building Rough
|
4/27/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Rough
|
4/27/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
4/27/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/30/2018
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/30/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
5/1/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/4/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
5/4/2018
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
5/4/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Rough
|
5/4/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
5/4/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
5/7/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
5/8/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/10/2018
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
5/10/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Rough
|
5/10/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
5/10/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/11/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
5/17/2018
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/18/2018
|
Conditional Approval
|
JONATHAN ALLEN
|
|
Deputy Drilled-In Anchors
|
5/21/2018
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
5/21/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/22/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
5/22/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/25/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/29/2018
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
5/29/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
METHANE-Rough
|
5/29/2018
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
5/29/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/31/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
6/4/2018
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
6/7/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Masonry Wall/Backfill
|
6/7/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Green Building Rough
|
6/11/2018
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Masonry Frame
|
6/11/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
6/15/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
6/26/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
6/27/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
6/29/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/3/2018
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
7/5/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
7/6/2018
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/9/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/10/2018
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
7/10/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/12/2018
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
7/16/2018
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Shotcrete
|
7/20/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/27/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/31/2018
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
7/31/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/1/2018
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/13/2018
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
8/15/2018
|
Partial Inspection
|
TONY HARTONO
|
|
Reinforced Concrete Frame
|
8/20/2018
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
8/21/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
8/29/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Drilled-In Anchors
|
9/6/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
9/19/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Steel/Welding
|
9/19/2018
|
Conditional Approval
|
TONY HARTONO
|
|
Reinforced Masonry Frame
|
9/20/2018
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
9/24/2018
|
Conditional Approval
|
JASON BORUTA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/25/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
9/25/2018
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
10/3/2018
|
Conditional Approval
|
TONY HARTONO
|
|
Wood Frame
|
10/10/2018
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Steel/Welding
|
10/26/2018
|
Conditional Approval
|
TONY HARTONO
|
|
Wall Anchors
|
10/26/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Wood Frame
|
10/26/2018
|
Corrections Issued
|
TONY HARTONO
|
|
Deputy Steel/Welding
|
10/29/2018
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Wood Construction
|
10/29/2018
|
Conditional Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/30/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
10/31/2018
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Wood Construction
|
10/31/2018
|
Approved
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/31/2018
|
Partial Approval
|
TONY HARTONO
|
|
Wood Frame
|
10/31/2018
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/6/2018
|
Partial Approval
|
TONY HARTONO
|
|
Pre-Inspection
|
11/6/2018
|
Partial Approval
|
TONY HARTONO
|
|
Wood Frame
|
11/6/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Wood Construction
|
11/20/2018
|
Approved
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/20/2018
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/11/2018
|
Partial Approval
|
TONY HARTONO
|
|
Wood Frame
|
12/11/2018
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/13/2018
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/14/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Wood Frame
|
12/14/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/28/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Wood Frame
|
12/28/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Wood Construction
|
1/2/2019
|
Conditional Approval
|
NICK LAROCCA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/2/2019
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/3/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
1/14/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Wood Construction
|
1/23/2019
|
Approved
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/23/2019
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Wood Construction
|
1/31/2019
|
Conditional Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/31/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Wall Anchors
|
1/31/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Wood Frame
|
1/31/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Wood Frame
|
2/11/2019
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/20/2019
|
Partial Approval
|
TONY HARTONO
|
|
Wood Frame
|
2/20/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Wood Construction
|
3/5/2019
|
Approved
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/5/2019
|
Partial Approval
|
TONY HARTONO
|
|
Wood Frame
|
3/13/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
3/18/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
3/21/2019
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/21/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/22/2019
|
Approved
|
DERRICK SPENCER
|
|
Insulation
|
3/27/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
3/28/2019
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/17/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/22/2019
|
Partial Approval
|
TONY HARTONO
|
|
Wood Frame
|
4/25/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Insulation
|
4/29/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
4/30/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Insulation
|
5/3/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
5/7/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
5/8/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
5/10/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
5/10/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
5/13/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
5/15/2019
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/20/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
5/28/2019
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/6/2019
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/11/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
6/11/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Insulation
|
6/17/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
6/19/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Insulation
|
6/24/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
6/28/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
7/2/2019
|
Partial Approval
|
TONY HARTONO
|
|
Drywall Nailing
|
7/10/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
7/17/2019
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Insulation
|
7/19/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
7/23/2019
|
Approved
|
TONY HARTONO
|
|
Interior/Exterior Lathing
|
7/25/2019
|
Partial Approval
|
TONY HARTONO
|
|
Light Gage Steel Frame
|
7/25/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
7/30/2019
|
Partial Approval
|
TONY HARTONO
|
|
Drywall Nailing
|
8/5/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
8/6/2019
|
Partial Approval
|
TONY HARTONO
|
|
Light Gage Steel Frame
|
8/6/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
8/14/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
8/20/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
8/26/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
8/26/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
8/26/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Structural Steel Frame
|
8/28/2019
|
Partial Approval
|
NICK LAROCCA
|
|
Insulation
|
9/4/2019
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
9/17/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
9/18/2019
|
Corrections Issued
|
SORIN CIRSTOIU
|
|
Interior/Exterior Lathing
|
9/20/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
9/25/2019
|
Partial Approval
|
TONY HARTONO
|
|
Interior/Exterior Lathing
|
9/26/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
10/1/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
10/7/2019
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
10/28/2019
|
Corrections Issued
|
SORIN CIRSTOIU
|
|
Drywall Nailing
|
11/4/2019
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Special/Order Compliance
|
1/2/2020
|
Corrections Issued
|
SORIN CIRSTOIU
|
|
Insulation
|
1/6/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Insulation
|
1/8/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Insulation
|
1/17/2020
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/31/2020
|
Approved
|
SORIN CIRSTOIU
|
|
Insulation
|
2/24/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
3/11/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Light Gage Steel Frame
|
3/26/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Drywall Nailing
|
4/21/2020
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Pre-Inspection
|
4/29/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Insulation
|
7/14/2020
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Final
|
10/22/2020
|
Not Ready for Inspection
|
TED RIES
|
|
Drywall Nailing
|
11/4/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Final
|
11/4/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
11/4/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Green Building Final
|
11/4/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
11/4/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Reinforced Masonry Frame
|
11/4/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
SGSOV-Seismic Gas S/O Valve
|
11/4/2020
|
SGSOV Not Ready
|
SORIN CIRSTOIU
|
|
Smoke Detectors
|
11/4/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Wood Frame
|
11/4/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Wood Frame
|
12/1/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Drywall Nailing
|
12/7/2020
|
Approved
|
SORIN CIRSTOIU
|
|
Final
|
12/7/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
12/7/2020
|
Approved
|
SORIN CIRSTOIU
|
|
Green Building Final
|
12/7/2020
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
12/7/2020
|
Approved
|
SORIN CIRSTOIU
|
|
Reinforced Masonry Frame
|
12/7/2020
|
Approved
|
SORIN CIRSTOIU
|
|
SGSOV-Seismic Gas S/O Valve
|
12/7/2020
|
SGSOV Approved
|
SORIN CIRSTOIU
|
|
Smoke Detectors
|
12/7/2020
|
Approved
|
SORIN CIRSTOIU
|
|
Final
|
3/17/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
|
Green Building Final
|
3/17/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Wood Frame
|
3/17/2021
|
Approved
|
JEFF BYTHEWAY
|
|
Final
|
4/14/2021
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
5/12/2021
|
Conditional Approval
|
SORIN CIRSTOIU
|