Pre-Inspection
|
12/8/2016
|
Partial Inspection
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
4/25/2017
|
Approved
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
4/26/2017
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
5/2/2017
|
Approved
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
5/2/2017
|
Partial Approval
|
TONY HARTONO
|
|
METHANE-Barrier
|
5/2/2017
|
Partial Approval
|
TONY HARTONO
|
|
METHANE-Subgrade
|
5/2/2017
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
5/3/2017
|
Approved
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
5/15/2017
|
No Access for Inspection
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
5/17/2017
|
Approved
|
TONY HARTONO
|
|
Special/Order Compliance
|
5/23/2017
|
Partial Inspection
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
6/8/2017
|
Partial Inspection
|
TONY HARTONO
|
|
METHANE-Barrier
|
6/8/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
METHANE-Subgrade
|
6/8/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Special/Order Compliance
|
6/9/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Special/Order Compliance
|
6/9/2017
|
Partial Inspection
|
JASON BORUTA
|
|
Excavation/Setback/Form/Re-Bar
|
7/6/2017
|
No Access for Inspection
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
7/6/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
METHANE-Barrier
|
7/6/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
METHANE-Subgrade
|
7/6/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Piling/Pier/Caisson
|
7/6/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Grading Pre-Inspection
|
7/24/2017
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Pre-Inspection
|
8/8/2017
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Special/Order Compliance
|
8/8/2017
|
Partial Inspection
|
TONY HARTONO
|
|
Special/Order Compliance
|
8/14/2017
|
Approved
|
JASON BORUTA
|
|
Deputy Methane Barrier
|
8/15/2017
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
8/16/2017
|
Approved
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
8/17/2017
|
Approved
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
8/18/2017
|
Approved
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
8/22/2017
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
8/23/2017
|
Approved
|
JASON BORUTA
|
|
Deputy Reinf. Concrete
|
8/29/2017
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
8/30/2017
|
Approved
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
8/30/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
METHANE-Barrier
|
8/30/2017
|
Approved
|
TONY HARTONO
|
|
METHANE-Subgrade
|
8/30/2017
|
Conditional Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
8/31/2017
|
Approved
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
9/6/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
METHANE-Subgrade
|
9/6/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
METHANE-Rough
|
9/7/2017
|
Partial Inspection
|
TONY HARTONO
|
|
Reinforced Concrete Frame
|
9/7/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
9/7/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Special/Order Compliance
|
9/15/2017
|
No Access for Inspection
|
TONY HARTONO
|
|
Special/Order Compliance
|
9/20/2017
|
Partial Inspection
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
9/27/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
METHANE-Subgrade
|
9/27/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
10/4/2017
|
Partial Approval
|
TONY HARTONO
|
|
METHANE-Subgrade
|
10/4/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Shotcrete
|
10/17/2017
|
Approved
|
TONY HARTONO
|
|
Deputy Shotcrete
|
10/18/2017
|
Conditional Approval
|
TONY HARTONO
|
|
METHANE-Rough
|
10/19/2017
|
Approved
|
TONY HARTONO
|
|
Reinforced Concrete Frame
|
10/19/2017
|
Partial Approval
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
10/19/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Shotcrete
|
10/20/2017
|
Approved
|
TONY HARTONO
|
|
Reinforced Masonry Frame
|
10/20/2017
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Shotcrete
|
10/23/2017
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
10/24/2017
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
10/31/2017
|
Approved
|
JASON BORUTA
|
|
Deputy Reinf. Concrete
|
11/1/2017
|
Approved
|
JASON BORUTA
|
|
Green Building Rough
|
11/1/2017
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Reinforced Concrete Frame
|
11/1/2017
|
Conditional Approval
|
JASON BORUTA
|
|
Verify Sprinkler Sign Off
|
11/1/2017
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Deputy Reinf. Masonry
|
11/2/2017
|
Approved
|
JASON BORUTA
|
|
Deputy Reinf. Masonry
|
11/3/2017
|
Approved
|
JASON BORUTA
|
|
Deputy Reinf. Masonry
|
11/6/2017
|
Conditional Approval
|
JONATHAN ALLEN
|
|
Deputy Reinf. Masonry
|
11/7/2017
|
Approved
|
JASON BORUTA
|
|
Green Building Rough
|
11/13/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Reinforced Masonry Frame
|
11/13/2017
|
Partial Approval
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
11/13/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
11/14/2017
|
Approved
|
TONY HARTONO
|
|
Deputy Methane Barrier
|
12/18/2017
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
12/22/2017
|
Conditional Approval
|
TONY HARTONO
|
|
Green Building Rough
|
12/27/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Reinforced Concrete Frame
|
12/27/2017
|
Partial Inspection
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
12/27/2017
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Shotcrete
|
12/29/2017
|
Conditional Approval
|
JONATHAN ALLEN
|
|
Green Building Rough
|
1/11/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Reinforced Concrete Frame
|
1/11/2018
|
Partial Inspection
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
1/11/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Green Building Rough
|
1/23/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Reinforced Concrete Frame
|
1/23/2018
|
Partial Approval
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
1/23/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/25/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/26/2018
|
Approved
|
TONY HARTONO
|
|
Green Building Rough
|
1/31/2018
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
1/31/2018
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Verify Sprinkler Sign Off
|
1/31/2018
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
Green Building Rough
|
2/12/2018
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
2/12/2018
|
Corrections Issued
|
SORIN CIRSTOIU
|
|
Verify Sprinkler Sign Off
|
2/12/2018
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
Reinforced Masonry Frame
|
2/13/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Special/Order Compliance
|
2/13/2018
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/14/2018
|
Partial Approval
|
JASON BORUTA
|
|
Deputy Methane Barrier
|
2/16/2018
|
Approved
|
JASON BORUTA
|
|
Deputy Reinf. Masonry
|
2/20/2018
|
Approved
|
JASON BORUTA
|
|
Deputy Reinf. Masonry
|
2/21/2018
|
Approved
|
JASON BORUTA
|
|
Deputy Reinf. Masonry
|
2/22/2018
|
Approved
|
JASON BORUTA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/27/2018
|
Partial Approval
|
JASON BORUTA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/16/2018
|
Conditional Approval
|
JASON BORUTA
|
|
Deputy Wood Construction
|
3/19/2018
|
Approved
|
JASON BORUTA
|
|
Deputy Reinf. Masonry
|
3/20/2018
|
Approved
|
TONY HARTONO
|
|
Deputy Wood Construction
|
4/3/2018
|
Approved
|
JASON BORUTA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/3/2018
|
Partial Approval
|
JASON BORUTA
|
|
Green Building Rough
|
4/3/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Verify Sprinkler Sign Off
|
4/3/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Deputy Wood Construction
|
4/13/2018
|
Approved
|
JASON BORUTA
|
|
Green Building Rough
|
4/16/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Verify Sprinkler Sign Off
|
4/16/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Wood Frame
|
4/16/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/27/2018
|
Partial Approval
|
JASON BORUTA
|
|
Green Building Rough
|
4/27/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Verify Sprinkler Sign Off
|
4/27/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Drywall Nailing
|
5/7/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Insulation
|
5/7/2018
|
Partial Approval
|
JASON BORUTA
|
|
Drywall Nailing
|
5/9/2018
|
Corrections Issued
|
JASON BORUTA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/9/2018
|
Partial Approval
|
JASON BORUTA
|
|
Green Building Rough
|
5/9/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Verify Sprinkler Sign Off
|
5/9/2018
|
Approved
|
JASON BORUTA
|
|
Wood Frame
|
5/9/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Green Building Rough
|
5/17/2018
|
Not Ready for Inspection
|
TONY HARTONO
|
|
Wood Frame
|
5/17/2018
|
Partial Approval
|
TONY HARTONO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/18/2018
|
Partial Approval
|
TONY HARTONO
|
|
Insulation
|
5/25/2018
|
Approved
|
JASON BORUTA
|
|
Insulation
|
6/1/2018
|
Partial Approval
|
TONY HARTONO
|
|
Green Building Rough
|
6/4/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Insulation
|
6/4/2018
|
Partial Approval
|
JASON BORUTA
|
|
Wood Frame
|
6/4/2018
|
Partial Approval
|
JASON BORUTA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/7/2018
|
Partial Approval
|
JASON BORUTA
|
|
Green Building Rough
|
6/7/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Insulation
|
6/7/2018
|
Partial Approval
|
JASON BORUTA
|
|
Drywall Nailing
|
6/11/2018
|
Partial Approval
|
JASON BORUTA
|
|
Insulation
|
6/11/2018
|
Partial Approval
|
JASON BORUTA
|
|
Drywall Nailing
|
6/13/2018
|
Partial Approval
|
JASON BORUTA
|
|
Insulation
|
6/13/2018
|
Approved
|
JASON BORUTA
|
|
Green Building Rough
|
6/18/2018
|
Approved
|
JASON BORUTA
|
|
Wood Frame
|
6/18/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/20/2018
|
Approved
|
JASON BORUTA
|
|
Insulation
|
7/17/2018
|
Corrections Issued
|
SORIN CIRSTOIU
|
|
Insulation
|
7/19/2018
|
Partial Approval
|
JASON BORUTA
|
|
Insulation
|
7/26/2018
|
Partial Approval
|
JASON BORUTA
|
|
Light Gage Steel Frame
|
7/26/2018
|
Partial Inspection
|
JASON BORUTA
|
|
Drywall Nailing
|
8/2/2018
|
Partial Approval
|
JASON BORUTA
|
|
Drywall Nailing
|
8/8/2018
|
Partial Approval
|
JASON BORUTA
|
|
Insulation
|
8/8/2018
|
Partial Approval
|
JASON BORUTA
|
|
Drywall Nailing
|
8/15/2018
|
Partial Approval
|
JOHN DODGE
|
|
Drywall Nailing
|
8/17/2018
|
Partial Approval
|
JASON BORUTA
|
|
Light Gage Steel Frame
|
8/17/2018
|
Partial Approval
|
JASON BORUTA
|
|
Interior/Exterior Lathing
|
8/21/2018
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Drywall Nailing
|
8/24/2018
|
Partial Approval
|
JASON BORUTA
|
|
Interior/Exterior Lathing
|
8/24/2018
|
Partial Approval
|
JASON BORUTA
|
|
Drywall Nailing
|
8/28/2018
|
Partial Approval
|
JASON BORUTA
|
|
Drywall Nailing
|
9/6/2018
|
Partial Approval
|
JASON BORUTA
|
|
Pre-Inspection
|
9/26/2018
|
Approved
|
JASON BORUTA
|
|
Deputy Methane Barrier
|
10/31/2018
|
Approved
|
JASON BORUTA
|
|
Deputy Drilled-In Anchors
|
12/19/2018
|
Conditional Approval
|
JASON BORUTA
|
|
Masonry Wall/Backfill
|
12/28/2018
|
Partial Approval
|
JASON BORUTA
|
|
Special/Order Compliance
|
4/12/2019
|
Partial Inspection
|
TONY HARTONO
|
|
Masonry Wall/Backfill
|
4/19/2019
|
Partial Approval
|
JOHN DODGE
|
|
Green Building Final
|
5/9/2019
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Drywall Nailing
|
11/18/2019
|
Approved
|
JASON BORUTA
|
|
Final
|
11/18/2019
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Footing/Foundation/Slab
|
11/18/2019
|
Approved
|
JASON BORUTA
|
|
Green Building Final
|
11/18/2019
|
Not Ready for Inspection
|
JASON BORUTA
|
|
METHANE-Subgrade
|
11/18/2019
|
Approved
|
JASON BORUTA
|
|
Reinforced Concrete Frame
|
11/18/2019
|
Approved
|
JASON BORUTA
|
|
Reinforced Masonry Frame
|
11/18/2019
|
Approved
|
JASON BORUTA
|
|
SGSOV-Seismic Gas S/O Valve
|
11/18/2019
|
SGSOV Approved
|
JASON BORUTA
|
|
Smoke Detectors
|
11/18/2019
|
Approved
|
JASON BORUTA
|
|
Structural Steel Frame
|
11/18/2019
|
Approved
|
JASON BORUTA
|
|
Wood Frame
|
11/18/2019
|
Approved
|
JASON BORUTA
|
|
Final
|
12/17/2019
|
Not Ready for Inspection
|
JASON BORUTA
|
|
Green Building Final
|
12/17/2019
|
Approved
|
JASON BORUTA
|
|
Final
|
1/17/2020
|
Partial Approval
|
JASON BORUTA
|
|
Final
|
6/2/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Final
|
6/8/2020
|
Corrections Issued
|
SORIN CIRSTOIU
|
|
Final
|
6/23/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Special/Order Compliance
|
6/26/2020
|
Not Ready for Inspection
|
SORIN CIRSTOIU
|
|
Final
|
12/10/2020
|
OK to Issue CofO
|
SORIN CIRSTOIU
|